Wage_Decision_Contract_No._1.pdf
PDF 293 KB Posted
- Solicitation number
- 2024-ITB-009
- Issued by
- Lackawanna County, New Mexico
About this file
This is a Wage Decision Approval Summary issued by the New Mexico Department of Workforce Solutions' Labor Relations Division for Contract No. 1 Well SJ-1491 Building and Equipping, a project for the City of Gallup located east of US Highway 491, 9.3 miles north of Interstate 40 in McKinley County. The project involves installing a new well house adjacent to an existing well, with work including earthwork, well building, yard piping, station piping, drainage, head wall, and water appurtenances. The project also encompasses primary and secondary electrical systems with a SCADA system, along with miscellaneous work like gravel surfacing, fencing, and erosion control. The estimated contract award date is 07/30/2024, with a wage decision expiration date of 10/16/2024, and the total estimated project cost is $1,335,250.13.
The project is not involving federal funds and includes a building construction component with interior station piping to a point 5' outside of the station. The contract is divided into two primary classification types: Highway/Utilities (A) with a cost of $1,173,156.38 and General Building (B) with a cost of $162,093.75. The document includes comprehensive wage rates for various trade classifications effective January 1, 2024, covering base rates and fringe rates for workers in different regions of New Mexico, including specific rates for trades like bricklayers, carpenters, electricians, laborers, and operators. The wage rates vary by trade classification, skill level, and specific county, with additional notes indicating that contractors must pay subsistence, zone, and incentive pay according to specific trade requirements.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Wage Decision Approval Summary
1) Project Title: Contract No. 1 Well SJ-1491 Building and Equipping Requested Date: 06/17/2024 Approved Date: 06/18/2024 Approved Wage Decision Number: MC-24-2091-A
Wage Decision Expiration Date: 10/16/2024
2) Physical Location of Jobsite for Project:
Job Site Address: East of US Highway 491, 9.3 Miles North of Interstate 40 Job Site City: Gallup Job Site County: McKinley
3) Contracting Agency Name (Department or Bureau): City of Gallup Contracting Agency Contact's Name: Frances Rodriguez Contracting Agency Contact's Phone: (505) 863-1334 Ext.
4) Estimated Contract Award Date: 07/30/2024
5) Estimated total project cost: $1,335,250.13
a. Are any federal funds involved?: No
b. Does this project involve a building?: Yes
- r well house construction including interior station piping to a point 5' outside of station, piping to well head, and mechanical equipment as detailed complete and in place.
c. Is this part of a larger plan for construction on or appurtenant to the property that is subject to this project?: No
d. Are there any other Public Works Wage Decisions related to this project?: No
e. What is the ultimate purpose or functional use of the construction once it is completed?: This project is for the installation of a new well house adjacent to an existing well. Work for this project includes earthwork, well building, yard piping, station piping, drainage, head wall, and other water appurtenances. It also contains primary and secondary electrical with a SCADA system. Other miscellaneous work includes gravel surfacing, fencing and erosion control.
6) Classifications of Construction:
Classification Type and Cost Total
Description
Highway/Utilities (A) Cost: $1,173,156.38
This project is for the installation of a new well house adjacent to an existing well. Work for this project includes earthwork, well building, yard piping, station piping, drainage, head wall, and other water appurtenances. It also contains primary and secondary electrical with a SCADA system. Other miscellaneous work includes gravel surfacing, fencing and erosion control.
General Building (B) Cost: $162,093.75
New well house construction including interior station piping to a point 5' outside of station, piping to well head, and mechanical equipment as detailed complete and in place.
LABOR RELATIONS DIVISION WWW.DWS.STATE.NM.US
401 Broadway NE Albuquerque, NM 87102 Phone: 505-841-4400 Fax: 505-841-4424
226 South Alameda Blvd Las Cruces, NM 88005 Phone: 575-524-6195 Fax: 575-524-6194
An Equal Opportunity Employer Page 1 of 2
An Equal Opportunity Employer Page 2 of 2
TYPE “A” – STREET, HIGHWAY, UTILITY & LIGHT ENGINEERING
Effective January 1, 2024
Trade Classification Base Rate Fringe Rate
Bricklayer/Block layer/Stonemason 27.03 10.99 Bricklayer/ Block layer/Stonemason – Curry, DeBaca, Quay and Roosevelt counties
23.10 8.89
Bricklayer/ Block layer/Stonemason – Dona Ana, Otero, Eddie, and Lea counties
29.56 14.10
Carpenter/Lather 29.11 12.79 Carpenter- Los Alamos county 33.18 13.58 Cement Mason 19.34 7.41 Drywall Finisher/Taper 26.40 8.86 Glazier/Fabricator 21.75 7.10 Ironworker Journeyman 28.49 18.71 Probationary Ironworker 22.79 18.71 Painter- Commercial 21.00 5.75 Paper Hanger 21.00 5.75 Plumber/Pipefitter 40.74 15.90 Electricians- Outside Classifications:
Zone 1
Ground man 26.32 12.79 Equipment Operator 37.76 17.13 Lineman 47.70 19.92 Journeyman technician 44.42 19.10 Cable Splicer 48.87 20.22 Electricians-Outside Classifications:
Zone 2
Ground man 26.32 12.79 Equipment Operator 37.76 17.13 Lineman 47.70 19.92 Journeyman technician 44.42 19.10
Cable Splicer 48.87 20.22 Electricians-Outside Classifications:
Los Alamos county
Ground man 27.07 12.81 Equipment Operator 38.85 17.17 Lineman/technician 48.95 20.24 Journeyman technician 45.70 19.42 Cable Splicer 53.75 21.44 Laborers Group I – unskilled 16.60 7.30 Group II – semiskilled 17.60 7.30 Group III – skilled 18.10 7.30 Group IV – specialty 18.60 7.30 Operators Group I 22.42 6.79 Group II 23.50 6.79 Group III 23.61 6.79 Group IV 24.09 6.79 Group V 24.21 6.79 Group VI 24.43 6.79 Group VII 24.62 6.79 Group VIII 25.33 6.79 Group IX 33.56 6.79 Group X 37.43 6.79 Soft Floor Layers 21.00 9.20 Truck Drivers
Group I-IX 19.75 9.15
NOTE: All contractors are required to pay SUBSISTENCE, ZONE AND INCENTIVE PAY according to the particular trade. Details are located in a PDF attachment at
WWW.DWS.STATE.NM.US. Search Labor Relations/Labor Information/Public Works/Prevailing Wage Rates.
For more information about the Subsistence, Zone, and Incentive Pay rates, or to file a wage claim, contact the Labor Relations Division at (505) 841-4400 or visit us online at www.dws.state.nm.us.
http://www.dws.state.nm.us/ http://www.dws.state.nm.us/
File details come from the government source that posted it. Updated .