COMBINED SYNOPSIS/SOLICITATION

GENERAL INFORMATION

Notice Type: Combined Synopsis / Solicitation Solicitation Number: W91WFU-16-T-0013 Posted Date: 29 June 2016 Solicitation Response Date: 11 August 2016, 2:00 PM Central European Time.

Set Aside: Full and open competition without exclusions NAICS Code: 238210 – Electrical Contractors DESCRIPTION: This combined synopsis / solicitation is for a non-personnel services contract to procure and install IT/AV materials/equipment, hardware testing, and build-out in rooms 101, 102, 111 and 111A in Building #3350, Kelley Barracks, Stuttgart, Germany as described in the Performance Work Statement (PWS).

I. This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. Additionally, the Government will utilize simplified procedures in accordance with Subpart 13.5. This announcement constitutes the only solicitation, quotes are being requested and a separate solicitation will not be issued.

II. This solicitation is issued as a Request for Quote (RFQ) in accordance with FAR Part 12 and 13. Submit electronic quotes on RFQ reference W91WFU-16-T-0013.

III. This combined synopsis/solicitation incorporates provisions and clauses in accordance with Federal Acquisition Circular (FAC) 2005-87.

IV. Due to the overseas location of this solicitation, no set-aside will be used.

V. Attachments: Attachment 1 – Performance Work Statement (PWS) dated 18 July 2016.

VI. The period of performance for this requirement shall be proposed by the contractor; however the completion date of installation of all equipment to include hardware system operational verification test (SOVT) shall be no later than 15 weeks from the date of contract. The service is to be performed at the following address: US Army Garrison Stuttgart – Kelley Barracks, Stuttgart, Bldg 3350.

VII. The government will hold a site visit on Thursday 12 July 2016 at 11:00 AM CET. Attendees are to contact the contract specialist/officer no later than 2 days prior to the site visit to coordinate site access.

VIII. The provision of FAR 52.212-1, Instructions to Offerors – Commercial Items, and the attached addendum applies to this acquisition.

INSTRUCTIONS TO OFFEROR – ADDENDUM TO 52.212-1

1. Paragraph (a) Small business size standard does not apply to this solicitation

2. Paragraph (b) is modified to add the following requirements for submission in response to the solicitation:

a. Instructions for Proposal Submission:

It is the Government’s intend to award without discussions, per FAR 52.212-1(g), offerors are cautioned to reexamine the solicitation in its entirety and to ensure that their quote contains all necessary information, provides all required documentation, and is complete in all respects. The Government reserves the right to conduct discussions if in the best interest of the Government.

Any exceptions made to any of the line items and conditions of the offer must be stated in a separate letter of transmittals that is to accompany your quote.

Offers submitted in response to this solicitation must delete, or by explicit language exclude, any conditions (preprinted or otherwise) appearing on the offeror’s letterhead or on the reverse thereof which may be in conflict with any of the general special conditions contained in this solicitation. Failure to eliminate such conflicting conditions may result in rejection of the quote as unacceptable as such offer would not conform to the solicitation.

Late offers will be processed in accordance with FAR 52.212-1(f) “Late submission, modifications, revisions, and withdrawals of offers” This request does not commit the Government to pay any costs incurred in the preparation and submission of offeror’s proposal/quote or in making any necessary studies for the preparation thereof or for any visit the Contracting Officer may request for the purpose of clarification of the proposal or for preparation for negotiations.

Submit any questions regarding the solicitation by email to Mr. Nathan Pauly at Nathan.r.pauly2.civ@mail.mil AND Mrs. Birgit De Luca at birgit.deluca.LN@mail.mil AND maria.h.summers2.LN@mail.mil . All questions must be submitted no later than 5 days prior to the solicitation closing date.

Answers to questions will be posted under the solicitation number on FBO. Offerors are responsible to monitor the website for all notifications.

b. Proposal Preparation:

Volume I- Technical: This volume shall have no reference to the offeror’s name, trademark, logo, or reference that would identify the Offeror except the cover page of the Volume. The Offeror’s proposed response to Technical Capability shall demonstrate a thorough and comprehensive understanding of the PWS to effectively integrate the tasks outlined in the PWS with the required certification and contractor provided equipment. The response shall provide the details and documentation necessary to substantiate the proposed approach. Offerors are advised to submit quotes that are fully and clearly acceptable without additional explanation of information since the Government may make a final determination as to whether a quote is acceptable or unacceptable solely on the basis of the quote as presented and submitted without requesting any further information.

Technical proposal (Volume 1) shall not exceed 10 pages. The following do not count against the page limit: cover page, table of contents, acronym lists, and compliance matrices. The pages in response must be single sided pages with no foldouts. The font must be no smaller than 11pt. Times New Roman, and the margins must be no smaller than 1 inch on all sides. Each page must be numbered, using the format “page # of #,” in the bottom center of the page. The government will only read/evaluate the maximum number of pages allowed.

The quotes shall address the following technical factors:

i. Provide sufficient documentation that demonstrates experience in integrating and installing Unclassified/Classified Networks to include compliance with the United States Army in Europe (USAREUR) Cable Distribution Standards (CDS) Construction Standards requirements.

ii. Provide sufficient documentation to demonstrate the employee(s) assigned to this contract will meet the security clearance requirements as described in paragraph 1.6.7.2. of the PWS

iii. Provide sufficient documentation that demonstrates key personnel meet the requirements of paragraphs 1.6.10 and 1.6.11.1 including all necessary certificates as described in the PWS.

iv. Provide a preliminary Plan of Action and Milestone (POA&M) that meets the requirements listed in paragraphs 1.5 and 5.4 of the PWS.

Volume II – Price: Provide pricing based on the CLIN structure below. Total Evaluated Price (TEP) – The TEP will be calculated as the sum of the offeror’s proposed prices, CLINs 0001-0007.

CLIN DescriptionUnit of IssueUnit Cost
0001100 % IDP Verification Report/Approved1 Job
(as a follow-on to the 60 % design plan
Provided)

0002 Quality Control Plan accepted 1 Job

0003 100 % Approved IDP/AV Equipment. 1 Job In order to invoice for this CLIN, All equipment must be physical present Either onsite or at the contractor’s Storage facility.

0004 100 % Completion of all Equipment/ 1 Job Material Installation & Integration

0005 Completion of all Post Installation 1 Job Testing to include SOVT.

0006 Final As-Builts and Site Cleanup 1 Job

0007 Contractor Manpower Reporting CMRA 1 Job

Total:

c. Proposal Submission:

These submittals shall be reviewed and analyzed by the Government IAW the evaluation criteria listed under 52.212-2 and any associated addendums. The submittal package (Volumes I, and II) must be received by the designated date and Central European Time (CET). Fax submittals will not be accepted. The Government shall not be held liable for offers not received. Quotes shall be submitted to:

Nathan.r.pauly2.civ@mail.mil AND Birgit.deluca.LN@mail.mil

IX. The provision of FAR 52.212-2, Evaluation – Commercial Items, and the attached addendum applies to this acquisition.

EVALUATION – ADDENDUM TO 52.212-2

1. The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government. The award will be based on the Lowest Priced Technically Acceptable (LPTA) best value process.

2. Evaluation Factors and Approach: Using LPTA, the Government will evaluate price and Technical Acceptability. The LPTA process is accomplished through the establishment of minimum requirements to be evaluated on an “acceptable” or “unacceptable” basis. Award will be made to the offeror who has the lowest priced technically acceptable offer. Offerors shall submit a proposal that demonstrates the ability to meet all required technical factors. Simply restating the technical criteria within a proposal may result in an unacceptable rating and preclude the vendor from award. To achieve an overall “Acceptable” technical rating, all factors must be assessed as “Acceptable”. Failure to demonstrate the ability to meet any of the factors will result in an Unacceptable” rating. Only those proposals determined to be technically acceptable, either initially or as a result of discussions, will be considered for award. Any vendor listed on the SAM (excluded Parties Listing) is prohibited from receiving Government Awards regardless of technical and pricing factor results.

The following factors shall be used to evaluate offers:

i. Documentation of 1 Project that demonstrates the experience in integrating and installing Unclassified/Classified Networks including compliance with the United States Army in Europe (USAREUR) Cable Distribution Standards (CDS) Construction standards requirements.

ii. A staffing approach that demonstrates the employee(s) assigned to this contract will meet the security clearance requirements listed in paragraph 1.6.7.2. of the PWS.

iii. Proposed key personnel meet the requirements of paragraphs 1.6.10 and 1.6.11.1 of the PWS.

iv. A comprehensive preliminary (POA&M) that meets the requirements listed in paragraphs 1.5 and 5.4 of the PWS.

X. Clauses/Provisions

52.203-3GratuitiesAPR 1984
52.203-6 Alt IRestrictions On Subcontractor Sales To The Government (Sep 2006) -- Alternate I OCT 1995
52.203-11Certification And Disclosure Regarding Payments To Influence Certain Federal Transactions 2007
52.203-12Limitation On Payments To Influence Certain Federal TransactionsOCT 2010
52.203-13Contractor Code of Business Ethics and ConductAPR 2010
52.204-2Security Requirements AUG 1996
52.204-7System for Award ManagementJUL 2013
52.204-9Personal Identity Verification of Contractor PersonnelJAN 2011
52.204-10Reporting Executive Compensation and First-Tier Subcontract AwardsJUL 2013
52.204-13System for Award Management MaintenanceJUL 2013
52.204-19Incorporation by Reference of Representations and CertificationsDEC 2014
52.209-2Prohibition on Contracting with Inverted Domestic Corporations--Representation DEC 2014
52.209-6Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment AUG 2013
52.209-9Updates of Publicly Available Information Regarding Responsibility MattersJUL 2013
52.209-10Prohibition on Contracting With Inverted Domestic CorporationsDEC 2014
52.212-1Instructions to Offerors--Commercial ItemsAPR 2014
52.212-2Evaluation - Commercial ItemsOCT 2014
52.212-3Offeror Representations and Certifications- Commercial Items OCT 2014
52.212-4Contract Terms and Conditions--Commercial ItemsDEC 2014
52.212-5Contract Terms and Conditions Required to Implement Statutes or Executive Orders Deviation Mar 2015
52.222-17Nondisplacement of Qualified WorkersMAY 2014
52.222-21Prohibition Of Segregated FacilitiesFEB 1999
52.222-26Equal OpportunityMAR 2007
52.222-35Equal Opportunity for VeteransJUL 2014
52.222-36Equal Opportunity for Workers with DisabilitiesJUL 2014
52.222-37Employment Reports on VeteransJUL 2014
52.222-40Notification of Employee Rights Under the National Labor Relations ActDEC 2010
52.222-50Combating Trafficking in PersonsMAR 2015
52.222-54Employment Eligibility VerificationAUG 2013
52.223-3Hazardous Material Identification And Material Safety DataJAN 1997
52.223-18Encouraging Contractor Policies To Ban Text Messaging While DrivingAUG 2011
52.225-13Restrictions on Certain Foreign PurchasesJUN 2008
52.225-25Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran-- Representation and Certifications.DEC 2012
52.228-5Insurance - Work On A Government InstallationJAN 1997
52.229-6Taxes--Foreign Fixed-Price ContractsFEB 2013
52.232-33Payment by Electronic Funds Transfer--System for Award ManagementJUL 2013
52.233-4Applicable Law for Breach of Contract ClaimOCT 2004
52.237-1Site VisitAPR 1984
52.237-2Protection Of Government Buildings, Equipment, And VegetationAPR 1984
252.203-7000Requirements Relating to Compensation of Former DoD OfficialsSEP 2011
252.203-7002Requirement to Inform Employees of Whistleblower RightsSEP 2013
252.203-7003Agency Office of the Inspector GeneralDEC 2012
252.204-0002Line Item Specific: Sequential ACRN OrderSEP 2009
252.204-7003Control Of Government Personnel Work ProductAPR 1992
252.204-7012Safeguarding of Unclassified Controlled Technical InformationNOV 2013
252.204-7015Disclosure of Information to Litigation Support ContractorsFEB 2014
252.205-7000Provision Of Information To Cooperative Agreement HoldersDEC 1991
252.209-7004Subcontracting With Firms That Are Owned or Controlled By The Government of a Country that is a State Sponsor of TerrorismDEC 2014
252.222-7002Compliance With Local Labor Laws (Overseas)JUN 1997
252.223-7001Hazard Warning LabelsDEC 1991
252.223-7006Prohibition On Storage, Treatment, and Disposal of Toxic or Hazardous MaterialsSEP 2014
252.225-7013Duty-Free Entry--Basic (Nov 2014)NOV 2014
252.225-7041Correspondence in EnglishJUN 1997
252.225-7993 Prohibition on Contracting with the Enemy (Deviation)SEP 2014
252.229-7000Invoices Exclusive of Taxes or DutiesJUN 1997
252.229-7002Customs Exemptions (Germany)JUN 1997
252.232-7003Electronic Submission of Payment Requests and Receiving ReportsJUN 2012
252.232-7006Wide Area Workflow Payment Instructions May 2013
252.232-7008Assignment of Claims (Overseas)JUN 1997
252.232-7010Levies on Contract PaymentsDEC 2006
252.233-7001Choice of Law (Overseas)JUN 1997
252.243-7002Requests for Equitable AdjustmentDEC 2012
252.247-7000Hardship ConditionsAUG 2000
252.247-7023Transportation of Supplies by SeaAPR 2014

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

http://www.arnet.gov/far http://farsite.hill.af.mil http://www.dtic.mil/dfars

(End of provision)

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

http://www.arnet.gov/far http://farsite.hill.af.mil http://www.dtic.mil/dfars

(End of clause)

CCE 204-4005 CONVENTIONAL FORCES EUROPE (CFE) TREATY VERIFICATION INSPECTION (March 2005)

Contractor-owned or controlled structures and containers located on U.S. Government installations are subject to short-notice inspections by CFE treaty inspection teams. The Government will endeavor to provide the Contractor as much notice as possible in the event of such inspections. The contractor shall provide access to such structures and containers at the request of the Government. The Contractor shall report such inspections to the Contracting Officer in writing within ten (10) calendar days of completion of the inspection. Contractor-owned or controlled structures and/or containers on U.S. installations may have to be inspected to comply with the CFE treaty even if Contractor personnel are unavailable to provide access. Any costs borne by the Contractor or any impact on contract performance as a result of the inspection will be a matter of negotiation between the Contractor and the Contracting Officer.

CCE 225-4000 AUTHORIZATION TO PERFORM SERVICES IN GERMANY (March 2005)

Contractors performing services in the Federal Republic of Germany (FRG) shall comply with German law. The Contractor shall determine whether performance requires registration with German authorities or authorization to do business in Germany and, if so, shall comply with all requirements. Whether or not registration or authorization to do business is required, the Contractor also shall determine what documents or authorization its employees and any subcontractor employees must possess to work in Germany. The Contractor shall ensure affirmatively that its employees and subcontractor employees possess such documents or authorizations.

Contractor employees who:

(a) are not nationals of Germany or other European Union countries, and

(b) are not members of the force, the civilian component or their dependents, and

(c) do not have assimilated status under Articles 71, 72, or 73 of the Supplementary Agreement to the NATO SOFA shall possess work and residence permits.

By acceptance of and performance under this contract and any task orders or delivery orders issued hereunder, the Contractor affirms that it has complied with the requirements above.

Compliance with this clause and German law is a material contract requirement. Noncompliance by the Contractor or Subcontractor at any tier shall be grounds for issuing a negative past performance evaluation and terminating this contract, task order, or delivery order for default.

(End of local clause)

CCE 225-4001 INSTALLATION CLEARANCE REQUIREMENTS (March 2005)

(a) Access to U.S. installations and controlled areas is limited to personnel who meet security criteria and are authorized by Host Nation law to work in that country. Failure to submit required information/data and obtain required documentation or clearances in accordance with AE Regulation 190-16, Installation Access Control, will be grounds for denying access to U.S. installations and controlled areas. The Contractor is responsible to ensure that any Subcontractor used in performance of this contract complies with these requirements and that all employees, of both the Contractor and any Subcontractor utilized by the contractor, are made aware of and comply with these requirements.

(b) The Contractor is responsible for being aware of and complying with the requirements associated with Installation Access Control. The Government is not liable for any costs associated with performance delays due solely to a firm’s failure to comply with Installation Access Control (IAC) processing requirements.

(c) The Contractor is responsible for returning installation passes to the issuing Installation Access Control Office (IACO) when the contract is completed or when a contractor employee no longer requires access.

(d) AE 190-16 (and AE 190-16-G German translation) can be found on the following website: http://www.hq.usacce.army.mil/

CCE.233-4002 AMC-LEVEL PROTEST PROGRAM (January 2014)

If you have complaints about this procurement, it is preferable that you first attempt to resolve those concerns with the responsible contracting officer. However, you can also protest to Headquarters, AMC. The HQ, AMC-Level Protest Program is intended to encourage interested parties to seek resolution of their concerns within AMC as an Alternative Dispute Resolution forum, rather than filing a protest with the Government Accountability Office or other external forum. Contract award or performance is suspended during the protest to the same extent, and within the same time periods, as if filed at the GAO. The AMC protest decision goal is to resolve protests within 20 working days from filing. To be timely, protests must be filed within the periods specified in FAR 33.103. Send protests (other than protests to the contracting officer) to:

Protest to HQAMC shall be filed at:

Headquarters U.S. Army Materiel Command Office of Command Counsel-Deputy Command Counsel 4400 Martin Road Rm: A6SE040.001 Redstone Arsenal, AL 35898-5000 Fax: (256) 450-8840 or e-mail: usarmy.redstone.usamc.mbx.protests@mail.mil

Packages sent by FedEx or UPS should be addressed to:

Headquarters U.S. Army Materiel Command Office of Command Counsel-Deputy Command Counsel 4400 Martin Road Rm: A6SE040.001 Redstone Arsenal, AL 35898-5000

The AMC-level protest procedures are found at:

http://www.amc.army.mil/pa/COMMANDCOUNSEL.asp

If Internet access is not available, contact the contracting officer or HQ, AMC to obtain the AMC-Level Protest Procedures.

(End of Provision)

CCE 236-4000 ACCIDENT PREVENTION - HOST NATION SAFETY LAWS AND REGULATIONS (GERMANY) (MAR 2005)

The Contractor shall comply with FAR 52.236-13, Accident Prevention (NOV 1991), the references contained therein (e.g. EM 385-1-1), and applicable Host Nation Safety Laws and Regulations. The requirements under FAR 52.236-13 and specifically of the EM 385-1-1 include, but are not limited to the following:

(a) Before initiation of work at the job site, an accident prevention plan, written by the Contractor for the specific work and hazards of the contract and implementing in detail the pertinent requirements of EM 385-1-1, will be approved by designated Government personnel. Specific requirements for development of the accident prevention plan are found in 01.A and Appendix A of EM 385-1-1. EM 385-1-1 is available online at www.usace.army.mil.

(b) Before beginning each activity involving a type of work presenting hazards not experienced in previous project operations or where a new work crew or subcontractor is to perform work, activity hazard analysis (AHA) shall be prepared by the Contractor performing the work activity (See paragraph 01.a.09 of EM 385-1-1).

(c) The Contractor shall require subcontractors to submit their plan of operations showing methods they propose to use in accomplishing major phases of work.

(d) The Contractor shall discuss the plans in conferences convened by the Contracting Officer prior to starting work on each major phase of operation. Plans shall include all pertinent information such as layout of haul roads, access roads, storage areas, electrical distribution lines, methods of providing minimum exposure to overhead loads, and methods of access to work areas. The plan for accomplishing the initial work phase shall be submitted within 15 calendar days after award of the contract. Plans for subsequent major phases of work shall be submitted no later than 15 calendar days prior to initiation of work on each major phase.

(e) In all areas where construction, demolition, alteration, building, or similar related activities take place, the contractor shall have the following minimum personal protective clothing and equipment requirements in place for any person working on or visiting the site:

(1) Short sleeve shirt.

(2) Long trousers.

(3) Steel-toed safety boots.

(4) Hard hat.

(f) In addition to other requirements for accident prevention specified in this contract, the Contractor is responsible for compliance with all Federal and State requirements governing safety and health protection on construction sites and other applicable occupational safety codes. In particular, within the requirements of the German Safety and Health Protection Regulation for Construction Sites, Baustellenverordnung (BaustellV), dated 10 June 1998, the Contractor is responsible for coordination of all work at the site, including development of plans and providing advance notices. The Contractor shall indicate his plan for compliance considering conditions of the work described by the design, technical proposal, operational activities of the Government or others in the area of the work, identification of the coordinator, and implementation of all other accident prevention provisions of this contract. For the compliance with host nation laws and regulations, the contractor will assure that he complies with the non-exclusive list of duties described in this clause. If the contractor determines that additional activities are required to fully comply, the contractor shall assure that compliance with the laws is complete. The duties include:

(1) Conditions of construction and operational activities to be considered include but are not limited construction activities meeting the following criteria:

(A) The work is scheduled to last longer than 30 working days and on which more than 20 workers are occupied simultaneously, or

(B) The volume of work is scheduled to exceed 500 person days, or the work presents particularly hazardous tasks (e.g. excavations deeper than 5 meters, falls from a height of greater than 7 meters, exposures to hazardous chemical or biological substances, work at less than 5 meters from high voltage lines, underground earth works or tunnels, danger of drowning, diving, use of compressed air, work with ionizing radiation, explosives, or work involving assembly or dismantling of heavy prefabricated components (10 tons or greater)).

(2) If the Contractor determines that the BaustellV, dated 10 June 1998, applies, the Contractor shall prepare a Safety and Health Protection Plan (SIGE) as required under that regulation. The SIGE shall be submitted two weeks prior to mobilization. In addition, the Contractor shall appoint a qualified Safety Coordinator who will ensure that safety measures are implemented during construction. The Safety Coordinator must meet minimum training and experience requirements required under Host Nation laws.

(A) The SIGE will be written in a comprehensive form and explained in language the workers understand and shall contain the following minimum information:

i) Maintenance of tools and equipment.

ii) Provisions for the storage and disposal of materials and waste, particular hazardous materials and substances.

iii) Modifying performance periods for such work, taking into consideration the site conditions.

iv) Organizing cooperation between different employers and contractors without employees.

v) Interaction between work at the site and other operational activities in the area, on which or near which the first identified work will be performed, and taking into consideration the instructions and advice of the coordinator as well as safety and health plans.

(B) The Contractor is responsible for completing and providing any safety notifications required by host nation authorities and will provide proof to the Contracting Officer that such notifications were made.

CCE-236-4001 PERMITS AND RESPONSIBILITIES (March 2005)

The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits, and for complying with any applicable laws, codes, and regulations applicable to the performance of the work. The Contractor shall also take proper safety and health precautions to protect the work, the workers, the public, and the property of others. The Contractor shall be responsible for all damages to persons or property that occur as a result of the Contractor’s fault or negligence. The Contractor shall also be responsible for all materials delivered and work performed until completion and acceptance of the entire work, except for any completed unit of work that may have been accepted under the contract.

CCE 237-4000 CONTRACTOR IDENTIFICATION REQUIREMENT (March 2005)

All contractor personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious are required to identify themselves as such to avoid being mistaken for Government officials. Contractors performing work at Government workplaces will provide their employees with an easily readable identification (ID) badge indicating the employee’s name, the contractor’s name, the functional area of assignment, and a recent color photograph of the employee. Contractors shall require their employees wear the ID badges visibly when performing work at Government workplaces. Contractor personnel must also ensure that all e-mails, documents or reports they produce are suitably marked as contractor products or that contractor participation is appropriately disclosed.

(End of local clause)