W91QVN21R0063 Barrack Repairs Bldg S-1115 Camp Casey.pdf
PDF 437 KB Posted
- Attached to
- Repair Barracks Bldg S-1115 Camp Casey
- Solicitation number
- W91QVN21R0063
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DRAWINGS (Elec) Repair Barracks.pdf | ||
| DRAWINGS (Mech 2).pdf | ||
| DRAWINGS (Civil )Repar Barracks.pdf | ||
| DRAWINGS (Mech 1) Repair Barracks.pdf | ||
| DRAWINGS (Arch) Repair Barracks.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0011605992
Repair Barracks Bldg 1115, Camp Casey Project: 243525, Repair Repair Barracks Bldg S-1115 (K-Work) Camp Casey AREA I, Korea
Pursuant to FAR 36.204 the estimated price range is betw een $1,000,000 and $5,000,000.
This is a NON-WORK PLAN TASK ORDER TO MATOC AREA I & II CONTRACTORS ONLY.Contract Numbers
W91QVN-18-D-0021;0022;0025;0026;0027;0028;0042;0044;0046;0050
Site Visit: Offerors w ho intend to propose on this solicitation are strongly encouraged to attend site visit. See site visit clause FAR 52.236-27 in Section L.
In the event a contractor is unable to submit an offer in response to this RFP, the contractor shall submit ”No-Offer Letter” by closing date and time specified in the solicitation
MRS. KING, JAINI M. 315-755-3351
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
16-Apr-2021
(RFP)
(IFB)
X
CALL:
Repair Barracks Bldg 1115 Camp Casey
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________180 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
YES X NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________30 Apr 2021 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
411TH CONTRACTING SUPPORT BRIGADE, KOREA
CONSTRUCTION & SUPPLY DIV, UNIT #15289
APO AP 96271
UNITED STATES
W91QVN
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
12:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
243525
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
W91QVN21R0063 38
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W91QVN21R0063
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job Repair (K) Work Non-Work Plan
FFP
The Contractor shall provide all labor, tools, equipment, supplies, and any other resources necessary to peform Project 243525, repair of building S-1115, 4 -stroy barracks including fire supperession system at Camp Casey Area I. All work will be in accordance with the statement of work (SOW), drawings, and all terms and conditions contained herein.
FOB: Destination
PURCHASE REQUEST NUMBER: 0011605992
PSC CD: Z2FC
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
War Hazard
FFP
Estimated Cost for War Hazard Losses is Zero ($0.00).
NET AMT
Section E - Inspection and Acceptance
CLAUSES INCORPORATED BY FULL TEXT
52.203-2 CERTIFICATE OF INDEPENDENT PRICE DETERMINATION (APR 1985)
(a) The offeror certifies that --
(1) The prices in this offer have been arrived at independently, without, for the purpose of restricting competition, any consultation, communication, or agreement with any other offeror or competitor relating to –
(i) Those prices,
(ii) The intention to submit an offer, or
(iii) The methods of factors used to calculate the prices offered:
(2) The prices in this offer have not been and will not be knowingly disclosed by the offeror, directly or indirectly, to any other offeror or competitor before bid opening (in the case of a sealed bid solicitation) or contract award (in the case of a negotiated solicitation) unless otherwise required by law; and
(3) No attempt has been made or will be made by the offeror to induce any other concern to submit or not to submit an offer for the purpose of restricting competition.
(b) Each signature on the offer is considered to be a certification by the signatory that the signatory --
(1) Is the person in the offeror's organization responsible for determining the prices offered in this bid or proposal, and that the signatory has not participated and will not participate in any action contrary to subparagraphs (a)(1) through (a)(3) of this provision; or
(2) (i) Has been authorized, in writing, to act as agent for the following principals in certifying that those principals have not participated, and will not participate in any action contrary to subparagraphs (a)(1) through (a)(3) of this provison ______________________________________________________ (insert full name of person(s) in the offeror's organization responsible for determining the prices offered in this bid or proposal, and the title of his or her position in the offeror's organization);
(ii) As an authorized agent, does certify that the principals named in subdivision (b)(2)(i) above have not participated, and will not participate, in any action contrary to subparagraphs (a)(1) through (a)(3) above; and
(iii) As an agent, has not personally participated, and will not participate, in any action contrary to subparagraphs (a)(1) through (a)(3) of this provision.
(c) If the offeror deletes or modifies subparagraph (a)(2) of this provision, the offeror must furnish with its offer a signed statement setting forth in detail the circumstances of the disclosure.
(End of Provision)
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 180 calander days after NTP*. The time stated for completion shall include final cleanup of the premises.
*The Contracting Officer shall specify either a number of days after the date the contractor receives the notice to proceed, or a calendar date.
(End of clause)
Section I - Contract Clauses
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)
(a) Definitions. As used in this clause—
“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.
“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.
“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232- 7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall—
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.beta.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items—
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
2 in 1
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
N/A
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial item financing, submit a commercial item financing request.
(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF “combo” document type to create some combinations of invoice and receiving report in one step.]
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
WAWF Invoice Type 2 in 1
Pay Official DoDAAC W56GBU
Issue By DoDAAC W91QVN
Admin DoDAAC** W91QVN
Inspect By DoDAAC W582LG
Ship To Code ____
Ship From Code ____
Mark For Code ____
Service Approver (DoDAAC) ____
Service Acceptor (DoDAAC) ____
Accept at Other DoDAAC W582LG
LPO DoDAAC ____
DCAA Auditor DoDAAC ____
Other DoDAAC(s) ____
(*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert “See Schedule” or “Not applicable.”)
(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)
(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.
Ms Sim, Sang Yim Email: sangyim.sim3.ln@mail.mil
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of clause)
Section J - List of Documents, Exhibits and Other Attachments
SOW/PROVISIONS/APPENDIX'S
DEPARTMENT OF THE ARMY
US ARMY INSTALLATION MANAGEMENT COMMAND
HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN-CASEY
UNIT #15543
APO AP 96224-5543
IMYN-C-PWF 28 January 2021
SPECIFICATIONS
FOR
PROJECT NO.: 243525
Repair Barracks, Building No. S-1115
Camp Casey, Korea
TABLE OF CONTENTS
1. Technical Provisions - I: Statement of Work
2. Technical Provisions - II: Technical Detail Specifications
3. Technical Provisions - III: Special Conditions
4. Appendix "A": List of Applicable Contract Drawings
5. Appendix “B”: List of materials for Material Approval Submittal
TECHNICAL PROVISIONS - I
STATEMENT OF WORK
PROJECT NO TITLE LOCATION
243525 Repair barracks, building No. 1115 Camp Casey
1. DESCRIPTION: The work to be performed to repair barracks, building No. 1115 is described below and executed by one or more of the groups.
1.1. Work by Contractor: The contractor shall provide all labor, tools, equipment, supplies and any other resources necessary to accomplish the scope of work contained herein as indicated in the drawings and in accordance with the specifications.
1.2. Work by In-House Labor: Not applicable to this project.
1.3. Work by Troop Labor: Not applicable to this project.
2. PRINCIPAL FEATURES: This project includes the following principal features:
2.1. Schedule #I, Repair (K): All work shall be in accordance with the attached drawings and specifications.
2.1.1. Civil Work
2.1.1.1. Replace concrete curb with granite curb.
2.1.1.2. Replace 1.2m width sidewalk with new.
2.1.1.3. Replace Asphalt Concrete (AC) surface course.
2.1.1.4. Paint 150mm thickness reflective white parking line.
2.1.1.5. Replace handrail on existing concrete step and bike shed with new.
2.1.1.6. Restore solid sodding including top soil.
TP I-1
2.1.2. Architectural Work
2.1.2.1. Floor work
2.1.2.1.1. Replace existing floor tile and rubber tile with new Polyvinyl Chloride Tile (PVCT) including Vinyl Cove Base (VCB) and Rubber Base (RB) as shown on new floor plan and interior finish schedule. The existing concrete flooring shall be smooth, true, level plane with all defects such as rough or scaling concrete, low spots, high spots, painting, and uneven surface shall be corrected for new flooring. Provide leveling concrete for existing concrete slab with government approval.
2.1.2.1.2. Replace existing quarry tile including quarry tile base with new as shown on floor plans and interior finish schedule.
2.1.2.1.3. Replace existing Ceramic Mosaic Tile (CMT) with new Ceramic Floor Tile (CFT) including cement bond coat, waterproof membrane, and mortar bed as shown on floor plans, section, and details drawings.
2.1.2.1.4. Replace existing concrete slab at corridor, each bath rooms, toilet, laundry, and mud room on 1st floor for mechanical sewer line works as shown on floor plan and mechanical drawings.
2.1.2.1.5. Apply epoxy coating with non-slip grits on existing floors as shown on floor plan and interior finish schedule.
2.1.2.2. Interior and exterior wall work
2.1.2.2.1. Replace existing all Gypsum Wall Board (GWB) wall board walls with new GWB wall (Normal, Water resistant or 'X' type) including metal studs as shown on floor plans, sections and detail drawings.
2.1.2.2.2. Paint all existing interior walls including Concrete Masonry Unit (CMU), metal, concrete surfaces, stairway, hand rails, and guard rails as shown on floor plan, detail drawings interior finish schedule.
2.1.2.2.3. Paint all existing exterior walls including Exterior Insulation and Finish System (EIFS), CMU, metal, woods, concrete surfaces, stairwells, hand rails, guard rails, and other components (bicycle rack, trash bin, pump house, and pavilion) of exterior surface of the building as shown on floor plan, detail drawings and pictures.
2.1.2.2.4. Apply texture coating with plastering at dressing room and closet as shown on floor plans, elevations and interior finish schedule.
2.1.2.2.5. Replace existing Glazed Ceramic Wall Tile (GCWT, full height) with new including cement bond coats, water proof membrane, plastering including metal lath, and waterproof GWB as shown on floor plans and sections.
2.1.2.2.6. Replace existing pipe chases and pipe cover with new CMU, waterproof type GWB pipe chases and metal cover including access door in each rooms for new mechanical piping system as per floor plans. Sections and detail drawing.
TP I-2
2.1.2.2.7. Remove existing AWP (Acoustical Wall Panels) and apply texture coat on new GWB in multi-purpose room, kitchen, lounge, and game room as shown on floor plan and interior finish schedule.
2.1.2.3. Interior and exterior ceiling and roof work
2.1.2.3.1. Replace existing ceiling with new acoustical ceiling tiles including metal suspension systems as shown on floor plans and interior finish schedule.
2.1.2.3.2. Replace existing ceiling with new GWB (Normal, Water resistant or 'X' type) ceiling including ceiling suspension system as shown on floor plans and finish schedule.
2.1.2.3.3. Paint all interior ceiling surfaces as shown on interior finish schedule and section.
2.1.2.3.4. Paint all existing exterior exposed metal, woods, fascia, and soffit as shown on floor plan and elevations.
2.1.2.3.5. Apply acrylic fluid-applied waterproofing coating on existing roof as shown on floor plan and sections.
2.1.2.3.6. Replace existing rain gutter with new at canopies as shown on floor plan and elevation.
2.1.2.4. Miscellaneous work
2.1.2.4.1. Replace existing doors and door frames with new including hardware sets as shown on new floor plan and door schedule.
2.1.2.4.2. Replace existing windows including insect screen with new aluminum thermal breaker type windows including glass as shown on floor plans, elevations and window schedule.
2.1.2.4.3. Replace existing window horizontal mini blinds with new, fireproof type.
2.1.2.4.4. Replace existing wooden head, jam and sill for all windows with new as shown on door/window schedule.
(Natural color, Oak)
2.1.2.4.5. Replace existing aluminum louver with new as shown on floor plans and louver schedule.
2.1.2.4.6. Replace existing Fire Extinguishers Cabinets (FEC) with new as shown on floor plans and detail drawing.
2.1.2.4.7. Replace existing all toilet accessories with new as shown on floor plans and detail drawings.
2.1.2.4.8. Replace existing all access doors on wall and ceiling with new as shown on floor plan and enlarged floor plan.
2.1.2.4.9. Replace existing kitchenette with new including base cabinet and upper cabinet as shown on floor plan, elevation and detail drawings.
2.1.2.4.10. Replace interior and exterior signages with new for all rooms as shown on floor plan, elevations and signage schedule.
2.1.2.4.11. Replace existing metal shelf with mop rack with new in janitor room.
TP I-3
2.1.2.4.12. Replace existing gravel bed and concrete curb with new 100mm deep gravel bed including granite curb around building as shown on floor plan and detail drawing.
2.1.2.4.13. Replace existing trench covers, hooks, and hose bib with new, and checked metal cover at mud room as shown on floor plan and detail drawing.
2.1.2.4.14. Replace existing al grating covers with new for each vest as shown on floor plan and detail drawing.
2.1.2.4.15. Replace existing counter top and Stainless Steel (SST) shelves with new at laundry as shown on floor plan and detail drawing.
2.1.2.4.16. Replace existing iron board cabinet with new as shown on floor plan pictures and detail drawing.
2.1.2.4.17. Replace existing exterior and interior bulletin boards, card holder, and flexi info with new as shown on floor plan, detail drawing and signage schedule.
2.1.2.4.18. Replace existing aluminum louvers with new as shown on floor plans and detail drawings.
2.1.2.4.19. Replace wooden shelf, SST rod and drawer cabinet with new in each closet as shown on floor plan and details.
2.1.2.4.20. Replace existing fire rated access doors (1-1/2 hours) with new at laundry room and stairwell as shown on floor plans.
2.1.2.4.21. Replace existing wooden chair rails and wooden hanger rails at each bed room, kitchen, lounge and game room with new as shown on floor plans, elevations and detail drawings.
2.1.2.4.22. Replace existing vanity cabinets including wall hung cabinet with new in all dressing room as shown on new floor plans and detail drawing.
2.1.2.4.23. Replace existing concrete stoops with new as shown on floor plan.
2.1.2.4.24. Replace existing 18mm thickness plywood shelves including plastic laminate at each storage bin as shown on floor plans and elevations.
2.1.2.4.25. Replace existing SST splash guards with new as shown on floor plans and exterior elevations.
2.1.3. Mechanical Work
2.1.3.1. Heating, Ventilating, and Air Conditioning (HVAC) system
2.1.3.1.1. Replace existing water chiller, air handling unit, heating and ventilating units, air conditioning units, control, concrete pads accessories, and associated piping and ductwork with new.
2.1.3.1.2. Replace existing fan coil units, room thermostat, control, accessories, and associated piping with new.
2.1.3.1.3. Replace existing supply air ducts, duct insulation, diffusers, registers, louvers dampers, grilles, and associated accessories with new.
2.1.3.1.4. Replace existing chilled and hot water circulation pump, air separator, expansion tank, chemical feeder, control system, and associated piping with new.
TP I-4
2.1.3.1.5. Replace existing all chilled and hot water main and branch-piping risers, insulation, ductwork, and accessories with new.
2.1.3.1.6. Replace all existing wall mounted exhaust fans, roof mounted exhaust fans, in-line exhaust fan, ceiling exhaust fans, control, and all associated ductwork with new.
2.1.3.1.7. Replace existing range hood, unit heaters, control, and all associated piping and ductwork with new.
2.1.3.1.8. Replace the existing exhaust air ductwork, dryer vent, square diffusers, register, grilles, outside air intake louver, outside air opening including motorized damper with new.
2.1.3.1.9. Perform DALT (Duct Air Leakage Test) and T.A.B (Testing, Adjusting, and Balancing) after construction to verify if the HVAC system works properly.
2.1.3.1.10. Pre-air leaking test is required prior to repair infiltration and sealing at mechanical room. Repair infiltration and seal air leaking portions including clearance between wall ceiling and penetrators (duct, water piping, conduct pipe, and flue vent pipe) at mechanical room. Provide final-air leakage test report.
2.1.3.2. Plumbing system
2.1.3.2.1. Replace the existing, hot water storage tank, domestic hot water circulation pump, domestic hot water re-circulation pump, control system, and associated piping with new.
2.1.3.2.2. Replace existing domestic cold and hot water main and branch piping riser, insulation, backflow preventer assembly, floor drains, floor cleanouts, sewer piping, vent piping, and temperature mixing valve including accessories with new.
2.1.3.2.3. Replace all existing plumbing fixtures, electric water cooler, water hammer arrests, washer valve boxes, and associated piping with new.
2.1.3.3. Fire protection
2.1.3.3.1. Replace the existing automatic fire protection sprinkler system and all associated accessories for fire protection system with new.
2.1.4. Electrical Work
2.1.4.1. Replace existing lighting fixtures, exit lights, exterior lights, toggle switches, 3-way switches, photocell, wires and conduits with new.
2.1.4.2. Replace existing receptacles and cover plates with new.
2.1.4.3. Replace existing safety switches, combination motor starters, magnetic motor starters, manual motor starters, junction boxes, control system, wires and conduits for HVAC system with new.
TP I-5
2.1.4.4. Replace fire alarm control system with new addressable fire alarm control and mass notification system panel, manual pull station, smoke detector and relay module, visual signal strobes, microphone, speaker device, and associated wiring and conduit.
2.1.4.5. Remove and reinstall existing fire alarm building transmitter, antenna, lighting arrester and CO detectors with new wiring and conduit.
2.1.4.6. Replace existing telephone outlets and cover plates with new.
2.1.4.7. Replace existing CATV outlets and cover plates with new.
2.1.4.8. Remove and reinstall existing CCTV system, cameras, and LCD television, and replace CCTV wiring and conduit with new.
2.2. Schedule #II, New Construction (L): All work shall be in accordance with the attached drawings and specifications.
None
TP I-6
TECHNICAL PROVISIONS - II
TECHNICAL DETAIL SPECIFICATIONS
PROJECT NO TITLE LOCATION
243525 Repair barracks, building No. 1115 Camp Casey
GENERAL: The specification sections listed below are applicable to this project. The specifications are from the “Standard Technical Specifications for O&MA Projects, Korea, Revision 1” (2014 OMA SPECS, REVISION 1), dated 20151030, located on the http://www.usfk.mil/Portals/105/Documents/Contracting/NewContract/2014-OMA- SPECS_REVISION-1.pdf. The electronic version of the specifications is Acrobat® PDF format and can be read with the Acrobat Reader® software.
The Standard Technical Detail Specifications:
The work shall conform to the most current version of the listed standards/specifications below.
DIVISION 01 – GENERAL REQUIREMENTS
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 45 00.00 10 QUALITY CONTROL
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 58 00 PROJECT IDENTIFICATION
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION AND DECONSTRUCTION
02 61 13 EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL
02 65 00 UNDERGROUND STORAGE TANK REMOVAL
02 81 00 TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS
02 82 14.00 10 ASBESTOS HAZARD CONTROL ACTIVITIES
TP II-1
02 83 19.00 10 LEAD BASED PAINT HAZARD ABATEMENT, TARGET
HOUSING & CHILD OCCUPIED FACILITIES
DIVISION 03 – CONCRETE
03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING
03 15 00.00 10 CONCRETE ACCESSORIES
03 20 00.00 10 CONCRETE REINFORCING
03 30 00 CAST-IN-PLACE CONCRETE
DIVISION 04 – MASONRY
04 20 00 MASONRY
DIVISION 05 – METALS
05 50 13 MISCELLANEOUS METAL FABRICATIONS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 20 00 FINISH CARPENTRY
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 14 00 FLUID-APPLIED WATERPROOFING
07 24 00 EXTERIOR INSULATION AND FINISH SYSTEMS
07 60 00 FLASHING AND SHEET METAL
07 92 00 JOINT SEALANTS
DIVISION 08 – OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 14 00 WOOD DOORS
08 51 13 ALUMINUM WINDOWS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL AND DOOR LOUVERS
DIVISION 09 – FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
TP II-2
09 22 36 LATH
09 29 00 GYPSUM BOARD
09 30 00 CERAMIC TILE, QUARRY TILE, AND PAVER TILE
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 90 00 PAINTS AND COATINGS
DIVISION 10 – SPECIALTIES
10 14 01 EXTERIOR SIGNAGE
10 14 02 INTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 28 13 TOILET ACCESSORIES
DIVISION 12 – FURNISHINGS
12 21 00 WINDOW BLINDS
12 32 00 MANUFACTURED WOOD CASEWORK
12 36 00 COUNTERTOPS
DIVISION 21 - FIRE SUPPRESSION
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
DIVISION 22 – PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 53.00 20 SPACE TEMPERATURE CONTROL SYSTEMS
23 52 00 HEATING BOILERS
23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS
23 82 02.00 10 UNITARY HEATING AND COOLING EQUIPMENT
TP II-3
DIVISION 26 – ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT
26 08 00 APPARATUS INSPECTION AND TESTING
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 27 – COMMUNICATIONS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
27 54 00.00 20 COMMUNITY ANTENNA TELEVISION (CATV) SYSTEMS
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 33.00 10 FIRE ALARM REPORTING SYSTEM, RADIO TYPE
28 31 49 CARBON MONOXIDE DETECTORS
28 31 64.00 10 FIRE DETECTION AND ALARM SYSTEM, ADDRESSABLE
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 – EARTHWORK
31 00 00 EARTHWORK
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 16.17 COLD MILLING OF BITUMINOUS PAVEMENTS
32 12 10 BITUMINOUS TACK AND PRIME COATS
32 12 11 BITUMINOUS SURFACE TREATMENT
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 92 23 SODDING
TP II-4
TECHNICAL PROVISIONS - III
SPECIAL CONDITIONS
PROJECT NO TITLE LOCATION
243525 Repair barracks, building No. 1115 Camp Casey
1. Material Approval Submittal:
(1) The contractor shall submit a shop drawing submittal schedule and the material approval request with all supporting documents to the COR within 14 days after receipt of NTP.
(2) Attached list of materials in Appendix “B” shall be included in the shop drawing submittal schedule and material approval request.
2. Environmental Requirements in Contract The Contractor shall perform work consistent with the relevant policy and objectives identified in Installation’s Environmental Management System (EMS). The Contractor shall perform work in a manner that conforms to all appropriate Environmental Management Programs and Operational Controls identified by Installation’s EMS, including pollution prevention, waste reduction, energy use, and natural resource protection. The Contractor shall provide monitoring and measurement information as necessary for the organization to address environmental performance relative to the environmental, energy, and transportation management goals. In addition, the Contractor shall advise their employees of their roles and responsibilities identified by the EMS and how these requirements affect their work performed under this contract. The Contractor is responsible for ensuring that the Contractor and any persons involved in the supervision or performance of the contract complete all required Environmental training.
In the event of any environmental nonconformance or noncompliance associated with the contracted services, the contractor shall take corrective and/or preventative actions. In the event of any noncompliance with any federal, state, or local environmental law, regulation or requirement, the Contractor shall immediately respond by taking all appropriate corrective actions and notifying the Contracting Officer’s Representative (COR) and the Environmental Office. For any nonconformance with the EMS, the Contractor shall take corrective action and initiate further preventative action, as required by the Environmental Office.
All on-site contractor personnel shall complete necessary safety and environmental training specified for the type of work conducted on-site. Upon contract award, the COR will notify the EMS Manager to arrange Environmental training for appropriate staff.
Additionally, when ordering supplies for use on Installation, all contractor personnel must favor energy-efficient, recycled or reclaimed material whenever practicable.
TP III-1
The responsibilities of all contractor personnel include:
(1) Comply with all applicable environmental laws, regulations and installation environmental policies.
(2) Control and prevent spills or hazardous substances releases IAW installation Spill Prevention Plan.
(3) Ensure dust, debris, materials, trash, etc., do not become air borne and travel off the project site.
(4) Do not remove, cut, deface, injure, or destroy land resources including trees, shrubs, vines, topsoil and land forms without approval, except in areas indicated on the drawings or specified to be cleared.
(5) Monitor all water areas affected by construction activities to prevent pollution of surface and ground waters. Do not apply toxic or hazardous chemicals to soil or vegetation unless otherwise indicated.
(6) Open burning is prohibited on the Government premises IAW installation environmental policy.
(7) Participate in installation’s recycling program.
(8) Reducing the amount of hazardous material and/or solvent used by purchasing fewer hazardous materials and by increasing the use of products with recycled content. Spills of hazardous or toxic materials must be immediately reported to the Contracting Officer and the Environmental Office. Storage, describing, packaging, labeling, marking and placarding of hazardous waste and hazardous material IAW applicable environmental laws, regulations and local environmental policies. Transport hazardous waste off
Government property and dispose of it in compliance with National, Provincial, and/or Local requirements for solid waste disposal.
(9) Reducing the amount of solid waste from construction and demolition debris, and scrap metal sent to municipal and rubble landfills by reducing, reusing, and recycling. Handling, storage, and disposal of solid waste must be conducted to prevent contamination. Transport solid waste off Government property and dispose of it in compliance with National, Provincial, and/or Local requirements for solid waste disposal.
(10) Conserving energy and water usage by turning off lights and equipment when not in use and using only the necessary amount of water needed to complete the required tasks. Continuous conservation of our natural resources is a must.
(11) When potential cultural or historic items are inadvertently found during construction activities, immediately cease activities in the vicinity of the discovery and report the findings to the Environmental Office.
(12) Participate in installation’s Integrated Pest Management (IPM) program whenever practicable.
TP III-2
(13) Minimize interference with disturbance to, and damage to fish, wildlife, and plants including their habitat.
3. CONTRACT REQUIREMENTS PACKAGE ANTITERRORISM/OPERATIONS SECURITY REVIEW
COVER SHEET
After Notice to process is issued, COR shall take following action, Section IV. Standard Contract Language/Contract Clause Applicability and/or Additional SOW Language.
A. AT Level I training. This standard language is for contractor employees with an area of performance within as Army controlled installation, facility or area. All contractor employees, including subcontractor employees, requiring access to Army installations, facilities, and controlled-access areas shall complete AT Level I awareness training within 30 calendar days after the contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 05 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website: http://jko.jten.mil B. Access and general protection/security policy and procedures. This standard language is for contractor employees with an area of performance within Army controlled installation, facility, or area. Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
B-a. For contractors that do not require CAC, but require access to a DoD facility or installation.
Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
TP III-3
C. iWATCH Training. The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award and within 05 calendar days of new employees commencing performance with the results reported to the COR NLT 30 calendar days after contract award.
D. For contracts that require OPSEC Training. Per AR 530-1 Operations Security, the contractor employees must complete Level I OPSEC Awareness training. New employees must be trained within 30 calendar days of their reporting for duty and annually thereafter.
TP III-4
APPENDIX "A"
LIST OF APPLICABLE CONTRACT DRAWINGS
PROJECT NO TITLE LOCATION
243525 Repair Barracks, Building No. S-1115 Camp Casey GENERAL: The work shall conform to the following contract drawings and OMA standard detail drawings, 2014 (dated 30 November 2015), issued by the Department of the Army, Installation Management Agency, Korea Region Office and located on http://www.usfk.mil/Portals/105/Documents/Contracting/NewContract/STANDARD- DETAIL-DRAWINGS-FOR-OMA-PROJECTS-KOREA_20151130.pdf, all of which form a part of the specifications.
Ring No. Sheet No. Description Date
1 T-1 TITLE SHEET 22 JAN 21
2 T-2 TITLE SHEET 22 JAN 21
CIVIL
3 C-1 LOCATION PLAN AND GENERAL NOTES 22 JAN 21
4 C-2 REMOVAL PLAN 22 JAN 21
5 C-3 SITE LAYOUT PLAN AND SCOPE OF WORK 22 JAN 21
6 C-4 MISC. DETAILS 22 JAN 21
ARCHITECTURAL
7 A-1 1ST FLOOR PLANS AND GENERAL NOTES 22 JAN 21
8 A-2 2ND - 4TH FLOOR PLANS AND SCOPE OF WORK 22 JAN 21
9 A-3 ELEVATIONS AND SCOPE OF WORK 22 JAN 21
10 A-4 ELEVATIONS AND PICTURES 22 JAN 21
11 A-5 GENERAL SECTIONS 22 JAN 21
12 A-6 INTERIOR WALL SECTIONS-1 22 JAN 21
13 A-7 INTERIOR WALL SECTIONS-2 22 JAN 21
14 A-8 TYPICAL ENLARGED FLOOR PLANS 22 JAN 21
15 A-9 ENLARGED FLOOR PLANS AND FIRE RATED ACCESS
DOOR NOTES
22 JAN 21
16 A-10 INTERIOR ELEVATIONS-1 22 JAN 21
17 A-11 INTERIOR ELEVATIONS-2 22 JAN 21
18 A-12 INTERIOR ELEVATIONS-3 22 JAN 21
19 A-13 INTERIOR ELEVATIONS-4 AND DETAILS-1 22 JAN 21
A-1
20 A-14 DETAILS-2 22 JAN 21
21 A-15 DETAILS-3 22 JAN 21
22 A-16 DETAILS-4 22 JAN 21
23 A-17 DETAILS-5 22 JAN 21
24 A-18 KITCHEN CABINET DETAILS 22 JAN 21
25 A-19 CLOSET DETAILS 22 JAN 21
26 A-20 INTERIOR, EXTERIOR FINISH SCHEDULE AND
MATERIAL & COLOR SCHEDULE
22 JAN 21
27 A-21 DOOR, WINDOW & LOUVER SCHEDULE AND
HARDWARE SCHEDULE
22 JAN 21
28 A-22 DOOR, WINDOW & LOUVER ELEVATIONS, NOTES AND
DETAILS
22 JAN 21
29 A-23 SIGNAGES SCHEDULE 22 JAN 21
MECHANICAL
30 M-1 MECHANICAL MATERIAL INDICATIONS & SYMBOLS 22 JAN 21
31 M-2 FIRE PROTECTION AND MECHANICAL GENERAL
NOTES NOTES & SCOPE OF WORK
22 JAN 21
32 M-3 MECHANICAL EQUIPMENT SCHEDULE - 1 22 JAN 21
33 M-4 MECHANICAL EQUIPMENT SCHEDULE - 2 22 JAN 21
34 M-5 NEW HVAC DUCT PLAN ( 1ST FLOOR ),AIR DEVICE
SCHEDULE AND NOTES
22 JAN 21
35 M-6 NEW HVAC PLAN ( 2ND - 3RD FLOOR )AND NOTES 22 JAN 21
36 M-7 NEW HVAC DUCT PLAN ( 4TH FLOOR )AND NOTES 22 JAN 21
37 M-8 NEW HVAC PIPING PLAN ( 1ST FLOOR ), NOTES AND
NOTE ON INSTALLATION OF PIPE INSULATION
22 JAN 21
38 M-9 NEW HVAC PIPING PLAN ( 2ND-3RD FLOOR ) NOTES
AND NOTE ON INSTALLATION OF PIPE INSULATION
22 JAN 21
39 M-10 NEW HVAC PIPING PLAN ( 4TH FLOOR ), NOTES AND
NOTE ON INSTALLATION OF PIPE INSULATION
22 JAN 21
40 M-11 MECHANICAL ROOM PARTIAL PLAN EXHAUST DUCT
ISOMETRIC DIAGRAM & LAUNDRY ROOM DUCT
22 JAN 21
41 M-12 NEW PLUMBING PIPING PLAN ( 1ST FLOOR ) NOTE ON
INSTALLATION OF PIPE INSULATION AND NOTES
22 JAN 21
42 M-13 NEW PLUMBING PIPING PLAN ( 2ND FLOOR )NOTE ON
INSTALLATION OF PIPE INSULATION AND NOTES
22 JAN 21
43 M-14 NEW PLUMBING PIPING PLAN ( 3RD FLOOR )NOTE ON
INSTALLATION OF PIPE INSULATION AND NOTES
22 JAN 21
44 M-15 NEW PLUMBING PIPING PLAN ( 4TH FLOOR )NOTE ON
INSTALLATION OF PIPE INSULATION AND NOTES
45 M-16 BATH. RM. PLUMBING PIPING PARTIAL PLAN ( BOTH
SIDE & ONE SIDE ) & PLUMBING FIXTURE SCHEDULE
A-2
46 M-17 BATH. RM. PLUMBING PIPING ISOMETRIC DIAGRAM
AND NOTES
22 JAN 21
47 M-18 LAUNDRY & MUD RM. PLUMBING PIPING ISOMETRIC
DIAGRAM & LAUNDRY & MUD RM PLUMBING PIPING
22 JAN 21
48 M-19 CONTROL - 1 22 JAN 21
49 M-20 CONTROL - 2 22 JAN 21
50 M-21 CONTROL - 3 22 JAN 21
51 M-22 MECH ROOM AIR LEAKAGE TEST FLOW CHART, AIR
BARRIERS AND QUALIFICATION OF AIR LEAKAGE
22 JAN 21
52 M-23 FIRE PROTECTION LEGEND & ABBREVIATION,
AUTOMATIC FIRE SUPPRESSION GENERAL NOTES
22 JAN 21
53 M-24 MECH ROOM FIRE PROTECTION PIPING PARTIAL PLAN
AND FIRE PROTECTION REQUIREMENTS
22 JAN 21
54 M-25 1ST FL. FIRE PROTECTION PIPING PLAN 22 JAN 21
55 M-26 2ND & 3RD FL. FIRE PROTECTION PIPING PLAN 22 JAN 21
56 M-27 4TH FL. FIRE PROTECTION PIPING PLAN 22 JAN 21
57 M-28 DETAILS - 1 22 JAN 21
58 M-29 DETAILS – 2 22 JAN 21
59 M-30 DETAILS – 3 22 JAN 21
60 M-31 DETAILS – 4 22 JAN 21
61 M-32 DETAILS – 5 22 JAN 21
62 M-33 DETAILS – 6 22 JAN 21
63 M-34 DETAILS – 7 22 JAN 21
64 M-35 DETAILS - 8 22 JAN 21
ELECTRICAL
65 E-1 LEGEND, GENERAL NOTES AND SCOPE OF WORKS 22 JAN 21
66 E-2 NEW 1ST FL LIGHTING PLAN 22 JAN 21
67 E-3 NEW 2ND-4TH FL LIGHTING PLAN 22 JAN 21
68 E-4 LIGHTING FIXTURE DETAILS-1 22 JAN 21
69 E-5 LIGHTING FIXTURE SCHEDULE & LIGHTING FIXTURE
DETAILS 2
70 E-6 NEW 1ST FL POWER PLAN 22 JAN 21
71 E-7 NEW 2ND-4TH FL POWER PLAN 22 JAN 21
72 E-8 TYPICAL MODULE ELEC. PLAN-A & PLAN-B, MECH.
ROOM POWER & CONTROL PLAN
22 JAN 21
73 E-9 NEW 1ST FL FIRE ALARM/MASS NOTIFIACATION
SYSTEM PLAN
22 JAN 21
74 E-10 NEW 2ND-4TH FL FIRE ALARM/MASS NOTIFIACATION
SYSTEM PLAN
A-3
75 E-11 NEW FIRE ALARM/MASS NOTIFICATION SYSTEM
DIAGRAM
22 JAN 21
76 E-12 NEW 1ST FL CCTV/CATV/TEL PLAN 22 JAN 21
77 E-13 NEW 2ND-4TH FL CCTV/CATV/TEL PLAN 22 JAN 21
78 E-14 CCTV SYSTEM DIAGRAM 22 JAN 21
A-4
APPENDIX "B"
List of materials for Material Approval Submittal
PROJECT NO TITLE LOCATION
243525 Repair Barracks, Building No. S-1115 Camp Casey
Submittal d ifi i
Description of Submittal
LC-1 Ready Mixed Conc. 240kg/cm2
LC-2 Hot mixed Asphalt Concrete #67
LC-3 #8-150x150 WWF
LC-4 Pipe Steel Galv 1 1/2" Dia.
LC-5 Granite Curb
LA-1 Granite curb stone, 200Wx300Dx1,000L
LA-2 Ready mixed concrete, 210kg/CM, slump 12
LA-3 Waterproofingl membrane
LA-4 Anodized AL blast door w/ AL frame & insulated glasses, HDW, 1714 x 2150
LA-5 Anodized AL door w/ AL frame & insulated glasses, HDW, 1714 x 2150
LA-6 Steel thermal insulated blast double door w/steel frame door size: 1,714 W X 2150 H X 44.5 Thk., 600 i l d lLA-7 Steel insulated thermal blast door with steel frame door size; 915W. X 2133H. X 44.5 Thk.
LA-8 Steel thermal insulated double door w/steel frame door size: 1,714 W X 2133 H X 44.5 Thk.
LA-9 Steel hollow core door, 1 hrs fire rate w/frame door size; 1066W. X 2133H. X 44.5 Thk. 100 X 600 i l d fi lLA-10 Steel hollow core door, 1 hrs fire rate w/frame door size; 1066W. X 2133H. X 44.5 Thk.
LA-11 Steel hollow core single door, 1/3 hrs fire door w/frame door size; 914W X 2133H. X 44.5 Thk.
LA-12 Wood solid core door w/frame door size; 914W X 2133H X 44.5 Thk. 1/3hrs fire rated & fixed steel i d fi d lLA-13 Wood solid door, 20 Min fire rate door, w/frame door size; 714W. X 2133H. X 44.5 Thk.
LA-14 Wood solid core double door w/frame door size; 1814W X 2133H X 44.5 Thk. 1/3hrs fire rated door / fi d lLA-15 Wood solid door, 20 Min fire rate door, w/frame door size; 914W. X 2133H. X 44.5 Thk.
LA-16 Wood solid door, 20 Min fire rate door, w/frame door size; 915W. X 2133H. X 44.5 Thk.,STC door
LA-17 Wood solid core single door w/frame, 19mm under cut door size; 712W. X 2133H. X 44.5 Thk.
LA-18 Wood solid door w/frame door size; 664W. X 2133H. X 44.5 Thk.
B-1
Submittal
Description of Submittal
LA-19 Wood solid double door, door size; 864W. X 2133H. X 34.9 Thk., 100x600 tempered glass
LA-20 Electronic card key lockset,HT-24 ONITY Co.,4ea card key, 3ea mechanical key, master key system i l di f bLA-21 Exit device, type 1, F-08, lever type
LA-22 Exit device, type 2, F-01, lever type
LA-23 Exit device, type 2, F-08, lever type
LA-24 Lockset, 1000-1, F-01, lever type
LA-25 Lockset, 1000-1, F-07, lever type
LA-26 Lockset, 1000-1, F-08, lever type
LA-27 Lockset, 4000-1, F-76
LA-28 Lockset, 4000-1, F-82
LA-29 Lockset, 4000-1, F-86
LA-30 Auxiliary dead lock, E0161
LA-31 Floor Closer, C06041 with offset pivot
LA-32 Door closer, C02021
LA-33 Door closer, C02011
LA-34 Hinge, butt, A2111, 127 x 114 (NRP)
LA-35 Hinge, butt, A8111, 127 x 114 (NRP)
LA-36 Hinge, butt, A2133, 114 x 114 (NRP)
LA-37 Hinge, butt, A8111, 127 x 114
LA-38 Hinge, butt, A8111, 114 x 114
LA-39 Hinge, butt, A8112, 114 x 114
LA-40 Hinge, butt, A2112, 114 x 114
LA-41 Hinge, butt, A2133, 114 x 114
LA-42 Hinge, butt, A2133, 101 x 101
LA-43 Door stop and holder, Exterior type w/Conc, H9", 3"x3"
LA-44 Door stop , L02161
LA-45 Door stop , L02141
LA-46 Push plate, J302
LA-47 Pull plate, J405
LA-48 Automatic door bottom Roy 335
LA-49 Kick plate, J102
LA-50 Door viewer, L03221
LA-51 Magnetic heavy duty door latch
LA-52 Auto flush bolt, Type 25
LA-53 Flush bolt, L04081
LA-54 Astragal
B-2
Description of Submittal
LA-55 Adjustable astragal
LA-56 Dustproof strike, L04011
LA-57 Threshold, aluminum, 150W, SGL
LA-58 Threshold, aluminum, 150W DBL
LA-59 Marble SSM threshold 150mm W
LA-60 Key box, E8351
LA-61 Aluminum blast window thermal break type, fixed & tilting window, 3000x1000, 26.75thk Low-e i l d l iLA-62 Aluminum blast window thermal break type, sliding window, 1200x1300, 26.75thk Low-e insulated l iLA-63 Aluminum blast window thermal break type, fixed & tilting window, 1200x1100, 26.75thk Low-e i l d l iLA-64 3/4hrs Fire rated steel fixed window, 1200 x 1100
LA-65 Aluminum thermal breaker pane glass, fixed window, 1000x1100, 10.75thkm laminated A/L sliding & fi d i dLA-66 Aluminum slidingWindow, 2000x1000, 18THK, tempered/laminated Glass
LA-67 Aluminum slidingWindow, 1200x1100, 18THK, tempered/laminated Glass
LA-68 AL louver with Insect Screen & Bird Screen
LA-69 Horizontal blinds, 1" aluminum slats
LA-70 Metal stud, 0.8 mm thk
LA-71 Metal runner, 0.8 mm thk
LA-72 Metal ceiling suspension system for GWB
LA-73 Acoustical ceiling suspension system, aluminum
LA-74 Gypsum board, 15mm thk x1,200 x2,400, normal
LA-75 Gypsum board, 15mm thk x1,200 x2,400, water resistant or X
LA-76 Gypsum board, 12mm thk x1,200 x2,400, normal
LA-77 Gypsum board, 12mm thk x1,200 x2,400, water resistant or X
LA-78 Gypsum board, 12mm thk x1,200 x2,400, fire rated
LA-79 Acoustical tile, 600x600x16mm thk.
LA-80 Floor ceramic tile
LA-81 Epoxy joint grout motor for 300 x 300 CMT
LA-82 Glazed ceramic wall tile with accessories
LA-83 PVC tile, KCC Neo Sense, 450 x 450 x 3Thk
LA-84 Vinyl cove base w/adhesive
LA-85 Rubber stair treads, 480 x 1200 x 3THK
LA-86
Rubber tile, size 500mm x 500mm x 3 THK, I-BADKA rubber flooring
B-3
Description of Submittal
LA-87 Rubber Base, 2THK
LA-88 Rubber stringer & risers, 178mm H X 2 THK
LA-89 Paint, MPI 57, varnish
LA-90 Paint, MPI 11, acrylic emulsion, exterior
LA-91 Paint, anti & mildew interior
LA-92 Paint, MPI 47, enamel, interior
LA-93 Paint, MPI 94, enamel, exterior
LA-94 Paint, MPI 79, primer for metal
LA-95 Texture coat, terracotta 25kg w/finish coat
LA-96 Noroo Paint, MPI 77, Epoxy Epoxy Paint Include Surface Preparation Base, Cleanpoxy3100, MPI77, /LA-97 Toilet tissue dispenser, Double Roll, Horizontal Type
LA-98 Towel bar
LA-99 Soap holder, recessed type
LA-100 Bulletin board, 1200 x 900, oak trim, tan nucork
LA-101 Bulletin board, 1800 x 1100, Fixed type w/AL trim, light fixture and lidi lLA-102 Mirror with plywood back board
LA-103 Shower curtain with rod, 1,800W Curtain
LA-104 Medicine cabinet with mirror, 410MMx510MM
LA-105 Soap dispenser, liquid, wall…