This Vendor Change Details Report documents modifications to Solicitation IFB605CO25000817 for the SE Piedmont Sanitary Extension project issued by the Missouri Department of Transportation (MoDOT). The project involves construction of approximately 653 linear feet of 8-inch SDR-35 PVC gravity sewer line with 6 manholes, 60 linear feet of 12-inch steel casing for sewer installation under the Union Pacific Railroad, and approximately 235 linear feet of 6-inch sewer lateral with cleanouts at the MoDOT Maintenance Facility in Texas County, Missouri. The project objectives include abandoning an existing septic tank system and connecting to the City of Piedmont sanitary sewer system. Attendance at a mandatory pre-proposal conference on November 13, 2024, at 11:00 AM and completion of a site visit are required for bid eligibility. Bids are due by 2:00 PM CST on December 20, 2024, with a Notice to Proceed anticipated by January 1, 2025, and project completion required by December 31, 2025. The most recent solicitation change is Addendum 005, added as of December 11, 2024.

The report indicates that new sections for Pre-Proposal Conference and Tours have been added to the solicitation, along with Addendum 005, which represents the substantive changes to the original solicitation. Contractors must provide a bid bond or security equal to 5 percent of the bid amount and, if awarded, a 100 percent performance and payment bond. The base bid must include excavation of 200 cubic yards of rock, with additional rock excavation priced separately per cubic yard. The solicitation includes a lump sum requirement of $3,300 for railroad permitting, with additional railroad charges to be addressed through change orders post-award. MBE and WBE participation goals are set at 10 percent and 5 percent, respectively. Prevailing wage rates per Wayne County Annual Wage Order #31 apply, and OSHA 10-hour construction safety training is mandatory for all on-site personnel. Contractors must provide $4,000,000 in general and automobile liability insurance coverage.

View the file

Other files

File Type Posted
IFB605CO25000817_Jun_23_25_solicitation_doc.pdf PDF
IFB605CO25000817_Nov_11_24_solicitation_doc.pdf PDF
IFB605CO25000817_May_15_26_solicitation_doc.pdf PDF
IFB605CO25000817_Aug_28_26_solicitation_doc.pdf PDF
IFB605CO25000817_Dec_30_24_solicitation_doc.pdf PDF
IFB605CO25000817_Aug_20_26_solicitation_doc.pdf PDF
IFB605CO25000817_Jan_20_25_solicitation_doc.pdf PDF
section 01300 and 01700.pdf PDF
IFB605CO25000817_Dec_2_24_solicitation_doc.pdf PDF
Exhibit M - ANTI-DISCRIMINATION AGAINST ISRAEL.pdf PDF
IFB605CO25000817_Aug_25_26_solicitation_doc.pdf PDF
IFB605CO25000817_May_8_26_solicitation_doc.pdf PDF
IFB605CO25000817_May_5_25_solicitation_doc.pdf PDF
Bid Form.pdf PDF
IFB605CO25000817_Feb_10_25_solicitation_doc.pdf PDF
IFB605CO25000817_Sep_23_26_solicitation_doc.pdf PDF
IFB605CO25000817_Apr_21_25_solicitation_doc.pdf PDF
IFB605CO25000817_Feb_24_25_solicitation_doc.pdf PDF
IFB605CO25000817_Apr_24_26_solicitation_doc.pdf PDF
IFB605CO25000817_Nov_4_24_solicitation_doc.pdf PDF
IFB605CO25000817_Mar_10_25_solicitation_doc.pdf PDF
IFB605CO25000817_Sep_15_26_solicitation_doc.pdf PDF
IFB605CO25000817_Mar_31_25_solicitation_doc.pdf PDF
IFB605CO25000817_Mar_17_25_solicitation_doc.pdf PDF
IFB605CO25000817_Feb_17_25_solicitation_doc.pdf PDF
IFB605CO25000817_Apr_17_26_solicitation_doc.pdf PDF
IFB605CO25000817_Nov_2_24_solicitation_doc.pdf PDF
Affidavits - Exhibit A and B.pdf PDF
IFB605CO25000817_Aug_14_26_solicitation_doc.pdf PDF
IFB605CO25000817_Jan_13_25_solicitation_doc.pdf PDF
IFB605CO25000817_Sep_22_26_solicitation_doc.pdf PDF
IFB605CO25000817_Jun_9_25_solicitation_doc.pdf PDF
IFB605CO25000817_Nov_25_24_solicitation_doc.pdf PDF
Piedmont MoDOT Standard Specifications.pdf PDF
IFB605CO25000817_Jan_6_25_solicitation_doc.pdf PDF
IFB605CO25000817_May_12_25_solicitation_doc.pdf PDF
IFB605CO25000817_Nov_18_24_solicitation_doc.pdf PDF
MoDOT_Piedmont_GravitySewer.pdf PDF
IFB605CO25000817_Feb_3_25_solicitation_doc.pdf PDF
IFB605CO25000817_Mar_3_25_solicitation_doc.pdf PDF
IFB605CO25000817_Aug_18_26_solicitation_doc.pdf PDF
IFB605CO25000817_Jan_27_25_solicitation_doc.pdf PDF
IFB605CO25000817_Apr_7_25_solicitation_doc.pdf PDF
IFB605CO25000817_Dec_9_24_solicitation_doc.pdf PDF
WayneAWO31.pdf PDF
IFB605CO25000817_Dec_23_24_solicitation_doc.pdf PDF
IFB605CO25000817_Dec_16_24_solicitation_doc.pdf PDF
IFB605CO25000817_Sep_4_26_solicitation_doc.pdf PDF
IFB605CO25000817_May_19_25_solicitation_doc.pdf PDF
IFB605CO25000817_Aug_7_26_solicitation_doc.pdf PDF
Show 40 more

Latest 50 of 58 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation Change Details Report Solicitation no.IFB605CO25000817

'SE Piedmont Sanitary Extension'

Header Information

There are no changes under this section.

Solicitation Fields

Section Title:PRE-PROPOSAL CONFERENCE

1. Section Created: SECTION PRE-PROPOSAL CONFERENCE WAS ADDED

Section Title:TOURS

2. Section Created: SECTION TOURS WAS ADDED

Section Title:Addendums

Field Changes:

Solicitation Questionnaire

Documents Added

Solicitation Group Changes

Field : Addendum 005

3. FIELD Addendum 005 WAS ADDED

Report Created: Dec 11, 2024 10:24 AM CST Page: 2

Solicitation IFB605CO25000817, SE Piedmont Sanitary Extension

Item Specifications and Quantities

File details come from the government source that posted it. Updated .