This is a combined synopsis/solicitation for maintenance services for the SUPERBOX Depleted Uranium (DU) Containment Facility located at Aberdeen Proving Ground, Maryland. The period of performance is one base year and two option years commencing on March 15, 2022.
The solicitation seeks quarterly maintenance, emergency repairs, and optional painting services for the SUPERBOX test site and constituent systems. The contractor shall provide labor, parts, materials, and equipment to perform inspections, preventative maintenance, repairs, and modifications. Pricing shall include firm-fixed-prices for quarterly maintenance and optional painting, as well as time and material rates for emergency and routine repairs.
Responses are due by February 8, 2022 and will be evaluated based on technical acceptability and lowest price. The solicitation is a 100% small business set-aside conducted under NAICS code 811310. The Department of the Army Materiel Command Army Contracting Command is the contracting agency.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A02 New_SUPERBOX_Maintenance_contract PWS.pdf | ||
| B08 COMBINED SYNOPSIS SOLICITATION SUPERBOX.pdf | ||
| A02 Schedule of Services Superbox update.pdf | ||
| Site Visit Notice 2nd.pdf | ||
| B08 SCHEDULE of SERVICES 4th ED.pdf | ||
| Site Visit Notice 2nd.pdf | ||
| B08 COMBINED SYNOPSIS SOLICITATION SUPERBOX.pdf | ||
| Site Visit Notice.pdf | ||
| Exhibit_4_Painting.pdf | ||
| Exhibit_5_Dimensions_for_Painting_with_Flight_Tunnel.pdf | ||
| A02 Schedule of Services Superbox.pdf | ||
| Exhibit_4_Painting.pdf | ||
| A03 Exhibit_2_ Superbox.pdf | ||
| A03 APG_NORTH_Exhibit_3_Map.pdf | ||
| Exhibit_5_Dimensions_for_Painting.pdf | ||
| B08 COMBINED SYNOPSIS SOLICITATION SUPERBOX.pdf | ||
| A03 Exhibit_1_Superbox_layout.pdf | ||
| Exhibit 6 CDRL.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUPERBOX
Maintenance Contract
C.1. General:
C.1.1 SCOPE OF WORK:
The Contractor shall furnish all Labor, Parts and Materials for:
Inspection, Preventative Maintenance, Repair and Modification (henceforth referred to as “maintenance”) of the SUPERBOX test site to include its constituent systems and components.
The three (3) Contract Line Items (CLINs) shall be:
CLIN #1: Quarterly Maintenance, CLIN #2: Repairs: Emergency & Routine.
CLIN #3: Painting the facility (******OPTIONAL*******)
The “SUPERBOX” is located at the U.S. Army Aberdeen Proving Ground (APG), MD & will be maintained in accordance with the Performance Work Statement (PWS) Section C.3.
System Description:
The SUPERBOX (aka “Depleted Uranium (DU) Containment Facility”) is an environmentally safe, enclosed facility for testing weapons and targets that have components made from depleted uranium (DU) (see photo below).
The SUPERBOX started operations in 1990. Its operations are licensed, regulated, and inspected by the following agencies: Nuclear Regulatory Commission (NRC), Department of Energy (DOE), Environmental Protection Agency (EPA), Occupational Safety & Health Administration (OSHA), and the U.S. Army Public Health Center (APHC).
It is composed of Seven (7) Air Trains , an 84’ diameter hemispherical Containment Vessel, a Flight Tunnel with high- and low-speed doors, and ancillary systems (to include mechanical, electrical, compressed air, and power distribution). Also included are support buildings for maintenance. (See drawing, Exhibit 1).
Fresh air is pumped into the top of the containment vessel via the AIR SUPPLY system, forcing suspended air particulates down toward the floor where it is drawn out through the EXHAUST system. Dampers, which control air flow, are closed, open, and throttled in accordance with operating modes. (See drawing, Exhibit 2).
The maximum air flow through the system is 64,000 cfm (cubic feet per minute). The AIR FILTRATION system is comprised of cartridge filters and HEPA (High Efficiency Particulate Air) filters which ensure that clean, uncontaminated air is discharged through the exhaust stack.
SALIENT HARDWARE is listed in Section C.3.1. (Please note that the listed Salient Hardware may not encompass all hardware covered in this maintenance contract, nor does it constitute separate systems. The Salient hardware merely lists prominent and representative items.)
C.1.2 PERIOD OF PERFORMANCE.
The period of performance of the contract is for one-year base (“Base Year”), with two (2) one-year options (“Option Years”).
C.1.3 PLACE OF PERFORMANCE. Performance will take place at the Aberdeen Test Center (ATC), Aberdeen Proving Ground (APG), Maryland, 21005-5059 at Fords Farm test site. (See map, exhibit 3).
C.1.4 HOURS OF NORMAL OPERATIONS.
ATC is operating under an Alternate Work Schedule. The work schedule is 8 workdays of 9 hours each, 1 workday of 8 hours, and every other Friday off as depicted below.
Sunday Monday Tuesday Wednesday Thursday Friday Saturday Week 1 hrs
0 9 9 9 9 8 0
Week 2 hrs
0 9 9 9 9 OFF 0
Nominal hours of operation are 6:00 a.m. to 3:30 p.m. with the exception of the first Friday in the Government’s bi-weekly pay period, which is 6:00 a.m. to 2:30 p.m.
The Contractor shall adhere to curtailing operations and ATC closures. Curtailments and ATC closures include any time when ATC is in a non-operational status for events including but not limited to emergency situations, power curtailments, furlough, ATC events, or planned training days. The COR will notify the Contractor of the dates of curtailment and closure.
Maintenance shall be performed between the hours of 0600 and 1530, Monday through Friday and alternating Fridays. Weekends, second Friday and Federal holidays are exceptions.
Maintenance services shall be scheduled through the Contracting Officer’s Representative (COR) fourteen (14) calendar days before work is to commence to avoid conflicting with the SUPERBOX testing schedules.
C.1.5 PERSONNEL.
C.1.5.1 Training, Education requirements. Personnel performing maintenance services shall be trained and have at least five (5) years’ experience performing services on equipment similar to that listed in Section C.3.
C.1.5.2 Certification requirements. Contractor personnel shall be certified and / or licensed accordingly. Examples include: Engineers, plumbers, carpenters, electricians, HVAC technicians, welders, and painters.
C.1.5.3 Hazardous Conditions. Contractor personnel may be exposed to the following conditions during performance of work:
C.1.5.3.1 High noise levels (impulse and steady state).
C.1.5.3.2 Proximity to electric power sources of high voltage and/or amperage.
C.1.5.3.3 Working in confined spaces.
C.1.5.3.4 Site-specific operations will be conducted at nearby ATC test sites. Contractor personnel shall check with the Facility Manager, range safety official, or person-in-charge to ensure that NO hazardous explosives or ammunition items are within the area where services are to be performed, PRIOR to entering work areas.
C.1.5.3.5 Depleted Uranium (DU). The Contractor will work both inside and outside of posted radiological materials (RAM) areas.
A. DU is a mild radioactive heavy metal, and its radioactivity is 60% less than that of natural uranium found everywhere in nature. It is not considered an external hazard but it is determined to be an internal hazard. Exposure to DU (via ingestion, inhalation or absorption through wounds) may result in some health effects due to its chemical and radiological toxicity.
B. ATC operates the Fords Farm test site under Nuclear Regulatory commission (NRC) License Number SUB-834. ATC has implemented a very robust radiological protection program which is inspected by the Nuclear Regulatory Commission. The personnel from the US Army Aberdeen Test Center (ATC) are experienced in handling DU to include complete decontamination and disposal procedures. On-site instrumentation monitors the air quality both inside and outside the containment vessel, to include real-time air quality monitoring.
C. ATC will provide the Contractor initial DU Hazard Awareness Training and recurrent briefings to understand the risks, procedures, and engineering controls. Other trainings such as, ingress/egress, and respiratory protection, may be required if determined by the ATC Radiation Safety Officer (RSO).
D. The tasks performed by the contractor won't generally require the contractor's personnel to use personal protective equipment (PPE) (e.g., respirators, rubber over-boots, gloves, and/or Tyvek suits), or don that PPE. If PPE is required, the ATC RSO will train the contractor's personnel on how to wear and don the PPE. A contractor employee may be required to submit a Urine Bioassay sample to monitor uranium intake if the contractor's personnel are required to work in a DU airborne area. If the ATC RSO determines the need of a bioassay, then the contractor's employee will be placed in the DU monitoring program.
E. The Contractor may be asked to work in areas adjacent to the Containment Vessel and Air Trains. Such areas potentially contain DU and are clearly demarcated by rope and “radiation” postings.
Ingress and egress points to such areas will be will be controlled.
In these instances the Contractor would be continuously monitored by Fords Farm qualified radiation workers, who would provide instructions and necessary PPE upon entering and exiting. These areas are not within the DU airbone areas and do not require monitoring by DU bioassays.
F. All efforts will be made to control personnel exposure and to keep it below the NRC limits for "individual members of the general public". (Note: the allowable dose limit for "the public" is 10% of that for occupational workers.)
G. ATC implements As Low As Reasonably Achievable (ALARA), by applying the following:
(1) Posting hazards and controlling access to radiation sources.
(2) Only using the amount of RAM or radiation sources necessary to accomplish the mission.
(3) Conducting hazard analysis of work processes and tests, and using engineering controls to reduce exposures. Provide feedback and appraisal of processes and procedures to improve work practices and controls.
(4) Evaluate and survey personnel exposure continuously and monitor personnel exposure by dosimetry and biossay (if determined it is needed).
(5) Limiting the duration in which personnel are exposed to ionizing radiation.
(6) Educating personnel on the hazards of ionizing radiation.
(7) Monitoring the effects of using RAM on the environment and workplace, and setting action levels to keep both safe and in compliance with federal regulations and standards.
(8) Establishing internal and standards operating procedures to provide guidance to personnel on how to perform operations safely when using RAM.
F. The point of contact for DU-related issues is the Radiation Safety Officer, Radiation Safety Team, Aberdeen Test Center, APG, Md. 21005-5059. Phone numbers are 410-278-9618, and 410-278-4688.
C.1.5.3.6. As deemed necessary and by mutual consent, Contractor personnel may be assisted by ATC personnel to include: crane and rigging operators, electricians, fabricators, mechanics, engineers, and technicians.
C.1.5.4 Program Management and Key Personnel.
The Contractor shall designate and provide a Program Manager (PM) who shall perform overall management of the PWS (Performance Work Statement). The PM shall be the Contractor’s primary point of contact and shall have the authority to make decisions on all matters on behalf of the Contractor. The PM shall interact primarily with the COR (Contracting Officer’s Representative) but may also interact with the Superbox Facility Manager under certain scenarios, such as emergency repairs (see C.3.13 Emergency Repairs). The Contractor shall also designate an Alternate PM who shall be authorized to make decisions in the absence of the PM. This designation shall be accomplished fourteen (14) calendar days, or earlier, prior to start of performance.
C.1.5.5 Identification of Contractor Personnel.
The Contractor shall wear visible identification that represents them and their company as a Contractor performing a mission support function. Furthermore, the Contractor shall prominently display their Security Badge as required by security regulations.
C.1.6 SAFETY. The Contractor shall provide all safety equipment required for personnel operating in an industrial area in accordance with OSHA standards and ATC regulations and procedures. Contractor personnel shall have personal protective equipment (PPE) in their possession at all times while performing maintenance services and shall utilize this equipment in accordance with OSHA standards, ATC regulations, and as conditions warrant. This shall include, but is not limited to, safety shoes, hard hats, eye protection, hearing protection, work gloves and personal fall arrest systems. The Contractor shall provide all contract personnel with hardhats, safety shoes, eye and ear protection, and gloves.
C.1.6.1 Personal Protective Equipment (PPE). All Contractor personnel shall wear the appropriate PPE when in the following work areas: range areas where entrance is controlled by the Range Operations Team, industrial buildings, at construction sites, test sites and test facilities. Other areas may be reviewed to determine if hazards are present which necessitate the use of PPE.
C.1.6.2 Tools. The contractor shall provide all tools, implements, and test equipment necessary to properly and efficiently maintain the covered equipment for the life of the contract.
Exceptions:
a. ATC will provide, upon request and mutual consent, all rigging (e.g., cranes, tow motors/forklifts, operators, and rigging equipment).
b. ATC will provide, upon request and mutual consent, man-lifts and scaffolds.
C.2 APPLICABLE DOCUMENTS The SUPERBOX systems are to be tested and maintained in accordance with the following:
(1) Performance Work Statement (PWS, Section C.3.),
(2) Manufacturer’s instructions, and
(3) Known standards, such as the National Electric Code (NEC), International Building Code (IBC), OSHA and National Fire Protection Association (NFPA) standards, as applicable.
Examples of applicable NEC Articles are:
Article 409 “Industrial Control Panels”, and Article 430 “Motor, Motor Circuits, and Controllers”.
C.3 REQUIREMENTS / PERFORMANCE WORK STATEMENT (PWS): The Contractor shall furnish all labor, parts and materials for “maintenance” of ATC’s Superbox in accordance with the instructions listed in this section.
C.3.1 SALIENT HARDWARE (not all-inclusive):
Electrical Enclosure:
Power Distribution & Motor Control Center (480 V, 3 phase, with 1200 /1600 amp main breaker & disconnect) (Cutler Hammer);
Main Switch Board; Switchgear; H-O-A motor starters.
Four (4) VFDs (Variable Frequency Drives) – (Honeywell “Smart VFD HVAC”).
Field devices (sensors, transmitters, & actuators).
Mechanical Enclosure:
Plant Air (Air Compressor, Instrument Air Distribution) – (Ingersoll Rand).
Field devices (sensors, transmitters, & actuators).
Containment Vessel / Dome:
Equipment Access Door and Inflatable Door Seal.
Staging Pad.
Field devices (sensors, transmitters, & actuators).
Flight Tunnel:
High Speed Door.
Low Speed Door.
Field devices (sensors, transmitters, & actuators).
Supply Air Ductwork:
Two 50 HP electric motors, 3 phase, 460 volts. (WEG: TEFC).
Dampers (Scotch Yoke and rack-and-pinion types). (FlowServe/ AutoMax).
Damper Actuators & Positioners.
Exhaust Air Ductwork:
Dust Filtration System.
HEPA Filter assemblies.
Two 100 HP electric motors, 3 phase, 460 volts (WEG: TEFC).
Dampers (Scotch Yoke and rack-and-pinion types). (FlowServe/ AutoMax)
Other ductwork: (Return Air Header, Bleed Bypass, Dilution Air Supply):
Dampers (Scotch Yoke and rack-and-pinion types). (FlowServe/ AutoMax)
Distributed Control System:
Allen-Bradley; three cabinets with ancillary equipment; Ethernet and AB data highways; ~ 200 channels of IO (Analog and Discrete).
Field devices (sensors, transmitters, & actuators).
Analog Transmitters include: Flow, Temperature, Dew Point, Aerosols.
Management Station (computer) in the Instrumentation Enclosure.
Evaporator Room:
Wastewater Evaporator (LakeView Engineered Products).
Air Operated Double Diaphram Pump (Ingersoll Rand).
Water Tanks (22,000 gallons, and 500 gallons).
Field devices (sensors, transmitters, & actuators) (e.g, Princo Instruments).
Change-out Room:
Split System Heat Pump (Mitsubishi).
Water Lift Station:
Sump Pump.
Floats.
visual/audible alarm.
C.3.2 Plan of Action: The Contractor shall create a Plan of Action prior to conducting specific maintenance on the SUPERBOX components and subsystems, and present it to the COR for review and approval (CDRL A001, exhibit 4). Such maintenance shall be conducted by the Contractor in accordance with the equipment manufacturer’s recommendations and industry practices. Upon reaching a consensus the Contractor will proceed with the agreed‐upon Plan of Action. The Plan of Action shall include functional test and general inspection of all systems and subsystems identified in the Salient Hardware, PWS Section C.3.1, above. Also incorporated into the Plan of Action shall be common industry‐accepted tasks (such as quarterly lubrication of the electric motors.)
C.3.3 Services: The Contractor shall provide - or arrange via Subcontractor - such services as:
A. Vibration Analysis and Correction.
B. Predictive and Preventive Maintenance.
C. Motor reconditioning and rewiring.
D. Electrical Testing to include:
1. Megger and “Hipot” Insulation tests.
2. Electrical Center Testing.
3. Rewinding / Reconditioning.
4. Power quality analysis.
5. Switchgear.
E. Laser Alignment.
F. Mechanical Repairs to include:
1. On-site and off-site machining.
2. On-site dynamic balancing.
G. Control Systems Service.
H. Thermal Imaging for detecting temperature differences on motors, controls, or process equipment.
I. Installation Services.
J. New Equipment and Parts, to include:
1. AC/DC Motors.
2. Industrial Controls and Starters (e.g., Soft-Starters, VFD’s).
3. Wire and Cable.
4. Drives.
5. Field devices (sensors, transmitters, & actuators).
L. Painting.
C.3.4 Restoration of system function: Contractor shall place the system(s) back into working order upon completion of all tests, maintenance, and repairs.
If the system requires service above the capabilities of personnel performing tests, the Contractor shall notify the COR and expedite repair services to place the system back in working order so that downtime will be kept to a minimum.
C.3.5 Repair work: Any deficiency discovered as a result of inspection or operation that is not correctable through normal maintenance shall be considered REPAIR WORK. The Contractor shall promptly notify the COR of any deficiency or safety hazard not correctable through maintenance.
The Contractor, COR, and Facility Manager shall mutually agree upon the responsible party for, and means of, implementing the repairs. Considerations will be made for the urgency of the repair, the magnitude of the repair, the Contractor’s or government’s ability to implement the repair, the remaining budget, and change‐order options.
Another consideration, especially for lengthy repair efforts, is the need to schedule such repairs/modifications during the Superbox’s “Shutdown periods”, typically lasting many weeks, at multiple times per year, to facilitate continuous, unfettered work and not interfere with normal testing operations.
C.3.6 Post maintenance briefing: Upon completion of maintenance, the Contractor shall notify the COR that all maintenance at the test site is complete and the system is operational and in service/online. The Contractor shall also provide to the COR all maintenance results, suggested preventive maintenance, routine repairs, and associated actions, and shall provide appropriate documentation.
C.3.7 Routine repairs (or modifications) may be requested by the COR at any time. Response time for initiation of routine repairs will be within forty eight (48) hours of notification. The Contractor shall furnish the COR a telephone number designated specifically for the initiation of all repair procedures.
C.3.8 Emergency repairs will be at the request of the COR or the Facility Manager. Response time for initiation of the emergency repairs shall be within four (4) hours of notification. The Contractor shall furnish the COR a telephone number designated specifically for the initiation of emergency repair procedures.
C.3.9 Replacement Parts/Materials: The contractor shall obtain all material, supplies, parts, and components for maintenance services, after obtaining the approval of the COR. All replacement parts, materials, and components shall be Original Equipment Manufacturer (OEM) parts for the unit for which they will be used. Any substitute parts must be approved by the COR prior to use.
C.3.10 Documentation: The Contractor shall provide copies of all maintenance records to the COR. The Contractor shall administer all maintenance records, with a copy stored at the test site where maintenance was conducted. All records shall be updated immediately upon completion of service. The COR shall be provided an additional copy of all records as services are performed. The Contractor shall submit a written service report covering the work accomplished. The Contractor shall notify the COR of any corrective actions required that are not covered by this contract.
C.3.10.1 Inspection and Maintenance Results Report: The Contractor shall provide an Inspection and Maintenance Results Report (CDRL A002, exhibit 5) immediately following inspection and maintenance of the system. The format of the report shall be approved by the
COR.
C.3.10.2 Written Service Report: The Contractor shall provide a Written Service Report (CDRL A003, exhibit 6) upon completion of remedial services and repairs. The Report shall consist of a description of the work performed, and a detail of the deficiencies, remediation actions taken, work labor hours and materials used. This may be hand written on a company form. The format of the report shall be approved by the COR. The form must be signed by the COR. Copy of the record shall be provided to the COR.
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
Exhibit 1 - Drawing of Superbox (Plan View/Simplified).
Exhibit 2 - Air Flow diagram Exhibit 3 - Map of Fords Farm/ Superbox Exhibit 4 ‐ Contract Data Requirements List (CDRL‐A001) Exhibit 5 ‐ Contract Data Requirements List (CDRL‐A002) Exhibit 6 ‐ Contract Data Requirements List (CDRL‐A003)
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
The following have been added by full text:
QUESTIONS & ANSWERS
QUESTION NO. 1: Will there be a site visit provided for this project prior to the bid due date?
ANSWER: No, a site visit is not currently scheduled, but can be arranged.