Atch 10 Questions and Answer- UPDATED.pdf
PDF 103 KB Posted
- Attached to
- RHN X-Band AC Replacement
- Solicitation number
- W91RUS26QA039
About this file
This is a Questions and Answers document for the CCAP-DDH federal contract opportunity dated July 28, 2026.
The document clarifies key requirements for the replacement of two 10-ton packaged air conditioning units. Regarding equipment specifications, copper tube/aluminum fin coils are acceptable for the units, and Trade Agreements Act (TAA) compliance is not applicable. For installation work, contractors are required to replace only transition ductwork connected to the equipment rather than all exposed ductwork, and electrical work is limited to replacing existing wires and conduits from the existing disconnect switch to the new unit. Both existing units may be replaced simultaneously rather than sequentially, and both 10-ton AC units must be worked on at the same time. The solicitation deadline was extended from the originally requested August 7, 2026 to August 5, 2026, providing contractors additional time to obtain manufacturer pricing and prepare bid requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CCAP-DDH July 28 2026 Questions & Answers
1. Is Trade Agreements Act (TAA)-compliant equipment acceptable for this project?
TAA is Not Applicable for this requirement.
2. For the 10Ton packaged air conditioning units, is a copper tube/copper fin coil required, or is a copper tube/aluminum fin coil acceptable? Copper tube/aluminum fin coil
3. Regarding the ductwork, is the requirement to replace all exposed ductwork, or only the transition ductwork connected to the equipment? Only the transition ductwork
4. For the electrical work, will we only replace the existing electrical wires and conduits from the existing disconnect switch to the new unit? Yes
5. Can we replace both existing units at the same time or one (1) unit at a time only? Both existing units at the same time
6. We respectfully request an extension for the submission of the bid until August 7, 2026. This additional time will enable us to obtain pricing from our manufacturers and adequately prepare the necessary bid requirements. Yes, we have extended the Solicitation, but we will only extend the Solicitation until 5th August 2026.
7. We would like to clarify the sequence of operations for the two 10-ton AC units associated with this project? “Need to work on both two 10-ton AC at the same time. If that’s what you mean sequence of operations.”