ATTACHMENT C.1

Task Order 1, Remove and replace all sealants/caulking and joint filler/backing rod on all masonry control joints and sidewalk areas and seal all exterior brick walls – Johnson City, New York Weather Forecast Office (WFO).

The Offeror shall prepare a proposal in accordance with the attached scope of work, price breakout, task order special clauses, and Davis Bacon General Wage Decision.

It is highly encouraged that you schedule a Pre-Site Visit to measure, visually observe conditions and verify conditions. Please contact Les Day at 607-761-6342 to schedule a site visit.

Notice to proceed for this task order will be issued after receipt of proof of insurance and any required properly executed payment and performance bonds.

ITEM NO SUPPLIES/SERVICES QTY UNIT UNIT PRICE AMOUNT

0001 Provide labor and materials to remove and replace all sealants/caulking and joint filler/backing rod on all masonry control joints and sidewalk areas and seal all exterior brick walls in accordance with Statement of Work dated 3/14/2016 and the Davis Bacon General Wage Decision Number NY160004, dated 5/06/2016 or the most recent Davis Bacon General Wage Decision is applicable to this solicitation.

1 JB $__________ $__________

TOTAL SCHEDULE $__________

Note: The proposal should include a breakout of the price for the materials and labor. Offers providing less than 90 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

Task Order Special Clauses

Name of Project: WFO Exterior Rehab

1. FAR 36.204 - DISCLOSURE OF THE MAGNITUDE OF THE CONSTRUCTION

PROJECT: The magnitude of this project is between $25,000 and $100,000.

2. FAR PROVISION 52.209-11- REPRESENTATION BY CORPORATIONS

REGARDING DELINQUENT TAX LIABILITY OR A FELONY CONVICTION

UNDER ANY FEDERAL LAW (FEB 2016) (a) As required by sections 744 and 745 of Division E of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L 113-235), and similar provisions, if contained in subsequent appropriations acts, the Government will not enter into a contract with any corporation that--

(1) Has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability, where the awarding agency is aware of the unpaid tax liability, unless an agency has considered suspension or debarment of the corporation and made a determination that suspension or debarment is not necessary to protect the interests of the Government; or

(2) Was convicted of a felony criminal violation under any Federal law within the preceding 24 months, where the awarding agency is aware of the conviction, unless an agency has considered suspension or debarment of the corporation and made a determination that this action is not necessary to protect the interests of the Government.

(b) The Offeror represents that—

(1) It is [ ] is not [ ] a corporation that has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability; and

(2) It is [ ] is not [ ] a corporation that was convicted of a felony criminal violation under a Federal law within the preceding 24 months.

3. FAR 52.211-10 - COMMENCEMENT, PROSECUTION, AND COMPLETION OF

WORK (APR 1984) The Contractor shall be required to (a) commence work under this task order within 10 days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 120 calendar days from date of notice to proceed. The time stated for completion shall include final cleanup of the premises.

4. FAR 52.222-23 - NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION

TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION

(FEB 1999)

Goals for minority participation for each trade:

1.1%

Goals for female participation for each trade:

6.9%

The covered area is: Broome County NY

5. WAGE DETERMINATION: Wage Determination number listed below, or the most recent, will be incorporated into the task order.

NY160004, dated 05/06/2016/- BROOME COUNTY

All Equal Employment Opportunity (EEO) posters can be obtained fromhttp://www.dol.gov/compliance/topics/posters.htm and must be posted at the site along with the Wage Determinations.

6. 52.232-18 -- AVAILABILITY OF FUNDS (APR 1984): Funds are not presently available for this contract. The Government’s obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer.

7. 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995): The offeror is not required to visit the site where services are to be performed. However, if they wish to visit the site to satisfy themselves as to all general and local conditions that may affect the cost of the performance of the task order, they may Contact Les Day at 607-761-6342 to schedule a site visit.

8. 52.246-12 – INSPECTION OF CONSTRUCTION (AUG 1996)

9. 52.249-2 Alt I – TERMINATION FOR CONVENIENCE (FIXED-PRICE)

(MAY 2004—ALTERNATE I (SEP 1996)

10. 1352.201-72 CONTRACTING OFFICER´s REPRESENTATIVE (C0R) (APR

2010) http://www.dol.gov/compliance/topics/posters.htm

To be Determined at Award

11. 1352.237-75 Key Personnel (APR 2010)

Site Superintendent:(Contractor provides with proposal)

12. 1352.246-70 PLACE OF ACCEPTANCE (APR 2010):

The place of acceptance will be: Weather Forecast Office (WFO), 32 Dawes Drive – Johnson City, New York

13. SCHEDULE OF DELIVERABLES

The following is a schedule of deliverables, including administrative deliverables, required during the performance of this task order. This list is not all-inclusive.

52.222-8 Payrolls and Basic Records (Jun 2010)

The contractor shall submit payrolls in accordance with the clause.

52.228-15 PERFORMANCE

AND PAYMENT BONDS--

CONSTRUCTION (NOV 2006)

Required within 10 calendar days after task order award for obligated amounts of $150,000 or greater.

52.228-13 ALTERNATIVE

PAYMENT PROTECTIONS (JUL

2000)

Required, within 10 calendar days after task order award for obligated amounts between $35,000 - $150,000.

The contractor shall submit one of the payment protections:

(a)Certified cashier’s check in the award contract amount, or an irrevocable letter of credit from a financial institution, or a fully executed payment bond.

(b)The amount of the payment protection shall be 100 percent of the contract price.

(c)The submission of the payment protection is required within 10 calendar days of contract award.

(d)The payment protection shall provide protection for the full contract performance period plus a one-year period.

(e)Except for escrow agreements and payment bonds, which provide their own protection procedures, the Contracting Officer is authorized to access funds under the payment protection when it has been alleged in writing by a supplier of labor or material that a nonpayment has occurred, and to withhold such funds pending resolution by administrative or judicial proceedings or mutual agreement of the parties.

(f)When a tripartite escrow agreement is used, the Contractor shall utilize only suppliers of labor and material that signed the escrow agreement.

1352.228-70, INSURANCE

COVERAGE, AND 52.228-5

INSURANCE – WORK ON A

GOVERNMENT INSTALLATION

Insurance coverage shall be provided in accordance with the clause. Proof of insurance shall be submitted before commencing work under this task order.

General Decision Number: NY160004 05/06/2016 NY4

Superseded General Decision Number: NY20150004

State: New York

Construction Types: Building, Heavy and Highway

Counties: Broome and Chenango Counties in New York.

BUILDING CONSTRUCTION PROJECTS FOR BROOME COUNTY ONLY (does not include single family homes and apartments up to and including 4 stories, HEAVY AND HIGHWAY CONSTRUCTION PROJECTS

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/08/2016 1 01/15/2016 2 04/01/2016 3 05/06/2016

* ASBE0030-001 05/01/2016

Rates Fringes

Asbestos/Insulator Worker includes application of all materials, protective coverings, coatings and finishings to all types of mechanical systems. Also the application of firestopping material to openings and penetrations in walls, floors, ceilings, curtain walls and all lead abatement......$ 31.15 20.66

HAZARDOUS MATERIAL HANDLER

SCOPE OF WORK: DUTIES

LIMITED TO preparation, wetting, stripping, removal, scrapping, vacuuming, bagging, and disposing of all insulation materials, whether they contain asbestos or not from mechanical system...........$ 18.72 9.95

BOIL0197-001 01/01/2013

Rates Fringes

BOILERMAKER......................$ 31.10 23.72

BRNY0003-002 07/01/2015

BINGHAMTON CHAPTER

Rates Fringes

BRICKLAYER

BUILDING CONSTRUCTION,

BROOME COUNTY

Bricklayers, Cement Masons, Stone Masons, Pointers, Caulkers and Cleaners...................$ 29.18 17.60 Marble Masons, Tile Layers, and Terrazzo Workers....................$ 28.66 15.77 Marble, Tile and Terrazzo Finishers..................$ 25.67 13.86

HEAVY AND HIGHWAY

CONSTRUCTION, BROOME &

CHENANGO COUNTIES

Cement Masons..............$ 29.87 17.79

CARP0277-010 06/01/2015

Rates Fringes

CARPENTER (BUILDING

CONSTRUCTION)

BROOME COUNTY

Carpenters, Carpet Layer, Drywall Applicator, Floor Coverer, Lather............$ 25.46 17.04 Millwrights................$ 23.06 14.22

CARPENTER (HEAVY & HIGHWAY

CONSTRUCTION)

BROOME COUNTY

Carpenter..................$ 28.40 18.29

CHENANGO COUNTY

Carpenter..................$ 28.40 20.45

FOOTNOTES:

a. Paid Holidays: Independence Day and Labor Day, provided the employee works his scheduled day before and his scheduled day after the holiday and is on the payroll in the payroll week in which the holiday falls.

ELEC0043-003 06/01/2015

CHENANGO (Twps of Columbus, New Berlin & Sherburne):

Rates Fringes

ELECTRICIAN......................$ 35.00 22.27

ELEC0325-002 06/01/2015

BROOME, CHENANGO (Entire County, except Columbus, New Berlin and Sherburne Townships)

CABLE SPLICER....................$ 36.00 24.75

ELECTRICIAN......................$ 31.75 24.75

ELEC1249-003 05/04/2015

ELECTRICIAN (LINE

CONSTRUCTION: LIGHTING AND

TRAFFIC SIGNAL Including any and all Fiber Optic Cable necessary for Traffic Signal Systems, Traffic Monitoring systems and Road Weather information systems) Flagman.....................$ 24.62 7%+20.50 Groundman (Truck Driver)....$ 32.83 7%+20.50 Groundman Truck Driver (tractor trailer unit)......$ 34.88 7%+20.50 Lineman & Technician........$ 41.04 7%+20.50 Mechanic....................$ 32.83 7%+20.50

FOOTNOTE:

a. New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, plus President's Day, Good Friday, Decoration Day, Election Day for the President of the United States and Election Day for the Governor of the State of New York, provided the employee works the day before or the day after the holiday.

ELEC1249-004 05/04/2015

Rates Fringes

ELECTRICIAN (Line Construction) Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :

Flagman....................$ 28.14 7%+20.50 Groundman digging machine operator...................$ 42.21 7%+20.50 Groundman truck driver (tractor trailer unit).....$ 39.87 7%+20.50 Groundman Truck driver.....$ 37.52 7%+20.50 Lineman and Technician.....$ 46.90 7%+20.50 Mechanic...................$ 37.52 7%+20.50 Substation:

Cable Splicer..............$ 51.59 7%+20.50 Flagman....................$ 28.14 7%+20.50 Ground man truck driver....$ 37.52 7%+20.50 Groundman digging machine operator...................$ 42.21 7%+20.50 Groundman truck driver (tractor trailer unit).....$ 39.87 7%+20.50 Lineman & Technician.......$ 46.90 7%+20.50 Mechanic...................$ 37.52 7%+20.50 Switching structures;

railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation Cable Splicer..............$ 53.02 7%+20.50 Flagman....................$ 28.92 7%+20.50 Groundman Digging Machine Operator...................$ 43.38 7%+20.50 Groundman Truck Driver (tractor-trailer unit).....$ 40.97 7%+20.50 Groundman Truck Driver.....$ 38.56 7%+20.50 Lineman & Technician.......$ 48.20 7%+20.50 Mechanic...................$ 38.56 7%+20.50

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Presidents' Day, Memorial Day, Good Friday, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, and Election Day for the President of the United States and Election Day for the Governor of New York State, provided the employee works two days before or two days after the holiday.

ELEC1249-008 01/01/2014

Rates Fringes

ELECTRICIAN (Line Construction)

TELEPHONE, CATV

FIBEROPTICS CABLE AND

EQUIPMENT

Cable splicer..............$ 29.12 3%+4.43 Groundman..................$ 12.98 3%+4.43 Installer Repairman- Teledata Lineman/Technician- Equipment Operator.........$ 27.64 3%+4.43 Tree Trimmer................$ 22.41 8.30+3%+a

a. New Year's Day, President's Day, Good Friday, Decoration Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, Day after Thanksgiving, Christmas Day.

ELEV0062-002 01/01/2016

Rates Fringes

Elevator Constructor Mechanics...................$ 42.87 29.985+a+b

FOOTNOTE:

a.Vacation: 6%/under 5 years based on regular hourly rate for all hours worked. 8%/over 5 years based on regular hourly rate for all hours worked.

b. PAID HOLIDAYS: New Year's Day; Memorial Day; Independence Day; Labor Day; Veterans' Day; Thanksgiving Day; the Friday after Thanksgiving Day; and Christmas Day.

ENGI0106-001 07/01/2015

HEAVY & HIGHWAY

Rates Fringes

Power equipment operators:

GROUP 1.....................$ 38.91 24.40+a GROUP 2.....................$ 38.00 24.40+a GROUP 3.....................$ 35.43 24.40+a GROUP 4.....................$ 42.91 24.40+a GROUP 5.....................$ 41.91 24.40+a GROUP 6.....................$ 40.91 24.40+a GROUP 7.....................$ 40.52 24.40+a

POWER EQUIPMENT OPERATOR CLASSIFICATIONS (HEAVY & HIGHWAY):

GROUP 1: Asphalt Curb Machine, Self Propelled, Slipform, Automated Concrete Spreader (CMI Type), Automatic Fine Grader, Backhoe (Except Tractor Mounted, Rubber Tired), Backhoe Excavator Full Swing (CAT 212 or similar type), Back Filling Machine, Belt Placer (CMI Type), Blacktop Plant (Automated), Boom truck , Cableway, Caisson Auger, Central Mix Concrete Plant (Automated), Concrete Curb Machine, Self Propelled, Slipform, Concrete Pump, Crane, Cherry Picker, Derricks (steel erection), Dragline, Overhead Crane (Gantry or Straddle type), Pile Driver, Truck Crane, Directional Drilling Machine, Dredge, Dual Drum Paver, Excavator (All Purpose Hydraulically Operated) (Gradall or Similar), Front End Loader ( 4 cu. yd. and Over), Head Tower (Sauerman or Equal), Hoist (Two or Three Drum), Holland Loader, Maintenance Engineer, Mine Hoist, Mucking Machine or Mole Pavement Breaker(SP) Wertgen; PB-4 and similar type, Power Grader, Profiler (over 105 H.P.)

Quad 9, Quarry Master (or equivalent), Scraper, Fireman, Fork Lift, Form Tamper, Grout Pump, Gunite Machine, Hammers (Hydraulic self-propelled), Hydra-Spiker, ride-on, Hydraulic Pump (jacking system), Hydro-Blaster (Water), Mulching Machine, Oiler, Parapet Concrete or Pavement, Shovel, Side Boom, Slip Form Paver, Tractor Drawn, BeltType Loader, Truck or Trailer Mounted Log , Chipper (Self Feeder), Tug Operator (Manned Rented Equipment Excluded), Tunnel Shovel

GROUP 2: Asphalt Paver, Backhoe (Tractor Mounted, Rubber Tired), Bituminous Recycler Machine, Bituminous Spreader and Mixer, Blacktop Plant (NonAutomated), Blast or Rotary Drill (Truck or Tractor Mounted), Boring Machine, Cage Hoist, Central Mix Plant (NonAutomated) and All Concrete Batching Plants, Cherry Picker (5 tons capacity and under), Concrete Paver (Over 16S), Crawler Drill, Self-contained, Crusher, Diesel Power Unit, Drill Rigs, Tractor Mounted, Front End Loader (Under 4 cu. yd.), Greaseman/Lubrication Engineer, HiPressure Boiler (15 lbs. and over), Hoist (One Drum), Hydro-Axe, Kolman Plant Loader and Similar Type Loaders, L.C.M. Work Boat Operator, Locomotive Mixer (for stabilized base selfpropelled), Monorail Machine, Plant Engineer, Profiler (105 H.P. and under), Grinder, Post Hole Digger and Post Driver, Power Broom (towed), Power Heaterman, Power Sweeper, Revinius Widener, Roller (Grade and Fill), Scarifier, ride-on, Shell Winder, Skid steer loader (Bobcat or similar), Span-Saw, ride-on, Steam Cleaner, Pug Mill, Pump Crete Ready Mix Concrete Plant Refrigeration Equipment (for soil stabilization)Road

Widener, Roller (all above subgrade), Sea Mule, Self-contained Ride-on Rock Drill, Excluding Air-Track Type Drill, Skidder, Tractor with Dozer and/or Pusher, Trencher.

Tugger Hoist, Vermeer saw (ride on, any size or type), Winch, Winch Cat

GROUP 3: A Frame Winch Hoist on Truck , Articulated Heavy Hauler, Aggregate Plant, Asphalt or Concrete Grooving, Machine (ride on), Ballast Regulator, Ride-on Boiler (used in conjunction with production), Bituminous Heater, self-propelled, Boat (powered), Cement and Bin Operator, Compressors, Dust Collectors, Generators, Pumps, Welding Machines, Light Plants, Heaters (hands-off equipment), Concrete Pavement Spreader and Finisher, Concrete Paver or Mixer (16S and under), Concrete Saw (self-propelled), Conveyor, Deck Hand, Directional Drill Machine Locator, Drill, (Core), Drill, (Well,) Farm Tractor with accessories, Fine Grade Machine, Tamper, ride-on, Tie Extractor, ride-on, Tie Handler, ride-on, Tie Inserter, ride-on, Tie Spacer, ride-on, Tire Repair, Track Liner, ride-on, Tractor, Tractor (with towed accessories), Vibratory Compactor, Vibro Tamp, Well Point

GROUP 4: Tower Cranes

GROUP 5: Cranes 50 tons and over

GROUP 6: Cranes 49 tons and below

GROUP 7: Master Mechanic

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, Lincoln's Birthday, Washington's Birthday, Good Friday, Columbus Day, November Election Day and Veteran's Day

ENGI0106-006 07/01/2015

Rates Fringes

Power equipment operators:

(BUILDING:)

GROUP A(1)..................$ 37.26 23.70+a GROUP A.....................$ 35.07 23.70+a GROUP B.....................$ 34.65 23.70+a GROUP C.....................$ 32.53 23.70+a

Hazardous work- Anytime Operating Engineers are involved with Level C or above, $3.00 per hour over regular rate.

FOOTNOTE:

a. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day.

POWER EQUIPMENT OPERATOR CLASSIFICATIONS (Building)

GROUP A(1): Crane, hydraulic cranes, tower crane, locomotive crane, piledriver, cableway, derricks, whirlies, dragline, boom trucks over 5 tons

GROUP A: Shovel, all excavators (including rubber tire, full swing), gradalls, power road grader all CMI equipment, front-end rubber tire loader, tractor-mounted drill (quarry master), mucking machine, concrete central mix plant, concrete pump, belcrete system, automated asphalt concrete plant, tractor road paver, boom trucks 5 tons and under, Maintenance Engineer, self contained crawler drill-hydraulic rock drill.

GROUP B: Backhoes (rubber tired backhoe/loader combination), bulldozer, pushcat, tractor, traxcavator, scraper, LeTourneau grader, form fine grader, road roller, blacktop roller, blacktop spreader, power brooms, sweepers, trenching machine, Barber Green loader, side booms, hydro hammer, concrete spreader, concrete finishing machine, one drum hoist, power hoisting (single drum), hoist two drum or more, three drum engine, power hoisting (two drum and over), two drum and swinging engine, three drum swinging engine, hod hoist, A-L frame winches, core and well drillers (one drum), post hole digger, model CHB VibroTamp or similar machine, batch bin and plant operator, dinkey locomotive, skid steer loader, track excavator 5/8 cu. yd.

or smaller.

GROUP C: Fork lift, high lift, lull, oiler, fireman and heavy-duty greaser, boilers and steam generators, pump, vibrator, motor mixer, air compressor, dust collector, selding machine, well point, mechanical heater, generators, temporary light plants, concrete pumps, electric submersible pump 4" and over, murphy type disel generator, conveyor, elevators, concrete mixer and beltcrete power pack (belcrete system seeding and mulching machines pumps.

IRON0060-001 05/01/2015

BROOME; CHENANGO (Twps. of Afton, Bainbridge, Coventry, German, Greene, Gilford, McDonough, Norwich, Oxford, Preston, and Smithville):

Ironworkers:

Structural, Ornamental, Reinforcing, Pre-cast Concrete Erector, Machinery Mover & Rigger, Fence Erector, Stone Derrickman, Welder, Sheeter, Sheeter Bucker-up..$ 28.70 23.05

IRON0440-003 05/01/2015

CHENANGO (Twps. of Columbus, New Berlin, North Norwich, Plymouth, Sherburne and Smyrna):

Ironworkers:

Structural, Ornamental, Rodmen, Reinforcement, Rigger, Machinery Mover, Fence Erector, Stone Derrickman..................$ 25.95 24.24

LABO0017-003 07/01/2014

TWPS. OF COLUMBUS, SHERBURNE AND NEW BERLIN IN CHENANGO COUNTY

LABORER

HEAVY and HIGHWAY

GROUP 1....................$ 30.05 22.40

GROUP 2....................$ 34.55 22.40

GROUP 3....................$ 38.55 22.40

GROUP 4....................$ 42.45 22.40

FOOTNOTES:

a. Paid Holidays: New Years Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, Washington's Birthday, Election Day, Veterans Day provided the employee works one day in the calendar week during which the holiday occurs

HEAVY AND HIGHWAY CLASSIFICATIONS

GROUP 1: Flagperson, gateperson

GROUP 2: General Laborers, Chuck Tenders, Handling and Distributing of Drinking Water, Distributing all Tools and Supplies of Laborers, AFL-CIO Trades Tenders, Nipper, Powder Carrier, Magazine Tender, Warehousemen, Concrete Men, Vibrator Men, Mason Tender, Mortar Men, Spraying, Brushing and Covering of Concrete for Curing and Preservative Purposes, Traffic Striper, Scaffold Builder, Concrete Curb and Sidewalk Form Setters, permanent traffic striping and reflective devices, placing and maintenance of all flares, cones, lights, signs, barricades, traffic patterns, and all temporary reflective type materials for traffic control, custodial work, traffic directors, temporary heat or light tenders, tool room, dewatering pump men, pitman, dumpmen, snow removal and firewatch, asphalt man, joint setter, signal person, pipelayer, pipelining and relining, wellpoints, conduit and duct layer, wire puller, rip rap and dry stone layer, steel rod carrier core drill, rock splitter, Hilti gun, air or electric, jackhammer, bush hammer, pavement breaker, chipping hammer, wagon drill, air track, jib rig, joy drill, gunite and sand blasting, coal passer and other machine operators, power tool operator sprayer and nozzle man on mulching and seeding machine, all guard rail and fence, all seeding and sod laying, all landscape work, grade checker, all bridge work, walk behind self-propelled power saw grinder, groover or similar type machine, walk behind tamper and roller of all types, salvage, stripping, wrecking and dismantling laborer (including barman, cutting torch and burner man), sheeting and shoring coming under laborers jurisdiction, bit grinder, operator of form pin puller and drivers, sandblasting joint and jet sealer, filling and wiring baskets for gabion walls, permanent sign man, median barrier, sta-wall or similar type product, chain saw operator, railroad track laborer, waterproofer, pre-stressed and pre-cast concrete brick, block and stone pavers, power tools used to perform work usually done by laborers, power buggy and pumpcrete operator, fireproof, plaster and acoustic pump, asbestos, toxic, bio-remediation, phyto-remediation, lead or hazardous materials abatement when protective clothing and equipment is not required, power brush cutter, retention liners, artificial turf, retaining walls, walk behind surface planer, welding related to laborers work, remote controlled equipment normally operated by laborers, all technician work including but not limited to stitching, seaming, heat welding, fireproof sprayer, mortar mixer, concrete finisher, form setter for concrete curbs and flatwork, gunite nozzle man, stone cutters, granite stone layer, manhole, catch basin or inlet installing, laser men, ground man on milling machine

GROUP 3: Ingersoll Rand heavy duty crawler master type HCMZ, any drill using 4" or larger bit, asbestos, toxic, bio-remediation, phyto-remediation, lead or hazardous material abatement when protective clothing and equipment is required, all working foremen including grade, pipe, concrete, clearing, blacktop drill, paving and blaster etc., hydraulic drill or similar, forklift for masonry only, blaster and asphalt screedman

GROUP 4: Asbestos, toxic, lead or hazardous material abatement foreman

LABO0785-012 07/01/2014

BROOME; CHENANGO (Remainder of Counties):

Rates Fringes

LABORER

LABORER HEAVY AND HIGHWAY:

GROUP 1....................$ 25.96 17.05

GROUP 2....................$ 26.16 17.05

GROUP 3....................$ 26.36 17.05

GROUP 4....................$ 26.56 17.05

GROUP 5....................$ 27.96 17.05

LABORER CLASSFICATIONS

GROUP 1: Laborers, flaggers, outboard and hand boats

GROUP 2: Bull float, chain saw, concrete aggregate, bin concrete bootman, gin buggy, hand or machine vibrator, jackhammer, mason tender, mortar mixer, pavement breaker, handlers of all steel mesh, small generators for laborers' tools, installation of bridge drainage pipe, pipelayers, vibrator type rollers, tamper, drill doctor tail or screw operator on asphalt paver, water pump operator (1 1\2' and single diaphragm), nozzle (asphalt gunnite, seeding and sandblasting), laborers on chain link fence erection, rock splitter and power unit, pusher type concrete saw and all other gas, electric, oil and air tool operators, wrecking laborers

GROUP 3: All rock or drilling machine operators (except quarry master and similar type), acetylene torch operators and asphalt paver, powderman

GROUP 4: Blasters, form setters, stone or granite curb setters

GROUP 5: Asbestos and hazardous waste removal

LABO0785-013 07/01/2012

BROOME (Remainder of County)

Rates Fringes

LABORER

LABORERS BUILDING:

GROUP 1....................$ 20.50 14.35

GROUP 2....................$ 21.50 14.35

GROUP 3....................$ 22.00 14.35

LABORERS CLASSIFICATION:

GROUP 1: Common laborers

GROUP 2: Masonry forklifts, bob cats, rock drilling equipment and blasters

GROUP 3: Asbestos and hazardous waste removal

PAIN0004-056 05/01/2015

Rates Fringes

Painters:

Bridges.....................$ 38.00 24.00 Epoxy-Brush & Roller........$ 24.95 17.03 Painters and Tapers.........$ 24.70 17.03 Spray Epoxy.................$ 25.95 17.03 Spray Work/Steeple Jack (over 100 ft)...............$ 25.70 17.03 Structural Steel (buildings) Spray Work......$ 25.20 17.03 Swing Scaffold, Boatswain Chair, Spray, Sandblasting, Steam Cleaning, Acid and High Pressure Water, Paperhangers, Vinyl Hangers, Power Grinders w/respirator................$ 25.20 17.03

PAIN0677-003 05/01/2015

Rates Fringes

GLAZIER..........................$ 23.85 15.99

PLUM0112-010 05/01/2015

BROOME COUNTY Townships of Lisle, Triangle, Barker, Nanticoke, Newark Valley, Owego, Maine, Union, Vestal, Kirkwood, Conklin, Chenango, Fenton, Colesville, Windsor and Stanford

CHENANGO COUNTY Townships of Linklaen, Otselic, Smyrna, Sherburne, Columbus, Pitcher, Pharsalia, Plymouth, North Norwich, New Berlin, German, McDonough, Preston, Norwich, Smithville, Oxford, Guilford

PLUMBER/PIPEFITTER

Southern Zone...............$ 32.48 23.69

ROOF0203-001 06/01/2011

Rates Fringes

ROOFER...........................$ 23.12 12.72

SFNY0669-001 01/01/2016

Rates Fringes

SPRINKLER FITTER.................$ 31.66 21.42

SHEE0058-002 05/01/2012

CHENANGO COUNTY:

SHEET METAL WORKER, Includes HVAC Duct Installation Projects over $10 million...$ 27.94 17.19 SHEETMETAL WORKER (HVAC Duct Installation Only) Projects with sheetmetal work contracts totalling $10 million or less.........$ 26.94 17.19

SHEE0112-003 01/01/2013

BROOME COUNTY

Rates Fringes

Sheet Metal Worker...............$ 27.60 15.26

TEAM0693-001 07/01/2015

Rates Fringes

Truck drivers:

HEAVY & HIGHWAY

GROUP 1....................$ 23.64 19.70+a GROUP 2....................$ 23.64 19.70+a GROUP 3....................$ 23.64 19.70+a GROUP 4....................$ 23.84 19.70+a GROUP 5....................$ 23.84 19.70+a

FOOTNOTES:

a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, provided the employee works the day before and the day after the holidays.

TRUCK DRIVERS HEAVY & HIGHWAY CLASSIFICATIONS:

GROUP 1: Pickups; panel trucks; flatboy material trucks (straight jobs); single-axle dump trucks; dumpsters;

receivers; greasers; truck tiremen

GROUP 2: Tandems; batch trucks mechanics

GROUP 3: Semi-trailers; low-boy trucks; asphalt distributors trucks; agitator; mixer trucks and dumpcrete type vehicles;

truck mechanic; fuel truck

GROUP 4: Specialized earth moving equipment - euclid type or similar off-highway equipment, where not self loaded;

straddle (ross) carrier; self contained concrete unit

GROUP 5: Off-highway tandem back-dump; twin engine equipment and double hitched equipment where not self loaded

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

NATIONAL WEATHER SERVICE

Weather Forecast Office

Johnson City, New York

Statement of Work (SOW)

EXTERIOR REHAB

March 14, 2016

Statement of Work - Exterior Rehab

National Weather Service (NWS) – Weather Forecast Office (WFO) – Johnson City, New York

SCOPE: Contractor shall provide all personnel, materials, labor, equipment and supervision to Remove and replace all sealants/caulking and joint filler/backing rod on all masonry control joints and sidewalk areas and seal all exterior brick walls – Johnson City, New York Weather Forecast Office

(WFO).

LOCATION: NWS WFO

32 Dawes Drive

Johnson City, NY 13790

GENERAL INFORMATION:

• Contract shall include all labor, materials, equipment, debris/trash removal, transportation, services, insurance coverage, bonds and permits for work outlined and shall be in accordance with local codes and ordinances.

• The contractor, if remotely located, shall designate a representative local to the contract site, with contact numbers, for the project representative to communicate with about the quality of work, progress, and technical details of the project.

• Submittal of proposed materials shall be provided to Contracting Officer Representative (COR) for approval prior to commencing work.

• All applicable CFR, NFPA, and DOL requirements apply. All Federal, State, DOT and Local laws shall be followed.

• The contractor will not commence work until they have been issued a “notice to proceed”. The award and issuance of a task order is not the Notice to Proceed (NTP) with this contract work. Prior to issuance of a NTP, the contractor shall submit for approval a project schedule showing the date when on-site work will begin, hours work will be performed, and date the work will be completed. Working hours are 9:00 a.m. to 5:00 p.m., Monday through Friday. No work will be performed on Sundays or Federal Holidays, unless approved by the COR. The COR shall be notified when changes in project schedule are requested along with justification for the schedule change.

• The Government reserves the right to inspect for quality control at any point during the construction.

• Workers must sign in and out of the building upon arrival and departure daily.

• The contractor shall clean up any work areas at the end of each day and ensure any restricted areas are clearly demarcated.

DESCRIPTION OF WORK:

This work applies to the WFO and EPG/Storage building:

1.1 SCOPE: Provide joint sealer as specified herein, and as required by field conditions and as agreed with the Contracting Officer’s

Representative (COR).

A. Applications include, but are not necessarily limited to:

1. Exterior building wall joints including joints at windows, control joints, rake joints, louvers, and exterior doors.

2. Flashing and coping joints.

3. Masonry exterior control joints.

4. Mechanical and electrical pipe/conduit exterior wall penetration.

1.2 APPLICABLE PUBLICATIONS: Industry publications controlling the work include:

A. American Society for Testing and Materials (ASTM):

ASTM C834 Acrylic-Emulsion Sealants.

ASTM C920 Chemically Curing Elastomeric Joint

Sealants ASTM D1751 Preformed Expansion Joint Filler for

Concrete and Structural Construction B. Federal Specification (FS):

FS TT-S-001543A Sealing Compound, Elastomeric Type, Single Compound

FS TT-S-00227E Sealing Compound, Elastomeric Type, Multi- Component

1.3 QUALITY ASSURANCE: Comply with the following requirements to assure a quality installation:

A. Examine existing areas and conditions where joint sealer has been installed. Remove all existing caulking by mechanical means. Removal is not limited to dirt, unsecured coatings, moisture and other substances which would interfere with bond of the sealant or caulking compound.

B. Etch concrete and masonry joint surfaces as recommended by sealant manufacturer, roughen vitreous or glazed joint surfaces as recommended by sealant manufacturer.

C. Prime or seal joint surfaces where recommended by sealant manufacturer. Do not allow primer/sealer to spill or migrate onto adjoining surfaces.

D. Do not proceed with installation of sealants under adverse weather conditions, or when temperatures are below/above manufacturer’s recommended limitations for installation. Proceed with the work only when forecasted weather conditions are favorable for proper cure and development of high early bond strength. Wherever joint width is affected by ambient temperature variations, elastomeric sealants shall be installed only when temperatures are in the lower third of the manufacturer’s recommended installation temperature range.

E. Apply sealants in uniform, continuous ribbons without gaps or air pockets and with complete, “wetting” of the joint bond surfaces equally on opposite sides. Sealant shall be slightly concave and slightly below adjoining surfaces. Where horizontal joints are between a horizontal surface and vertical surface, fill joint to form a slight cove, so that joint will not trap moisture and dirt.

F. Installation of the joint filler/backing rod shall meet manufacturer’s requirements no wider than 50% of the joints width.

G. Sealant backer rod shall be compressible rod stock of polyethylene foam. Polyethylene jacketed polyurethane foam, butyl rubber foam, neoprene foam or other flexible, permanent, durable non-absorptive material recommended for compatibility with the sealant by the sealant manufacturer.

F. All sealants and caulk shall match current color scheme.

H. Contractor needs to have all MSDS and safety gear on site while work is being completed.

1.4 PRODUCTS: Provide only materials that are new and of the type and quality specified. Manufacturers that provide products meeting these specifications have been identified. Other manufacturers meeting these specifications may be acceptable subject to submittals of certification of compliance, review and approval.

This work applies to the EXTERIOR BRICK:

Apply Protectosil®CHEM-TRETE® PB 100 equivalent or better to the exterior brick surfaces of the Weather Forecast Office and EPG building. If a different product is suggested, COR must approve prior to work starting.

A. Environmental Requirements:

1. Maintain ambient temperature above 20 degrees F during and 24 hours after installation.

2. Do not proceed with application on materials if ice or frost is covering the substrate.

3. Do not proceed with application if ambient temperature of surface exceeds 100 degrees F.

4. Do not proceed with the application of materials in rainy conditions or if heavy rain is anticipated within 4 hours after application.

B. Surface Preparation:

1. Verify masonry joints found to be unsound, hollow, or otherwise defective, have been raked out to a depth of 1/2 inch and pointed with mortar.

2. Verify cracks that exceed 1/64 inch wide have been filled with pointing mortar.

3. All repointing must be completed and allowed to cure.

4. Remove dirt, dust and materials that will interfere with the proper and effective application of the penetrating sealer. The Contractor shall prepare the surfaces of the concrete as recommended by the Water Repellent Manufacturer.

C. Application:

A. Product shall be applied as supplied by the manufacturer without dilution or alteration.

B. Apply with a low-pressure (15 psi) airless spray equipment with a fan spray coarse nozzle, flooding the surface to obtain uniform coverage unless otherwise recommended by the manufacturer.

C. Apply at a rate of not less than 80 square foot/gallon unless the field tests determine that a heavier rate of application is necessary to meet the performance requirements.

D. Apply at temperature and weather conditions recommended by the manufacturer or written in this specification.

E. Follow manufacturers’ recommendations concerning protection of glass, metal and other non-porous substrates. Contractor will be responsible to clean all surfaces that are contaminated by the water repellent.

F. Follow manufacturer’s recommendation concerning protection of plants, grass and other vegetation. Contractor will be responsible for replacing all plants, grass or vegetation damaged by the water repellent.

G. Apply water repellent by brush only at locations where overspray would affect adjacent materials and where not practicable for spray application.

D. Cleaning:

• While Work Progresses: Clean spillage and overspray from adjacent surfaces using materials and methods as recommended by water repellent manufacturer. The contractor shall clean up any work areas at the end of each day and ensure any restricted areas are clearly demarcated.

SUBMITTALS AND APPROVALS:

Three (3) copies of all product information cut sheets and Material Safety Data Sheets (MSDS) shall be delivered 10 days prior to start of work for approval prior to ordering the materials to be used. MSDS need to stay at WFO when work is completed.

Prior to full commencement of the project, the Contractor will prepare surfaces at three test locations in the three (3) primary areas affected by this contract for approval by the COR, and to be used as the minimally accepted standard for reference on the project:

• masonry control joint

• concrete flatwork

• roof coping

ACCIDENT PREVENTION:

The contractor shall provide and maintain work environments and procedures which will:

1. Safeguard the public and Government personnel, property, materials, supplies, and equipment exposed to contractor operations and activities. This includes the prevention of contamination to government-owned and private vehicles.

2. Utilize appropriate safety barricades and signage.

3. Comply with the OSHA Standards 29 CFR Part 1926 and 29 CFR Part 1910.

Whenever the Contracting Officer becomes aware of any noncompliance with these requirements, or any condition which poses a serious or imminent danger to the health or safety of the public or Government personnel, the Contracting Officer shall notify the contractor orally, with written confirmation, and request immediate initiation of corrective action. This notice, when delivered to the contractor or the Contractor’s representative at the work site, shall be deemed sufficient notice of the noncompliance and that corrective action is required. After receiving the notice, the Contractor shall immediately take corrective action. If the Contractor fails or refuses to promptly take corrective action, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. The Contractor shall not be entitled to any equitable adjustment of the contract price or extension of the performance schedule on any stop work order issued under this clause.

The Contractor shall insert this clause, including this paragraph, with appropriate changes in the designation of the parties, in all subcontracts.

COMPLETION:

Contractor shall remove all debris from resulting work. To include caulk, cans, tape, buckets, boxes, fasteners, tools, debris, etc. and sweep up on a daily basis. Contractor shall perform walk through inspection of the project with the COR or POC for acceptance. Any punch list items identified will be documented in writing and be corrected before final de-mobilization by the contractor, unless authorized by the COR.

Contractor will warranty product and workmanship for a minimum period of one (1) year.

-END-