WayneAWO31.pdf

PDF 211 KB Posted

Attached to
SE Piedmont Sanitary Extension
Solicitation number
IFB605CO25000817
Issued by
Texas County, Missouri

About this file

This is an Annual Wage Order issued by the Missouri Department of Labor and Industrial Relations, Division of Labor Standards, establishing prevailing wage rates for construction work in Wayne County under Section 115. The wage order applies to public works projects and specifies distinct rate schedules for building construction and heavy construction classifications. For building construction, prevailing hourly rates range from $21.49 for occupational titles including Asbestos Workers, Bricklayers, Cement Masons, Electricians, Glaziers, Ironworkers, Operating Engineers, Sheet Metal Workers, and Truck Drivers, to higher rates for Carpenter ($52.85), Laborer ($43.44), Painter ($42.09), and Plumber ($68.37). Heavy construction rates are generally lower, with most classifications set at $21.49 per hour for Carpenter, Electrician (Outside Lineman), Laborer, Operating Engineer, and Truck Driver positions. The wage order was filed with the Missouri Secretary of State on March 8, 2024, with an objection deadline of April 8, 2024. Any objections must be filed in triplicate with the Labor and Industrial Relations Commission.

The prevailing hourly rates include applicable fringe benefit amounts as defined in Missouri Revised Statutes Section 290.210. Overtime compensation is mandated at one and one-half times the prevailing hourly rate for work exceeding ten hours in a single day or forty hours in a calendar week. Work performed on Sundays or designated holidays—including January 1, Memorial Day, July 4, Labor Day, Veterans Day, Thanksgiving, and Christmas—requires payment at twice the prevailing hourly rate. Workers are entitled to a thirty-minute unpaid lunch period daily. The wage order applies to all workers employed on public works construction projects, exclusive of maintenance work, and establishes the minimum wage requirements for the SE Piedmont Sanitary Extension project located in Texas County, which involves approximately 653 linear feet of sewer line installation with six manholes and associated infrastructure work.

View the file

Other files

File Type Posted
IFB605CO25000817_Jun_23_25_solicitation_doc.pdf PDF
IFB605CO25000817_Nov_11_24_solicitation_doc.pdf PDF
IFB605CO25000817_May_15_26_solicitation_doc.pdf PDF
IFB605CO25000817_Aug_28_26_solicitation_doc.pdf PDF
IFB605CO25000817_Dec_30_24_solicitation_doc.pdf PDF
VendorChangeDetailsReport_IFB605CO25000817_v5_Dec_11_24.pdf PDF
IFB605CO25000817_Aug_20_26_solicitation_doc.pdf PDF
IFB605CO25000817_Jan_20_25_solicitation_doc.pdf PDF
section 01300 and 01700.pdf PDF
IFB605CO25000817_Dec_2_24_solicitation_doc.pdf PDF
Exhibit M - ANTI-DISCRIMINATION AGAINST ISRAEL.pdf PDF
IFB605CO25000817_Aug_25_26_solicitation_doc.pdf PDF
IFB605CO25000817_May_8_26_solicitation_doc.pdf PDF
IFB605CO25000817_May_5_25_solicitation_doc.pdf PDF
Bid Form.pdf PDF
IFB605CO25000817_Feb_10_25_solicitation_doc.pdf PDF
IFB605CO25000817_Sep_23_26_solicitation_doc.pdf PDF
IFB605CO25000817_Apr_21_25_solicitation_doc.pdf PDF
IFB605CO25000817_Feb_24_25_solicitation_doc.pdf PDF
IFB605CO25000817_Apr_24_26_solicitation_doc.pdf PDF
IFB605CO25000817_Nov_4_24_solicitation_doc.pdf PDF
IFB605CO25000817_Mar_10_25_solicitation_doc.pdf PDF
IFB605CO25000817_Sep_15_26_solicitation_doc.pdf PDF
IFB605CO25000817_Mar_31_25_solicitation_doc.pdf PDF
IFB605CO25000817_Mar_17_25_solicitation_doc.pdf PDF
IFB605CO25000817_Feb_17_25_solicitation_doc.pdf PDF
IFB605CO25000817_Apr_17_26_solicitation_doc.pdf PDF
IFB605CO25000817_Nov_2_24_solicitation_doc.pdf PDF
Affidavits - Exhibit A and B.pdf PDF
IFB605CO25000817_Aug_14_26_solicitation_doc.pdf PDF
IFB605CO25000817_Jan_13_25_solicitation_doc.pdf PDF
IFB605CO25000817_Sep_22_26_solicitation_doc.pdf PDF
IFB605CO25000817_Jun_9_25_solicitation_doc.pdf PDF
IFB605CO25000817_Nov_25_24_solicitation_doc.pdf PDF
Piedmont MoDOT Standard Specifications.pdf PDF
IFB605CO25000817_Jan_6_25_solicitation_doc.pdf PDF
IFB605CO25000817_May_12_25_solicitation_doc.pdf PDF
IFB605CO25000817_Nov_18_24_solicitation_doc.pdf PDF
MoDOT_Piedmont_GravitySewer.pdf PDF
IFB605CO25000817_Feb_3_25_solicitation_doc.pdf PDF
IFB605CO25000817_Mar_3_25_solicitation_doc.pdf PDF
IFB605CO25000817_Aug_18_26_solicitation_doc.pdf PDF
IFB605CO25000817_Jan_27_25_solicitation_doc.pdf PDF
IFB605CO25000817_Apr_7_25_solicitation_doc.pdf PDF
IFB605CO25000817_Dec_9_24_solicitation_doc.pdf PDF
IFB605CO25000817_Dec_23_24_solicitation_doc.pdf PDF
IFB605CO25000817_Dec_16_24_solicitation_doc.pdf PDF
IFB605CO25000817_Sep_4_26_solicitation_doc.pdf PDF
IFB605CO25000817_May_19_25_solicitation_doc.pdf PDF
IFB605CO25000817_Aug_7_26_solicitation_doc.pdf PDF
Show 40 more

Latest 50 of 58 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Division of Labor Standards

WAGE AND HOUR SECTION

MICHAEL L. PARSON, Governor

Annual Wage Order No. 31 Section 115

WAYNE COUNTY

In accordance with Section 290.262 RSMo 2000, within thirty (30) days after a certified copy of this Annual Wage Order has been filed with the Secretary of State as indicated below, any person who may be affected by this Annual Wage Order may object by filing an objection in triplicate with the Labor and Industrial Relations Commission, P.O. Box 599, Jefferson City, MO 65102- 0599. Such objections must set forth in writing the specific grounds of objection. Each objection shall certify that a copy has been furnished to the Division of Labor Standards, P.O. Box 449, Jefferson City, MO 65102-0449 pursuant to 8 CSR 20-5.010(1). A certified copy of the Annual Wage Order has been filed with the Secretary of State of Missouri.

Original Signed by Todd Smith, Director Division of Labor Standards

Filed With Secretary of State: March 8, 2024

Last Date Objections May Be Filed: April 8, 2024

Prepared by Missouri Department of Labor and Industrial Relations

Missouri

Building Construction Rates for WAYNE County

Section 115

**Prevailing OCCUPATIONAL TITLE Hourly

Rate Asbestos Worker $21.49* Boilermaker $21.49* Bricklayer-Stone Mason $21.49* Carpenter $52.85 Lather Linoleum Layer Millwright Pile Driver Cement Mason $21.49* Plasterer Communication Technician $21.49* Electrician (Inside Wireman) $21.49* Electrician Outside Lineman $21.49* Lineman Operator Lineman - Tree Trimmer Groundman Groundman - Tree Trimmer Elevator Constructor $21.49* Glazier $21.49* Ironworker $21.49* Laborer $43.44 General Laborer First Semi-Skilled Second Semi-Skilled Mason $21.49* Marble Mason Marble Finisher Terrazzo Worker Terrazzo Finisher Tile Setter Tile Finisher Operating Engineer $21.49* Group I Group II Group III Group III-A Group IV Group V Painter $42.09 Plumber $68.37 Pipe Fitter Roofer $21.49* Sheet Metal Worker $21.49* Sprinkler Fitter $21.49* Truck Driver $21.49* Truck Control Service Driver Group I Group II Group III Group IV

*The Division of Labor Standards received fewer than 1,000 reportable hours for this occupational title. The public works contracting minimum wage is established for this occupational title using data provided by Missouri Economic Research and Information Center.

**The Prevailing Hourly Rate includes any applicable fringe benefit amounts for each occupational title as defined in RSMo Section 290.210.

ANNUAL WAGE ORDER NO. 31 3/24

Heavy Construction Rates for WAYNE County

Section 115

**Prevailing OCCUPATIONAL TITLE Hourly

Rate Carpenter $21.49* Millwright Pile Driver Electrician (Outside Lineman) $21.49* Lineman Operator Lineman - Tree Trimmer Groundman Groundman - Tree Trimmer Laborer $21.49* General Laborer Skilled Laborer Operating Engineer $21.49* Group I Group II Group III Group IV Truck Driver $21.49* Truck Control Service Driver Group I Group II Group III Group IV

Use Heavy Construction Rates on Highway and Heavy construction in accordance with the classifications of construction work established in 8 CSR 30-3.040(3).

Use Building Construction Rates on Building construction in accordance with the classifications of construction work established in 8 CSR 30-3.040(2).

If a worker is performing work on a heavy construction project within an occupational title that is not listed on the Heavy Construction Rate Sheet, use the rate for that occupational title as shown on the Building Construction Rate Sheet.

*The Division of Labor Standards received fewer than 1,000 reportable hours for this occupational title.

Public works contracting minimum wage is established for this occupational title using data provided by Missouri Economic Research and Information Center.

**The Prevailing Hourly Rate includes any applicable fringe benefit amounts for each occupational title.

ANNUAL WAGE ORDER NO. 31 3/24

OVERTIME

and

HOLIDAYS

ANNUAL WAGE ORDER NO. 31 3/24

OVERTIME

For all work performed on a Sunday or a holiday, not less than twice (2x) the prevailing hourly rate of wages for work of a similar character in the locality in which the work is performed or the public works contracting minimum wage, whichever is applicable, shall be paid to all workers employed by or on behalf of any public body engaged in the construction of public works, exclusive of maintenance work.

For all overtime work performed, not less than one and one-half (1½) the prevailing hourly rate of wages for work of a similar character in the locality in which the work is performed or the public works contracting minimum wage, whichever is applicable, shall be paid to all workers employed by or on behalf of any public body engaged in the construction of public works, exclusive of maintenance work or contractual obligation.

For purposes of this subdivision, "overtime work" shall include work that exceeds ten hours in one day and work in excess of forty hours in one calendar week; and

A thirty-minute lunch period on each calendar day shall be allowed for each worker on a public works project, provided that such time shall not be considered as time worked.

HOLIDAYS

January first;

The last Monday in May;

July fourth;

The first Monday in September;

November eleventh;

The fourth Thursday in November; and December twenty-fifth;

If any holiday falls on a Sunday, the following Monday shall be considered a holiday.

Cover
BC Rates
HC Rates
Overtime and Holidays

File details come from the government source that posted it. Updated .