AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

1. The purpose of this amendment is to incorporate the follow ing:

a. Provide answ ers to the potential offerors' questions received during the question period stated in the solicitation.

b. Add requirement for all Key Personnel in Subfactor 3 to submit a resume to substantiate the experience requirements listed in Subfactor 3.

c. Extend the proposal due date from 19 May 2022 at 1:00 P.M. to 26 May 2022 at 1:00 P.M.

2. All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

1 18

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 10-May-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91QVN22R0009

X 9B. DATED (SEE ITEM 11)

18-Apr-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

10-May-2022

CODE

411TH CONTRACTING SUPPORT BRIGADE, KOREA

HUMPHREYS CONTRACTING DIVISION

UNIT 15289

APO AP 96271-5584

UNITED STATES

W91QVN 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W91QVN22R0009

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

ANSWERS TO QUESTIONS RECEIVED

Solicitation Issued April 18, Solicitation # W91QVN22R0009 Questions as of April 29, 2022

Maintenance and Repair of Electronic Security System Closed Circuit

Reference

(PWS/RFP)

Question Answer

FAR 52.212-2

Addendum, Factor A.

Technical Capability - Subfactor 1.

Prime Contractor's Business Registration

I have a clarification regarding Business Registration. Are these item categories (Repair for internet and computing technologies, networking and telecommunications, and radio) all required for the Prime Contractor's Business Registration?

Is it possible for a company which has only one of those item categories to take part in the solicitation?

Per Factor A, Subfactor 1, the Prime Contractor is required to have a valid Certificate of Business Registration for Repair for internet and computing technologies, networking and telecommunications, and radio. Only the Prime Contractor's Business Registration will be considered for this qualification requirement. Submission of subcontractor's business registration cannot be substituted for the prime contractor's business registration and will not be considered technically acceptable.

General

Is there an incumbent contractor performing services or is this a brand-new contract? If there is an incumbent, could you please provide the current / previous contract number.

This requirement is a competitive follow-on action that will result in a new contract for Maintenance and Repair of Electronic Security System Closed Circuit. The current contract for this service is contract number W91QVN-17-D-0038

PWS CLIN 0004,

1004, 2004, 3004, Do the repair part need to be Brand Name or Equal?

All repair items under this contract shall be brand name or equal. If not Brand Name, the contractor shall provide the COR with all technical data pertaining to the repair part for a determination.

PWS para 3 Contractor

Requirements

Will the contractor receive a USFK Pass for installation access?

IAW the PWS, contractor shall submit the required documents to the local Area DES for validation and pass issuance. Contractor personnel will be given an 8th Army installation pass. (Access to Osan Air Base is not required under this contract).

PWS para 2.0 Description of Work and para

2.5 Emergency

On Call Maintenance

Repair Service

We hope to know if personnel (CM, CT, Technicians) must keep staying on standby during working hours (0800 - 1700)? (CM does not need to stay, but CT and technicians must keep staying?) Or all the personnel visit the sites only when there are Performance Objectives?

The Contractor shall perform maintenance and repair on all CCTV Systems equipment and components listed in Appendix A as required in the performance work statement (PWS). The priority of performance shall be Emergency On-Call repair, followed by Corrective Maintenance repair and then Scheduled Maintenance repair services at all locations listed in Appendix A. The Government will initiate Emergency on-call service when the CCTV system is not functioning properly.

Qualified personnel shall be available to provide service to the complete CCTV system. Service personnel shall be at the site within eight (8) hours after receiving a request for service. The EM service can be accomplished within eight (8) hours of work. Forecasted frequency of EM is to be estimated at 15 jobs (less or over) per each area.

RFP - Addendum to FAR 52.212-1

Instructions to Offeror's para 4

Submittal Requirements

Subcontract is not allowed?

If subcontractors are used, all submittal requirements as outlined in the subfactors must be submitted for the subcontractors along with the prime contractor. Both prime and subcontractor will be technically evaluated.

PWS para 8.5 Standard for satisfactory Performance

What is the meaning of "Re-accomplish" (in the table on page 25)? It means "Normal Operation?"

If the standards of performance are not completed to the stated standard, the contractor will re-perform that specific identified performance objective within 24 hours of notification from the COR.

PWS par 2.0.1

Is there any quantity of bucket truck we have to keep in the bases all the time? Or can we deliver bucket trucks from outside of the bases only when we need it for Performance Objectives?

The Contractor shall provide all personnel, management, supervision, testing, equipment, tools, supplies, and transportation necessary for EM, CM, and SM and repair of all Closed Circuit Television (CCTV) equipment. All Contractor furnished equipment will be taken off the job site at the end of the day. No Contractor equipment is allowed to remain on a military installation overnight or be stored therein.

PWS CLIN 0004,

1004, 2004, 3004, What is the meaning of "Estimated Qty"? Does it mean the estimated Qty of CCTV Cameras to be repaired/replaced, so that we can estimate other necessary Repair/Replacement parts based on the Qty of cameras?

The estimated quantity is the Government's estimate of the number of repair/replacement parts that will need to be replaced during the base year or a specific option year of the contract.

General

Could you please tell us if there is any method generally used to estimate the parts within the given amount?

The Government cannot provide any information on how to obtain an estimate. This is a re-equipment solely for the Contractor to provide.

CLIN 0001

ITEM NO./Clin 0001, option clines:

Is preventive maintenance (PM) service and its amount equals to Quarterly Scheduled Maintenance (SM), Preventive Maintenance (SM), SM’s descriptions (para. 2.3.) within the PWS? Is it the same service?

Scheduled Maintenance is the same as Preventive Maintenance as stated in the respective CLINS

CLIN 0002

What is the quantity, unit of ITEM NO. 0002 (CM), option clins?

Is this price proposal for all labor, parts, transportation, total cost for

CM?

CLIN 0002 is a requirements CLIN and is for informational purposes only. Pricing shall only be provided for SUBCLIN 0002AA. The price proposal for SUBCLIN 0002AA is for all labor, transportation, and total cost for CM.

Repair/Replacement Parts are separately priced under CLIN 0004, 1004, 2004, 3004, and 4004.

CLIN 0002

Is Item no./clin 0002AA included in Item no. 0002? or a separate price?

SUBCLIN 0002AA is included in CLIN 0002.

CLIN 0002 is for informational purposes only.

Pricing shall be provided for SUBCLIN 0002AA only.

CLIN 0004 and Appendix B

Item no. 0004, option clines: What is the exact list of parts of required quantity by each year (32/24/24/27/25 parts)? Appendix B parts list has a total of 38 parts.

Also, what is the reason for the difference among quantities (32/24/24/27/25 parts) by each year?

Is it because of the difference in warranty?

The exact list of parts required is unknown. The quantities listed are government estimates on the anticipated number of parts that will need to be replaced each year.

CLIN 0004 and Appendix B

Item no. 0004, option clines: Should the amount include only the total cost of the parts or include total cost including replace/repair labor, equipment, transportation, etc.?

Is the limited amount applied to only the cost for the parts or other costs such as replace/repair labor, equipment, transportation, etc.? (Ex. KRW 16,062,042 for base year)

CLIN 0004 price should only include the total cost of parts. The not-to-exceed limit is only applied to the cost of parts.

CLIN 0005

Could you please clarify CLIN 0005, option clines? Should I submit ‘zero (0)’ for this amount?

The estimated cost for war hazard loss is zero (0).

The contractor shall not submit a price for this

CLIN.

PWS 2.3.2

PWS 2.3.2.: Should the price proposal for repair parts exceeding 30,000 won be excluded within the requested CLINs? Will these parts over 30,000won be paid by the U.S.

government when it occurs? (not included in our price proposal)

The price for all parts shall be provided with the proposal. Parts over 30,000 won will be paid by the U.S. Government, but the prices must be included in the Offeror's proposal.

PWS 3.1.11

PWS 3.1.11. Level I OPSEC training, annual OPSEC awareness training: Is this training both online or offline? Is it free training? How many hours is each training?

OPSEC training can be conducted on-line. It is a self-paced course. Normally it takes 1-2 hours to complete. The course is in English Only. This course if free of charge. The training can be completed at:

https://securityawareness.usalearning.gov/opsec/stor y.html

Appendix A

Appendix A: What is the installation date/year of each item listed at the Appendix A list?

Also, what is the current status of each item, which is operating appropriately and which item is malfunctioning, to be repaired and replaced?

The installation date for the equipment listed at Appendix A is unknown. There are currently some items that are non-operational however, this changes daily. As stated during the Site Visit and also IAW the PWS para 2.2 Existing System Overview, within the first 90-days the contractor shall verify and validate equipment in Appendix A as part of baseline inventory of the initial SM for each location. Once verified, validated, and inventoried, the Contractor shall submit a conclusive list per each location for each area to the

COR.

Appendix A

Appendix A: Will it be possible to know the missing information, make, model numbers, and quantities within the list?

The information provided in Appendix A is all the information the Government has.

- Area II ESS equipment location R- 5-5 model number

- Area III Galer gate model number;

CAM #CPX2A (IR Fixed #11) Lane 2-A quantity, Yoon gate make, model number, CAM #22 quantity

- Area IV make, model number, quantity of all listed items

Appendix A

Should I submit the price proposal only covering the quantity of the items listed in Appendix A? excluding the blank quantities?

Price proposal for Appendix-A should include only those items with a listed quantity

Appendix A Could you please define JMMT, location?

US Mail Distribution Center at Incheon Airport

Appendix A and Appendix B

In case of discontinued items/parts of Appendix A, B: Should I submit the amount/price proposal for similar or equivalent items/parts?

All items/parts must be brand-name or equal. If items/parts are discontinued, proposed substitutes must be at least equal to or greater in all aspects. If not Brand Name, the contractor shall provide the COR with all technical data pertaining to the repair part for a determination. Prices shall be submitted for all items/parts.

General

Is all the related Electronical Security Equipment being connected with a separated independent network or connected with an Official sharing network for operation?

The CCTV network is a separate / closed security network.

Appendix A and Appendix B

Upon the provided Equipment list for this solicitation, some of them are not available no more up to manufacturer's discontinuance decision which causing impossible for repair nor replacement. For those items, will Replaced equipment being provided by contractor or

COR?

All items/parts must be brand-name or equal. If items/parts are discontinued, proposed substitutes must be at least equal to or greater in all aspects. If not Brand Name, the contractor shall provide the COR with all technical data pertaining to the repair part for a determination.

General

Furthermore, on the provided Parts and Material list for this solicitation, there are consummative items such as HDD, etc. As their functioning period gets longer, it will cause decreased product performance which lead to malfunction. If product failure happens due to these kinds of items with no more productions nor support for those items by manufacture, what’s the contractor’s service area? (For example, installed IDR9932 Hybrid DVR Recorder is not available by manufacturer for discountenance, so malfunction has to be resolved by itself. In case repair might be needed since performance decrease of HDD is expected.

All electronic systems and or specific items fail over a period of time. The contractor shall identify the failure and propose a repair item that is brand name or equal. If not Brand Name, the contractor shall provide the COR with all technical data pertaining to the repair part for a determination.

General

There is no performable update for Current Control System Software.

Also it has on-going security issues with expecting compatibility conflicts. Please set clear work boundaries for contractors in this situation.

If the operating management software is non-operational and there are no updates, the contractor is required to provide the government a solution using brand name or equal. If not Brand Name, the contractor shall provide the COR with all technical data pertaining to the repair part for a determination.

Subfactor 3: Key Personnel

Qualification

Regards CT and Technicians requested Certificate on PWS Technical Factor Para., [b. Communications Technician

(CT):

- Prior Experience: ……,

- Certificate: A valid communication certificate from an accredited ROK institution.] [c. Technicians:

- Prior Experience: ……,

- Note: ……,

- Certificate: A valid communication certificate from an accredited ROK institution.].

As quoted, provided information for official certificates are merely described as "A valid communication certificate from an accredited ROK institution." Could you clarify the exact official title of the required Technician certificate in Korean?

Valid certification shall be in the form of an accredited ROK institution. The government cannot specifically state what the certificate must state as there are several ROK accredited institutions.

Certification proof must be submitted in English.

CLIN 0002

On CLIN, Item No. 0002 is the section for estimated amount of Corrective Maintenance (CM) services.

However, there was no Estimated Quantity nor unit that we can utilize.

Upon the following item which 0002AA is for Technician (CT)

CLIN 0002 is a requirements CLIN and is for informational purposes only. Pricing shall only be provided for SUBCLIN 0002AA. CM service shall include all labor costs for technician services.

labor, is CM service considered as included in all labor amounts with other Technician services?

SUBCLIN

0002AA

On CLIN Item No,0002AA, the SUPPLIES/SERVICES was put as “Technicians (CT)”. Communication Technician (CT) and other Technicians requirements are different, yet there is only one item section to put an amount in. Is this “Technicians (CT)” meaning includes CT as part of Technicians or do we have to offer separate offers for CT and Technicians?

SUBCLIN 0002AA shall be used to price the total of all technicians for Corrective Maintenance.

CLIN 0004, 1004,

2004, 3004, 4004

For those item sections about Repair/Replacement on CLIN, the requested amount is all different for each year, 32EA/25EA/24EA/27EA/25EA.

Therefore, we’d like to know the background of how these requested unit amounts came out.

The exact list of parts required is unknown. The quantities listed are government estimates on the anticipated number of parts that will need to be replaced each year.

CLIN 0004, 1004,

2004, 3004, 4004 and Appendix B

Among the submittal documents, we have to provide each price by EA for every part which is listed in [Appendix B. CCTV Parts and Material].

Yet all Items for Repair/Replacements on CLIN, requested amount is all different for each year, 32EA/25EA/24EA/27EA/25EA.

Besides there are 38 items listed on Appendix B which none of them are the same as numbers of listed parts and materials.

Could you advise how to estimate the price amount for CLIN repair/replacement section?

It’s confusing that USFK wants 32EA/25EA/24EA/27EA/25EA for each product on Appendix or USFK will choose specific products among listed items on Appendix B as amount of 32EA/25EA/24EA/27EA/25EA per year.

If implied meaning is the last one, which listed products on Appendix B USFK requesting in each year, Is

The exact list of parts required is unknown. The quantities listed are government estimates on the anticipated number of parts that will need to be replaced each year.

specific items list that requested per a year going to be provided?

PWS Para 2.5

We understand that we should visit quarterly in order to provide PM service, and CM service shall be conducted when some issues detected during PM.

If possible, we would like to know historical CM/EM service call (for example, how often current contractor had visited for CM/EM service during the contract period)

The government cannot state the exact CM/EM service calls. The contractor should note the forecasted frequency of EM is estimated at 15 jobs (less or over) per each area.

CLIN 0001 and PWS para 2.3

According to PWS Para 2.3, PM service should be conducted quarterly but Clin/Item0001 seems that PM service should be provided monthly (Qty:12 / Unit: Months) Please advise.

The PWS is correct, the PM service is performed quarterly for each location in accordance with Appendix-A. The quantity is correct as listed (12) as this is for billing requirements.

PWS para 2.0.1

When the government adds the number of CCTV systems, will the government provide additional funds to the contractor to maintain them?

If the government adds or removes items from this contract, an appropriate MOD will be provided from 411th CSB

PWS para 2.1

What are the examples of additional improvements?

Will the government provide additional funds for improvement works?

If the requested additional improvements are beyond the contractor’s capability, does the

Additional improvement may include the addition of CCTV cameras at various locations. 411th CSB will notify the contractor or any such changes to the contract contractor still need to perform the work?

PWS para 3.3.4

Will the government provide maps for all location including as-built drawing, blueprints, underground wiring status, piping, etc. to perform tasks upon contract award?

Does require key personnel has the capability to provide as-built drawings?

If not, will the government provide engineering support or funds to the contractor to hire subcontractors to perform tasks?

Maps to each location i.e., Casey, Yongsan, JMMT, Humphreys, Daegu, Pier-8, and Busan Storage Facility can be obtained from the internet. The government will not provide any maps. The government does not have any as-built drawing of the current system installed at the locations in Appendix-A. If the contractor is tasked to add or change a location of CCTV, the contractor is responsible to develop the as-built drawings and provide to the government. The government will not provide any engineering support nor any additional funding to support this effort.

PWS para 3.8.2

If the part, component, or system is not available and unable to replace or repair, could we get an extension with prior approval by the government?

Will the government provide existing operation manual (O&M) for current system upon contract award?

All items/parts must be brand-name or equal. If items/parts are discontinued, proposed substitutes must be at least equal to or greater in all aspects. If not Brand Name, the contractor shall provide the COR with all technical data pertaining to the repair part for a determination. If an item is delayed, the contractor shall inform the COR and the KO as to the reason why and the expected date of part arrival.

The government does not have the original O/M manuals.

Subfactor 3: Key Personnel

Qualification

There are three (3) types of communication certificates accredited by ROK institutions.

Could you please confirm which of the three qualifications meets the requirements of the PWS?

1. 정보통신산업기사 / Industrial Engineer Information Communication

2. 정보통신기사 / Engineer Information Communication

3. 정보통신기술사 / Professional Engineer Information Communication

Any accredited communications certificate is acceptable. The Communications Technician's experience must show that the CT meets the minimum qualifications as described in Technical Subfactor. Subfactor 3: Key personnel Qualification (b) Communications Technician (CT) list the specific requirements i.e. Prior Experience:

A minimum of two (2) years working experience within the last seven (7) years as of closing date of the solicitation as a CT on similar projects. CT must be experienced with fiber based closed security networks and be able to program a CCTV head-end system for multiple remote viewing locations.

RFP - Addendum to FAR 52.212-1 Instructions to the Offeror's para 4 Submittal Requirements

On page 33, there is required qualification for the contractor.

Subfactor 1 : Prime Contractor’s Business Registration – Prime Contractor’s current and valid Certificate of Business Registration

(사업자 등록증명) for the business item category of “Repair for internet and computing technologies, networking and telecommunications, and radio (통신공사, 통신장비, 유지보수 사업자 등록증)” issued by the Republic of Korea (ROK) Government National Tax Service (NTS). But there were camera boxes under the poles, and there were UPS, electrical parts to support the camera.

So, just out of curiosity; Shouldn't the contractor also be qualified for UPS and electrical areas, not only telecommunications areas? And the prior UPS maintenance experience should be one of the factors? In Korea, without certain business registrations for CCTV and UPS maintenance, contractors normally can't get to work on government contracts. The required Business Registration is Electrical Construction Business Registration

(전기공사업 등록증), I just wondering if the prime contractor or subcontractor don't need this.

Contractors are required to submit the documents outlined in the Submittal Requirements. Contractor proposals will be evaluated on the factors listed in the RFP - Addendum to FAR 52.212-1 Instructions to the Offeror's para 4 Submittal Requirements.

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 19-May-2022 01:00 PM to 26-May-2022 01:00 PM.

The following have been modified:

ADDENDUM TO FAR 52.212-1

ADDENDUM TO FAR 52.212-1, INSTRUCTIONS TO THE OFFEROR(S)

NOTICE TO OFFERORS

All sources may submit a proposal or quote as applicable. However, the Republic of Korea (ROK)-United States (U.S.) Status of Forces Agreement (SOFA), precludes the U.S. Government from granting Invited Contractor or

Technical Representative status to any offeror, for this requirement. All sources submitting a proposal or quote, as applicable, including U.S. sources, must already have, or obtain the requisite business licenses directly from the ROK Government, and conduct business in accordance with all applicable ROK laws, including but not limited to, rules and policies regarding labor, taxation, and immigration. Any Contractor not already doing business in Korea, must submit adequate verification in its initial proposal or quote, that it has the requisite authorization and capacity to compete for the requirement, and to conduct business in accordance with all applicable ROK laws, including but not limited to, rules and policies regarding labor, taxation, and immigration. If an initial proposal does not fully demonstrate this authorization and capacity, it will not be further considered for award. Whether an offeror qualifies shall be determined by the Contracting Officer. All offeror(s) interested in competing for this requirement are required to submit their price proposal, as applicable, in Korean won only. A proposal submitted in currency other than Korean won will not be considered for award.

1. CONTRACT AWARD:

1.1. The Government intends to execute a Requirements with Firm Fixed Price CLINs contract. In accordance with FAR Parts 12 and 13, this award will be made to the responsible Offeror submitting the Lowest Priced Technically Acceptable (LPTA) offer that satisfies all terms and conditions of the solicitation. Offers will be evaluated for acceptability, but not ranked using the non-price factors/subfactors. All non-price factors and subfactors will be rated as either “acceptable” or “unacceptable”. In order to be considered for award, there must be an “acceptable” rating in every non-price factor/subfactor. In other words, a rating of “unacceptable” for any factor or subfactor will result in the entire offer being rated “unacceptable”.

The following ratings will be used in evaluating all non-price factors and subfactors except Past Performance:

Acceptable Proposal meets the requif the solicitation.

Unacceptable Proposal does not meet the requirements of the solicitation.

1.2. In accordance with FAR 52.212-1 “Instructions to Offerors-Commercial Items (NOV 2021), the Government reserves the right, based on the Government’s best interests, to make a determination to: 1) award without discussions; 2) make a single award for this requirement; 3) establish a competitive range in order to conduct discussions; and/or 4) make no award if, upon evaluation, none of the offers are deemed likely to meet the requirements.

2. OFFER SUBMISSION: Offerors shall adhere to the following instructions:

2.1. These instructions are designed to ensure submission of essential information in order for the Government to understanding and evaluate offers. Offerors are cautioned to follow the detailed instructions fully and carefully, as the Government reserves the right to make award based on initial offers received, without discussions with Offerors.

2.2. Offerors are cautioned to submit adequate information to enable the Government team to fully ascertain each Offeror’s capability to perform all of the requirements identified in the solicitation. All commitments made in the offer shall become a part of the resultant contract.

2.3. Offerors are required to submit complete offers (Technical, Past Performance, and Price) by e-mail to Contracting Officer, Ms. Mullen, Jamika at jamika.d.mullen.civ@army.mil and Contract Specialist, Mr. Moser, Emery at emery.s.moser.civ@army.mil by 13:00 hours on the closing date of the SF 1449. Once submitted, offerors are required to confirm with Mr. Moser, Emery, Contract Specialist, Tel (0503) 355-3403 that the offer was received properly via e-mail before closing time and date.

Failure to submit offer via e-mail as required in this solicitation shall be grounds for determining the offer to be ineligible for contract award.

The Offeror shall submit Technical, Past Performance, and Price as separate attachments.

The Offeror(s) shall round up/down all unit prices to the nearest whole Korean Won (KRW) thereby eliminating the use of any decimal points.

All questions should be emailed to Mr. Moser, Emery at emery.s.moser.civ@army.mil and M. Mullen, Jamika at jamika.d.mullen.civ@army.mil within one (1) week after the solicitation is issued or within two (2) days after the site visit, whichever is later. Questions received after this date and time may not be answered.

2.4. FAR Clause 52.212-3, Alt I, OFFEROR REPRESENTATIONS AND CERTIFICATIONS COMMERCIAL ITEMS: The offeror shall provide a complete FAR 52.212-3, Alt 1, (h) & (k).

2.5. Local Clause 5152.204-4032, Representations and Certifications: The offeror shall submit completed local clause 5152.204-4032, Representations and Certifications. The offeror shall indicate specific types and quantities of POL products upon which offeror’s based and for which tax exemption is allowed in the “Representations and Certifications”.

2.6. Signed Solicitation and Amendment: Signed first page of the solicitation (SF1449) and each amendment (SF30) (if any amendments are issued).

2.7. Point of Contact (POC): Name, telephone number, and e-mail address of person(s) authorized to conduct discussions/negotiations and to financially bind the company.

3.0. OFFICIAL MEANS OF DISSEMINATING INFORMATION:

3.1. Official Means of Disseminating Information after the solicitation is issued through SAM.GOV such as requests for clarification and/or information concerning this solicitation shall be submitted in writing or electronically to the following point of contact: (for each question, comment or observation, identify the page and/or paragraph number being referenced).

411th CSB HC Division ATTN: Mr. Moser, Emery Reference: W91QVN22R0009 for Maintenance and Repair of Electronic Security System Closed Circuit Television (CCTV), IMCOM-Pacific, Korea Wide.

E-mail: emery.s.moser.civ@army.mil

3.2. No information concerning this solicitation or requests for clarification will be provided in response to Offeror initiated telephone calls. All such requests must be made in writing and submitted to the above email address.

Written inquiries will be answered in writing and provided to all Offerors. The deadline for submission of questions regarding this solicitation is No Later than (NLT) within one (1) week after this solicitation issue or within two (2) days after the site visit, whichever is later. Questions received after this date and time may not be answered.

4.0. SUBMITTAL REQUIREMENTS

FACTOR A TECHNICAL:

Subfactor 1: Prime Contractor’s Business Registration – Prime Contractor’s current and valid Certificate of

Business Registration (사업자 등록증명) for the business item category of “Repair for internet and computing technologies, networking and telecommunications, and radio (통신공사, 통신장비, 유지보수 사업자 등록증)” issued by the Republic of Korea (ROK) Government National Tax Service (NTS).

Note: Only the Prime Contractor’s Business Registration will be considered for this qualification requirement.

Submission of subcontractor’s business registration cannot be substituted for the prime contractor’s business registration and will not be considered technically acceptable.

Subfactor 2: Prime Contractor’s Prior Experience – A minimum two (2) years prior experience in inspection, repair and maintenance (ITM) of CCTV, internet and computing technologies, networking and telecommunications, and radio or similar type of services within the last seven (7) years as of closing date of the solicitation. The experience of a subcontractor cannot be substituted for the prime contractor’s experience.

Subfactor 3: Key Personnel Qualification:

NOTE: A resume shall be submitted for each key personnel listed below:

a. Contract Manager (CM)

-Prior Experience: A minimum of two (2) years working experience within the last seven (7) years as of closing date of the solicitation in Repair services for CCTV, internet and computing technologies, networking and telecommunications, and radio or similar type of experience.

b. Communications Technician (CT):

- Prior Experience: A minimum of two (2) years working experience within the last seven (7) years as of closing date of the solicitation as a CT on similar projects . CT must be experienced with fiber based closed security networks and be able to program a CCTV head-end system for multiple remote viewing locations.

- Certificate: A valid communication certificate from an accredited ROK institution.

c. Technicians:

- Prior Experience: A minimum of one (1) year working experience within the last seven (7) years as of closing date of the solicitation in Repair services for CCTV, internet and computing technologies, networking and telecommunications, and radio or similar type of experience.

- Note: Contractor shall provide a minimum of three (3) technicians to meet the requirement of the

PWS.

FACTOR B PAST PERFORMANCE:

Past performance shall be evaluated on an acceptable/unacceptable basis.

The following ratings will be used in evaluating Past Performance:

Acceptable Based on the offeror’s performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror’s performance record is unknown. (See note below).

Unacceptable Based on the offeror’s performance record, the Government does not have a reasonable expectation that the offeror will be able to successfully perform the required effort.

NOTE: In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305(a)(2)(iv)). Therefore, the offeror shall be determined to have unknown (or “neutral”) past performance. In the context of acceptability/unacceptability, a neutral rating shall be considered “acceptable.”

Offerors are authorized to provide information on the problems encountered on the identified contracts and the offeror’s corrective action. The offeror shall have recent and relevant past performance in the same or similar projects related to this requirement. Recent past performance is within the last seven (7) years from the solicitation issue date. Relevant past performances are those that are the same or similar services based on size, scope, complexity, and contract type.

Past Performance of offerors will be evaluated based on the following processes:

1. Review of the detailed explanation submitted by offerors, demonstrating the relevance of the references to the requirements of the solicitation.

2. References will be contacted by phone to verify contents in detail explanation and to determine record of compliance with contract requirements, accuracy of reports, technical and quality awards/certificates.

3. The Government reserves the right to obtain past performance information from any reasonable source available, including the Government database; Contractor Performance Assessment Reporting System (CPARS) website http://www.cpars.gov in order to evaluate offerors’ past performance.

Note: As part of the Responsibility Determination, the Contracting Officer will evaluate past performance to determine the offeror’s capability to perform the contract. Failure to submit data or lack of any performance history will not in itself be a reason for determination of non-responsibility. The Contracting Officer is not limited to the information provided. The Contracting Officer may use this data along with data obtained from other sources the Contracting Officer determines appropriate to obtain sufficient information on the offeror’s past performance to make a responsibility determination

FACTOR C PRICE:

Price analysis will be conducted for each proposal to ensure completeness, price realism, price reasonableness and unbalanced pricing.

The following applies to that evaluation:

1. Completeness. The Offeror shall complete the pricing information for all CLINs and Sub-CLINs identified for all five (5) years. Any underlying assumptions including proposed escalation rates between base and subsequent option periods shall be clearly explained.

2. Price Realism. Price Analysis in conjunction with Technical Analysis will be used to perform a Price

Realism Analysis to determine if the price is realistic for the work to be performed. The proposal will be evaluated using price analysis techniques to determine whether the proposal reflects a thorough understanding of the PWS, and whether the price proposed is realistic for the work to be performed and is consistent with approaches described in the technical proposal. Price proposals, which are unrealistically low, will be deemed reflective of a failure to comprehend the complexity and risk of the proposed contractual requirement and may be grounds for rejection of the proposal.

3. Price Reasonableness. Price should also reflect fair market value and be reasonable when compared to the independent Government estimate, previous prices for same or similar services and/or when compared among other technically acceptable offers.

4. Unbalanced Pricing. As part of the price evaluation, proposals will be reviewed to identify any unbalanced pricing. IAW FAR 15.404-1(g)(3), Unbalanced Pricing, a proposal may be rejected if the Contracting Officer determines the lack of balance poses an unacceptable risk to the Government.

Note 1: The Government will examine price proposals for artificially low unit prices. Offers found to be unreasonably high, unrealistically low (an indication of “buy-in”), or unbalanced, may be considered unacceptable and may be rejected on that basis.

Note 2: Price is not scored. The Government will review the price proposal to determine the extent to which it is reasonable, realistic, and consistent with the technical proposal. The lowest price for award purposes will be the combined total of the effective period five (5) years from the date of award. Price shall include all CLINs and Sub- CLINs as listed on the Price Schedule, including all five (5) years. The Government intends to evaluate proposals and award a contract without discussions. Therefore, Offerors are instructed that submitted proposals should contain their best pricing.

Option Clause 52.217-8. As part of price evaluation, the Government will evaluate its option to extend services (FAR Clause 52.217-8 - Option to Extend Services) by adding one-half of the Offeror’s final option period price to the Offeror’s total price. Thus, the Offeror’s total price for the purpose of evaluation will include the 1st year, 2nd year, 3rd year, 4th year, 5th year, and one-half of the 5th year. Offerors are required only to price the five (5) years.

Offerors shall not provide a price for the potential one-half year extension of services period.

5.0. SITE VISIT

Offerors are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the price of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award. Attendess must bring a Korean Idenitification Card (주민등록증) to attend the site visit. The site orientation schedule is as follows:

Camp Casey

Date: 27 April 2022, Time: 1000 AM Meeting Location: Camp Casey Pedestrian Gate. https://waze.com/ul/hwydreqb2r POC: Bob Aldridge Tel No.: (DSN) (315) 755-8036, (Comm) 0503-355-8036 E-mail Address: robert.l.aldridge2.civ@army.mil

NOTE: Any offeror(s) who are interested in participation of the site visit shall present at the Camp Casey Pedestrian Gate no later than the above indicated time and date and also provide a list of attendant’s information (Contractor name, attendant name and telephone number, ROK ID number) to POC through e-mail 48 hours prior to the site visit for the installation access process. No vehicles will be allowed onto the installation.

The CCTV system is in close proximity to the Pedestrian Gate. Due to limited access on specific military installations, it is requested that each Contractor send no more than two (2) representatives.

6.0. PRE-AWARD SURVEY:

A pre-award survey may be conducted on any firm, to include joint venture partners and subcontractors indicating firm commitments to this acquisition, submitting offers. The pre-award survey is to determine the prospective Contractor’s responsibility in accordance with FAR Part 9.104-1. Information may be requested as required by the Contracting Officer and the information shall be submitted within three working days of the request.

End of ADDENDUM TO FAR 52.212-1 INSTRUCTION TO OFFERORS – COMMERCIAL ITEMS (NOV 2021)

ADDENDUM TO FAR 52.212-2

ADDENDUM TO FAR 52.212-2 EVALUATION-COMMERCIAL ITEMS (NOV 2021)

EVALUATION CRITERIA

In accordance with FAR Parts 12 and 13, award will be made to the responsible Offeror submitting the Lowest Priced Technically Acceptable (LPTA) offer that satisfies all terms and conditions of the solicitation. Offers will be evaluated for acceptability, but not ranked using the non-price factors/subfactors. All non-price factors and subfactors will be rated as either “acceptable” or “unacceptable”. In order to be considered for award, there must be an “acceptable” rating in every non-price factor/subfactor. In other words, a rating of “unacceptable” for any factor or subfactor will result in the entire offer being rated “unacceptable”.

The following ratings will be used in evaluating all non-price factors and subfactors except Past Performance:

Acceptable Proposal meets the requif the solicitation.

Unacceptable Proposal does not meet the requirements of the solicitation.

Factor A. Technical Capability: All technical factors shall be evaluated on an acceptable or unacceptable basis. A rating of unacceptable for any factor will result in a technically unacceptable rating. Failure to provide the below requirements will result in a rating of “Unacceptable”.

Prime Contractor’s Business Certificate of Registration: The prime contractor shall posess and submit the copies of both English and Korean versions of the following valid and current business certificates;

Subfactor 1: Prime Contractor’s Business Registration – Prime Contractor’s current and valid Certificate of

Business Registration (사업자 등록증명) for the business item category of “Repair for internet and computing technologies, networking and telecommunications, and radio (통신공사, 통신장비, 유지보수

사업자 등록증)” issued by the Republic of Korea (ROK) Government National Tax Service (NTS).

Note: Only the Prime Contractor’s Business Registration will be considered for this qualification requirement. Submission of subcontractor’s business registration cannot be substituted for the prime contractor’s business registration and will not be considered technically acceptable.

Subfactor 2: Prime Contractor’s Prior Experience – A minimum two (2) years prior experience in inspection, repair and maintenance (ITM) of CCTV, internet and computing technologies, networking and telecommunications, and radio or similar type of services within the last seven (7) years as of closing date of the solicitation. The experience of a subcontractor cannot be substituted for the prime contractor’s experience.

Subfactor 3: Key Personnel Qualification:

NOTE: A resume shall be submitted for each key personnel listed below:

d. Contract Manager (CM)

-Prior Experience: A minimum of two (2) years working experience within the last seven (7) years as of closing date of the solicitation in Repair services for CCTV, internet and computing technologies, networking and telecommunications, and radio or similar type of experience.

e. Communications Technician (CT):

- Prior Experience: A minimum of two (2) years working experience within the last seven (7) years as of closing date of the solicitation as a CT on similar projects . CT must be experienced with fiber based closed security networks and be able to program a CCTV head-end system for multiple remote viewing locations.

f. Technicians:

- Prior Experience: A minimum of one (1) year working experience within the last seven (7) years as of closing date of the solicitation in Repair services for CCTV, internet and computing technologies, networking and telecommunications, and radio or similar type of experience.

- Note: Contractor shall provide a minimum of three (3) technicians to meet the requirement of the

PWS.

Factor B. Past Performance: Past performance shall be evaluated on an acceptable/unacceptable basis.

The following ratings will be used in evaluating Past Performance:

Acceptable Based on the offeror’s performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror’s performance record is unknown. (See note below).

Unacceptable Based on the offeror’s performance record, the Government does not have a reasonable expectation that the offeror will be able to successfully perform the required effort.

NOTE: In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305(a)(2)(iv)). Therefore, the offeror shall be determined to have unknown (or “neutral”) past performance. In the context of acceptability/unacceptability, a neutral rating shall be considered “acceptable.”

Offerors are authorized to provide information on the problems encountered on the identified contracts and the offeror’s corrective action. The offeror shall have recent and relevant past performance in the same or similar projects related to this requirement. Recent past performance is within the last seven (7) years from the solicitation issue date. Relevant past performances are those that are the same or similar services based on size, scope, complexity, and contract type.

Past Performance of offerors will be evaluated based on the following processes:

4. Review of the detailed explanation submitted by offerors, demonstrating the relevance of the references to the requirements of the solicitation.

5. References will be contacted by phone to verify contents in detail explanation and to determine record of compliance with contract requirements, accuracy of reports, technical and quality awards/certificates.

6. The Government reserves the right to obtain past performance information from any reasonable source available, including the Government database; Contractor Performance Assessment Reporting System (CPARS) website http://www.cpars.gov in order to evaluate offerors’ past performance.

Note: As part of the Responsibility Determination, the Contracting Officer will evaluate past performance to determine the offeror’s capability to perform the contract. Failure to submit data or lack of any performance history will not in itself be a reason for determination of non-responsibility. The Contracting Officer is not limited to the information provided. The Contracting Officer may use this data along with data obtained from other sources the Contracting Officer determines appropriate to obtain sufficient information on the offeror’s past performance to make a responsibility determination

Factor C. Price.

Price analysis will be conducted for each proposal to ensure completeness, price realism, price reasonableness and unbalanced pricing.

The following applies to that evaluation:

5. Completeness. The Offeror shall complete the pricing information for all CLINs and Sub-CLINs identified for all five (5) years. Any underlying assumptions including proposed escalation rates between base and subsequent option periods shall be clearly explained.

6. Price Realism. Price Analysis in conjunction with Technical Analysis will be used to perform a Price

Realism Analysis to determine if the price is…