Exhibit_4_Painting.pdf

PDF 65 KB Posted

Attached to
SUPERBOX Depleted Uranium (DU) Containment Facility Federal contract opportunity
Solicitation number
W91ZLK-22-R-0004
Issued by
Department of the Army Materiel Command Army Contracting Command Aberdeen Proving Ground

About this file

This combined synopsis/solicitation requests proposals for quarterly maintenance and emergency repair services for the SUPERBOX Depleted Uranium Containment Facility. Key details include:

  • The solicitation number is W91ZLK-22-R-0004 and is set aside 100% for small businesses. The period of performance is one base year and two option years from March 15, 2022 to March 14, 2025.

  • Services required include quarterly painting maintenance as well as time and materials emergency and routine repair work for the facility and its systems. Proposals are due by February 8, 2022 and must include separate technical and pricing volumes.

  • The contract will be awarded as a lowest price technically acceptable hybrid firm-fixed price and time & materials contract. Prices should be proposed for fixed-price CLINs covering maintenance painting as well as time and materials rates for repair CLINs. Acceptability will be determined by meeting all requirements of the attached performance work statement.

View the file

Other files for this federal contract opportunity

Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit #4 Painting Scope of Work (SOW)

Items Include:

Flight Tunnel, Air Trains, Containment Vessel, Wash-Down Recovery Tanks, and 5,000 gallon Tank (see Exhibits 1, 2, & 5)

Work Required (not all-inclusive):

1. Pressure Wash to remove the grim, rust and flaking paint from the entire Facility.

2. Prime all Bare Metal.

3. Apply First Coat of White Paint to the Facility.

4. Apply Second Coat of White Paint to the Facility.

5. Apply First Coat of Gray Paint to the H&V System and the box covers that run along the pad.

6. Apply Second Coat of Gray Paint to the H&V System and the box covers that run along the pad.

7. Paint Hand Rails Safety Yellow.

8. Radioactive Sign Replacements.