NSN 7540-01-152-8070 STANDARD FORM 30. (Rev. 10-83) Previous Edition unusable Prescribed by GSA FAR (48 CFR) 53.243

Page of Pages AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code

2. AMENDMENT MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (if applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than item 6) CODE

(x) 9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

8. NAME AND ADDRESS OF CONTRACTOR (NO., Street, Country, State and ZIP Code)

CODE FACILITY CODE

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning ______ copies of amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OR OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

Check One

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _______ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible)

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR 16B. UNITED STATES OF AMERICA

(Signature of person authorized to sign)

15C. DATE SIGNED

(Signature of Contracting Officer)

16C. DATE SIGNED

See Attachment Page.

1 67

A0002 MAY 12, 2016 NWWN4200-16-00120

AJ830023

NOAA/AGO/EAD

601 E 12TH STREET

ROOM 1734

KANSAS CITY MO 64106

WC-1330-16-RP-0015

APR 01, 2016

See Schedule

Attachment Page

PAGE 2 OF 67 WC-1330-16-RP-0015/A0002

The SOLICITATION is amended as follows:

1. Offerors are required to acknowledge receipt of this amendment on the Bidding Form in the space provided. Failure to acknowledge all amendments may cause rejection of the proposal.

2. The due date for the proposals has changed from May 16, 2016 , 2 pm CST to May 27, 2016, 2 pm CST

3. Solicitation/Contract is changed to a Multiple Award Task Order Contract (MATOC), Indefinite Delivery, Indefinite Quantity (IDIQ).

4. Block 10, CLIN Schedule, and Sections B-M are re-issued to reflect contract changed to a MATOC.

5. Attachment C Task Order 1 (Seed Task Order) is re-issued with an updated waged determination.

6. Questions and Answers are posted on FBO for informational purposes only.

7. All other terms and conditions remain unchanged and in full force.

Attachment Page

PAGE 3 OF 67 WC-1330-16-RP-0015/A0002

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN

THESE DOCUMENTS (CONTINUED)

INDEFINITE DELIVERY, INDEFINITE QUANTITY (IDIQ)

TASK ORDER CONTRACT TO PROVIDE A FULL

RANGE OF GENERAL FACILITIES CONSTRUCTION (GFC) SERVICES

TO PRIMARILY SUPPORT THE NATIONAL WEATHER SERVICE (NWS),EAST

REGION AND MAY INCLUDE OTHER NATIONAL OCEANIC AND ATMOSPHERIC

ADMINISTRATION (NOAA) IN THE U

Government intends to award up to ) in response to this solicitation.

Each contract has a ( )

SCHEDULE Continued

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

PAGE 4 OF 67 WC-1330-16-RP-0015/A0002

There is one price proposal schedule in this solicitation that reflects the work that is to be performed under Task

Order 0001 (Seed Task Order). Task Order 0001 will be awarded based upon pricing received in response to this solicitation. The evaluation of Offeror’s price proposal will be based upon Task Order 0001 Price Proposal Schedule located in the General Requirements Section behind Attachment C.

0001 Multiple Award Task Order Contract (MATOC), Indefinite Delivery, Indefinite Quantity (IDIQ) contract for General Construction, Design/Build Construction, Alterations, Maintenance and Repair Project primarily for the National Weather Service (NWS), Eastern Region and may include other National Oceanic and Atmospheric Administration (NOAA) entities in the U.S. Award up to five (5) MATOC contractors with a pool of $9.9 million for a period of one (1) base year and four (4) option years.

1.00 JB

Option I

OPT

0002 Multiple Award Task Order Contract (MATOC), Indefinite

Delivery, Indefinite Quantity (IDIQ) contract for General Construction, Design/Build Construction, Alterations, Maintenance and Repair Project primarily for the National Weather Service (NWS), Eastern Region and may include other National Oceanic and Atmospheric Administration (NOAA) entities in the U.S. Award up to five (5) MATOC contractors with a pool of $9.9 million for a period of one (1) base year and four (4) option years.

Period of Performance: 06/21/2017 to 06/20/2018

1.00 JB

Option II

OPT

0003 Multiple Award Task Order Contract (MATOC), Indefinite

Delivery, Indefinite Quantity (IDIQ) contract for General Construction, Design/Build Construction, Alterations, Maintenance and Repair Project primarily for the National Weather Service (NWS), Eastern Region and may include other National Oceanic and Atmospheric Administration (NOAA) entities in the U.S. Award up to five (5) MATOC contractors with a pool of $9.9 million for a period of one (1) base year and four (4) option years.

Period of Performance: 06/21/2018 to 06/20/2019

1.00 JB

Option III

OPT

0004 Multiple Award Task Order Contract (MATOC), Indefinite

Delivery, Indefinite Quantity (IDIQ) contract for General Construction, Design/Build Construction, Alterations, Maintenance and Repair Project primarily for the National Weather Service (NWS), Eastern Region and

1.00 JB

SCHEDULE Continued

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

PAGE 5 OF 67 WC-1330-16-RP-0015/A0002

may include other National Oceanic and Atmospheric Administration (NOAA) entities in the U.S. Award up to five (5) MATOC contractors with a pool of $9.9 million for a period of one (1) base year and four (4) option years.

Period of Performance: 06/21/2019 to 06/20/2020

Option IV

OPT

0005 Multiple Award Task Order Contract (MATOC), Indefinite

Delivery, Indefinite Quantity (IDIQ) contract for General Construction, Design/Build Construction, Alterations, Maintenance and Repair Project primarily for the National Weather Service (NWS), Eastern Region and may include other National Oceanic and Atmospheric Administration (NOAA) entities in the U.S. Award up to five (5) MATOC contractors with a pool of $9.9 million for a period of one (1) base year and four (4) option years.

Period of Performance: 06/21/2020 to 06/20/2021

1.00 JB

Table of Contents

PAGE 6 OF 67 WC-1330-16-RP-0015/A0002

SECTION B SUPPLIES OR SERVICES AND PRICES/COSTS

B. 1 1352.216-75 MINIMUM AND MAXIMUM CONTRACT AMOUNTS (APR 2010)

B. 2 TASK ORDER DEFINITION

SECTION C DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

C. 1 SECTION C

SECTION D PACKAGING AND MARKING

D. 1 SECTION D

SECTION E INSPECTION AND ACCEPTANCE

E. 1 52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)

E. 2 52.246-13 INSPECTION--DISMANTLING, DEMOLITION, OR REMOVAL OF IMPROVEMENTS (AUG 1996)

E. 3 1352.246-70 PLACE OF ACCEPTANCE (APR 2010)

SECTION F DELIVERIES OR PERFORMANCE

F. 1 52.242-14 SUSPENSION OF WORK (APR 1984)

F. 2 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

F. 3 52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

F. 4 1352.270-70 PERIOD OF PERFORMANCE (APR 2010)

F. 5 SCHEDULE OF DELIVERABLES

SECTION G CONTRACT ADMINISTRATION DATA

G. 1 1352.201-70 CONTRACTING OFFICER´s AUTHORITY (APR 2010)

G. 2 1352.201-72 CONTRACTING OFFICER´s REPRESENTATIVE (C0R) (APR 2010)

G. 3 1352.216-76 PLACEMENT OF ORDERS (APR 2010)

G. 4 SUBMITTAL OF INVOICES

SECTION H SPECIAL CONTRACT REQUIREMENTS

H. 1 1352.208-70 RESTRICTIONS ON PRINTING AND DUPLICATING (APR 2010)

H. 2 1352.209-72 RESTRICTIONS AGAINST DISCLOSURE (APR 2010)

H. 3 1352.209-73 COMPLIANCE WITH THE LAWS (APR 2010)

H. 4 1352.209-74 ORGANIZATIONAL CONFLICT OF INTEREST (APR 2010)

H. 5 1352.216-74 TASK ORDERS (APR 2010)

H. 6 1352.228-72 DEDUCTIBLES UNDER REQUIRED INSURANCE COVERAGE- FIXED PRICE (APR 2010)

H. 7 1352.237-71 SECURITY PROCESSING REQUIREMENTS - LOW RISK CONTRACTS (APR 2010)

H. 8 1352.228-70 INSURANCE COVERAGE (APR 2010)

H. 9 1352.237-75 KEY PERSONNEL (APR 2010)

H. 10 TASK ORDER BETTERMENTS

SECTION I CONTRACT CLAUSES

I. 1 52.202-1 DEFINITIONS (NOV 2013)

I. 2 52.203-3 GRATUITIES (APR 1984)

I. 3 52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)

I. 4 52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (SEP 2006)

I. 5 52.203-7 ANTI-KICKBACK PROCEDURES (MAY 2014)

I. 6 52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR IMPROPER ACTIVITY

(MAY 2014)

I. 7 52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)

I. 8 52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS (OCT 2010)

PAGE 7 OF 67 WC-1330-16-RP-0015/A0002

I. 9 52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND REQUIREMENT TO INFORM EMPLOYEES OF

WHISTLEBLOWER RIGHTS (APR 2014)

I. 10 52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER CONTENT PAPER (MAY 2011)... 27

I. 11 52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (JAN 2011)

I. 12 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS (OCT 2015).. 27

I. 13 52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (JULY 2013)

I. 14 52.204-15 SERVICE CONTRACT REPORTING REQUIREMENTS FOR INDEFINITE-DELIVERY CONTRACTS (JAN

2014)

I. 15 52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MANAGEMENT (JUL 2015)

I. 16 52.209-6 PROTECTING THE GOVERNMENT`S INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS

DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (OCT 2015)

I. 17 52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS (NOV 2015)

I. 18 52.215-2 AUDIT AND RECORDS--NEGOTIATION (OCT 2010)

I. 19 52.215-8 ORDER OF PRECEDENCE--UNIFORM CONTRACT FORMAT (OCT 1997)

I. 20 52.215-10 PRICE REDUCTION FOR DEFECTIVE CERTIFIED COST OR PRICING DATA (AUG 2011)

I. 21 52.215-12 SUBCONTRACTOR CERTIFIED COST OR PRICING DATA (OCT 2010)

I. 22 52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (NOV 2011)

I. 23 52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (OCT 2014)

I. 24 52.219-14 LIMITATIONS ON SUBCONTRACTING (NOV 2011)

I. 25 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REPRESENTATION (OCT 2014)

I. 26 52.222-3 CONVICT LABOR (JUN 2003)

I. 27 52.222-4 CONTRACT WORK HOURS AND SAFETY STANDARDS --OVERTIME COMPENSATION (MAY 2014)

I. 28 52.222-6 CONSTRUCTION WAGE RATE REQUIREMENTS (MAY 2014)

I. 29 52.222-7 WITHHOLDING OF FUNDS (MAY 2014)

I. 30 52.222-8 PAYROLLS AND BASIC RECORDS (MAY 2014)

I. 31 52.222-9 APPRENTICES AND TRAINEES (JUL 2005)

I. 32 52.222-10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS (FEB 1988)

I. 33 52.222-11 SUBCONTRACTS (LABOR STANDARDS) (MAY 2014)

I. 34 52.222-12 CONTRACT TERMINATION--DEBARMENT (MAY 2014)

I. 35 52.222-13 COMPLIANCE WITH CONSTRUCTION WAGE RATE REQUIREMENTS AND RELATED REGULATIONS (MAY

2014)

I. 36 52.222-14 DISPUTES CONCERNING LABOR STANDARDS (FEB 1988)

I. 37 52.222-15 CERTIFICATION OF ELIGIBILITY (MAY 2104)

I. 38 52.222-21 PROHIBITION OF SEGREGATED FACILITIES (APR 2015)

I. 39 52.222-26 EQUAL OPPORTUNITY (APR 2015)

I. 40 52.222-27 AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS FOR CONSTRUCTION (APR 2015)

I. 41 52.222-30 CONSTRUCTION WAGE RATE REQUIREMENTS--PRICE ADJUSTMENT (NONE OR SEPARATELY

SPECIFIED METHOD) (MAY 2014)

I. 42 52.222-35 EQUAL OPPORTUNITY FOR VETERANS. [OCT 2015]

I. 43 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUL 2014)

I. 44 52.222-37 EMPLOYMENT REPORTS ON VETERANS (FEB 2016)

I. 45 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT (DEC

2010)

I. 46 52.222-41 SERVICE CONTRACT LABOR STANDARDS (MAY 2014)

I. 47 52.222-43 FAIR LABOR STANDARDS ACT AND SERVICE CONTRACT LABOR STANDARDS--PRICE ADJUSTMENT

(MULTIPLE YEAR AND OPTION CONTRACTS) (MAY 2014)

I. 48 52.222-50 COMBATING TRAFFICKING IN PERSONS (MAR 2015)

I. 49 52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION (OCT 2015)

I. 50 52.222-55 MINIMUM WAGES UNDER EXECUTIVE ORDER 13658 (DEC 2015)

I. 51 52.223-2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER SERVICE AND CONSTRUCTION

CONTRACTS (SEP 2013)

PAGE 8 OF 67 WC-1330-16-RP-0015/A0002

I. 52 52.223-5 POLLUTION PREVENTION AND RIGHT-TO-KNOW INFORMATION (MAY 2011)

I. 53 52.223-6 DRUG-FREE WORKPLACE (MAY 2001)

I. 54 52.223-12 REFRIGERATION EQUIPMENT AND AIR CONDITIONERS (MAY 1995)

I. 55 52.223-15 ENERGY EFFICIENCY IN ENERGY-CONSUMING PRODUCTS (DEC 2007)

I. 56 52.223-17 AFFIRMATIVE PROCUREMENT OF EPA-DESIGNATED ITEMS IN SERVICE AND CONSTRUCTION

CONTRACTS (MAY 2008)

I. 57 52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING (AUG 2011). 31

I. 58 52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JUN 2008)

I. 59 52.227-1 AUTHORIZATION AND CONSENT (DEC 2007)

I. 60 52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT INFRINGEMENT (DEC 2007)

I. 61 52.227-4 PATENT INDEMNITY--CONSTRUCTION CONTRACTS (DEC 2007)

I. 62 52.227-17 RIGHTS IN DATA--SPECIAL WORKS (DEC 2007)

I. 63 52.228-2 ADDITIONAL BOND SECURITY (OCT 1997)

I. 64 52.228-5 INSURANCE--WORK ON A GOVERNMENT INSTALLATION (JAN 1997)

I. 65 52.228-12 PROSPECTIVE SUBCONTRACTOR REQUESTS FOR BONDS (MAY 2014)

I. 66 52.228-15 PERFORMANCE AND PAYMENT BONDS--CONSTRUCTION (OCT 2010)

I. 67 52.229-3 FEDERAL, STATE, AND LOCAL TAXES (FEB 2013)

I. 68 52.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (MAY 2014)

I. 69 52.232-17 INTEREST (MAY 2014)

I. 70 52.232-18 AVAILABILITY OF FUNDS (APR 1984)

I. 71 52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014)

I. 72 52.232-27 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS (MAY 2014)

I. 73 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER--SYSTEM FOR AWARD MANAGEMENT (JUL 2013)... 32

I. 74 52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS (JUNE 2013)

I. 75 52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (DEC 2013)

I. 76 52.233-1 DISPUTES (MAY 2014)

I. 77 52.233-3 PROTEST AFTER AWARD (AUG 1996)

I. 78 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)

I. 79 52.236-2 DIFFERING SITE CONDITIONS (APR 1984)

I. 80 52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (APR 1984)

I. 81 52.236-5 MATERIAL AND WORKMANSHIP (APR 1984)

I. 82 52.236-6 SUPERINTENDENCE BY THE CONTRACTOR (APR 1984)

I. 83 52.236-7 PERMITS AND RESPONSIBILITIES (NOV 1991)

I. 84 52.236-8 OTHER CONTRACTS (APR 1984)

I. 85 52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND

IMPROVEMENTS (APR 1984)

I. 86 52.236-10 OPERATIONS AND STORAGE AREAS (APR 1984)

I. 87 52.236-11 USE AND POSSESSION PRIOR TO COMPLETION (APR 1984)

I. 88 52.236-12 CLEANING UP (APR 1984)

I. 89 52.236-13 I ACCIDENT PREVENTION (NOV 1991)--ALTERNATE I (NOV 1991)

I. 90 52.236-14 AVAILABILITY AND USE OF UTILITY SERVICES (APR 1984)

I. 91 52.236-15 SCHEDULES FOR CONSTRUCTION CONTRACTS (APR 1984)

I. 92 52.236-17 LAYOUT OF WORK (APR 1984)

I. 93 52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (FEB 1997)

I. 94 52.236-23 RESPONSIBILITY OF THE ARCHITECT-ENGINEER CONTRACTOR (APR 1984)

I. 95 52.236-24 WORK OVERSIGHT IN ARCHITECT-ENGINEER CONTRACTS (APR 1984)

I. 96 52.236-25 REQUIREMENTS FOR REGISTRATION OF DESIGNERS (JUN 2003)

I. 97 52.236-26 PRECONSTRUCTION CONFERENCE (FEB 1995)

I. 98 52.242-13 BANKRUPTCY (JUL 1995)

I. 99 52.243-4 CHANGES (JUN 2007)

PAGE 9 OF 67 WC-1330-16-RP-0015/A0002

I. 100 52.244-4 SUBCONTRACTORS AND OUTSIDE ASSOCIATES AND CONSULTANTS (ARCHITECT-ENGINEER

SERVICES) (AUG 1998)

I. 101 52.244-5 COMPETITION IN SUBCONTRACTING (DEC 1996)

I. 102 52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS (FEB 2016)

I. 103 52.248-3 VALUE ENGINEERING--CONSTRUCTION (OCT 2015)

I. 104 52.249-2 I TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE) (APR 2012)--

ALTERNATE I (SEP 1996)

I. 105 52.249-10 DEFAULT (FIXED-PRICE CONSTRUCTION) (APR 1984)

I. 106 52.253-1 COMPUTER GENERATED FORMS (JAN 1991)

I. 107 52.203-99 PROHIBITION ON CONTRACTING WITH ENTITIES THAT REQUIRE CERTAIN INTERNAL

CONFIDENTIALITY AGREEMENTS (FEB 2015)

I. 108 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014)... 34

I. 109 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS (JULY

2013)

I. 110 52.215-21 IV REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN CERTIFIED

COST OR PRICING DATA--MODIFICATIONS (OCT 2010)--ALTERNATE IV (OCT 2010)

I. 111 52.216-18 ORDERING (OCT 1995)

I. 112 52.216-19 ORDER LIMITATIONS (OCT 1995)

I. 113 52.216-22 INDEFINITE QUANTITY (OCT 1995)

I. 114 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)

I. 115 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)

I. 116 52.222-42 STATEMENT OF EQUIVALENT RATES FOR FEDERAL HIRES (MAY 2014)

I. 117 52.225-9 BUY AMERICAN--CONSTRUCTION MATERIALS (MAY 2014)

I. 118 52.228-11 PLEDGES OF ASSETS (JAN 2012)

I. 119 52.228-14 IRREVOCABLE LETTER OF CREDIT (NOV 2014)

I. 120 52.236-4 PHYSICAL DATA (APR 1984)

I. 121 52.236-22 DESIGN WITHIN FUNDING LIMITATIONS (APR 1984)

I. 122 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

I. 123 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984)

I. 124 NOTICE OF POST-GOVT EMPLOYMENT

SECTION J LIST OF ATTACHMENTS

J. 1 LIST OF ATTACHMENTS

SECTION K REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS

K. 1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (APR 2016)

K. 2 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (JULY 2013)

K. 3 52.209-11 REPRESENTATION BY CORPORATIONS REGARDING DELINQUENT TAX LIABILITY OR A FELONY

CONVICTION UNDER ANY FEDERAL LAW (FEB 2016)

K. 4 52.203-98 PROHIBITION ON CONTRACTING WITH ENTITIES THAT REQUIRE CERTAIN INTERNAL

CONFIDENTIALITY AGREEMENTS - #REPRESENTATION (FEB 2015)

SECTION L INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

L. 1 52.204-7 SYSTEM FOR AWARD MANAGEMENT (JUL 2013)

L. 2 52.204-16 COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING (JUL 2015)

L. 3 52.215-1 INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION (JAN 2004)

L. 4 1352.242-70 POSTAWARD CONFERENCE (APR 2010)

L. 5 52.211-1 AVAILABILITY OF SPECIFICATIONS LISTED IN THE GSA INDEX OF FEDERAL SPECIFICATIONS, STANDARDS AND COMMERCIAL ITEM DESCRIPTIONS, FPMR PART 101-29 (AUG 1998)

L. 6 52.215-20 IV REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN CERTIFIED

COST OR PRICING DATA (OCT 2010)--ALTERNATE IV (OCT 2010)

PAGE 10 OF 67 WC-1330-16-RP-0015/A0002

L. 7 52.216-1 TYPE OF CONTRACT (APR 1984)

L. 8 52.222-5 Construction Wage Rate Requirements Secondary Site of the Work (May 2014)

L. 9 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT

OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

L. 10 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT--CONSTRUCTION MATERIALS (MAY 2014)

L. 11 52.228-1 BID GUARANTEE (SEP 1996)

L. 12 52.233-2 SERVICE OF PROTEST (SEP 2006)

L. 13 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)

L. 14 52.236-28 PREPARATION OF PROPOSALS--CONSTRUCTION (OCT 1997)

L. 15 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

L. 16 52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)

L. 17 1352.215-72 INQUIRIES (APR 2010)

L. 18 1352.233-70 AGENCY PROTESTS (APR 2010)

L. 19 1352.233-71 GAO AND COURT OF FEDERAL CLAIMS PROTESTS (APR 2010)

L. 20 1352.215-70 PROPOSAL PREPARATION (APR 2010)

SECTION M EVALUATION FACTORS FOR AWARD

M. 1 1352.215-74 BEST VALUE EVALUATION (APR 2010)

M. 2 1352.215-75 EVALUATION CRITERIA (APR 2010)

PAGE 11 OF 67 WC-1330-16-RP-0015/A0002

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

B. 1 1352.216-75 MINIMUM AND MAXIMUM CONTRACT AMOUNTS (APR 2010)

During the term of the contract, the Government shall place orders totaling a minimum of $25,000 .

The amount of all orders shall not exceed $9,900,000 .

(End of clause)

B. 2 TASK ORDER DEFINITION

MULTIPLE AWARD TASK ORDER CONTRACT

Fixed price task orders shall normally be issued in accordance with FAR 16.505 “Ordering” against the awarded IDIQ contracts from this solicitation at the Contracting Officer’s discretion.

Ordering Procedures For Task Orders:

1) ORDERING: To further clarify the ordering procedures and specific terms directly associated with the issuance of task orders.

a. Proposals for each task order shall be requested in writing. Letter requests for proposals will be issued by the Contracting Officer. Oral or telecommunication requests will be issued only by the Contracting Officer or an authorized representative(s). (See also "Emergency Issuance of Task Orders" in this contract section). Any type of request for proposal shall not be interpreted as a Notice to Proceed with the work.

b. A Request For Proposal (RFP) will include but not be limited to: (1)a scope work; (2) the place of performance; (3)the period of performance;(4) technical requirements which supplement or complement those contained in the Scope of Work of the base contract; (5) Wage Determinations when applicable;

(6) Performance and Payment Bond information when applicable; (7) Socio-economic goals; and (8) a price schedule to be completed by the Contractor.

c. The contractor shall prepare a firm fixed price proposal to perform the work and submit his/her proposal in writing to the person and within the time specified in each RFP. A verbal proposal, when so requested and authorized, shall be directed only to the Contracting Officer or his/her authorized representative(s).

d. The work described in the RFP for each task order may be discussed between the contractor, Contracting Officer, and the Contracting Officer's representative's, as necessary, to develop a mutual understanding of:

1) The type of work anticipated, milestones, deliverables, magnitude of the work, objectives, expectations, and schedule for work to be accomplished, including accuracy criteria;

2) The end product required by the Government;

3) Existing site conditions, survey control, and other available data applicable to the requirement and

e. Each task order will contain the agreed to scope of work for the project to be performed, specify the period of performance, identify specific deliverable items, and include the final negotiated fixed price for performing the work.

f. Emergency Issuance of Task Orders: For certain restricted types of work requiring expedited and immediate field support, only the Contracting Officer or an authorized representative(s) may telephonically convey the scope of work and negotiate time and cost. Only the Contracting Officer may then issue a verbal order to proceed with the work.

g. The Government may issue a solicitation to one of the selected contractor’s to satisfy the minimum guarantee order of $25,000. This task order will be negotiated on a firm fixed price lump sum basis.

Contractor may have to provide backup details such as subcontractor quotations; labor hours and associated costs; proposed materials and supplies and quotations; equipment costs; extended overhead (field office) costs; performance and payment bond costs; travel costs; and proposed profit/fee.

PAGE 12 OF 67 WC-1330-16-RP-0015/A0002

2) UNAUTHORIZED INSTRUCTIONS FROM GOVERNMENT OR OTHER PERSONNEL: The contractor shall not accept instructions or directions from any person employed by the U.S. Government, other than the Contracting Officer, or the authorized representative of the Contracting Officer. Only the Contracting Officer has the authority to negotiate or make any commitments on behalf of the Government

3) EXTENDING THE TERM OF THE CONTRACT: The Government shall evaluate the Contractor’s past performance on earlier orders under the contract, including quality, timeliness, and cost control prior to exercising all options. The Government may not exercise options on contracts with unsatisfactory or marginal past performance. See FAR Clause 52.217-9

4) DESIGNATION OF CONTRACTING OFFICER'S REPRESENTATIVE(S) (COR): Designation will be made upon award of each task order and a copy of the designation letters will be furnished to the contractor. Limits of authority are described in each designation letter.

5) RELEASE OF INFORMATION: The contractor shall not, unless authorized in writing by the Contracting Officer, release or provide any information or interpretation concerning data prepared under this contract to prospective construction contractors, manufacturers, or suppliers for their use in bidding or submitting quotations.

6) OPTION(S) WITHIN TASK ORDERS AND/OR MODIFICATIONS: The Government may require performance of additional work, identified as an option item in individual task orders or modifications to task orders, at the price stated. The Contracting Officer may exercise the option by written notice to the Contractor prior to execution of final payment on each appropriate task order.

11) GENERAL WAGE DECISION: Applicable Davis-Bacon wage rates will be identified for all Design Build or Design Bid Build Construction Task Orders issued under this contract current as of the time of award of the task order. Applicable Service Contract Act wage rages will be identified for Task Orders issued for maintenance repairs or demolition.

12) AVAILABILITY OF FUNDS (REFERENCE FAR 52.232-18): The Government may request proposals for Task Orders for which funding is not currently available for the award. If funds fail to become available for the award of the project, the event shall not constitute a basis for equitable adjustment under this contract. If after the Government receives a contractor’s proposal and funds are not available the Government may request an extension of the contractor’s proposal acceptance period without further competition for the project or re-solicit the project at its option. If the proposal acceptance period is not extended by the contractor the project may be resolicited.

(End of Supplemental Ordering Procedures)

PAGE 13 OF 67 WC-1330-16-RP-0015/A0002

SECTION C

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

C. 1 SECTION C

PAGE 14 OF 67 WC-1330-16-RP-0015/A0002

SECTION D

PACKAGING AND MARKING

D. 1 SECTION D

PAGE 15 OF 67 WC-1330-16-RP-0015/A0002

SECTION E

INSPECTION AND ACCEPTANCE

E. 1 52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)

(Reference 52.246-12)

E. 2 52.246-13 INSPECTION--DISMANTLING, DEMOLITION, OR REMOVAL OF IMPROVEMENTS (AUG 1996)

(Reference 52.246-13)

E. 3 1352.246-70 PLACE OF ACCEPTANCE (APR 2010)

(a) The Contracting Officer or the duly authorized representative will accept supplies and services to be provided under this contract. (b) The place of acceptance will be:

(TO BE DETERMINED ON A TASK ORDER BASIS)

PAGE 16 OF 67 WC-1330-16-RP-0015/A0002

SECTION F

DELIVERIES OR PERFORMANCE

F. 1 52.242-14 SUSPENSION OF WORK (APR 1984)

(Reference 52.242-14)

F. 2 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to

(a) commence work under this contract within (THE TIME FRAME SPECIFIED IN THE INDIVIDUAL TASK ORDERS) calendar days after the date the Contractor receives the notice to proceed,

(b) prosecute the work diligently, and

(c) complete the entire work ready for use not later than (THE NUMBER OF DAYS SPECIFIED IN THE TASK ORDER) The time stated for completion shall include final cleanup of the premises.

(End of Clause)

F. 3 52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of (TO BE DETERMINED ON A TASK ORDER BASIS) for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor`s right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

F. 4 1352.270-70 PERIOD OF PERFORMANCE (APR 2010)

(a) The base period of performance of this contract is from the date of award through one (1) year thereafter . If an option is exercised, the period of performance shall be extended through the end of that option period.

(b) The option periods that may be exercised are as follows:

Period Start Date End Date Option I One Year after date of award for a period of 12 months

Option II Two Years after date of award for a period of 12 months

Option III Three Years after date of award for a period of 12 months

Option IV Four Years after date of award for a period of 12 months

(c)The notice requirements for unilateral exercise of option periods are set out in FAR 52.217-9.

F. 5 SCHEDULE OF DELIVERABLES

PAGE 17 OF 67 WC-1330-16-RP-0015/A0002

PAGE 18 OF 67 WC-1330-16-RP-0015/A0002

PAGE 19 OF 67 WC-1330-16-RP-0015/A0002

PAGE 20 OF 67 WC-1330-16-RP-0015/A0002

PAGE 21 OF 67 WC-1330-16-RP-0015/A0002

PAGE 22 OF 67 WC-1330-16-RP-0015/A0002

SECTION G

CONTRACT ADMINISTRATION DATA

G. 1 1352.201-70 CONTRACTING OFFICER´s AUTHORITY (APR 2010)

(Reference 1352.201-70)

G. 2 1352.201-72 CONTRACTING OFFICER´s REPRESENTATIVE (C0R) (APR 2010)

(a) (At time of award a COR will be designated for the base contract. COR's will also be designated on a task order basis) is hereby designated as the Contracting Officer´s Representative (COR).

The COR may be changed at any time by the Government without prior notice to the contractor by a unilateral modification to the contract. The COR is located at:

Phone Number:

Email:

(b) The responsibilities and limitations of the COR are as follows:

(1) The COR is responsible for the technical aspects of the contract and serves as technical liaison with the contractor. The COR is also responsible for the final inspection and acceptance of all deliverables and such other responsibilities as may be specified in the contract.

(2) The COR is not authorized to make any commitments or otherwise obligate the Government or authorize any changes which affect the contract price, terms or conditions. Any contractor request for changes shall be referred to the Contracting Officer directly or through the COR. No such changes shall be made without the express written prior authorization of the Contracting Officer.

The Contracting Officer may designate assistant or alternate COR(s) to act for the COR by naming such assistant/alternate(s) in writing and transmitting a copy of such designation to the contractor.

G. 3 1352.216-76 PLACEMENT OF ORDERS (APR 2010)

(a) The contractor shall provide goods and/or services under this contract only as directed in orders issued by authorized individuals. In accordance with FAR 16.505, each order will include:

(1) Date of order;

(2) Contract number and order number;

(3) Item number and description, quantity, and unit price or estimated cost or fee;

(4) Delivery or performance date;

(5) Place of delivery or performance (including consignee);

(6) Packaging, packing, and shipping instructions, if any;

(7) Accounting and appropriation data;

(8) Method of payment and payment office, if not specified in the contract;

(9) Any other pertinent information.

(b) In accordance with FAR 52.216-18, Ordering, the following individuals (or activities) are authorized to place orders against this contract:

Any warranted Contracting Officer within the Eastern Acquisition Division (EAD), Kansas City, Missouri and/or if a portion of the contract capacity is transferred to another NOAA Acquisition Office, the warranted Contracting Officer will be designated in the contract modification which transfers that authority.

(c) If multiple awards have been made, the contact information for the DOC task and delivery order ombudsman is Rafael Roman at rafael.roman@noaa.gov

G. 4 SUBMITTAL OF INVOICES

PAGE 23 OF 67 WC-1330-16-RP-0015/A0002

PAGE 24 OF 67 WC-1330-16-RP-0015/A0002

SECTION H

SPECIAL CONTRACT REQUIREMENTS

H. 1 1352.208-70 RESTRICTIONS ON PRINTING AND DUPLICATING (APR 2010)

(Reference 1352.208-70)

H. 2 1352.209-72 RESTRICTIONS AGAINST DISCLOSURE (APR 2010)

(Reference 1352.209-72)

H. 3 1352.209-73 COMPLIANCE WITH THE LAWS (APR 2010)

(Reference 1352.209-73)

H. 4 1352.209-74 ORGANIZATIONAL CONFLICT OF INTEREST (APR 2010)

(Reference 1352.209-74)

H. 5 1352.216-74 TASK ORDERS (APR 2010)

(Reference 1352.216-74)

H. 6 1352.228-72 DEDUCTIBLES UNDER REQUIRED INSURANCE COVERAGE- FIXED PRICE (APR 2010)

(Reference 1352.228-72)

H. 7 1352.237-71 SECURITY PROCESSING REQUIREMENTS - LOW RISK CONTRACTS (APR 2010)

(Reference 1352.237-71)

H. 8 1352.228-70 INSURANCE COVERAGE (APR 2010)

(a) Workers Compensation and Employer´s Liability. The contractor is required to comply with applicable federal and state workers'' compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer´s liability section of the insurance policy, except when contract operations are so commingled with a contractor´s commercial operations that it would not be practical to require this coverage. Employer´s liability coverage of at least $100,000 shall be required, except in states with exclusive or monopolistic funds that do not permit workers'' compensation to be written by private carriers.

(b) General liability.

(1) The contractor shall have bodily injury liability insurance coverage written on the comprehensive form of policy of at least $500,000 per occurrence.

(2) When special circumstances apply in accordance with FAR 28.307-2(b), Property Damage Liability Insurance shall be required in the amount of $500,00.00(unless specified amount changes based on Task Order requirements) .

(c) Automobile liability. The contractor shall have automobile liability insurance written on the comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract.

Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage.

(d) Aircraft public and passenger liability. When aircraft are used in connection with performing the contract, the contractor shall have aircraft public and passenger liability insurance. Coverage shall be at least $200,000 per person and $500,000 per occurrence for bodily injury, other than passenger liability, and $200,000 per occurrence for property damage. Coverage for passenger liability bodily injury shall be at least $200,000 multiplied by the number of seats or passengers, whichever is greater.

PAGE 25 OF 67 WC-1330-16-RP-0015/A0002

(e) Vessel liability. When contract performance involves use of vessels, the Contractor shall provide, vessel collision liability and protection and indemnity liability insurance as determined by the Government.

H. 9 1352.237-75 KEY PERSONNEL (APR 2010)

(a) The contractor shall assign to this contract the following key personnel:

FOR THE BASE CONTRACT LEVEL: PROGRAM MANAGER: ______________________

FOR THE BASE CONTRACT LEVEL: ASSISTANT PROGRAM MANAGER: ______________________

FOR THE BASE CONTRACT LEVEL: QUALITY CONTROL MANAGER: ______________________

(Contractor provides with proposal)

Project managers and site superintendents applicable to individual task orders will be identified on the specific task orders.

(b) The contractor shall obtain the consent of the Contracting Officer prior to making key personnel substitutions. Replacements for key personnel must possess qualifications equal to or exceeding the qualifications of the personnel being replaced, unless an exception is approved by the Contracting Officer.

(c) Requests for changes in key personnel shall be submitted to the Contracting Officer at least 15 working days prior to making any permanent substitutions. The request should contain a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer. The Contracting Officer will notify the contractor within 10 working days after receipt of all required information of the decision on substitutions. The contract will be modified to reflect any approved changes.

H. 10 TASK ORDER BETTERMENTS

PAGE 26 OF 67 WC-1330-16-RP-0015/A0002

PAGE 27 OF 67 WC-1330-16-RP-0015/A0002

SECTION I

CONTRACT CLAUSES

I. 1 52.202-1 DEFINITIONS (NOV 2013)

(Reference 52.202-1)

I. 2 52.203-3 GRATUITIES (APR 1984)

(Reference 52.203-3)

I. 3 52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)

(Reference 52.203-5)

I. 4 52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (SEP 2006)

(Reference 52.203-6)

I. 5 52.203-7 ANTI-KICKBACK PROCEDURES (MAY 2014)

(Reference 52.203-7)

I. 6 52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)

(Reference 52.203-8)

I. 7 52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)

(Reference 52.203-10)

I. 8 52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS (OCT 2010)

(Reference 52.203-12)

I. 9 52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND REQUIREMENT TO INFORM EMPLOYEES OF

WHISTLEBLOWER RIGHTS (APR 2014)

(Reference 52.203-17)

I. 10 52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER CONTENT PAPER (MAY 2011)

(Reference 52.204-4)

I. 11 52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (JAN 2011)

(Reference 52.204-9)

I. 12 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS (OCT 2015)

(Reference 52.204-10)

I. 13 52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (JULY 2013)

(Reference 52.204-13)

PAGE 28 OF 67 WC-1330-16-RP-0015/A0002

I. 14 52.204-15 SERVICE CONTRACT REPORTING REQUIREMENTS FOR INDEFINITE-DELIVERY CONTRACTS (JAN

(Reference 52.204-15)

I. 15 52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MANAGEMENT (JUL 2015)

(Reference 52.204-18)

I. 16 52.209-6 PROTECTING THE GOVERNMENT`S INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (OCT 2015)

(Reference 52.209-6)

I. 17 52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS (NOV 2015)

(Reference 52.209-10)

I. 18 52.215-2 AUDIT AND RECORDS--NEGOTIATION (OCT 2010)

(Reference 52.215-2)

I. 19 52.215-8 ORDER OF PRECEDENCE--UNIFORM CONTRACT FORMAT (OCT 1997)

(Reference 52.215-8)

I. 20 52.215-10 PRICE REDUCTION FOR DEFECTIVE CERTIFIED COST OR PRICING DATA (AUG 2011)

(Reference 52.215-10)

I. 21 52.215-12 SUBCONTRACTOR CERTIFIED COST OR PRICING DATA (OCT 2010)

(Reference 52.215-12)

I. 22 52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (NOV 2011)

(Reference 52.219-6)

I. 23 52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (OCT 2014)

(Reference 52.219-8)

I. 24 52.219-14 LIMITATIONS ON SUBCONTRACTING (NOV 2011)

(Reference 52.219-14)

I. 25 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REPRESENTATION (OCT 2014)

(Reference 52.219-28)

I. 26 52.222-3 CONVICT LABOR (JUN 2003)

(Reference 52.222-3)

I. 27 52.222-4 CONTRACT WORK HOURS AND SAFETY STANDARDS --OVERTIME COMPENSATION (MAY 2014)

(Reference 52.222-4)

PAGE 29 OF 67 WC-1330-16-RP-0015/A0002

I. 28 52.222-6 CONSTRUCTION WAGE RATE REQUIREMENTS (MAY 2014)

(Reference 52.222-6)

I. 29 52.222-7 WITHHOLDING OF FUNDS (MAY 2014)

(Reference 52.222-7)

I. 30 52.222-8 PAYROLLS AND BASIC RECORDS (MAY 2014)

(Reference 52.222-8)

I. 31 52.222-9 APPRENTICES AND TRAINEES (JUL 2005)

(Reference 52.222-9)

I. 32 52.222-10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS (FEB 1988)

(Reference 52.222-10)

I. 33 52.222-11 SUBCONTRACTS (LABOR STANDARDS) (MAY 2014)

(Reference 52.222-11)

I. 34 52.222-12 CONTRACT TERMINATION--DEBARMENT (MAY 2014)

(Reference 52.222-12)

I. 35 52.222-13 COMPLIANCE WITH CONSTRUCTION WAGE RATE REQUIREMENTS AND RELATED REGULATIONS (MAY

(Reference 52.222-13)

I. 36 52.222-14 DISPUTES CONCERNING LABOR STANDARDS (FEB 1988)

(Reference 52.222-14)

I. 37 52.222-15 CERTIFICATION OF ELIGIBILITY (MAY 2104)

(Reference 52.222-15)

I. 38 52.222-21 PROHIBITION OF SEGREGATED FACILITIES (APR 2015)

(Reference 52.222-21)

I. 39 52.222-26 EQUAL OPPORTUNITY (APR 2015)

(Reference 52.222-26)

I. 40 52.222-27 AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS FOR CONSTRUCTION (APR 2015)

(Reference 52.222-27)

I. 41 52.222-30 CONSTRUCTION WAGE RATE REQUIREMENTS--PRICE ADJUSTMENT (NONE OR SEPARATELY SPECIFIED

METHOD) (MAY 2014)

(Reference 52.222-30)

PAGE 30 OF 67 WC-1330-16-RP-0015/A0002

I. 42 52.222-35 EQUAL OPPORTUNITY FOR VETERANS. [OCT 2015]

(Reference 52.222-35)

I. 43 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUL 2014)

(Reference 52.222-36)

I. 44 52.222-37 EMPLOYMENT REPORTS ON VETERANS (FEB 2016)

(Reference 52.222-37)

I. 45 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT (DEC 2010)

(Reference 52.222-40)

I. 46 52.222-41 SERVICE CONTRACT LABOR STANDARDS (MAY 2014)

(Reference 52.222-41)

I. 47 52.222-43 FAIR LABOR STANDARDS ACT AND SERVICE CONTRACT LABOR STANDARDS--PRICE ADJUSTMENT

(MULTIPLE YEAR AND OPTION CONTRACTS) (MAY 2014)

(Reference 52.222-43)

I. 48 52.222-50 COMBATING TRAFFICKING IN PERSONS (MAR 2015)

(Reference 52.222-50)

I. 49 52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION (OCT 2015)

(Reference 52.222-54)

I. 50 52.222-55 MINIMUM WAGES UNDER EXECUTIVE ORDER 13658 (DEC 2015)

(Reference 52.222-55)

I. 51 52.223-2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER SERVICE AND CONSTRUCTION

CONTRACTS (SEP 2013)

(Reference 52.223-2)

I. 52 52.223-5 POLLUTION PREVENTION AND RIGHT-TO-KNOW INFORMATION (MAY 2011)

(Reference 52.223-5)

I. 53 52.223-6 DRUG-FREE WORKPLACE (MAY 2001)

(Reference 52.223-6)

I. 54 52.223-12 REFRIGERATION EQUIPMENT AND AIR CONDITIONERS (MAY 1995)

(Reference 52.223-12)

I. 55 52.223-15 ENERGY EFFICIENCY IN ENERGY-CONSUMING PRODUCTS (DEC 2007)

(Reference 52.223-15)

PAGE 31 OF 67 WC-1330-16-RP-0015/A0002

I. 56 52.223-17 AFFIRMATIVE PROCUREMENT OF EPA-DESIGNATED ITEMS IN SERVICE AND CONSTRUCTION

CONTRACTS (MAY 2008)

(Reference 52.223-17)

I. 57 52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING (AUG 2011)

(Reference 52.223-18)

I. 58 52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JUN 2008)

(Reference 52.225-13)

I. 59 52.227-1 AUTHORIZATION AND CONSENT (DEC 2007)

(Reference 52.227-1)

I. 60 52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT INFRINGEMENT (DEC 2007)

(Reference 52.227-2)

I. 61 52.227-4 PATENT INDEMNITY--CONSTRUCTION CONTRACTS (DEC 2007)

(Reference 52.227-4)

I. 62 52.227-17 RIGHTS IN DATA--SPECIAL WORKS (DEC 2007)

(Reference 52.227-17)

I. 63 52.228-2 ADDITIONAL BOND SECURITY (OCT 1997)

(Reference 52.228-2)

I. 64 52.228-5 INSURANCE--WORK ON A GOVERNMENT INSTALLATION (JAN 1997)

(Reference 52.228-5)

I. 65 52.228-12 PROSPECTIVE SUBCONTRACTOR REQUESTS FOR BONDS (MAY 2014)

(Reference 52.228-12)

I. 66 52.228-15 PERFORMANCE AND PAYMENT BONDS--CONSTRUCTION (OCT 2010)

(Reference 52.228-15)

I. 67 52.229-3 FEDERAL, STATE, AND LOCAL TAXES (FEB 2013)

(Reference 52.229-3)

I. 68 52.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (MAY 2014)

(Reference 52.232-5)

I. 69 52.232-17 INTEREST (MAY 2014)

(Reference 52.232-17)

I. 70 52.232-18 AVAILABILITY OF FUNDS (APR 1984)

PAGE 32 OF 67 WC-1330-16-RP-0015/A0002

(Reference 52.232-18)

I. 71 52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014)

(Reference 52.232-23)

I. 72 52.232-27 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS (MAY 2014)

(Reference 52.232-27)

I. 73 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER--SYSTEM FOR AWARD MANAGEMENT (JUL 2013)

(Reference 52.232-33)

I. 74 52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS (JUNE 2013)

(Reference 52.232-39)

I. 75 52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (DEC 2013)

(Reference 52.232-40)

I. 76 52.233-1 DISPUTES (MAY 2014)

(Reference 52.233-1)

I. 77 52.233-3 PROTEST AFTER AWARD (AUG 1996)

(Reference 52.233-3)

I. 78 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)

(Reference 52.233-4)

I. 79 52.236-2 DIFFERING SITE CONDITIONS (APR 1984)

(Reference 52.236-2)

I. 80 52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (APR 1984)

(Reference 52.236-3)

I. 81 52.236-5 MATERIAL AND WORKMANSHIP (APR 1984)

(Reference 52.236-5)

I. 82 52.236-6 SUPERINTENDENCE BY THE CONTRACTOR (APR 1984)

(Reference 52.236-6)

I. 83 52.236-7 PERMITS AND RESPONSIBILITIES (NOV 1991)

(Reference 52.236-7)

I. 84 52.236-8 OTHER CONTRACTS (APR 1984)

(Reference 52.236-8)

PAGE 33 OF 67 WC-1330-16-RP-0015/A0002

I. 85 52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND

IMPROVEMENTS (APR 1984)

(Reference 52.236-9)

I. 86 52.236-10 OPERATIONS AND STORAGE AREAS (APR 1984)

(Reference 52.236-10)

I. 87 52.236-11 USE AND POSSESSION PRIOR TO COMPLETION (APR 1984)

(Reference 52.236-11)

I. 88 52.236-12 CLEANING UP (APR 1984)

(Reference 52.236-12)

I. 89 52.236-13 I ACCIDENT PREVENTION (NOV 1991)--ALTERNATE I (NOV 1991)

(Reference 52.236-13 I)

I. 90 52.236-14 AVAILABILITY AND USE OF UTILITY SERVICES (APR 1984)

(Reference 52.236-14)

I. 91 52.236-15 SCHEDULES FOR CONSTRUCTION CONTRACTS (APR 1984)

(Reference 52.236-15)

I. 92 52.236-17 LAYOUT OF WORK (APR 1984)

(Reference 52.236-17)

I. 93 52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (FEB 1997)

(Reference 52.236-21)

I. 94 52.236-23 RESPONSIBILITY OF THE ARCHITECT-ENGINEER CONTRACTOR (APR 1984)

(Reference 52.236-23)

I. 95 52.236-24 WORK OVERSIGHT IN ARCHITECT-ENGINEER CONTRACTS (APR 1984)

(Reference 52.236-24)

I. 96 52.236-25 REQUIREMENTS FOR REGISTRATION OF DESIGNERS (JUN 2003)

(Reference 52.236-25)

I. 97 52.236-26 PRECONSTRUCTION CONFERENCE (FEB 1995)

(Reference 52.236-26)

I. 98 52.242-13 BANKRUPTCY (JUL 1995)

(Reference 52.242-13)

PAGE 34 OF 67 WC-1330-16-RP-0015/A0002

I. 99 52.243-4 CHANGES (JUN 2007)

(Reference 52.243-4)

I. 100 52.244-4 SUBCONTRACTORS AND OUTSIDE ASSOCIATES AND CONSULTANTS (ARCHITECT-ENGINEER SERVICES)

(AUG 1998)

(Reference 52.244-4)

I. 101 52.244-5 COMPETITION IN SUBCONTRACTING (DEC 1996)

(Reference 52.244-5)

I. 102 52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS (FEB 2016)

(Reference 52.244-6)

I. 103 52.248-3 VALUE ENGINEERING--CONSTRUCTION (OCT 2015)

(Reference 52.248-3)

I. 104 52.249-2 I TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE) (APR 2012)--

ALTERNATE I (SEP 1996)

(Reference 52.249-2 I)

I. 105 52.249-10 DEFAULT (FIXED-PRICE CONSTRUCTION) (APR 1984)

(Reference 52.249-10)

I. 106 52.253-1 COMPUTER GENERATED FORMS (JAN 1991)

(Reference 52.253-1)

I. 107 52.203-99 PROHIBITION ON CONTRACTING WITH ENTITIES THAT REQUIRE CERTAIN INTERNAL

CONFIDENTIALITY AGREEMENTS (FEB 2015)

(a) The Contractor shall not require employees or subcontractors seeking to report fraud, waste, or abuse to sign or comply with internal confidentiality agreements or statements prohibiting or otherwise restricting such employees or subcontractors from lawfully reporting such waste, fraud, or abuse to a designated investigative or law enforcement representative of a Federal department or agency authorized to receive such information.

(b) The contractor shall notify employees that the prohibitions and restrictions of any internal confidentiality agreements covered by this clause are no longer in effect.

(c) The prohibition in paragraph (a) of this clause does not contravene requirements applicable to Standard Form 312, Form 4414, or any other form issued by a Federal department or agency governing the nondisclosure of classified information.

(d)(1) In accordance with section 743 of Division E, Title VII, of the Consolidated and Further Continuing Resolution Appropriations Act, 2015 (Pub. L. 113-235), use of funds appropriated (or otherwise made available) under that or any other Act may be prohibited, if the Government determines that the Contractor is not in compliance with the provisions of this clause.

(2) The Government may seek any available remedies in the event the Contractor fails to comply with the provisions of this clause.

I. 108 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014)

PAGE 35 OF 67 WC-1330-16-RP-0015/A0002

The Contractor`s representations and certifications, including those completed electronically via the System for Award Management (SAM), are incorporated by reference into the contract. (End of clause)

I. 109 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS (JULY 2013)

(a) The Contractor shall update the information in the Federal Awardee Performance and Integrity Information System (FAPIIS) on a semi-annual basis, throughout the life of the contract, by posting the required information in the System for Award Management database at https:// www.acquisitions.gov.

(b) As required by section 3010 of the Supplemental Appropriations Act, 2010 (Pub. L. 111-212), all information posted in FAPIIS on or after April 15, 2011, except past performance reviews, will be publicly available. FAPIIS consists of two segments--

(1) The non-public segment, into which Government officials and the Contractor post information, which can only be viewed by--

(i) Government personnel and authorized users performing business on behalf of the Government;

or

(ii) The Contractor, when viewing data on itself; and

(2) The publicly-available segment, to which all data in the non-public segment of FAPIIS is automatically transferred after a waiting period of 14 calendar days, except for--

(i) Past performance reviews required by subpart 42.15;

(ii) Information that was entered prior to April 15, 2011; or

(iii) Information that is…