0011605992

Repair Barracks Bldg 1115, Camp Casey Project: 243525, Repair Repair Barracks Bldg S-1115 (K-Work) Camp Casey AREA I, Korea

Pursuant to FAR 36.204 the estimated price range is betw een $1,000,000 and $5,000,000.

This is a NON-WORK PLAN TASK ORDER TO MATOC AREA I & II CONTRACTORS ONLY.Contract Numbers

W91QVN-18-D-0021;0022;0025;0026;0027;0028;0042;0044;0046;0050

Site Visit: Offerors w ho intend to propose on this solicitation are strongly encouraged to attend site visit. See site visit clause FAR 52.236-27 in Section L.

In the event a contractor is unable to submit an offer in response to this RFP, the contractor shall submit ”No-Offer Letter” by closing date and time specified in the solicitation

MRS. KING, JAINI M. 315-755-3351

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

16-Apr-2021

(RFP)

(IFB)

X

CALL:

Repair Barracks Bldg 1115 Camp Casey

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________180 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

YES X NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________30 Apr 2021 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, X is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

411TH CONTRACTING SUPPORT BRIGADE, KOREA

CONSTRUCTION & SUPPLY DIV, UNIT #15289

APO AP 96271

UNITED STATES

W91QVN

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

12:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

243525

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

W91QVN21R0063 38

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W91QVN21R0063

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job Repair (K) Work Non-Work Plan

FFP

The Contractor shall provide all labor, tools, equipment, supplies, and any other resources necessary to peform Project 243525, repair of building S-1115, 4 -stroy barracks including fire supperession system at Camp Casey Area I. All work will be in accordance with the statement of work (SOW), drawings, and all terms and conditions contained herein.

FOB: Destination

PURCHASE REQUEST NUMBER: 0011605992

PSC CD: Z2FC

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

War Hazard

FFP

Estimated Cost for War Hazard Losses is Zero ($0.00).

NET AMT

Section E - Inspection and Acceptance

CLAUSES INCORPORATED BY FULL TEXT

52.203-2 CERTIFICATE OF INDEPENDENT PRICE DETERMINATION (APR 1985)

(a) The offeror certifies that --

(1) The prices in this offer have been arrived at independently, without, for the purpose of restricting competition, any consultation, communication, or agreement with any other offeror or competitor relating to –

(i) Those prices,

(ii) The intention to submit an offer, or

(iii) The methods of factors used to calculate the prices offered:

(2) The prices in this offer have not been and will not be knowingly disclosed by the offeror, directly or indirectly, to any other offeror or competitor before bid opening (in the case of a sealed bid solicitation) or contract award (in the case of a negotiated solicitation) unless otherwise required by law; and

(3) No attempt has been made or will be made by the offeror to induce any other concern to submit or not to submit an offer for the purpose of restricting competition.

(b) Each signature on the offer is considered to be a certification by the signatory that the signatory --

(1) Is the person in the offeror's organization responsible for determining the prices offered in this bid or proposal, and that the signatory has not participated and will not participate in any action contrary to subparagraphs (a)(1) through (a)(3) of this provision; or

(2) (i) Has been authorized, in writing, to act as agent for the following principals in certifying that those principals have not participated, and will not participate in any action contrary to subparagraphs (a)(1) through (a)(3) of this provison ______________________________________________________ (insert full name of person(s) in the offeror's organization responsible for determining the prices offered in this bid or proposal, and the title of his or her position in the offeror's organization);

(ii) As an authorized agent, does certify that the principals named in subdivision (b)(2)(i) above have not participated, and will not participate, in any action contrary to subparagraphs (a)(1) through (a)(3) above; and

(iii) As an agent, has not personally participated, and will not participate, in any action contrary to subparagraphs (a)(1) through (a)(3) of this provision.

(c) If the offeror deletes or modifies subparagraph (a)(2) of this provision, the offeror must furnish with its offer a signed statement setting forth in detail the circumstances of the disclosure.

(End of Provision)

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 180 calander days after NTP*. The time stated for completion shall include final cleanup of the premises.

*The Contracting Officer shall specify either a number of days after the date the contractor receives the notice to proceed, or a calendar date.

(End of clause)

Section I - Contract Clauses

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)

(a) Definitions. As used in this clause—

“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.

“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.

“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232- 7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall—

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.beta.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

(1) Document type. The Contractor shall submit payment requests using the following document type(s):

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items—

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

2 in 1

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

N/A

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial item financing, submit a commercial item financing request.

(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

[Note: The Contractor may use a WAWF “combo” document type to create some combinations of invoice and receiving report in one step.]

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

WAWF Invoice Type 2 in 1

Pay Official DoDAAC W56GBU

Issue By DoDAAC W91QVN

Admin DoDAAC** W91QVN

Inspect By DoDAAC W582LG

Ship To Code ____

Ship From Code ____

Mark For Code ____

Service Approver (DoDAAC) ____

Service Acceptor (DoDAAC) ____

Accept at Other DoDAAC W582LG

LPO DoDAAC ____

DCAA Auditor DoDAAC ____

Other DoDAAC(s) ____

(*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert “See Schedule” or “Not applicable.”)

(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)

(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.

Ms Sim, Sang Yim Email: sangyim.sim3.ln@mail.mil

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

(End of clause)

Section J - List of Documents, Exhibits and Other Attachments

SOW/PROVISIONS/APPENDIX'S

DEPARTMENT OF THE ARMY

US ARMY INSTALLATION MANAGEMENT COMMAND

HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN-CASEY

UNIT #15543

APO AP 96224-5543

IMYN-C-PWF 28 January 2021

SPECIFICATIONS

FOR

PROJECT NO.: 243525

Repair Barracks, Building No. S-1115

Camp Casey, Korea

TABLE OF CONTENTS

1. Technical Provisions - I: Statement of Work

2. Technical Provisions - II: Technical Detail Specifications

3. Technical Provisions - III: Special Conditions

4. Appendix "A": List of Applicable Contract Drawings

5. Appendix “B”: List of materials for Material Approval Submittal

TECHNICAL PROVISIONS - I

STATEMENT OF WORK

PROJECT NO TITLE LOCATION

243525 Repair barracks, building No. 1115 Camp Casey

1. DESCRIPTION: The work to be performed to repair barracks, building No. 1115 is described below and executed by one or more of the groups.

1.1. Work by Contractor: The contractor shall provide all labor, tools, equipment, supplies and any other resources necessary to accomplish the scope of work contained herein as indicated in the drawings and in accordance with the specifications.

1.2. Work by In-House Labor: Not applicable to this project.

1.3. Work by Troop Labor: Not applicable to this project.

2. PRINCIPAL FEATURES: This project includes the following principal features:

2.1. Schedule #I, Repair (K): All work shall be in accordance with the attached drawings and specifications.

2.1.1. Civil Work

2.1.1.1. Replace concrete curb with granite curb.

2.1.1.2. Replace 1.2m width sidewalk with new.

2.1.1.3. Replace Asphalt Concrete (AC) surface course.

2.1.1.4. Paint 150mm thickness reflective white parking line.

2.1.1.5. Replace handrail on existing concrete step and bike shed with new.

2.1.1.6. Restore solid sodding including top soil.

TP I-1

2.1.2. Architectural Work

2.1.2.1. Floor work

2.1.2.1.1. Replace existing floor tile and rubber tile with new Polyvinyl Chloride Tile (PVCT) including Vinyl Cove Base (VCB) and Rubber Base (RB) as shown on new floor plan and interior finish schedule. The existing concrete flooring shall be smooth, true, level plane with all defects such as rough or scaling concrete, low spots, high spots, painting, and uneven surface shall be corrected for new flooring. Provide leveling concrete for existing concrete slab with government approval.

2.1.2.1.2. Replace existing quarry tile including quarry tile base with new as shown on floor plans and interior finish schedule.

2.1.2.1.3. Replace existing Ceramic Mosaic Tile (CMT) with new Ceramic Floor Tile (CFT) including cement bond coat, waterproof membrane, and mortar bed as shown on floor plans, section, and details drawings.

2.1.2.1.4. Replace existing concrete slab at corridor, each bath rooms, toilet, laundry, and mud room on 1st floor for mechanical sewer line works as shown on floor plan and mechanical drawings.

2.1.2.1.5. Apply epoxy coating with non-slip grits on existing floors as shown on floor plan and interior finish schedule.

2.1.2.2. Interior and exterior wall work

2.1.2.2.1. Replace existing all Gypsum Wall Board (GWB) wall board walls with new GWB wall (Normal, Water resistant or 'X' type) including metal studs as shown on floor plans, sections and detail drawings.

2.1.2.2.2. Paint all existing interior walls including Concrete Masonry Unit (CMU), metal, concrete surfaces, stairway, hand rails, and guard rails as shown on floor plan, detail drawings interior finish schedule.

2.1.2.2.3. Paint all existing exterior walls including Exterior Insulation and Finish System (EIFS), CMU, metal, woods, concrete surfaces, stairwells, hand rails, guard rails, and other components (bicycle rack, trash bin, pump house, and pavilion) of exterior surface of the building as shown on floor plan, detail drawings and pictures.

2.1.2.2.4. Apply texture coating with plastering at dressing room and closet as shown on floor plans, elevations and interior finish schedule.

2.1.2.2.5. Replace existing Glazed Ceramic Wall Tile (GCWT, full height) with new including cement bond coats, water proof membrane, plastering including metal lath, and waterproof GWB as shown on floor plans and sections.

2.1.2.2.6. Replace existing pipe chases and pipe cover with new CMU, waterproof type GWB pipe chases and metal cover including access door in each rooms for new mechanical piping system as per floor plans. Sections and detail drawing.

TP I-2

2.1.2.2.7. Remove existing AWP (Acoustical Wall Panels) and apply texture coat on new GWB in multi-purpose room, kitchen, lounge, and game room as shown on floor plan and interior finish schedule.

2.1.2.3. Interior and exterior ceiling and roof work

2.1.2.3.1. Replace existing ceiling with new acoustical ceiling tiles including metal suspension systems as shown on floor plans and interior finish schedule.

2.1.2.3.2. Replace existing ceiling with new GWB (Normal, Water resistant or 'X' type) ceiling including ceiling suspension system as shown on floor plans and finish schedule.

2.1.2.3.3. Paint all interior ceiling surfaces as shown on interior finish schedule and section.

2.1.2.3.4. Paint all existing exterior exposed metal, woods, fascia, and soffit as shown on floor plan and elevations.

2.1.2.3.5. Apply acrylic fluid-applied waterproofing coating on existing roof as shown on floor plan and sections.

2.1.2.3.6. Replace existing rain gutter with new at canopies as shown on floor plan and elevation.

2.1.2.4. Miscellaneous work

2.1.2.4.1. Replace existing doors and door frames with new including hardware sets as shown on new floor plan and door schedule.

2.1.2.4.2. Replace existing windows including insect screen with new aluminum thermal breaker type windows including glass as shown on floor plans, elevations and window schedule.

2.1.2.4.3. Replace existing window horizontal mini blinds with new, fireproof type.

2.1.2.4.4. Replace existing wooden head, jam and sill for all windows with new as shown on door/window schedule.

(Natural color, Oak)

2.1.2.4.5. Replace existing aluminum louver with new as shown on floor plans and louver schedule.

2.1.2.4.6. Replace existing Fire Extinguishers Cabinets (FEC) with new as shown on floor plans and detail drawing.

2.1.2.4.7. Replace existing all toilet accessories with new as shown on floor plans and detail drawings.

2.1.2.4.8. Replace existing all access doors on wall and ceiling with new as shown on floor plan and enlarged floor plan.

2.1.2.4.9. Replace existing kitchenette with new including base cabinet and upper cabinet as shown on floor plan, elevation and detail drawings.

2.1.2.4.10. Replace interior and exterior signages with new for all rooms as shown on floor plan, elevations and signage schedule.

2.1.2.4.11. Replace existing metal shelf with mop rack with new in janitor room.

TP I-3

2.1.2.4.12. Replace existing gravel bed and concrete curb with new 100mm deep gravel bed including granite curb around building as shown on floor plan and detail drawing.

2.1.2.4.13. Replace existing trench covers, hooks, and hose bib with new, and checked metal cover at mud room as shown on floor plan and detail drawing.

2.1.2.4.14. Replace existing al grating covers with new for each vest as shown on floor plan and detail drawing.

2.1.2.4.15. Replace existing counter top and Stainless Steel (SST) shelves with new at laundry as shown on floor plan and detail drawing.

2.1.2.4.16. Replace existing iron board cabinet with new as shown on floor plan pictures and detail drawing.

2.1.2.4.17. Replace existing exterior and interior bulletin boards, card holder, and flexi info with new as shown on floor plan, detail drawing and signage schedule.

2.1.2.4.18. Replace existing aluminum louvers with new as shown on floor plans and detail drawings.

2.1.2.4.19. Replace wooden shelf, SST rod and drawer cabinet with new in each closet as shown on floor plan and details.

2.1.2.4.20. Replace existing fire rated access doors (1-1/2 hours) with new at laundry room and stairwell as shown on floor plans.

2.1.2.4.21. Replace existing wooden chair rails and wooden hanger rails at each bed room, kitchen, lounge and game room with new as shown on floor plans, elevations and detail drawings.

2.1.2.4.22. Replace existing vanity cabinets including wall hung cabinet with new in all dressing room as shown on new floor plans and detail drawing.

2.1.2.4.23. Replace existing concrete stoops with new as shown on floor plan.

2.1.2.4.24. Replace existing 18mm thickness plywood shelves including plastic laminate at each storage bin as shown on floor plans and elevations.

2.1.2.4.25. Replace existing SST splash guards with new as shown on floor plans and exterior elevations.

2.1.3. Mechanical Work

2.1.3.1. Heating, Ventilating, and Air Conditioning (HVAC) system

2.1.3.1.1. Replace existing water chiller, air handling unit, heating and ventilating units, air conditioning units, control, concrete pads accessories, and associated piping and ductwork with new.

2.1.3.1.2. Replace existing fan coil units, room thermostat, control, accessories, and associated piping with new.

2.1.3.1.3. Replace existing supply air ducts, duct insulation, diffusers, registers, louvers dampers, grilles, and associated accessories with new.

2.1.3.1.4. Replace existing chilled and hot water circulation pump, air separator, expansion tank, chemical feeder, control system, and associated piping with new.

TP I-4

2.1.3.1.5. Replace existing all chilled and hot water main and branch-piping risers, insulation, ductwork, and accessories with new.

2.1.3.1.6. Replace all existing wall mounted exhaust fans, roof mounted exhaust fans, in-line exhaust fan, ceiling exhaust fans, control, and all associated ductwork with new.

2.1.3.1.7. Replace existing range hood, unit heaters, control, and all associated piping and ductwork with new.

2.1.3.1.8. Replace the existing exhaust air ductwork, dryer vent, square diffusers, register, grilles, outside air intake louver, outside air opening including motorized damper with new.

2.1.3.1.9. Perform DALT (Duct Air Leakage Test) and T.A.B (Testing, Adjusting, and Balancing) after construction to verify if the HVAC system works properly.

2.1.3.1.10. Pre-air leaking test is required prior to repair infiltration and sealing at mechanical room. Repair infiltration and seal air leaking portions including clearance between wall ceiling and penetrators (duct, water piping, conduct pipe, and flue vent pipe) at mechanical room. Provide final-air leakage test report.

2.1.3.2. Plumbing system

2.1.3.2.1. Replace the existing, hot water storage tank, domestic hot water circulation pump, domestic hot water re-circulation pump, control system, and associated piping with new.

2.1.3.2.2. Replace existing domestic cold and hot water main and branch piping riser, insulation, backflow preventer assembly, floor drains, floor cleanouts, sewer piping, vent piping, and temperature mixing valve including accessories with new.

2.1.3.2.3. Replace all existing plumbing fixtures, electric water cooler, water hammer arrests, washer valve boxes, and associated piping with new.

2.1.3.3. Fire protection

2.1.3.3.1. Replace the existing automatic fire protection sprinkler system and all associated accessories for fire protection system with new.

2.1.4. Electrical Work

2.1.4.1. Replace existing lighting fixtures, exit lights, exterior lights, toggle switches, 3-way switches, photocell, wires and conduits with new.

2.1.4.2. Replace existing receptacles and cover plates with new.

2.1.4.3. Replace existing safety switches, combination motor starters, magnetic motor starters, manual motor starters, junction boxes, control system, wires and conduits for HVAC system with new.

TP I-5

2.1.4.4. Replace fire alarm control system with new addressable fire alarm control and mass notification system panel, manual pull station, smoke detector and relay module, visual signal strobes, microphone, speaker device, and associated wiring and conduit.

2.1.4.5. Remove and reinstall existing fire alarm building transmitter, antenna, lighting arrester and CO detectors with new wiring and conduit.

2.1.4.6. Replace existing telephone outlets and cover plates with new.

2.1.4.7. Replace existing CATV outlets and cover plates with new.

2.1.4.8. Remove and reinstall existing CCTV system, cameras, and LCD television, and replace CCTV wiring and conduit with new.

2.2. Schedule #II, New Construction (L): All work shall be in accordance with the attached drawings and specifications.

None

TP I-6

TECHNICAL PROVISIONS - II

TECHNICAL DETAIL SPECIFICATIONS

PROJECT NO TITLE LOCATION

243525 Repair barracks, building No. 1115 Camp Casey

GENERAL: The specification sections listed below are applicable to this project. The specifications are from the “Standard Technical Specifications for O&MA Projects, Korea, Revision 1” (2014 OMA SPECS, REVISION 1), dated 20151030, located on the http://www.usfk.mil/Portals/105/Documents/Contracting/NewContract/2014-OMA- SPECS_REVISION-1.pdf. The electronic version of the specifications is Acrobat® PDF format and can be read with the Acrobat Reader® software.

The Standard Technical Detail Specifications:

The work shall conform to the most current version of the listed standards/specifications below.

DIVISION 01 – GENERAL REQUIREMENTS

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 32 01.00 10 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 45 00.00 10 QUALITY CONTROL

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 58 00 PROJECT IDENTIFICATION

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION AND DECONSTRUCTION

02 61 13 EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL

02 65 00 UNDERGROUND STORAGE TANK REMOVAL

02 81 00 TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS

02 82 14.00 10 ASBESTOS HAZARD CONTROL ACTIVITIES

TP II-1

02 83 19.00 10 LEAD BASED PAINT HAZARD ABATEMENT, TARGET

HOUSING & CHILD OCCUPIED FACILITIES

DIVISION 03 – CONCRETE

03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING

03 15 00.00 10 CONCRETE ACCESSORIES

03 20 00.00 10 CONCRETE REINFORCING

03 30 00 CAST-IN-PLACE CONCRETE

DIVISION 04 – MASONRY

04 20 00 MASONRY

DIVISION 05 – METALS

05 50 13 MISCELLANEOUS METAL FABRICATIONS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

06 20 00 FINISH CARPENTRY

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 14 00 FLUID-APPLIED WATERPROOFING

07 24 00 EXTERIOR INSULATION AND FINISH SYSTEMS

07 60 00 FLASHING AND SHEET METAL

07 92 00 JOINT SEALANTS

DIVISION 08 – OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 14 00 WOOD DOORS

08 51 13 ALUMINUM WINDOWS

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

08 91 00 METAL WALL AND DOOR LOUVERS

DIVISION 09 – FINISHES

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

TP II-2

09 22 36 LATH

09 29 00 GYPSUM BOARD

09 30 00 CERAMIC TILE, QUARRY TILE, AND PAVER TILE

09 51 00 ACOUSTICAL CEILINGS

09 65 00 RESILIENT FLOORING

09 90 00 PAINTS AND COATINGS

DIVISION 10 – SPECIALTIES

10 14 01 EXTERIOR SIGNAGE

10 14 02 INTERIOR SIGNAGE

10 21 13 TOILET COMPARTMENTS

10 28 13 TOILET ACCESSORIES

DIVISION 12 – FURNISHINGS

12 21 00 WINDOW BLINDS

12 32 00 MANUFACTURED WOOD CASEWORK

12 36 00 COUNTERTOPS

DIVISION 21 - FIRE SUPPRESSION

21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

DIVISION 22 – PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 09 53.00 20 SPACE TEMPERATURE CONTROL SYSTEMS

23 52 00 HEATING BOILERS

23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS

23 82 02.00 10 UNITARY HEATING AND COOLING EQUIPMENT

TP II-3

DIVISION 26 – ELECTRICAL

26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS

26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT

26 08 00 APPARATUS INSPECTION AND TESTING

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 51 00 INTERIOR LIGHTING

26 56 00 EXTERIOR LIGHTING

DIVISION 27 – COMMUNICATIONS

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

27 54 00.00 20 COMMUNITY ANTENNA TELEVISION (CATV) SYSTEMS

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 31 33.00 10 FIRE ALARM REPORTING SYSTEM, RADIO TYPE

28 31 49 CARBON MONOXIDE DETECTORS

28 31 64.00 10 FIRE DETECTION AND ALARM SYSTEM, ADDRESSABLE

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

DIVISION 31 – EARTHWORK

31 00 00 EARTHWORK

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 16.17 COLD MILLING OF BITUMINOUS PAVEMENTS

32 12 10 BITUMINOUS TACK AND PRIME COATS

32 12 11 BITUMINOUS SURFACE TREATMENT

32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS

32 92 23 SODDING

TP II-4

TECHNICAL PROVISIONS - III

SPECIAL CONDITIONS

PROJECT NO TITLE LOCATION

243525 Repair barracks, building No. 1115 Camp Casey

1. Material Approval Submittal:

(1) The contractor shall submit a shop drawing submittal schedule and the material approval request with all supporting documents to the COR within 14 days after receipt of NTP.

(2) Attached list of materials in Appendix “B” shall be included in the shop drawing submittal schedule and material approval request.

2. Environmental Requirements in Contract The Contractor shall perform work consistent with the relevant policy and objectives identified in Installation’s Environmental Management System (EMS). The Contractor shall perform work in a manner that conforms to all appropriate Environmental Management Programs and Operational Controls identified by Installation’s EMS, including pollution prevention, waste reduction, energy use, and natural resource protection. The Contractor shall provide monitoring and measurement information as necessary for the organization to address environmental performance relative to the environmental, energy, and transportation management goals. In addition, the Contractor shall advise their employees of their roles and responsibilities identified by the EMS and how these requirements affect their work performed under this contract. The Contractor is responsible for ensuring that the Contractor and any persons involved in the supervision or performance of the contract complete all required Environmental training.

In the event of any environmental nonconformance or noncompliance associated with the contracted services, the contractor shall take corrective and/or preventative actions. In the event of any noncompliance with any federal, state, or local environmental law, regulation or requirement, the Contractor shall immediately respond by taking all appropriate corrective actions and notifying the Contracting Officer’s Representative (COR) and the Environmental Office. For any nonconformance with the EMS, the Contractor shall take corrective action and initiate further preventative action, as required by the Environmental Office.

All on-site contractor personnel shall complete necessary safety and environmental training specified for the type of work conducted on-site. Upon contract award, the COR will notify the EMS Manager to arrange Environmental training for appropriate staff.

Additionally, when ordering supplies for use on Installation, all contractor personnel must favor energy-efficient, recycled or reclaimed material whenever practicable.

TP III-1

The responsibilities of all contractor personnel include:

(1) Comply with all applicable environmental laws, regulations and installation environmental policies.

(2) Control and prevent spills or hazardous substances releases IAW installation Spill Prevention Plan.

(3) Ensure dust, debris, materials, trash, etc., do not become air borne and travel off the project site.

(4) Do not remove, cut, deface, injure, or destroy land resources including trees, shrubs, vines, topsoil and land forms without approval, except in areas indicated on the drawings or specified to be cleared.

(5) Monitor all water areas affected by construction activities to prevent pollution of surface and ground waters. Do not apply toxic or hazardous chemicals to soil or vegetation unless otherwise indicated.

(6) Open burning is prohibited on the Government premises IAW installation environmental policy.

(7) Participate in installation’s recycling program.

(8) Reducing the amount of hazardous material and/or solvent used by purchasing fewer hazardous materials and by increasing the use of products with recycled content. Spills of hazardous or toxic materials must be immediately reported to the Contracting Officer and the Environmental Office. Storage, describing, packaging, labeling, marking and placarding of hazardous waste and hazardous material IAW applicable environmental laws, regulations and local environmental policies. Transport hazardous waste off

Government property and dispose of it in compliance with National, Provincial, and/or Local requirements for solid waste disposal.

(9) Reducing the amount of solid waste from construction and demolition debris, and scrap metal sent to municipal and rubble landfills by reducing, reusing, and recycling. Handling, storage, and disposal of solid waste must be conducted to prevent contamination. Transport solid waste off Government property and dispose of it in compliance with National, Provincial, and/or Local requirements for solid waste disposal.

(10) Conserving energy and water usage by turning off lights and equipment when not in use and using only the necessary amount of water needed to complete the required tasks. Continuous conservation of our natural resources is a must.

(11) When potential cultural or historic items are inadvertently found during construction activities, immediately cease activities in the vicinity of the discovery and report the findings to the Environmental Office.

(12) Participate in installation’s Integrated Pest Management (IPM) program whenever practicable.

TP III-2

(13) Minimize interference with disturbance to, and damage to fish, wildlife, and plants including their habitat.

3. CONTRACT REQUIREMENTS PACKAGE ANTITERRORISM/OPERATIONS SECURITY REVIEW

COVER SHEET

After Notice to process is issued, COR shall take following action, Section IV. Standard Contract Language/Contract Clause Applicability and/or Additional SOW Language.

A. AT Level I training. This standard language is for contractor employees with an area of performance within as Army controlled installation, facility or area. All contractor employees, including subcontractor employees, requiring access to Army installations, facilities, and controlled-access areas shall complete AT Level I awareness training within 30 calendar days after the contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 05 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website: http://jko.jten.mil B. Access and general protection/security policy and procedures. This standard language is for contractor employees with an area of performance within Army controlled installation, facility, or area. Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

B-a. For contractors that do not require CAC, but require access to a DoD facility or installation.

Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

TP III-3

C. iWATCH Training. The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award and within 05 calendar days of new employees commencing performance with the results reported to the COR NLT 30 calendar days after contract award.

D. For contracts that require OPSEC Training. Per AR 530-1 Operations Security, the contractor employees must complete Level I OPSEC Awareness training. New employees must be trained within 30 calendar days of their reporting for duty and annually thereafter.

TP III-4

APPENDIX "A"

LIST OF APPLICABLE CONTRACT DRAWINGS

PROJECT NO TITLE LOCATION

243525 Repair Barracks, Building No. S-1115 Camp Casey GENERAL: The work shall conform to the following contract drawings and OMA standard detail drawings, 2014 (dated 30 November 2015), issued by the Department of the Army, Installation Management Agency, Korea Region Office and located on http://www.usfk.mil/Portals/105/Documents/Contracting/NewContract/STANDARD- DETAIL-DRAWINGS-FOR-OMA-PROJECTS-KOREA_20151130.pdf, all of which form a part of the specifications.

Ring No. Sheet No. Description Date

1 T-1 TITLE SHEET 22 JAN 21

2 T-2 TITLE SHEET 22 JAN 21

CIVIL

3 C-1 LOCATION PLAN AND GENERAL NOTES 22 JAN 21

4 C-2 REMOVAL PLAN 22 JAN 21

5 C-3 SITE LAYOUT PLAN AND SCOPE OF WORK 22 JAN 21

6 C-4 MISC. DETAILS 22 JAN 21

ARCHITECTURAL

7 A-1 1ST FLOOR PLANS AND GENERAL NOTES 22 JAN 21

8 A-2 2ND - 4TH FLOOR PLANS AND SCOPE OF WORK 22 JAN 21

9 A-3 ELEVATIONS AND SCOPE OF WORK 22 JAN 21

10 A-4 ELEVATIONS AND PICTURES 22 JAN 21

11 A-5 GENERAL SECTIONS 22 JAN 21

12 A-6 INTERIOR WALL SECTIONS-1 22 JAN 21

13 A-7 INTERIOR WALL SECTIONS-2 22 JAN 21

14 A-8 TYPICAL ENLARGED FLOOR PLANS 22 JAN 21

15 A-9 ENLARGED FLOOR PLANS AND FIRE RATED ACCESS

DOOR NOTES

22 JAN 21

16 A-10 INTERIOR ELEVATIONS-1 22 JAN 21

17 A-11 INTERIOR ELEVATIONS-2 22 JAN 21

18 A-12 INTERIOR ELEVATIONS-3 22 JAN 21

19 A-13 INTERIOR ELEVATIONS-4 AND DETAILS-1 22 JAN 21

A-1

20 A-14 DETAILS-2 22 JAN 21

21 A-15 DETAILS-3 22 JAN 21

22 A-16 DETAILS-4 22 JAN 21

23 A-17 DETAILS-5 22 JAN 21

24 A-18 KITCHEN CABINET DETAILS 22 JAN 21

25 A-19 CLOSET DETAILS 22 JAN 21

26 A-20 INTERIOR, EXTERIOR FINISH SCHEDULE AND

MATERIAL & COLOR SCHEDULE

22 JAN 21

27 A-21 DOOR, WINDOW & LOUVER SCHEDULE AND

HARDWARE SCHEDULE

22 JAN 21

28 A-22 DOOR, WINDOW & LOUVER ELEVATIONS, NOTES AND

DETAILS

22 JAN 21

29 A-23 SIGNAGES SCHEDULE 22 JAN 21

MECHANICAL

30 M-1 MECHANICAL MATERIAL INDICATIONS & SYMBOLS 22 JAN 21

31 M-2 FIRE PROTECTION AND MECHANICAL GENERAL

NOTES NOTES & SCOPE OF WORK

22 JAN 21

32 M-3 MECHANICAL EQUIPMENT SCHEDULE - 1 22 JAN 21

33 M-4 MECHANICAL EQUIPMENT SCHEDULE - 2 22 JAN 21

34 M-5 NEW HVAC DUCT PLAN ( 1ST FLOOR ),AIR DEVICE

SCHEDULE AND NOTES

22 JAN 21

35 M-6 NEW HVAC PLAN ( 2ND - 3RD FLOOR )AND NOTES 22 JAN 21

36 M-7 NEW HVAC DUCT PLAN ( 4TH FLOOR )AND NOTES 22 JAN 21

37 M-8 NEW HVAC PIPING PLAN ( 1ST FLOOR ), NOTES AND

NOTE ON INSTALLATION OF PIPE INSULATION

22 JAN 21

38 M-9 NEW HVAC PIPING PLAN ( 2ND-3RD FLOOR ) NOTES

AND NOTE ON INSTALLATION OF PIPE INSULATION

22 JAN 21

39 M-10 NEW HVAC PIPING PLAN ( 4TH FLOOR ), NOTES AND

NOTE ON INSTALLATION OF PIPE INSULATION

22 JAN 21

40 M-11 MECHANICAL ROOM PARTIAL PLAN EXHAUST DUCT

ISOMETRIC DIAGRAM & LAUNDRY ROOM DUCT

22 JAN 21

41 M-12 NEW PLUMBING PIPING PLAN ( 1ST FLOOR ) NOTE ON

INSTALLATION OF PIPE INSULATION AND NOTES

22 JAN 21

42 M-13 NEW PLUMBING PIPING PLAN ( 2ND FLOOR )NOTE ON

INSTALLATION OF PIPE INSULATION AND NOTES

22 JAN 21

43 M-14 NEW PLUMBING PIPING PLAN ( 3RD FLOOR )NOTE ON

INSTALLATION OF PIPE INSULATION AND NOTES

22 JAN 21

44 M-15 NEW PLUMBING PIPING PLAN ( 4TH FLOOR )NOTE ON

INSTALLATION OF PIPE INSULATION AND NOTES

45 M-16 BATH. RM. PLUMBING PIPING PARTIAL PLAN ( BOTH

SIDE & ONE SIDE ) & PLUMBING FIXTURE SCHEDULE

A-2

46 M-17 BATH. RM. PLUMBING PIPING ISOMETRIC DIAGRAM

AND NOTES

22 JAN 21

47 M-18 LAUNDRY & MUD RM. PLUMBING PIPING ISOMETRIC

DIAGRAM & LAUNDRY & MUD RM PLUMBING PIPING

22 JAN 21

48 M-19 CONTROL - 1 22 JAN 21

49 M-20 CONTROL - 2 22 JAN 21

50 M-21 CONTROL - 3 22 JAN 21

51 M-22 MECH ROOM AIR LEAKAGE TEST FLOW CHART, AIR

BARRIERS AND QUALIFICATION OF AIR LEAKAGE

22 JAN 21

52 M-23 FIRE PROTECTION LEGEND & ABBREVIATION,

AUTOMATIC FIRE SUPPRESSION GENERAL NOTES

22 JAN 21

53 M-24 MECH ROOM FIRE PROTECTION PIPING PARTIAL PLAN

AND FIRE PROTECTION REQUIREMENTS

22 JAN 21

54 M-25 1ST FL. FIRE PROTECTION PIPING PLAN 22 JAN 21

55 M-26 2ND & 3RD FL. FIRE PROTECTION PIPING PLAN 22 JAN 21

56 M-27 4TH FL. FIRE PROTECTION PIPING PLAN 22 JAN 21

57 M-28 DETAILS - 1 22 JAN 21

58 M-29 DETAILS – 2 22 JAN 21

59 M-30 DETAILS – 3 22 JAN 21

60 M-31 DETAILS – 4 22 JAN 21

61 M-32 DETAILS – 5 22 JAN 21

62 M-33 DETAILS – 6 22 JAN 21

63 M-34 DETAILS – 7 22 JAN 21

64 M-35 DETAILS - 8 22 JAN 21

ELECTRICAL

65 E-1 LEGEND, GENERAL NOTES AND SCOPE OF WORKS 22 JAN 21

66 E-2 NEW 1ST FL LIGHTING PLAN 22 JAN 21

67 E-3 NEW 2ND-4TH FL LIGHTING PLAN 22 JAN 21

68 E-4 LIGHTING FIXTURE DETAILS-1 22 JAN 21

69 E-5 LIGHTING FIXTURE SCHEDULE & LIGHTING FIXTURE

DETAILS 2

70 E-6 NEW 1ST FL POWER PLAN 22 JAN 21

71 E-7 NEW 2ND-4TH FL POWER PLAN 22 JAN 21

72 E-8 TYPICAL MODULE ELEC. PLAN-A & PLAN-B, MECH.

ROOM POWER & CONTROL PLAN

22 JAN 21

73 E-9 NEW 1ST FL FIRE ALARM/MASS NOTIFIACATION

SYSTEM PLAN

22 JAN 21

74 E-10 NEW 2ND-4TH FL FIRE ALARM/MASS NOTIFIACATION

SYSTEM PLAN

A-3

75 E-11 NEW FIRE ALARM/MASS NOTIFICATION SYSTEM

DIAGRAM

22 JAN 21

76 E-12 NEW 1ST FL CCTV/CATV/TEL PLAN 22 JAN 21

77 E-13 NEW 2ND-4TH FL CCTV/CATV/TEL PLAN 22 JAN 21

78 E-14 CCTV SYSTEM DIAGRAM 22 JAN 21

A-4

APPENDIX "B"

List of materials for Material Approval Submittal

PROJECT NO TITLE LOCATION

243525 Repair Barracks, Building No. S-1115 Camp Casey

Submittal d ifi i

Description of Submittal

LC-1 Ready Mixed Conc. 240kg/cm2

LC-2 Hot mixed Asphalt Concrete #67

LC-3 #8-150x150 WWF

LC-4 Pipe Steel Galv 1 1/2" Dia.

LC-5 Granite Curb

LA-1 Granite curb stone, 200Wx300Dx1,000L

LA-2 Ready mixed concrete, 210kg/CM, slump 12

LA-3 Waterproofingl membrane

LA-4 Anodized AL blast door w/ AL frame & insulated glasses, HDW, 1714 x 2150

LA-5 Anodized AL door w/ AL frame & insulated glasses, HDW, 1714 x 2150

LA-6 Steel thermal insulated blast double door w/steel frame door size: 1,714 W X 2150 H X 44.5 Thk., 600 i l d lLA-7 Steel insulated thermal blast door with steel frame door size; 915W. X 2133H. X 44.5 Thk.

LA-8 Steel thermal insulated double door w/steel frame door size: 1,714 W X 2133 H X 44.5 Thk.

LA-9 Steel hollow core door, 1 hrs fire rate w/frame door size; 1066W. X 2133H. X 44.5 Thk. 100 X 600 i l d fi lLA-10 Steel hollow core door, 1 hrs fire rate w/frame door size; 1066W. X 2133H. X 44.5 Thk.

LA-11 Steel hollow core single door, 1/3 hrs fire door w/frame door size; 914W X 2133H. X 44.5 Thk.

LA-12 Wood solid core door w/frame door size; 914W X 2133H X 44.5 Thk. 1/3hrs fire rated & fixed steel i d fi d lLA-13 Wood solid door, 20 Min fire rate door, w/frame door size; 714W. X 2133H. X 44.5 Thk.

LA-14 Wood solid core double door w/frame door size; 1814W X 2133H X 44.5 Thk. 1/3hrs fire rated door / fi d lLA-15 Wood solid door, 20 Min fire rate door, w/frame door size; 914W. X 2133H. X 44.5 Thk.

LA-16 Wood solid door, 20 Min fire rate door, w/frame door size; 915W. X 2133H. X 44.5 Thk.,STC door

LA-17 Wood solid core single door w/frame, 19mm under cut door size; 712W. X 2133H. X 44.5 Thk.

LA-18 Wood solid door w/frame door size; 664W. X 2133H. X 44.5 Thk.

B-1

Submittal

Description of Submittal

LA-19 Wood solid double door, door size; 864W. X 2133H. X 34.9 Thk., 100x600 tempered glass

LA-20 Electronic card key lockset,HT-24 ONITY Co.,4ea card key, 3ea mechanical key, master key system i l di f bLA-21 Exit device, type 1, F-08, lever type

LA-22 Exit device, type 2, F-01, lever type

LA-23 Exit device, type 2, F-08, lever type

LA-24 Lockset, 1000-1, F-01, lever type

LA-25 Lockset, 1000-1, F-07, lever type

LA-26 Lockset, 1000-1, F-08, lever type

LA-27 Lockset, 4000-1, F-76

LA-28 Lockset, 4000-1, F-82

LA-29 Lockset, 4000-1, F-86

LA-30 Auxiliary dead lock, E0161

LA-31 Floor Closer, C06041 with offset pivot

LA-32 Door closer, C02021

LA-33 Door closer, C02011

LA-34 Hinge, butt, A2111, 127 x 114 (NRP)

LA-35 Hinge, butt, A8111, 127 x 114 (NRP)

LA-36 Hinge, butt, A2133, 114 x 114 (NRP)

LA-37 Hinge, butt, A8111, 127 x 114

LA-38 Hinge, butt, A8111, 114 x 114

LA-39 Hinge, butt, A8112, 114 x 114

LA-40 Hinge, butt, A2112, 114 x 114

LA-41 Hinge, butt, A2133, 114 x 114

LA-42 Hinge, butt, A2133, 101 x 101

LA-43 Door stop and holder, Exterior type w/Conc, H9", 3"x3"

LA-44 Door stop , L02161

LA-45 Door stop , L02141

LA-46 Push plate, J302

LA-47 Pull plate, J405

LA-48 Automatic door bottom Roy 335

LA-49 Kick plate, J102

LA-50 Door viewer, L03221

LA-51 Magnetic heavy duty door latch

LA-52 Auto flush bolt, Type 25

LA-53 Flush bolt, L04081

LA-54 Astragal

B-2

Description of Submittal

LA-55 Adjustable astragal

LA-56 Dustproof strike, L04011

LA-57 Threshold, aluminum, 150W, SGL

LA-58 Threshold, aluminum, 150W DBL

LA-59 Marble SSM threshold 150mm W

LA-60 Key box, E8351

LA-61 Aluminum blast window thermal break type, fixed & tilting window, 3000x1000, 26.75thk Low-e i l d l iLA-62 Aluminum blast window thermal break type, sliding window, 1200x1300, 26.75thk Low-e insulated l iLA-63 Aluminum blast window thermal break type, fixed & tilting window, 1200x1100, 26.75thk Low-e i l d l iLA-64 3/4hrs Fire rated steel fixed window, 1200 x 1100

LA-65 Aluminum thermal breaker pane glass, fixed window, 1000x1100, 10.75thkm laminated A/L sliding & fi d i dLA-66 Aluminum slidingWindow, 2000x1000, 18THK, tempered/laminated Glass

LA-67 Aluminum slidingWindow, 1200x1100, 18THK, tempered/laminated Glass

LA-68 AL louver with Insect Screen & Bird Screen

LA-69 Horizontal blinds, 1" aluminum slats

LA-70 Metal stud, 0.8 mm thk

LA-71 Metal runner, 0.8 mm thk

LA-72 Metal ceiling suspension system for GWB

LA-73 Acoustical ceiling suspension system, aluminum

LA-74 Gypsum board, 15mm thk x1,200 x2,400, normal

LA-75 Gypsum board, 15mm thk x1,200 x2,400, water resistant or X

LA-76 Gypsum board, 12mm thk x1,200 x2,400, normal

LA-77 Gypsum board, 12mm thk x1,200 x2,400, water resistant or X

LA-78 Gypsum board, 12mm thk x1,200 x2,400, fire rated

LA-79 Acoustical tile, 600x600x16mm thk.

LA-80 Floor ceramic tile

LA-81 Epoxy joint grout motor for 300 x 300 CMT

LA-82 Glazed ceramic wall tile with accessories

LA-83 PVC tile, KCC Neo Sense, 450 x 450 x 3Thk

LA-84 Vinyl cove base w/adhesive

LA-85 Rubber stair treads, 480 x 1200 x 3THK

LA-86

Rubber tile, size 500mm x 500mm x 3 THK, I-BADKA rubber flooring

B-3

Description of Submittal

LA-87 Rubber Base, 2THK

LA-88 Rubber stringer & risers, 178mm H X 2 THK

LA-89 Paint, MPI 57, varnish

LA-90 Paint, MPI 11, acrylic emulsion, exterior

LA-91 Paint, anti & mildew interior

LA-92 Paint, MPI 47, enamel, interior

LA-93 Paint, MPI 94, enamel, exterior

LA-94 Paint, MPI 79, primer for metal

LA-95 Texture coat, terracotta 25kg w/finish coat

LA-96 Noroo Paint, MPI 77, Epoxy Epoxy Paint Include Surface Preparation Base, Cleanpoxy3100, MPI77, /LA-97 Toilet tissue dispenser, Double Roll, Horizontal Type

LA-98 Towel bar

LA-99 Soap holder, recessed type

LA-100 Bulletin board, 1200 x 900, oak trim, tan nucork

LA-101 Bulletin board, 1800 x 1100, Fixed type w/AL trim, light fixture and lidi lLA-102 Mirror with plywood back board

LA-103 Shower curtain with rod, 1,800W Curtain

LA-104 Medicine cabinet with mirror, 410MMx510MM

LA-105 Soap dispenser, liquid, wall…