WCC 260-B5260-075 (M25WC153) Addendum No. 1 2026-10-21.pdf
PDF 392 KB Posted
- Solicitation number
- DBB-129825
- Issued by
- Wise County, Virginia
About this file
Addendum No. 1 to Grayson Hall Elevator and Loading Dock Project
This addendum document, issued by Thompson & Litton, Inc. on behalf of the Virginia Community College System (VCCS) and Wytheville Community College (WCC), modifies the original bidding documents for the replacement of an elevator and installation of a loading dock leveler at Grayson Hall. The project scope includes removal of the existing elevator with retention of the pit ladder and existing door frames (to receive new stainless-steel finish), installation of a new elevator with updated controls, mechanical upgrades, fire suppression systems, and electrical enhancements. Additional work encompasses installation of a new sump pit requiring slab removal and replacement, a new pre-action sprinkler system, a ductless mini-split air conditioning unit with an external condensing unit, and modifications to the existing loading dock gate to accommodate the new edge of dock leveler. A pre-bid conference was held on October 20, 2026, at Wytheville Community College in Grayson Hall Room 111. Sealed bids are due electronically through eVA or by hand delivery to Mrs. Sibyl Roberts, Virginia Community College System, 300 Arboretum Place, Suite 200, Richmond, Virginia 23236, on November 12, 2026, at 2:00 p.m. sharp, with bids to be publicly opened and read on November 13, 2026, at 2:00 p.m. at the same location. Substantial completion is required within 180 consecutive calendar days after Notice to Proceed, with final completion within 30 consecutive calendar days thereafter. Work is anticipated to occur over the summer if possible.
A Standard Commonwealth Bid Bond (form CO-10.2) is required, and contract security (performance and payment bonds) is mandatory regardless of bid amount. All bidders must maintain current eVA vendor registration and process all pay applications and invoices through e-Builder, the owner's web-based project management software, at no cost. The project presents special conditions including the requirement to maintain life safety systems without disruption (requiring seven days' notice to the owner for any necessary shutdowns), maintain building egress and pedestrian traffic flow throughout construction, and adhere to all Federal and State occupational safety and health standards. Notable site constraints include asbestos found in floor tile mastic at the elevator landing, which must be addressed in accordance with project specifications. The deadline for submitting pre-bid questions was October 26, 2026, at 12:00 p.m., with responses provided via addendum. The project is funded by the Virginia Community College System, with all documentation required on designated Virginia Department of General Services forms.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ENGINEERS ARCHITECTS SURVEYORS
T&L 726 Auburn Avenue Radford, Virginia 24141 tel: 540.633.1897 fax: 540.633.1896 www.T-L.com
ADDENDUM NO. 001
TO: All Plan Holders
RE: Wytheville Community College (WCC)
WCC Grayson Hall Elevator and Loading Dock
Project Code: 260-B5260-075 M25WC153
T&L Project No. 19736
DATE: October 21, 2026
BIDS RECEIVED DATE: November 12, 2026, 2:00 PM
BIDS OPEN DATE: November 13, 2026, 2:00 PM
This Addendum forms a part of the Contract Documents and modifies the original Bidding Documents dated
September 3, 2026, as noted below. Acknowledge receipt of this Addendum in the space provided on the Bid Form.
Failure to do so may subject Bidder to disqualification.
This Addendum consists of 7 pages.
CLARIFICATIONS AND ANSWERS TO PRE-BID QUESTIONS:
1. This addendum includes the Pre-Bid Conference Meeting Minutes.
2. This addendum includes the Pre-Bid Conference Attendance Record.
Enclosures: Pre-Bid Conference Meeting Minutes, 4 Sheets
Pre-Bid Conference Attendance Record, 2 Sheets
All other general terms, conditions, and specifications shall remain the same.
END OF ADDENDUM #1
10/21/2026
ENGINEERS ARCHITECTS SURVEYORS
T&L 726 Auburn Avenue Radford, Virginia 24141 tel: 540.633.1897 fax: 540.633.1896 www.T-L.com
PRE-BID CONFERENCE MEETING MINUTES
PROJECT: Wytheville Community College (WCC)
Grayson Hall Elevator and Loading Dock
Project Code: 260-B5260-075 M25WC153
T&L Project No. 19736
DATE: October 20, 2026
1. PROJECT PERSONNEL:
VCCS Representative: Clint Bailey, Senior Capital Outlay Program Manager
Telephone: (434) 738-8299
WCC Representative: Joseph Collins, Facilities Supervisor
Telephone: (276) 223-4792
Architectural/Engineering (A/E) Firm: Thompson & Litton, Inc.
Architectural/Engineering Representative: Trey Harden
Telephone: (540) 633-1897
Project Manager: Barry Collier, AIA, PMP
Telephone: (540) 633-1897
2. SCOPE OF PROJECT:
The Project includes the replacement of an existing elevator located in Grayson Hall on the campus of
Wytheville Community College and the installation of edge of dock leveler at the loading dock. Elevator installation will include new controls as well as, mechanical, fire suppression, and electrical upgrades. The removal of the existing elevator will include the removal of the piston and guide rails; the pit ladder will remain as well as the existing elevator door frames. The exiting frames will receive new stainless-steel finish.
A new sump pit will be installed which will result in some slab removal and replacement. There will be a new pre-action sprinkler system installed along with a ductless mini split with the condensing unit located outside the mechanical equipment room. Note the fire rated wall assemblies and the penetration requirements. Modifications to the existing gate at the loading dock will be necessary for the gate to swing past the edge of dock leveler.
Pre-Bid Conference Minutes
October 20, 2026
T&L www.T-L.com
3. PROJECT REVIEW:
A. All documentation will be on the required DGS forms
B. eVA Vendor Registration is required.
C. Instructions to Bidders:
1. Attendance is optional.
2. Bid Bond is required.
3. Contract security (i.e. Performance & Payments Bonds) are required.
4. Contractors are to complete the bids by signing the bids, acknowledging all Addenda.
D. Lump sum Base bid.
E. Awarded contractor will submit billing and Schedule of Values through e-Builder. Any questions regarding e-Builder can be directed to the state.
F. Asbestos and Lead Based Paint survey can be found in the project manual.
a. Asbestos was found in floor tile mastic on non-ACM floor tile located under vinyl flooring at the elevator landing.
4. SPECIAL CONCERNS OR CONDITIONS:
A. Do not disrupt or shut down life safety systems, including but not limited to fire sprinklers and fire alarm systems, without 7 days notice to Owner.
B. Maintain clear egress throughout Grayson Hall.
C. All Federal and State occupational safety and health standards (OSHA) apply. Worker safety is important.
D. Pedestrian traffic flow shall be maintained and protected at all times. Pedestrian safety is highly important.
E. No firearms, alcohol, or drugs may be brought on to campus at any time.
F. Smoking is not allowed on campus except in designated areas.
G. Minors are on campus. There shall be no inappropriate comments or gestures.
5. STAGING AREA/COORDINATION WITH OWNER:
Will be coordinated with the awarded contractor.
Utilities
Site Limitations
Access
Parking
Storage
6. PROTECTION OF ADJACENT AREAS AND FACILITIES:
A. Contractor is responsible for any damage to adjacent areas and facilities.
B. Building will be occupied during construction.
C. Egress routes shall remain accessible.
7. COMPLETION DATES:
Substantial Completion shall be achieved within 180 consecutive calendar days after Notice to Proceed.
Final Completion shall be achieved within 30 consecutive calendar days after Substantial Completion as determined by the A/E.
Notice to Proceed (NTP) anticipated to be issued after bid and contracting process. No intention to wait to award and issue NTP. If possible, work will occur over the summer.
8. BID DOCUMENTS:
Bid Documents (electronic) are available for download from the eVA website at www.eva.virginia.gov.
9. CONTRACTOR’S QUESTIONS:
All questions must be submitted in writing using the Pre-Bid Question form provided in the Bid
Documents. Instructions for submission (via email or fax) are included on the form. Responses to questions, if deemed necessary, will be made via addendum(a).
Deadline (Date/Time) for Submitting Questions: October 26, 2026 at 12:00 PM
10. CONFIRMATION OF BID DATE AND TIME:
Sealed bids will be received electronically through eVA or at Virginia Community College System, Attention: Mrs. Sibyl Roberts, 300 Arboretum Place, Suite 200, Richmond, Virginia 23236, Telephone
(804) 819-4918.
PLEASE NOTE: For shipping/mailing, use Suite 390; for hand delivery, use Suite 200.
The deadline for submitting bids is 2:00 P.M. sharp, as determined by the Bid Officer, on Thursday
November 12, 2026. The bids will be opened publicly and read aloud beginning at 2:00 P.M., on the following day, Friday, November 13, 2026, at the same location.
11. ADDENDA/ITEMS TO BE CLARIFIED:
Submit questions using the Pre-Bid question form which will be addressed via addenda.
12. DISCUSSION ITEMS:
• Elevator subs indicated elevator components are about a 14-week lead time, unless engineered.
• Elevator sub will submit questions about cab size and options for modernization in-lieu of full replacement.
• Contractor indicated they would submit question regarding vegetation removal.
• Schedule of Values can include engineering fee line item.
13. SITE VISIT:
Contractors were provided the opportunity to view the site.