Repair_Building_5002_REV_1_-_Existing_Plans-Drawings.pdf
PDF 1 MB Posted
- Attached to
- Repair Building 5002
- Solicitation number
- W91SMC-17-B-0004
About this file
Existing Plans/Drawings for Building 5002
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G.1
A.1
A.2
A.3
A.3.1
A.4
A.5
A.6
A.7
A.8
COVER SHEET
NOTE SHEET
LAYOUT AREAS / LEGEND
AREA 1
SERVICE DESK DETAILS
AREA 2
AREA 3
AREA 4
AREA 5
AREA 6
1. ALL CUTTING AND PATCHING REQUIRED FOR THE INSTALLATION OF NEW CONSTRUCTION,
EQUIPMENT AND FINISHES.
2. ALTERATIONS REQUIRED BY THE DRAWINGS AND AS REQUIRED BY THE CONDITIONS
ENCOUNTERED DURING PROGRESS OF THE WORK.
3. ALTERATIONS NEITHER INDICATED ON THE CONSTRUCTION DRAWINGS, NOR SPECIFIED
HEREIN, BUT NECESSARY TO RESTORE EXISTING WORK DISTURBED UNDER THIS CONTRACT
TO FINISH CONDITION SATISFACTORY TO THE CONTRACTING OFFICER.
4. TEMPORARY WORK REQUIRED BY THE DRAWINGS AND/OR HEREIN SPECIFIED, INCLUDING THE
PROTECTION OF EXISTING CONSTRUCTION AND FINISHES. TEMPORARY ENCLOSURES AND
OTHER PRECAUTIONS AS MAY BE REQUIRED TO PREVENT DAMAGES.
5. PREPARATION OF EXISTING SURFACES AND WORK AS REQUIRED FOR PROPER INSTALLATION
OF NEW CONSTRUCTION AND FINISHES.
6. OVERHEAD CONSTRUCTION, DUCTWORK, PIPES, ETC. INTERFERING WITH REQUIRED CEILING
HEIGHTS AND LIGHTING FIXTURES SHALL BE NOTED. GENERAL CONTRACTOR SHALL REPORT
EXTENT OF INTERFERENCE (IF ANY) TO THE CONTRACTING OFFICER WITHOUT DELAY.
7. ALL DRYWALL CONSTRUCTION IS TO BE DONE AS RECOMMENDED BY THE MANUFACTURER IN
STRICT ACCORDANCE WITH THEIR SPECIFICATIONS. ALL INSIDE AND OUTSIDE CORNERS, CUT
EDGES OF WALL BOARD, ETC. TO RECEIVE APPROPRIATE CORNER BEAD, REINFORCEMENT
TAPE, EDGE TRIM, ETC. EDGE TRIM TO BE USED AT REVEALS AND WHEREVER DRYWALL
ABUTS A DIFFERENT MATERIAL. ADD MOISTURE RESISTANT 5/8" DRYWALL TO ALL
APPROPRIATE WET AREAS TO SATISFY ALL STATE, LOCAL, AND FEDERAL CODES.
8. ALL EXISTING FLOOR SUBSTRATE WITHIN THE SCOPE OF WORK SHALL BE LEVELED, FILLED
AND PATCHED BY THE CONTRACTOR WITH APPROPRIATE COMPOUND. THE CONTRACTOR
SHALL FILL DENTS, CRACKS, HOLLOW PLACES, OPEN JOINTS AND OTHER IRREGULARITIES, IN
EXISTING WALLS, WITH SUITABLE FILLER.
9. EXISTING INTERIOR WOOD DOORS TO REMAIN AND OR SALVAGE FOR REUSE WITHIN THE
DEFINED SCOPE OF WORK. WOOD DOOR STAIN TO MATCH EXISTING FINISH. HOLLOW METAL
FRAMES TO MATCH COLOR OF EXISTING HOLLOW METAL FRAMES. - UNLESS NOTED
OTHERWISE. EXISTING DOOR HARDWARE TO REMAIN AND REUSED - UNLESS NOTED
OTHERWISE. NEW DOOR HARDWARE TO MATCH EXISTING.
10. THE CONTRACTOR SHALL PROVIDE SUFFICIENT FRAMING AND BLOCKING FOR ALL WALL
OPENINGS FOR DUCTWORK, RETURN AIR OPENINGS AND GRILLE OPENINGS ABOVE AND
BELOW SUSPENDED CEILINGS AND SHALL COORDINATED WITH HVAC DRAWINGS AND THE
MECHANICAL SHOP DRAWINGS. ALL OPENINGS SHALL BE PROPERLY SEALED FOR
SOUNDPROOFING VIBRATION AND FIRE-RATED, IF REQUIRED.
11. ALL INFILL AREAS OF EXISTING WALLS, COLUMN ENCLOSURE, CHASE WALLS, ETC. THAT HAVE
BEEN CUT OPEN PRIOR TO CONSTRUCTION, FOR EXPLORATORY OPERATIONS, OR DURING
CONSTRUCTION OPERATIONS. USE SIMILAR MATERIALS ADJACENT TO EXISTING
CONSTRUCTION, PREPARE SURFACE READY TO RECEIVE NEW FINISHES.
12. PROVIDE DUSTPROOF AND NOISE CONTROL BARRIER PARTITIONS TO ADJACENT OCCUPIED
SPACES.
13. GENERAL CONTRACTOR SHALL COORDINATE WITH MILL WORKER FOR INSTALLATION OF FIRE
RETARDANT WOOD BLOCKING IN DRYWALL (INCLUDING SHELVES, CABINETS, DOOR FRAMES,
COUNTERTOPS, ARTWORK, AND LIGHT FIXTURES, ETC.).
14. ALL NEW INTERIOR DOOR OPENINGS SHALL BE CONSTRUCTED 4" FROM THE FINISHED FACE
OF THE ADJACENT WALL, UNLESS NOTED OTHERWISE.
15. LUMBER IN CONTACT WITH WEATHER, MASONRY OR CONCRETE SHALL BE TREATED WITH
WOOD PRESERVATIVE AND BE FIRE RETARDANT.
16. FINISH WOODWORK AND MILLWORK SHALL MEET ARCHITECTURAL WOODWORK INSTITUTE
QUALITY STANDARDS.
17. INSTALL ALL WORK PLUMB, LEVEL, TRUE, SQUARE, STRAIGHT AND IN PROPER ALIGNMENT
WITH NO DISTORTIONS, PROVIDE SHIMS AS REQUIRED.
18. FASTEN SECURELY ARCHITECTURAL WOODWORK ITEMS TO BLOCKING WITH CONCEALED
FASTENERS ONLY. WHERE SURFACE NAILING IS REQUIRED, COUNTERSINK AND FILL FLUSH
WITH THE WOODWORK SO THAT FINISHED HEADS ARE UNDETECTABLE.
19. COORDINATE INSTALLATION WITH THE WORK OF OTHER TRADES TO ENSURE EXACT FIT AND
PERFECT ALIGNMENT. VERIFY DIMENSIONS BEFORE PROCEEDING AND OBTAIN
MEASUREMENTS AT JOB SITE FOR WORK REQUIRED TO BE ACCURATELY FITTED TO OTHER
CONSTRUCTION.
20. DO ALL CUTTING AND PATCHING REQUIRED TO MAKE OTHER PARTS OF THE WORK COME
TOGETHER PROPERLY AND TO FIX WORK TO RECEIVE OR BE RECEIVED BY OTHER TRADES AS
INDICATED ON CONTRACT DOCUMENTS.
21. REFER TO FINISH PLANS AND FINISH LEGEND SPECIFICATION FOR ALL FINISH INFORMATION
AND COORDINATION.
22. DIMENSION PARTITIONS FROM FACE TO FACE OF GYPSUM BOARD UNLESS OTHERWISE
NOTED. LAYOUT PARTITIONS ON SITE AND CONFIRM DIMENSION WITH THE CONTRACTING
OFFICER PRIOR TO SECURING PARTITION TRACKS.
23. DO NOT SCALE DRAWINGS, INDICATED DIMENSIONS SHALL GOVERN. LARGER SCALED
DRAWINGS SHALL GOVERN OVER SMALLER SCALED DRAWINGS.
24. ALL WORK AND MATERIALS SHALL BE GUARANTEED AGAINST DEFECTS UNTIL AFTER
ACCEPTANCE OF INSTALLATION IS MADE BY THE CONTRACTING OFFICER.
25. PROVIDE WOOD BLOCKING AND FRAMING, ANCHORS, CLIPS, SUPPORTING AND ATTACHING
DEVICES REQUIRED FOR COMPLETE INSTALLATION.
26. ALL AREAS WITH EXISTING CARPETING WITHIN THE SCOPE OF WORK TO BE DEMOLISHED AND
REMOVED, UNLESS NOTED OTHERWISE (UNO) - PREP SUBSTRATE TO RECEIVE NEW
CARPETING IN SAME LOCATION AS EXISTING.
27. GYPSUM BOARD SURFACES TO BE PATCHED AND REPAIRED TO LIKE NEW CONDITION READY
TO RECEIVE NEW PAINT FINISH - TYPICAL FOR INTERIOR WALL SURFACES UNLESS NOTED
OTHERWISE.
28. PROVIDE AND INSTALL FIRE SAFING INSULATION AT ALL PIPE, DUCT, ELECTRICAL, ETC. , PENETRATIONS THROUGH CONCRETE FLOOR SLABS AND AT FIRE AND SMOKE WALLS.
29. ALL DUCT PENETRATION THROUGH PARTITIONS AND CEILING SHALL BE PROVIDED WITH
NECESSARY FRAMES AND BRACING AROUND THE OPENING AND SHALL BE PROVIDED WITH
AUTOMATIC FIRE DAMPERS AS REQUIRED BY THE BUILDING DEPARTMENT FOR FIRE RATED
PENETRATIONS.
30. SAW CUT AND REMOVE INTERIOR CONCRETE SLAB AS REQUIRED AND WHERE INDICATED ON
THE CONSTRUCTION DRAWINGS. WHERE EXISTING INTERIOR CONCRETE SLABS ARE
REMOVED FOR THE INSTALLATION OF PLUMBING OR ELECTRICAL SYSTEMS, REMOVE
CONCRETE COMPLETELY. BACKFILL AND COMPACT SUBBASE TO MINIMUM 95%
COMPACTIONS. PATCH / REPLACE EXISTING MATERIALS WITH: INSECTICIDE SOIL TREATMENT
AT DISTURBED AREAS, 4" THICK CRUSHED ROCK SUBGRADE, 10 MIL POLYETHYLENE VAPOR
BARRIER AND WELDED WIRE FABRIC REINFORCED CONCRETE SLAB. POUR CONCRETE DEPTH
TO MATCH EXISTING THICKNESS WITH A MINIMUM 3,000 PSI. REFERENCE MECHANICAL
DRAWINGS FOR EXTENT OF CONCRETE SLAB REMOVAL.
MOBILITY
STORAGE
PARTS/TOOLS
ENGINEERING
SECTION
LOCK
SHOP
JAN.
CONFERENCE
CONFERENCE
PLANNING
DEPUTY
BCE
TESTING
109B
SHOP
TRAINING
ROOM
UTILITIES/
HVAC/SHOP
CARPENTER
SHOP
SHOP
TRAINING
ROOM
109A
OPERATIONS
SHOP
TRAINING
ROOM
BREAK
ROOM
EQUIP.
STORAGE
CORRIDOR
ENVMTAL
ENGINEERING
OFFICER
VEST.
WOMEN
FACILITY
MGR.
PLOT/
CADD
CORRIDOR
VEST.
MECHANICAL/
ELECTRICAL
MEN
COMM./
ELECT.
LEKTRIEVER
AREA
INSTRUCTOR
OFFICE
BCE ADMIN.
COMMANDER
BCE
COPY/
FAX/
SUPP.
TESTING
OFFICE
CLASSROOM
BCE CONF
ROOM
1ST SGT
ABO
CLASS
CLASSROOM
108A
STATE
SUPERVISOR
DEPUTY
BCE
VEST.
BCE ADMIN.
COMMANDER
BCE
BCE CONF
ROOM
OPERATIONS
VEST.
FACILITY
MGR.
108A
STATE
SUPERVISOR
CONFERENCE
OPERATIONS
CORRIDOR
FACILITY
MGR.
SHOP
SHOP
TRAINING
ROOM
TRAINING
ROOM
BREAK
ROOM
CORRIDOR
PLOT/
CADD
LOCK
SHOP
SHOP
TRAINING
ROOM
SHOP
TRAINING
ROOM
SHOP
TRAINING
ROOM
ENVMTAL
ENGINEERING
MOBILITY
STORAGE
PARTS/TOOLS
UTILITIES/
HVAC/SHOP
File details come from the government source that posted it. Updated .