About this file

This is a civil engineering design document for a gravity sewer system and sewer connection project at the Missouri Department of Transportation (MoDOT) Piedmont Maintenance Building in Piedmont, Missouri, prepared in coordination with the City of Piedmont. The project consists of the construction of approximately 653 linear feet of 8-inch SDR-35 PVC gravity sewer line with six manholes, 60 linear feet of 12-inch steel casing for sewer crossing under the Union Pacific Railroad, and approximately 235 linear feet of 6-inch sewer lateral with cleanouts to connect the existing MoDOT Maintenance Facility to the City of Piedmont sanitary sewer system while abandoning the existing septic tank system. A mandatory pre-bid meeting is scheduled for November 13, 2024, at 11:00 AM with mandatory site visit requirements for bidder eligibility. Bids are due by 2:00 PM CST on December 20, 2024, with the contract term extending to December 31, 2025, and a Notice to Proceed anticipated by January 1, 2025. The project involves complex coordination with Union Pacific Railroad, including requirements for 30-minute separation from railroad centerline, H-20 loading-rated manholes within the railroad right-of-way, and steel casing installations with minimum 5-foot cover from the rail base.

The base bid must include excavation of 200 cubic yards of rock, with additional rock excavation to be priced separately per cubic yard, and must incorporate $3,300 for railroad permitting in the lump sum bid. Contractors are required to provide a 5 percent bid bond or security and, upon award, a 100 percent performance and payment bond. The project requires prevailing wage rates according to Wayne County Annual Wage Order #31, OSHA 10-hour construction safety training for all on-site employees, and comprehensive insurance coverage including $4,000,000 in general and automobile liability. MBE and WBE participation is encouraged with goals of 10 percent MBE and 5 percent WBE involvement. Bids must be submitted electronically through MissouriBUYS or by mail, UPS, or FedEx with five business days' advance notice to the buyer of record at Michael.Yoder@modot.mo.gov for hard copy submissions. The contract evaluation will focus on the lowest responsive and responsible bidder meeting all specified requirements, with no specific budget range explicitly stated in the procurement documents.

View the file

Other files

File Type Posted
IFB605CO25000817_Jun_23_25_solicitation_doc.pdf PDF
IFB605CO25000817_Nov_11_24_solicitation_doc.pdf PDF
IFB605CO25000817_May_15_26_solicitation_doc.pdf PDF
IFB605CO25000817_Aug_28_26_solicitation_doc.pdf PDF
IFB605CO25000817_Dec_30_24_solicitation_doc.pdf PDF
VendorChangeDetailsReport_IFB605CO25000817_v5_Dec_11_24.pdf PDF
IFB605CO25000817_Aug_20_26_solicitation_doc.pdf PDF
IFB605CO25000817_Jan_20_25_solicitation_doc.pdf PDF
section 01300 and 01700.pdf PDF
IFB605CO25000817_Dec_2_24_solicitation_doc.pdf PDF
Exhibit M - ANTI-DISCRIMINATION AGAINST ISRAEL.pdf PDF
IFB605CO25000817_Aug_25_26_solicitation_doc.pdf PDF
IFB605CO25000817_May_8_26_solicitation_doc.pdf PDF
IFB605CO25000817_May_5_25_solicitation_doc.pdf PDF
Bid Form.pdf PDF
IFB605CO25000817_Feb_10_25_solicitation_doc.pdf PDF
IFB605CO25000817_Sep_23_26_solicitation_doc.pdf PDF
IFB605CO25000817_Apr_21_25_solicitation_doc.pdf PDF
IFB605CO25000817_Feb_24_25_solicitation_doc.pdf PDF
IFB605CO25000817_Apr_24_26_solicitation_doc.pdf PDF
IFB605CO25000817_Nov_4_24_solicitation_doc.pdf PDF
IFB605CO25000817_Mar_10_25_solicitation_doc.pdf PDF
IFB605CO25000817_Sep_15_26_solicitation_doc.pdf PDF
IFB605CO25000817_Mar_31_25_solicitation_doc.pdf PDF
IFB605CO25000817_Mar_17_25_solicitation_doc.pdf PDF
IFB605CO25000817_Feb_17_25_solicitation_doc.pdf PDF
IFB605CO25000817_Apr_17_26_solicitation_doc.pdf PDF
IFB605CO25000817_Nov_2_24_solicitation_doc.pdf PDF
Affidavits - Exhibit A and B.pdf PDF
IFB605CO25000817_Aug_14_26_solicitation_doc.pdf PDF
IFB605CO25000817_Jan_13_25_solicitation_doc.pdf PDF
IFB605CO25000817_Sep_22_26_solicitation_doc.pdf PDF
IFB605CO25000817_Jun_9_25_solicitation_doc.pdf PDF
IFB605CO25000817_Nov_25_24_solicitation_doc.pdf PDF
Piedmont MoDOT Standard Specifications.pdf PDF
IFB605CO25000817_Jan_6_25_solicitation_doc.pdf PDF
IFB605CO25000817_May_12_25_solicitation_doc.pdf PDF
IFB605CO25000817_Nov_18_24_solicitation_doc.pdf PDF
IFB605CO25000817_Feb_3_25_solicitation_doc.pdf PDF
IFB605CO25000817_Mar_3_25_solicitation_doc.pdf PDF
IFB605CO25000817_Aug_18_26_solicitation_doc.pdf PDF
IFB605CO25000817_Jan_27_25_solicitation_doc.pdf PDF
IFB605CO25000817_Apr_7_25_solicitation_doc.pdf PDF
IFB605CO25000817_Dec_9_24_solicitation_doc.pdf PDF
WayneAWO31.pdf PDF
IFB605CO25000817_Dec_23_24_solicitation_doc.pdf PDF
IFB605CO25000817_Dec_16_24_solicitation_doc.pdf PDF
IFB605CO25000817_Sep_4_26_solicitation_doc.pdf PDF
IFB605CO25000817_May_19_25_solicitation_doc.pdf PDF
IFB605CO25000817_Aug_7_26_solicitation_doc.pdf PDF
Show 40 more

Latest 50 of 58 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SITE

LOCATION

PIEDMONT

HH

B

SITE MAP DRAWING LIST

UTILITY CONTACTS

LEGEND & ABBREVIATIONS

DRAWING NO.

PROJECT NO.

TI

TL

E

SH

EE

T

C

IV

IL

D

R

AW

IN

G

S

SE

W

ER

S

YS

TE

M

PI

ED

M

O N

T M

AI

N

TE

N

AN

C

E

BU

IL

D

IN

G

S

April 30, 2024

GENERAL CONDITIONS

GRAVITY SEWER AND SEWER SYSTEM CONNECTION

AT

PIEDMONT MAINTENANCE BUILDING

FOR

MISSOURI DEPARTMENT OF TRANSPORTATION

SOUTHEAST DISTRICT

GENERAL: REV

CIVIL:

SANITARY SEWER LATERAL PLAN

SANITARY SEWER PLAN & PROFILE

TITLE SHEET

WATER & SEWER

OWNER

CITY OF PIEDMONT

MISSOURI DEPARTMENT OF TRANSPORTATION

MAINTENANCE BUILDING

MODOT

XXX-XXX-XXXX PHONE

XXX-XXX-XXXX CELL

EXISTING POWER POLE

EXISTING LIGHT POLE

EXISTING WATER METER

EXISTING WATER VALVE

EXISTING SANITARY MANHOLE

EXISTING FIRE HYDRANT

EXISTING SIGN

EXISTING TELEPHONE PEDESTAL

EXISTING CURB INLET

EXISTING DROP INLET

EXISTING TREE

EXISTING GAS METER

EXISTING BENCHMARK

EXISTING GUY WIRE ANCHOR

RIP RAP

N

VICINITY MAP

(NOT TO SCALE)

PRELIMINARY

NOT FOR

CONSTRUCTION

OR PERMIT

4 GENERAL NOTES & DETAILS

5 DETAILS

GAS

GAS

GAS

GAS

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

MH A-6

STA: 0+00.0

MH A-5

STA: 0+25.0

SAN

SAN

SAN

SAN

SAN

SAN

SA

N

SAN

SAN

SAN

SAN

SAN

SAN

0+00

1+00

2+00

2+35

W

W W

W W

W W

W

W

W

W

W

W

W

W

W

W

W

SAN

SAN

SAN

SAN

SAN

160°

R/W

R/W

R/W

R/W

R/W

R/W

DRAWING NO.

CDG PROJECT NO.

SI

TE

P

LA

N C

IV

IL

D R

AW

IN

G S

SA

N

IT

AR

Y

SE

W

ER

L

AT

ER

AL

P

LA

N

PI

ED

M

O N

T M

AI

N

TE

N

AN

C

E

BU

IL

D

IN

G

S

September 1, 2021

ENGINEER - E027607

ANDREW NOVINGER

N

LIFT STATION PLAN VIEW

SCALE: 1 INCH = 50 FT

EXISTING OFFICE

BUILDING

EXISTING

MAINTENANCE

BUILDING

STA. 0+30

PROVIDE WYE

6X6X4

STA. 0+92.9

PROVIDE 45°

BEND

STA. 0+85.9 PROVIDE

45° BEND W/ SS

CLEANOUT PER

DETAIL 6/SHEET 4

EXISTING STORAGE

BUILDING

EXISTING HYDRANT

EXISTING EDGE OF

GRAVEL

CORE DRILL AND CONNECT TO

MANHOLE A1 W/ A-LOK GASKET OR

APPROVED EQUAL. REFER TO

DETAIL 7/4 & SHEET 3.

RIM.= 568.9'

INV. OUT= 561.3

INV. IN= 561.1

APPROX. LOCATION OF

EXISTING SEPTIC TANK

POTHOLE PRIOR TO

CONSTRUCTION AND

CONNECT TO EXISTING

LATERALS. FIELD VERIFY

LOCATION.

BEFORE STARTING ANY BUILDING PAD GRADING AND PLUMBING

WORK THE CONTRACTOR SHALL FIELD VERIFY LOCATION,

MATERIAL, CONDITION, ACCESSIBILITY (INCLUDING STATE HIGHWAY

OR OTHER RIGHTS-OF-WAY) AND WORKABLE FLOW LINE ELEVATION

OF THE EXISTING SANITARY SEWER SERVICE LINE OR MAIN.

IF A WORKABLE FLOW LINE HAS NOT BEEN ESTABLISHED AT THE

TIME OF FINAL SANITARY SEWER SERVICE CONNECTION. THEN THE

CONTRACTOR SHALL BE RESPONSIBLE FOR ALL EXPENSES

ASSOCIATED WITH THE INSTALLATION OF A NEW GRINDER PUMP

SYSTEM TO MEET OWNER AND LOCAL REQUIREMENTS.

CONTRACTOR CAUTION!!

VERIFY SEWER LINE ELEVATION

INFORMATION ON THIS DRAWING CONCERNING

TYPE AND LOCATION OF UNDERGROUND AND

OTHER UTILITIES IS NOT GUARANTEED TO BE

ACCURATE OR ALL INCLUSIVE. THE CONTRACTOR IS

RESPONSIBLE FOR MAKING HIS OWN

DETERMINATION AS TO THE TYPE AND LOCATION OF

UNDERGROUND AND OTHER UTILITIES AS MAY BE

NECESSARY TO AVOID DAMAGE THERETO.

1. IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION

PRACTICES, THE CONTRACTOR WILL BE SOLELY AND COMPLETELY

RESPONSIBLE FOR CONDITIONS OF THE JOB SITE, INCLUDING SAFETY OF

ALL PERSONS AND PROPERTY DURING PERFORMANCE OF THE WORK.

THIS REQUIREMENT WILL APPLY CONTINUOUSLY AND NOT BE LIMITED TO

NORMAL WORKING HOURS.

2. THE DUTY OF THE ENGINEER OR OWNER TO CONDUCT CONSTRUCTION

REVIEW OF THE CONTRACTOR'S PERFORMANCE IS NOT INTENDED TO

INCLUDE REVIEW OF THE ADEQUACY OF THE CONTRACTOR'S SAFETY

MEASURES IN, ON, OR NEAR THE CONSTRUCTION SITE.

SAFETY NOTICE TO CONTRATORS:

CONTRACTOR TO PERFORM DETAILED SITE INSPECTION TO LOCATE

ALL EXISTING UTILITES AND VERIFY ANY POSSIBLE CONFLICTS WITH

PROPOSED IMPROVEMENTS PRIOR TO BEGINNING ANY

CONSTRUCTION. CONTACT ENGINEER WITH ANY CONFLICTS.

SPECIAL NOTE:

CAUTION:

PRELIMINARY

NOT FOR

CONSTRUCTION

OR PERMIT

EXISTING HYDRANT

REMOVE EXISTING 6''

CLEANOUT. PLUG AND FILL

EXISTING LINE INTO TANK.

REFER TO SHEET 3

FOR BORE & MAIN

DETAILS.

PROPOSED BORE PIT

PROPOSED BORE PIT

STA. 1+58.3 PROVIDE

TRAFFIC RATED TWO

WAY SS CLEANOUT

PER DETAIL 6/SHEET 4

PROVIDE 6'' Ø SCH. 40 PVC SANITARY SEWER

LATERAL W/ TRACER WIRE AS GENERALLY SHOWN

TO CONNECT EXISTING 6'' Ø CLEANOUT TO MH 1.

PROVIDE CLEANOUTS AT CHANGES IN DIRECTION

AND AT 100' MAX. SPACING. FIELD VERIFY ROUTE

AND CONTACT ENGINEER IF DISCREPANCY OCCURS

. APPROX. 235 HF MAINTAIN 1% SLOPE MIN.

CONTRACTOR TO INVENTORY EXISTING SANITARY

SEWER DISCHARGE POINTS AND VERIFY THAT ALL

SEWER CONNECTIONS ARE REROUTED TO MH1.

REFER TO LATERAL NOTE FOR DETAILS. VERIFY W/

MODOT STAFF ONSITE AND CONTACT ENGINEER IF

DISCREPANCY OCCURS.

SPECIAL NOTE:

RAILROAD RIGHT OF

WAY

REMOVE EXIST. SEPTIC TANK. DISPOSE OF

CONTENTS BY LICENSED HAULER. PLUG &

ABANDON ALL EXIST. PIPES ABANDONED IN

PLACE. COLLAPSE FILL W/ COMPACTED SOIL

AND DISPOSE OF SEPTIC TANK PER COUNTY

HEALTH & APPLICABLE REQUIREMENTS.

EXIST. CONC. STRUCTURE TO

BE REMOVED & DISPOSED OF

BY CONTRACTOR DISCONNECT

ALL EXIST. PIPES, CAP &

ABANDONED. FILL W/

COMPACTED SOIL. SLOPE TO

DRAIN. FIELD VERIFY

REQUIREMENTS.

EXIST WATER LINE. FIELD VERIFY

LOCATION & CLEARANCE.

COORDINATE ADJUSTMENT W/

OWNER.

EXIST. CITY WATER.

FIELD VERIFY

LOCATION.

EXIST. POWER POLE & METER

(FIELD VERIFY LOCATION)

CAUTION!!!

EXIST. BURIED ELECTRIC. FIELD

VERIFY LOCATION

EXISTING

WATER VALVE

CAUTION!!! UTILITY

CROSSING. PROVIDE

18" CLEANOUT @

CROSSING. FIELD

VERIFY LOCATION.

EXIST. WATER

METER (FIELD

VERIFY LOCATION)

CAUTION!!!

UTILITY CROSSING.

FIELD VERIFY

LOCATION.

EXIST. OIL

SEPARATOR

(ABANDONDED/NOT

IN USE)

PROPOSED NEW

BUILDING (APPROX

130'X60') TO REPLACE

EXISTING. EXACT

LOCATION TBD.

PROVIDE APPROX. 1200 GAL. OIL

SEPARATOR PER DETAIL & PER

SUPPLIER'S RECOMMENDATIONS.

CONNECT TO NEW 6" SEWER USING

6" SCH. 40 PVC LATERAL 45° BEND &

WYE. FIELD VERIFY LOCATION & TOP

ELEVATION.

EXIST. SEWER. FIELD VERIFY LOCATION.

REROUTE EXIST. SEWER USING

4" SCH. 40 PVC. FIELD VERIFY

LOCATION & REQUIREMENTS.

USE COMPATIBLE FITTINGS AS

REQUIRED. EXPLORATORY

EXCAVATION REQUIRED.PROVIDE

CLEANOUTS BEFORE ALL BENDS.

CAUTION!!! UTILITY

CROSSING. PROVIDE

18" CLEANOUT @

CROSSING. FIELD

VERIFY LOCATION.

PROVIDE 10 LF 6'' SCH. 40 PVC STUB

W/ REMOVABLE CAP.FIELD VERIFY

LOCATION W. OWNER

PROPOSED 4'' SCH. 40

PVC SEWER LATERAL

(BY OTHERS)

SAN

SAN

SAN

SAN

SAN

SAN

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

6+53

0+00

1+00

2+00

3+00

4+

5+

6+00

MH A-6

STA: 0+00.0

MH A-5

STA: 0+25.0

MH A-4

STA: 0+95.9

MH A-3

STA: 3+71.9

MH A-2

STA: 5+53.3

MH A-1

STA: 6+53.3

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SA

N

SA

N

91°

SAN

SAN

SAN

W W

W

W

W

W

W

W

160°

168°

90°

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

PIEDMONT GRAVITY SEWER

FGEG

-0+25

FG

.8

EG

.8

0+00

FG

.9

EG

.9

0+50

FG

.3

EG

.3

1+00

FG

.5

EG

.5

1+50

FG

.6

EG

.6

2+00

FG

.5

EG

.5

2+50

FG

.8

EG

.8

3+00

FG

.3

EG

.3

3+50

FG

.2

EG

.2

4+00

FG

.4

EG

.4

4+50

FG

.4

EG

.4

5+00

FG

.5

EG

.5

5+50

FG

.7

EG

.7

6+00

FG

.3

EG

.3

6+50

FGEG

7+00

FGEG

7+25

25.00 L.F. X 8" SDR 35 PVC @ 6.67%

276.04 L.F. X 8" SDR 35 PVC @ 2.90%

181.34 L.F. X 8" SDR 35 PVC @ 1.43%

100.00 L.F. X 8" SDR 35 PVC @ 1.88%

70.91 L.F. X 8" SDR 35 PVC @ 1.65%

MH A-6

STA 0+00.0

RIM = 568.9'

FL OUT (NE) 8" = 561.3

MH A-5

STA 0+25.0

RIM = 564.0'

FL IN (SW) 8" = 559.7

FL OUT (NE) 8" = 554.0

MH A-4

STA 0+95.9

RIM = 560.8'

FL IN (SW) 8" = 552.9

FL OUT (NE) 8" = 551.3

MH A-3

STA 3+71.9

RIM = 549.3'

FL IN (SW) 8" = 543.3

FL OUT (E) 8" = 543.1

MH A-1

(DOGHOUSE MANHOLE)

STA 6+53.3

RIM = 547.9'

FL IN (S) 8" = 538.5

MH A-2

STA 5+53.3

RIM = 549.5'

FL IN (W) 8" = 540.5

FL OUT (N) 8" = 540.3

DRAWING NO.

CDG PROJECT NO.

SI

TE

P

LA

N C

IV

IL

D R

AW

IN

G S

SA

N

IT

AR

Y

SE

W

ER

P

LA

N A

N D

P R

O

FI

LE

PI

ED

M

O N

T M

AI

N

TE

N

AN

C

E

BU

IL

D

IN

G

S

April 30, 2024N

SANITARY SEWER PLAN VIEW

SCALE: 1 INCH = 40 FT

SANITARY SEWER PROFILE VIEW

HORIZONTAL SCALE: 1 INCH = 40 FT

VERTICAL SCALE: 1 INCH = 8 FT

EXISTING GRADE

APPROX.

MAINTAIN 3' MIN.

COVER

CONNECT TO EXISTING

SANITARY SEWER INV.

538.23'. FIELD VERIFY

LOCATION & ELEVATION.

REFER TO DETAIL 3 SHEET 3

PROPOSED 15'

SANITARY SEWER

EASEMENT VERIFY

LOCATION

EXISTING

MANHOLE

RIM= 549.35

INV= 539.33

EXISTING

MANHOLE

RIM= 542.60

INV= 532.51

PROPOSED BORE PIT FIELD

ADJUST AND MAINTAIN 30'

MIN. SEPARATION FROM

CENTER LINE OF TRACK

PROPOSED BORE PIT FIELD

ADJUST AND MAINTAIN 30'

MIN. SEPARATION FROM

CENTER LINE OF TRACK

EXISTING GRAVEL

DRIVE. REPAIR

WHERE DISTURBED

MAGNOLIA DRIVE

(ASPHALT)

CAUTION!! WATERLINE

CROSSING FIELD

VERIFY ELEVATION

PRIOR TO

CONSTRUCTION AND

MAINTAIN 18''

VERTICAL SEPARATION

BETWEEN PIPES

CAUTION!! WATERLINE

CROSSING FIELD VERIFY

LOCATION AND ELEVATION.

PROVIDE 60 HF OF 12'' STEEL CASING

W/ SPACERS MAINTAIN 5' MIN. COVER

FROM BASE OF RAIL. EXTEND 30' MIN.

FROM CENTERLINE OF TRACK. REFER

TO DETAIL

NOTE: ALL MANHOLES WITHIN

UNION PACIFIC RIGHT OF WAY TO

BE CAPABLE OF WITHSTANDING

H-20 LOADING. REFER TO MODOT

STANDARD DETAIL 614.30E

PROVIDE 60 HF OF 12'' STEEL

CASING MAINTAIN 5' MIN.

COVER FROM BASE OF RAIL.

EXTEND 30' MIN. FROM

CENTERLINE OF TRACK.

VERIFY REQUIREMENTS W/

ENGINEER & UNION PACIFIC

PRIOR TO CONSTRUCTION.

EXISTING TREE LINE

PROPERTY LINE

EXISTING FENCE

PRELIMINARY

NOT FOR

CONSTRUCTION

OR PERMIT

EXISTING BUILDING

CONTRACTOR TO PERFORM DETAILED SITE INSPECTION TO LOCATE

ALL EXISTING UTILITES AND VERIFY ANY POSSIBLE CONFLICTS WITH

PROPOSED IMPROVEMENTS PRIOR TO BEGINNING ANY

CONSTRUCTION. CONTACT ENGINEER WITH ANY CONFLICTS.

SPECIAL NOTE:

INFORMATION ON THIS DRAWING CONCERNING

TYPE AND LOCATION OF UNDERGROUND AND

OTHER UTILITIES IS NOT GUARANTEED TO BE

ACCURATE OR ALL INCLUSIVE. THE CONTRACTOR IS

RESPONSIBLE FOR MAKING HIS OWN

DETERMINATION AS TO THE TYPE AND LOCATION OF

UNDERGROUND AND OTHER UTILITIES AS MAY BE

NECESSARY TO AVOID DAMAGE THERETO.

CAUTION:

STA, 0+60 UNION

PACIFIC RAILROAD

CENTER LINE

PROPOSED SEWER

LATERAL REFER TO

SHEET 2.

-UNION PACIFIC RIGHT OF WAY

PROVIDE DOGHOUSE MANHOLE

OVER EXISTING 8'' Ø SANITARY

SEWER MAIN. ASSUMED DEPTH:

10'. CONTRACTOR TO EXCAVATE

SEWER MAIN PRIOR TO

BEGINNING WORK OR ORDERING

MATERIALS. CONTACT ENGINEER

IF DISCREPANCY OCCURS. REFER

TO DETAIL 3 SHEET 3.

EXISTING

GRAVEL DRIVE

CONTRACTOR SHALL COORD. WORK IN RAILROAD RIGHT-OF-WAY W/

APPROVAL AGENCIES & PROVIDE WORK PER THEIR REQUIREMENTS.

ADDITIONAL INSURANCE, INSPECTION, PERMITS AND OTHER WORK

REQUIRED. COORD. W/ UNION PACIFIC & ENGINEER. SCHEDULE OF

WORK TO BE MODIFIED IN CONSIDERATION OF APPLICABLE APPROVALS.

RAILROAD PERMIT & REQUIREMENTS:

TRACER WIRE

12 GA. TW COPPER

3" WIDE WARNING TAPE

"CAUTION BURIED SEWER LINE"

4"

3' -6

GRAVEL SURFACE

COMPACTED

GRANULAR

BACKFILL

DRAWING NO.

CDG PROJECT NO.

G

EN

ER

AL

N O

TE

D

D

ET

AI

LS

C

IV

IL

D R

AW

IN

G S

LI

FT

S

TA

TI

O

N

S

EW

ER

S

YS

TE

M

PI

ED

M

O N

T M

AI

N

TE

N

AN

C

E

BU

IL

D

IN

G

S

April 30, 2024

ENGINEER - E027607

ANDREW NOVINGER

CAUTION:

INFORMATION ON THIS DRAWING CONCERNING THE TYPE AND

LOCATION OF EXISTING UNDERGROUND AND OTHER UTILITIES IS NOT

GUARANTEED TO BE ACCURATE OR ALL INCLUSIVE. THE CONTRACTOR

IS RESPONSIBLE FOR MAKING HIS OWN DETERMINATION AS TO THE

TYPE AND LOCATION OF BOTH EXISTING UNDERGROUND AND OTHER

UTILITIES AS MAY BE NECESSARY TO AVOID DAMAGE THERETO.

MANHOLE BASE

FINISHED COVER ELEVATION

AS SPECIFIED ON DRAWINGS

OR APPROVED

EQUAL.(TYP.)

A-LOK GASKET

FLOW

4'-0" DIA.

MIN.

PE

R

D R

AW

IN

G S

D

EP

TH

V

AR

IE

S

EC

C

EN

TR

IC

C

O N

E

SE

C

TI

O N

" M

IN

" M

AX

NOTES:

THIS DETAIL TYPICAL FOR ALL MANHOLES WITH DEPTHS OF

6'-0" AND GREATER.

FOR MANHOLES WITH DEPTHS LESS THAN 6'-0" SEE SEW-6.

SEE SEW-7 OR SEW-8

ADJUSTMENT

RING IF REQUIRED

NEENAH R-1769-A OR EQUAL

MANHOLE FRAME & COVER

6" WIDE

JOINT WRAP

EXISTING GRADE

COMPACTED

EARTH BACKFILL

COMPACTED

GRANULAR

STONE BEDDING

PIPE

6" 6"

AS

R

EQ

'D

P

ER

P

LA

N S

NOTES:

SEWERS SHALL BE TRENCHED, BEDDED AND BACKFILLED AS

SHOWN.

DEPTH TO PRESSURE SEWERS SHALL BE 36" MIN. MEASURED

FROM TOP OF PIPE TO FINISHED SURFACE.

TRENCH SHALL BE EXCAVATED TO PROVIDE VERTICAL

WALLS.

TRENCH SHALL BE EXCAVATED TO A DEPTH OF 6" BELOW

BOTTOM OF PIPE AND BACKFILLED TO 6" ABOVE PIPE WITH

GRAVEL OR CRUSHED STONE CONFORMING TO THE

SPECIFIED GRADATION TO PROVIDE UNIFORM BEDDING FOR

THE ENTIRE LENGTH OF THE PIPE.

+ 12"

PRE CAST MANHOLE DETAIL2 SCALE: NTS

PIPE TRENCHING & BEDDING DETAIL1 SCALE: NTS

SPECIAL NOTE:

CONTRACTOR TO PERFORM DETAILED SITE INSPECTION TO

LOCATE ALL EXISTING UTILITES AND VERIFY ANY POSSIBLE

CONFLICTS WITH PROPOSED IMPROVEMENTS PRIOR TO

BEGINNING ANY CONSTRUCTION. CONTACT ENGINEER WITH

ANY CONFLICTS.

1. CONSTRUCTION METHODS AND MATERIALS SHALL CONFORM TO THE LATEST

REVISIONS OF THE STANDARD GENERAL CONDITIONS AND TECHNICAL

SPECIFICATIONS FOR THE CITY OF PIEDMONT, MISSOURI.

2. THE CONTRACTOR SHALL FIELD VERIFY ALL HORIZONTAL AND VERTICAL LINES

AND GRADES OF EXISTING UTILITIES PRIOR TO THE CONSTRUCTION OF

IMPROVEMENTS. THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY

UPON DISCOVERY OF ANY DISCREPANCY BETWEEN CONTRACT DRAWINGS AND

ACTUAL FIELD CONDITIONS.

3. APPLICABLE PERMITS MUST BE OBTAINED FROM THE CITY, STATE AND COUNTY

PRIOR TO EXCAVATION WITHIN ANY RIGHT-OF-WAY, AND PRIOR TO ANY

CONSTRUCTION.

4. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THE LOCATION

OF ANY UNDERGROUND UTILITIES OR OTHER OBSTRUCTIONS AND TO BE LIABLE

FOR DAMAGE AND CONSEQUENT REPAIR TO SUCH IN THE COURSE OF HIS

OPERATIONS.

5. THE CONTRACTOR AND/OR BUILDER WILL KEEP THE PROJECT AREA NEAT AND

ORDERLY AT ALL TIMES WHILE CONSTRUCTION IS TAKING PLACE. ALL CITY

STREETS ADJACENT TO THE DEVELOPMENT SHALL BE KEPT CLEAR OF MUD,

ROCK, DIRT, DEBRIS, PAPER AND WASTE MATERIAL AT ALL TIMES. THE PROPER

AMOUNT OF INSPECTION SHALL BE CALLED FOR AT THEIR PROPER TIMES, OR

ANY AND ALL WORK MAY BE REJECTED.

6. IF ANY WORK OR ACCESS TO ANY ADJOINING PROPERTY IS DONE, IT IS THE FULL

RESPONSIBILITY OF THE APPLICANT/OWNER TO OBTAIN PROPER RELEASES

FROM ADJOINING PROPERTY OWNERS AND ASSUME ALL LIABILITY FOR ACTION

TAKEN DURING ALL CONSTRUCTION.

7. ALL DISTURBED AREAS ARE TO BE RESEEDED IN ACCORDANCE WITH THE

CURRENT REQUIREMENTS OF THE CITY'S DESIGN STANDARDS FOR PUBLIC

IMPROVEMENTS.

8. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY DAMAGE TO EXISTING

PAVEMENT, CURB AND GUTTER, AND SIDEWALK, BACK IN ACCORDANCE WITH THE

LATEST DESIGN STANDARDS, GENERAL CONDITIONS & TECHNICAL

SPECIFICATIONS, AND STANDARD DRAWING DETAILS FOR PUBLIC

IMPROVEMENTS.

9. ALL TRENCHES, WHICH LIE UNDER PROPOSED PAVEMENT OR LIE WITHIN TWO

FEET OF THE BACK OF CURB SHALL BE BACKFILLED TO PAVEMENT SUBGRADE

WITH COMPACTED GRANULAR MATERIAL.

10.TESTING BY CONTRACTOR PER CITY AND MDNR GUIDELINES. COORD.

OBSERVATION W/CITY.

11.FOR MANHOLE COVERS, VALVE BOXES AND OTHER UTILITY APPURTENANCES

SHALL NOT ENCROACH ON SIDEWALKS, CURBS OR PAVEMENT. WHERE

CONFLICTS ARE DISCOVERED, THE CONTRACTOR SHALL CONTACT THE

ENGINEER FOR INSTRUCTION PRIOR TO PROCEEDING.

12.THE CONTRACTOR SHALL NOTIFY THE INSPECTOR OF ANY NEW SINKHOLES

DISCOVERED DURING CONSTRUCTION.

13.PIPE BEDDING WITHIN UNIMPROVED AREAS TO CONFORM TO CITY

SPECIFICATIONS.

14.BACKFILL WITHIN RIGHT-OF-WAY TO CONFORM TO CITY OF PIEDMONT

STANDARDS.

15.THE CONTRACTOR IS RESPONSIBLE FOR ALL METHODS, SEQUENCING, AND

SAFETY CONCERNS ASSOCIATED WITH THIS PROJECT DURING CONSTRUCTION,

UNLESS SPECIFICALLY ADDRESSED OTHERWISE IN THIS PLAN OR ELSEWHERE IN

THE CONTRACT.

16.THE QUANTITIES AND SITE CONDITIONS DEPICTED IN THESE PLANS ARE FOR

INFORMATIONAL PURPOSES ONLY AND ARE SUBJECT TO ERROR AND OMISSION.

CONTRACTORS SHALL SATISFY THEMSELVES AS TO ACTUAL QUANTITIES AND

SITE CONDITIONS PRIOR TO BIDDING THE WORK FOR THE CONSTRUCTION

COVERED BY THIS PLAN.

17. A REASONABLE EFFORT HAS BEEN MADE TO SHOW THE LOCATIONS OF EXISTING

UNDERGROUND FACILITIES AND UTILITIES IN THE CONSTRUCTION AREA. THE

CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE TO UTILITIES AND/OR

FACILITIES CAUSED DURING THEIR CONSTRUCTION OPERATIONS.

18.THE CONTRACTOR IS RESPONSIBLE FOR ALL COORDINATION OF CONSTRUCTION

AFFECTING UTILITIES AND THE COORDINATION OF ANY NECESSARY UTILITY

RELOCATION WORK.

19.COORDINATION BETWEEN ALL PARTIES IS ESSENTIAL PART OF CONTRACT.

20.NO MEASUREMENTS SHOULD BE SCALED OFF PLANS. USE ONLY LABELED

DISTANCES.

GENERAL NOTES

DOGHOUSE MANHOLE CONNECTION DETAIL3 SCALE: NTS

STEEL CASING DETAIL4 SCALE: NTS

PRELIMINARY

NOT FOR

CONSTRUCTION

OR PERMIT

SANITARY SEWER CLEANOUT DETAIL6 SCALE: NTS

INSERT

GASKET

CORE DRILLED OPENING

SIZE PER GASKET MFR.

REQUIREMENTS

WALL OF

EXISTING

MANHOLE

TRENCHING UNDER GRAVEL DRIVE DETAIL5 SCALE: NTS

EXISTING MANHOLE CONNECTION DETAIL7 SCALE: NTS

DRAWING NO.

CDG PROJECT NO.

D

ET

AI

LS

C

IV

IL

D

R

AW

IN

G

S

LI

FT

S

TA

TI

O

N

S

EW

ER

S

YS

TE

M

PI

ED

M

O N

T M

AI

N

TE

N

AN

C

E

BU

IL

D

IN

G

S

April 30, 2024

ENGINEER - E027607

ANDREW NOVINGER

1,200 GALLON OIL SEPARATOR DETAIL1 SCALE: NTS

PRELIMINARY

NOT FOR

CONSTRUCTION

OR PERMIT

H-20 LOADING-8'' CAST IRON FRAME & COLLAR.

(TYPICAL) ADJUST TOP TO 1'' OVER FINAL GRADE.

SLOPE ADJACENT GROUND TO DRAIN AWAY FROM

COVERS.

JOINTS TO BE SEALED WITH

SPECIAL CS-400 GREY COLOR

MASTIC SEALANT PROVIDE

PLACE & BED PER SUPPLIER

BED ON 2'' MIN. CLEAN 3/4 '' AGGREGATE OVER

COMPACTED EARTH.

PROVIDE PIPE CONNECTION USING APPROVED

GASKET OR SEALED CONNECTION. FIELD VERIFY

ELEVATIONS.

Sheets and Views
PiedmontGravitySewer(8-9-24)North-COVER
PiedmontGravitySewer(8-9-24)North-SITE PLAN
PiedmontGravitySewer(8-9-24)North-SANITARY PROFILE
PiedmontGravitySewer(8-9-24)North-DETAILS
PiedmontGravitySewer(8-9-24)North-DETAILS (2)
PiedmontGravitySewer(8-9-24)North-DETAILS (3)