Exhibit_4_Painting.pdf
PDF 65 KB Posted
- Attached to
- SUPERBOX Depleted Uranium (DU) Containment Facility Federal contract opportunity
- Solicitation number
- W91ZLK-22-R-0004
About this file
This combined synopsis/solicitation requests proposals for quarterly maintenance and emergency repair services for the SUPERBOX Depleted Uranium Containment Facility. Offerors shall provide firm fixed pricing for maintenance including painting services and time and materials pricing for emergency and routine repairs. Proposals are due no later than February 8, 2022 and the period of performance is from March 15, 2022 to March 14, 2025 including one base year and two option years. The solicitation is set aside for small businesses and will be awarded as a lowest price technically acceptable contract by the Department of the Army Materiel Command Army Contracting Command located at Aberdeen Proving Ground.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A02 New_SUPERBOX_Maintenance_contract PWS.pdf | ||
| B08 COMBINED SYNOPSIS SOLICITATION SUPERBOX.pdf | ||
| A02 Schedule of Services Superbox update.pdf | ||
| Site Visit Notice 2nd.pdf | ||
| B08 SCHEDULE of SERVICES 4th ED.pdf | ||
| Site Visit Notice 2nd.pdf | ||
| B08 COMBINED SYNOPSIS SOLICITATION SUPERBOX.pdf | ||
| Site Visit Notice.pdf | ||
| Exhibit_5_Dimensions_for_Painting_with_Flight_Tunnel.pdf | ||
| A02 Schedule of Services Superbox.pdf | ||
| A02 New_SUPERBOX_Maintenance_contract PWS.pdf | ||
| Exhibit_4_Painting.pdf | ||
| A03 Exhibit_2_ Superbox.pdf | ||
| A03 APG_NORTH_Exhibit_3_Map.pdf | ||
| Exhibit_5_Dimensions_for_Painting.pdf | ||
| B08 COMBINED SYNOPSIS SOLICITATION SUPERBOX.pdf | ||
| A03 Exhibit_1_Superbox_layout.pdf | ||
| Exhibit 6 CDRL.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Exhibit #4 Painting Scope of Work (SOW)
Items Include:
Flight Tunnel, Air Trains, Containment Vessel, Wash-Down Recovery Tanks, and 5,000 gallon Tank (see Exhibits 1, 2, & 5)
Work Required (not all-inclusive):
1. Pressure Wash to remove the grim, rust and flaking paint from the entire Facility.
2. Prime all Bare Metal.
3. Apply First Coat of White Paint to the Facility.
4. Apply Second Coat of White Paint to the Facility.
5. Apply First Coat of Gray Paint to the H&V System and the box covers that run along the pad.
6. Apply Second Coat of Gray Paint to the H&V System and the box covers that run along the pad.
7. Paint Hand Rails Safety Yellow.
8. Radioactive Sign Replacements.