Atch 2 FI-MUE - Guam RHN X-Band AC Replacement (SOW) r1.pdf
PDF 8 MB Posted
- Attached to
- RHN X-Band AC Replacement
- Solicitation number
- W91RUS26QA039
About this file
This is a Statement of Work (SOW) for the turnkey replacement of two 10-ton packaged air conditioning units providing mission-critical cooling for the Naval Computer and Telecommunications Station (NCTS) / Regional Hub Node (RHN) Guam X-Band Terminal at Camp Blaz, Guam.
The contractor shall manage the complete decommissioning, removal, and disposal of two existing legacy Daikin AC units in full compliance with EPA and local Guam environmental regulations, including refrigerant recovery, compressor oil drainage, and proper transportation to authorized disposal facilities. The contractor must provide official receipts and certificates of disposal/destruction as a condition of project acceptance. Installation of two new packaged AC units must include site preparation, delivery and rigging coordination, electrical integration to the existing power panel (with allowance to reuse existing conduits and wiring if serviceable and properly sized, or provide new wiring as needed), connection to existing ductwork per SMACNA standards, and installation of new refrigerant lines sized and pressure-tested per manufacturer specifications. The new units shall be 10-ton packaged AC units with N+1 redundancy, R-410A or EPA-approved refrigerant, corrosion-resistant coatings suitable for marine environments, digital scroll compressors, independent unit controllers capable of standalone or Building Automation System integration, and IEER efficiency meeting current U.S. Department of Energy standards. The contractor must develop and submit a comprehensive Test and Commissioning Plan 14 days prior to testing, conduct functional performance testing including refrigerant charge verification, airflow measurement (CFM), temperature differentials, and static pressure verification, and coordinate power outages with the Contracting Officer's Representative at least 30 business days in advance. Deliverables include the two new units, complete turnkey installation with testing and commissioning, Test and Commissioning Plan, final documentation package with as-built drawings, O&M manuals, startup/commissioning reports and warranty certificates, on-site training for government personnel, detailed project schedule submitted 30 days prior to work start, and disposal certificates. All contractor personnel performing work must be U.S. citizens eligible for base access to Camp Blaz and will be escorted by authorized personnel at all times. The contract shall include a minimum two-year comprehensive warranty covering all parts and labor, provided by the contractor or Original Equipment Manufacturer.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
FI-MUE Gaum RHN X-Band AC Replacement
78th Signal Battalion
1. INTRODUCTION
This Statement of Work (SOW) defines the requirements, scope, responsibiliƟes, and deliverables for the turnkey replacement of two (2) 10-ton packaged Air CondiƟoning (AC) units that provide mission-criƟcal cooling for the Naval Computer and TelecommunicaƟons StaƟon (NCTS) / Regional Hub Node (RHN)
Guam X-Band Terminal.
2. SCOPE OF WORK
The contractor shall provide all necessary project management, materials, equipment, labor, and technical services to perform the following:
2.1. Decommissioning and Removal of ExisƟng AC Units
Perform lock-out/tag-out (LOTO) and safely disconnect both legacy AC units from the electrical distribuƟon system.
In accordance with all environmental regulaƟons, recover and reclaim all refrigerant from both units.
Drain and contain all compressor oils and other lubricants for proper disposal.
Rigorously disconnect and remove the units from their roof curbs/mounƟng pads.
Dismantle and transport the legacy AC units from the site to an authorized disposal and recycling facility.
Remove and dispose of any associated conduits, refrigerant lines, or ductwork that cannot be reused for the new system installaƟon.
2.2. Disposal and Environmental Compliance
The contractor is solely responsible for the off-base transportaƟon and final disposal of the two decommissioned AC units, including all components, refrigerants, and oils.
All hazardous materials must be handled and disposed of in strict compliance with U.S.
Environmental ProtecƟon Agency (EPA) and applicable local Guam environmental regulaƟons.
The contractor shall provide the ContracƟng Officer's RepresentaƟve (COR) with official receipts and cerƟficates of disposal/destrucƟon for all hazardous materials and decommissioned equipment as a condiƟon of project acceptance.
2.3. InstallaƟon of New Packaged AC Units
Prepare the site for installaƟon, including any necessary modificaƟons to the exisƟng mounƟng pads to accommodate the new units.
Coordinate the delivery, rigging, and offloading of the two new packaged AC units.
Install and securely anchor both units in their designated posiƟons.
Perform electrical integraƟon to the exisƟng power panel. The contractor may reuse exisƟng conduits and wiring, provided they are in serviceable condiƟon, appropriately sized per the new equipment specificaƟons, and can be connected without splicing. If exisƟng wiring is inadequate, the contractor shall provide and install new wiring from the panel to the units.
Connect to exisƟng ductwork. If modificaƟons are required, they shall be executed to Sheet
Metal and Air CondiƟoning Contractors' NaƟonal AssociaƟon (SMACNA) standards.
Install new refrigerant lines, ensuring they are correctly sized, insulated, and pressure-tested per manufacturer specificaƟons.
2.4. TesƟng and Commissioning
The contractor shall develop and submit a comprehensive Test and Commissioning Plan to the technical POC for review and approval no later than 14 days prior to scheduled tesƟng.
Verify all electrical connecƟons, safeƟes, and control sequences.
Conduct funcƟonal performance tesƟng, which must include, at a minimum: verificaƟon of refrigerant charge, measurement of airflow (CFM), temperature differenƟals across coils, and staƟc pressures.
Demonstrate the system's ability to meet the cooling load requirements as specified.
Coordinate any required power outages with the COR at least 30 business days in advance.
2.5. Handover and DocumentaƟon
Provide on-site training for facility personnel covering the operaƟon, rouƟne maintenance, and troubleshooƟng of the new HVAC system.
Submit a final documentaƟon package containing as-built drawings, manufacturer's installaƟon and operaƟon manuals, a complete startup/commissioning report, and all warranty documents.
Conduct a final project walkthrough with the COR for official handover and acceptance.
3. TECHNICAL SPECIFICATIONS
3.1. ExisƟng Unit Details (For Disposal)
QuanƟty: Two (2)
Nominal Capacity: 10 Tons (each)
Status: Unserviceable and funcƟonally obsolete. To be decommissioned and disposed of.
3.2. New Packaged AC Unit SpecificaƟons
QuanƟty: Two (2)
Nominal Capacity: 10 Tons (each), providing N+1 redundancy.
Voltage: To match exisƟng site electrical service (e.g., 208V/3-Phase, 480V/3-Phase). The contractor is responsible for verifying exact site voltage during the pre-proposal site survey.
Efficiency: Shall meet or exceed current U.S. Department of Energy minimum IEER (Integrated
Energy Efficiency RaƟo) standards for this equipment class.
Refrigerant: R-410A or other modern, EPA-approved, non-ozone-depleƟng refrigerant.
Features:
Corrosion-resistant coaƟng on condenser and evaporator coils suitable for a marine environment.
Digital scroll compressors.
Independent unit controllers capable of standalone operaƟon and/or integraƟon with a future Building AutomaƟon System (BAS).
Unit-mounted non-fused disconnect switch for maintenance isolaƟon.
Environmental Compliance: Must meet all relevant U.S. and Guam standards for noise and environmental impact.
Warranty: The contract shall include a minimum two-year comprehensive warranty covering all parts and labor, provided by the contractor or Original Equipment Manufacturer (OEM).
4. DELIVERABLES
The contractor shall provide the following key deliverables:
Two (2) new 10-ton packaged AC units meeƟng all specificaƟons herein.
A complete, turnkey installaƟon including tesƟng and commissioning.
A Test and Commissioning Plan.
Final DocumentaƟon Package (As-built drawings, O&M Manuals, Test Reports, Warranty
CerƟficates).
On-site training for government personnel.
A detailed Project Schedule submiƩed to the COR 30 days prior to the start of work.
Official receipts and cerƟficates for the disposal of all legacy equipment and hazardous materials.
5. CONTRACTOR RESPONSIBILITIES
Ensure all work performed, including disposal, complies with all applicable U.S. federal and
Guam environmental, safety, and building code regulaƟons.
Provide a safe work environment for all contractor, subcontractor, and government personnel.
This includes developing and adhering to a site-specific safety plan.
Maintain the confidenƟality and security of all site informaƟon and government assets.
Conduct any necessary pre-proposal site surveys to verify all exisƟng condiƟons, measurements, and electrical parameters prior to bid submission.
6. PLACE OF PERFORMANCE AND SECURITY REQUIREMENTS
6.1 Place of Performance: Guam Remote Ground Terminal System (X-Band Antenna RADOME), HRQR+38G, Finegayan StaƟon, Camp Blaz, Guam.
6.2 Security & Access Requirements: All Contractor personnel performing inspecƟons must be United
States ciƟzens. Personnel must be eligible for base access to Camp Blaz / Naval Computer and
TelecommunicaƟons StaƟon (NCTS) Guam and will be escorted by authorized personnel at all Ɵmes while inside the Guam Remote Ground Terminal System (X-Band facility).
7. ACCEPTANCE CRITERIA
The Government shall accept the project upon successful verificaƟon of the following:
The installed units fully comply with the technical specificaƟons outlined in SecƟon 3.
The system successfully passes all tests documented in the approved Test and Commissioning
Plan.
The contractor has delivered all documentaƟon and training specified in SecƟon 4 and 2.5.
The COR has received all required cerƟficates of disposal for the legacy equipment.
8. POINT OF CONTACTS
9. REFERENCES
Document Number Document Title Engineering Manual 385-l-1
Safety and Health Requirements
AR 385-10
The Army Safety Program
AR 200-1 Environmental Protection and Enhancement
AR 385-40 Accident Reporting and Records Title 29 Code of Federal Regulations U.S. Department of Labor, Occupational
Safety and Health Administration(OSHA)Standards
- Part 1926.62 For Construction OMA 214 Standard Technical Specifications for
OMA Projects Korea
TIA-607-C (Revision of TIA-607-B) Generic Telecommunications Bonding and Grounding (Earthing) For Customer Premises
TM 5-692 Maintenance of Mechanical and Electrical Equipment at C4ISR Facilities
NETCOM Regulation 420-1 Site Power Coordinator Program
UFC 3-540-01 Engine-Driven Generator Systems for Prime and Standby power applications
UFC 3-560-01 Safety/ Operations/ Management
UFC 3-600-01 Fire protection criteria
UFC 3-501-01 Electrical General Requirements
UFC 3-580-01 Telecommunications interior infrastructure planning & design
UFC 3-460-01 Petroleum Fuel facilities
NFPA 1 Fire Code
NFPA 30 Flammable and Combustible Liquids Code
NFPA 37 Installation and Use of Stationary Combustion engines and Gas turbines
NFPA 70 National Electrical Code
NFPA 70E Electrical Safety in the Workplace
NFPA 110 Emergency and Standby Power systems
10. ATTACHMENTS AND DOCUMENTATION:
The following pages provide some of the relevant nameplate data and locaƟon of the two (2) packaged units to be replaced.
Unit #1 Unit #2
X-Band Terminal
Units #1 & Unit #2