Warranty_Letter.pdf

PDF 91 KB Posted

Attached to
Construction Engineering and Inspection Services for SUN Trail
Solicitation number
25/26-016
Issued by
Clay County, Harold CDP, Florida

About this file

This is a Contractor Warranty Letter issued by the Clay County Board of County Commissioners for construction projects. The warranty document establishes that the contractor warrants all labor, materials, and work performed comply with the Contract Documents and authorized modifications, and will remain free from defects due to defective materials or workmanship for two years from the date of completion and acceptance by the County. The contractor agrees to remedy any defects that develop during the warranty period at its sole expense and commits to responding to warranty calls from the Owner within twenty-four hours of notification. The warranty excludes work that has been abused or neglected by the owner, damage caused by Acts of God, and normal wear and tear, and does not preclude additional warranties required by the Contract Documents.

The warranty letter serves as a standard form requiring the contractor to provide identifying information including the contractor's name, address, project name, contract number, and license number, with signature and date certification required. This warranty requirement aligns with the Construction Engineering and Inspection Services solicitation for the SUN Trail project, where the selected consultant must maintain professional liability insurance and comply with all contract administration and inspection standards. The form functions as a protective mechanism for Clay County to ensure construction quality and establish clear remediation obligations for the contractor throughout the two-year post-completion period.

View the file

Other files

Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CLAY COUNTY BOARD OF COUNTY COMMISSIONERS

CONTRACTOR WARRANTY

Contractor’s Name:

Address:

Project:

Contract Number:

Contractor’s License Number:

The undersigned warrants all labor and materials furnished and work performed in conjunction with the above referenced project are in accordance with the Contract Documents and authorized modifications thereto, and will be free from defects due to defective materials or workmanship for a period of two years from the Date of Completion and acceptance of all improvements by the Clay County Board of County Commissioners.

Should any defect(s) develop during the two (2) year warranty period due to improper materials, workmanship or arrangement, the undersigned agrees to remedy all defects at its sole expense.

Further, the undersigned agrees to respond to any and all warranty calls from the Owner within twenty-four (24) hours after notification.

Nothing above shall be deemed to apply to work that has been abused or neglected by the owner, to damage caused by Acts of God or to normal wear and tear. This does not preclude or replace additional warranties that may be required by the Contract Documents.

Contractor’s Signature

Printed Name

Date

File details come from the government source that posted it. Updated .