This document is an amendment to a solicitation for a contract to provide a turnkey solution for the removal and disposal of an old UPS system and the provision and installation of a new comparable UPS system at a radio tower site. The amendment adds questions and answers related to the installation process, including the availability of a forklift, the need for a temporary outage, and the time constraints for such an outage due to the site's importance for DOD first responders and military testing and training. The key details are that the contractor is responsible for all transportation and installation requirements, and any outage must be minimized and justified, as the radio site cannot be down for an extended period. The solicitation number is W91RUS24R0013, and the effective date of the amendment is April 15, 2024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Directions to LMR-S Building_240325.pdf | ||
| W91RUS24R00130001.pdf | ||
| DeConcini schematics.pdf | ||
| DCHill UPS Question and Answers.pdf | ||
| liebert nfinity 208240v user manual.pdf | ||
| W91RUS24R0013.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0012060984
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this solicitation amendment is to:
(a) Add questions and answ ers.
(b) See summary of changes.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 15-Apr-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W91RUS24R0013
X 9B. DATED (SEE ITEM 11)
05-Mar-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
15-Apr-2024
CODE
ACC-APG - HUACHUCA DIVISION
2133 CUSHING ST
BLDG 61801 RM 3410
FORT HUACHUCA AZ 85613
W91RUS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W91RUS24R0013
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
The following have been added by full text:
QUESTIONS AND ANSWERS
1. Will Ft. Huachuca personnel transfer the new UPS system to the radio tower or are we needed to do so?
A: The solicitation calls for a turn-key solution to remove and dispose of the old UPS, provide and install a new and comparable UPS, with all of the transport requirements handled start to finish. We have options for short term outdoor storage at the radio site or protected storage at the shipping address. If we store at the shipping address, I expect the vendor to handle transport to and offloading at the radio site on the install date.
2. Is there a forklift available onsite?
A: There is no forklift available at the install site. Arrangements might be available at the shipping address, but offloading at the repeater site will still need to be provided.
3. There will need to be an outage to disconnect the old UPS and wall mount bypass and install the new system. However, the panel that feeds the current UPS has space to provide a new circuit breaker for the new system so a lot of prep work can be done for the new system. Can an outage be performed and if so, how long can it take place for?
A: Administrative Service Interruptions are possible but should be kept to a minimum amount of time. Once the outage is scheduled, the installer ultimately dictates the time the system is down. A safe and professional install to industry standards is expected, and that takes as long as it takes. Be advised any outage lasting longer than 2 hours will have to be explained and justified, so the LMR manager can then explain and justify the loss of radio coverage to the department Chiefs prior to scheduling the work. The repeater site handles radio traffic for DOD First Responders as well as Military test and training support. It cannot be down for long.
(End of Summary of Changes)