Attachment 3-Order 1-Updated.xlsx
XLSX spreadsheet 25 KB Posted
- Attached to
- USAG-S Environmental Compliance Lab Support
- Solicitation number
- W91WFU26QA007
About this file
This is a pricing schedule and line item detail document (Attachment 3) for Order #1 under the USAG-S Environmental Compliance Lab Support contract (Solicitation W91WFU26QA007). The document specifies 85 distinct line items across multiple service categories required by the U.S. Army at Grafenwoehr Training Area in Germany, with pricing to be provided by offerors in EUR and USD.
The services encompass project management and advisory services (450 hours of PM/advisory work, 30 mobilization events, and compliance assessment support); management plan development and updates (3 jobs with site visits); comprehensive training delivery including online seminars, in-person training, field exercises, materials, exams, and certifications (totaling 26 jobs across multiple formats); inspections ranging from standard 2-hour inspections to technical certifications by qualified specialists and re-inspections (94 total inspection jobs); field surveys including verification surveys, geospatial data updates, and database updates (5 jobs); technical environmental services such as safety cabinet inspections and parts cleaner services for multiple equipment models (61 services); hard copy printing, documentation development and updates, and permit renewals (17 jobs); spill supplies; water sampling and analysis across drinking water, storm water, wastewater, and specialized contaminant testing (244 sampling and analysis line items covering parameters such as bromate, chlorite, BTEX, PAH, heavy metals, PCB, and petroleum hydrocarbons); building materials sampling and reporting; and expedited analysis options with 24-hour and 36-hour turnaround times. The line items use various unit measures including hours, pages, jobs, and each item (EA), with quantities ranging from 1 to 70 units per line item.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 1-PWS_Compliance Lab Support.pdf | ||
| Attachment 4- W91WFU26QA0070001.pdf | ||
| REQUEST FOR QUOTE-Compliance-Amd 1.pdf | ||
| Attachment 2- Price List-Updated.xlsx | XLSX spreadsheet | |
| Attachment 5-SF 30.pdf | ||
| Attachment 6- Answers to Contractors RFI.xlsx | XLSX spreadsheet | |
| REQUEST FOR QUOTE-Issued.pdf | ||
| Attachment 4-SF1449 - W91WFU26QA007.pdf | ||
| Attachment 1-PWS Compliance.pdf | ||
| Attachment 2- Price List.xlsx | XLSX spreadsheet | |
| Attachment 3- Order 1.xlsx | XLSX spreadsheet |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Order 1 Order #1
| Item | Service Type | Service Description | Unit | Qty. | Unit Price/€ | Total / € | Total/ $ | |
| 0001 | Project Management/Advisory Services | Project Management/Advisory Services (paragraph 5.2.1) | hrs | 450 | ||||
| 0002 | Project Management | Mobilization per Event | Job | 30 | ||||
| 0003 | Advisory Services | Compliance Assessment Report | ||||||
| (paragraph 5.2.2.5) | 20 Pages | 5 | ||||||
| 0004 | Advisory Services | Correspondence with Authorities | ||||||
| (paragraph 5.) | Hrs | 2 | ||||||
| 0005 | Advisory Services | Meeting with Authorities | ||||||
| (paragraph 5.) | Hrs | 2 | ||||||
| 0006 | Advisory Services | Hazardous Substance Compliance Program Support | ||||||
| (paragraph 5.2.2.1) | Hrs | 265 | ||||||
| 0007 | Advisory Services | Environmental Awareness Support - Events | ||||||
| (paragraph 5.2.2.2) | Hrs | 10 | ||||||
| 0008 | Advisory Services | EPAS Support | ||||||
| (paragraph 5.2.2.3) | Hrs | 15 | ||||||
| 0009 | Advisory Services | Internal EPAAS Follow Up Support | ||||||
| (paragraph 5.2.2.3) | Hrs | 15 | ||||||
| 0010 | Advisory Services | Hazard Communication Program | ||||||
| (paragraph 5.) | Hrs | 15 | ||||||
| 0011 | Management Plan | Update Management Plan | ||||||
| (paragraph 5.2.3) | Job | 3 | ||||||
| 0012 | Management Plan | Site Visit for a Management Plan | ||||||
| (paragraph 5.2.3) | hrs | 5 | ||||||
| 0014 | Training | Update Training - | ||||||
| (paragraph 5.2.4.2) | Job | 1 | ||||||
| 0015 | Training | Provide Training - Online Seminar (up to 4 hours) | ||||||
| (paragraph 5.2.4.3) | Job | 4 | ||||||
| 0016 | Training | Provide Training - In-Person Training (up to 4 hours) | ||||||
| (paragraph 5.2.4.4) | Job | 4 | ||||||
| 0017 | Training | Provide Training - Field Exercise (up to 2 hours) | ||||||
| (paragraph 5.2.4.5) | Job | 5 | ||||||
| 0018 | Training | Provide training material for students (up to 10 pages) | ||||||
| (paragraph 5.2.4.6) | Job | 5 | ||||||
| 0019 | Training | Provide Exam (up to 10 Questions) | ||||||
| (paragraph 5.2.4.7) | Job | 5 | ||||||
| 0020 | Training | Training Certification (1 Training Certificate for up to 10 Students) (paragraph 5.2.4.8) | Job | 7 | ||||
| 0021 | Inspection | Inspection (2 hours) | ||||||
| (paragraph 5.2.5.1) | Job | 50 | ||||||
| 0022 | Inspection | Technical Inspection (qualified specialist) | ||||||
| (paragraph 5.2.5.2) | Job | 15 | ||||||
| 0023 | Inspection | Technical Certification Inspection (certified expert, Sachverständiger i.e. TÜV) | ||||||
| (paragraph 5.2.5.3) | Job | 10 | ||||||
| 0024 | Inspection | Re-Inspection (4 hours) | ||||||
| (paragraph 5.2.5.4) | Job | 4 | ||||||
| 0025 | Inspection | Site visit (2 hours) | ||||||
| (paragraph 5.2.5.5) | Job | 15 | ||||||
| 0026 | Surveys | Field Verification Survey and a Report | ||||||
| (paragraph 5.2.6.1) | Hrs | 2 | ||||||
| 0027 | Surveys | Geospatial Data Update (up to 50 pages) | ||||||
| (paragraph 5.2.6.2) | Job | 2 | ||||||
| 0028 | Surveys | Database Update (up to 50 pages) | ||||||
| (paragraph 5.2.6.3) | Job | 1 | ||||||
| 0030 | Technical Environmental Services | Safety Cabinet Inspection (paragraph 5.2.7.2) | Job | 1 | ||||
| 0031 | Technical Environmental Services | Parts Cleaner Services for model 112 | ||||||
| (paragraph 5.2.7.3) | Job | 12 | ||||||
| 0032 | Technical Environmental Services | Parts Cleaner Services for model 100 | ||||||
| (paragraph 5.2.7.3) | Job | 48 | ||||||
| 0033 | Hard copy / Printing services | Printing service to finalize deliverables required under specific tasks. For each deliverable, for eample booklets, fliers, the Government will specify quantity and quality according to the specifications. (paragraph 5.2.7.4) | Job | 5 | ||||
| 0034 | Documentation | Development of Documentation (up to 2 pages) | ||||||
| (paragraph 5.2.7.5) | Job | 5 | ||||||
| 0035 | Documentation | Update Documentation (up to 2 pages) | ||||||
| (paragraph 5.2.7.5) | Job | 7 | ||||||
| 0036 | Permits | Update or renewal of a permit (paragraph 5.2.7.6) | Job | 5 | ||||
| 0037 | Spill Supplies | Provision of Spill Supplies (Paragraph 5.2.7.7) | Job | 4 | ||||
| 0038 | Storm Water | Storm Water Sampling - qualified sample (qualifizierte Stichprobe) including weather conditions, field parameters and observations | Job | 70 | ||||
| 0039 | Storm Water | Storm Water Investigation Report for Panzer Kaserne (English & German) | EA | 1 | ||||
| 0040 | Drinking Water | Drinking Water Sampling - Bromate Sampling | EA | 35 | ||||
| 0041 | Drinking Water | Drinking Water Sampling - Residual Chlorine & Fluoride Sampling | EA | 35 | ||||
| 0042 | Drinking Water | Drinking Water Sampling - Chlorite Sampling | EA | 35 | ||||
| 0049 | Building Materials Support | Building Materials Sampling - from an existing pile | EA | 8 | ||||
| 0050 | Building Materials Support | Building Materials Sampling Reporting (English & German) | EA | 15 | ||||
| 0051 | Drinking Water Analysis | Bromate | EA | 25 | ||||
| 0052 | Drinking Water Analysis | Fluoride | EA | 25 | ||||
| 0053 | Drinking Water Analysis | Nitrate | EA | 4 | ||||
| 0056 | Drinking Water Analysis | Copper | EA | 4 | ||||
| 0057 | Drinking Water Analysis | Nitrite | EA | 4 | ||||
| 0058 | Drinking Water Analysis | Carbon Dioxide | EA | 4 | ||||
| 0059 | Drinking Water Analysis | Free Available Chlorine | EA | 25 | ||||
| 0060 | Drinking Water Analysis | Chlorite | EA | 25 | ||||
| 0061 | Drinking Water Analysis | Iron | EA | 3 | ||||
| 0062 | Storm Water Analysis | Lab analysis for stormwater to include: conductivity at 20°C (μS/cm), 25°C (μS/cm), pH, settleable solids (absetzbare Stoffe), chloride, sulfate, magnesium, sodium, potassium, cyanide | EA | 70 | ||||
| 0063 | Waste Water Analysis | Total Dissolved and Suspended and settleable Solids | EA | 7 | ||||
| 0064 | Waste Water Analysis | Total Organic Carbon (TOC), Chemical Oxygen Demand (COD), Biological Oxygen Demand (BOD), pH value, electric conductivity | EA | 7 | ||||
| 0065 | Waste Water Analysis | Inorganic parameters: Calcium (Ca), Potassium (K), Magnesium (Mg), Sodium (Na), Chloride (Cl), Sulfate (SO4), Cyanides | EA | 7 | ||||
| 0066 | Water Analysis | Sum BTEX and single parameters | EA | 2 | ||||
| 0067 | Water Analysis | PAH acc. to EPA incl. Benzo(a)pyrene, Sum PAH (16), Sum PAH (15) w/o Naphthalene, and single parameters | EA | 1 | ||||
| 0068 | Water Analysis | Total Trihalogenmethanes (TTHM) | EA | 2 | ||||
| 0069 | Water Analysis | Hexavalent and Trivalent Chrome (E 1413 Chrome VI, method: DIN 38405-D24) | EA | 2 | ||||
| 0070 | Water Analysis | Sum Total Petroleum Hydrocarbons(TPH), Hydrocarbon Index C10-C40 | EA | 2 | ||||
| 0071 | Water Analysis | Polychlorinated Biphenyls (PCB) : sum PCB (7) congeners and single parameters | EA | 2 | ||||
| 0072 | Water Analysis | Chlorinated Hydrocarbons (CHC) incl. Vinyl Chloride, sum and single parameters | EA | 2 | ||||
| 0073 | Water Analysis | Heavy metals: incl. Arsenic, Lead, Cadmium, Copper, Chromium, Mercury, Nickel, Thallium, Zinc | EA | 2 | ||||
| 0083 | Emergency Services | Emergency Services - Water & Building Sampling | EA | 2 | ||||
| 0084 | Expedited Analysis - Water Analysis - 24hrs | Analysis within 24 hours | EA | 2 | ||||
| 0085 | Expedited Analysis - Water Analysis - 36hrs | Analysis within 36 hours | EA | 2 | ||||
| Total: | ||||||||
| FY26 Exchange rate 0.9303 |
&K0000FFCall#1
File details come from the government source that posted it. Updated .