DRAWINGS (Mech 2).pdf

PDF 9 MB Posted

Attached to
Repair Barracks Bldg S-1115 Camp Casey
Solicitation number
W91QVN21R0063
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M-19

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

MECHANICAL

CHONG,ST

SEQUENCE OF OPERATION

AHU-1 SEQUENCE OF OPERATION

AND BELOW THE COOLING THERMOSTAT TC MODULATES THE FACE AND

BY-PASS DAMPER MOTOR TO MAINTAIN THE LEAVING AIR TEMP AT

1. WHEN AHU-1 MOTOR RUNS, FAN MOTOR AUXILLARY CONTACT CLOSES

FAN F-5 SHALL BE DE-ENERGIZED AND THE O.A. DAMPER SHALL CLOSE.

COOLING AND HEATING

1. THE AIR HANDLING UNIT MOTOR SHALL BE MANUALLY ENERGIZED AND

FAN AND ROOF EXHAUST FAN SHALL BE DE-ENERGIZED AND THE O.A.

GENERALA.

B.

RUN CONTINUOUSLY. WHEN THE UNIT IS CALLED TO RUN,

MAKE UP

ASSEMBLY

BACK FLOW PREVENTER

SET AT 0.84KG/CM

PRESSURE REDUCING VALVE

H W

S

OUTDOOR AIR THERMOSTAT

W/REMOTE BULB

SUNSHIELD

H

AIR COOLED

WATER CHILLER

CIRC.PUMP

CHILLED/HOT WATER

CHEMICAL FEEDER

CHR

CHS

C H

S

H W

R

C H

R

AS

WC

E.A.

AIR SEPARATOR

P

C/HWR

C/HWS

FROM/TO BLDG. HEATING

AND COOLING SYSTEM

ET CHILLED/HOT WATER

EXPANSION TANK1

THE OUTSIDE AIR DAMPER SHALL OPEN.

WHEN THE OUTSIDE AIR DAMPER IS OPEN, A DAMPER MOUNTED END

TO BE ENERGIZED.

SWITCH SHALL CLOSE ALLOWING THE MOTOR STARTER HOLDING COIL

4. THE TOILET EXHAUST FANS SHALL BE ELECTRICALLY INTERLOCKED WITH

AHU-1.

HWS

HWR

PIPING LINE

COLD WATER

CIRC.PUMP

HOT WATER P

SYSTEM ZONE

TO HEATING

0-100 DEG. RANGE

TO MAKE ON FALL IN TEMP

V-1

V-1

V-2 V-2

TO

SUNSHIELD

OT

C

OUTDOOR AIR THERMOSTAT

W/ REMOTE BULB

WIRE TO MAKE ON RISE

RANGE)

IN TEMP(0-100 DEG. C

STARTER

STARTER

CHILLER FLOW SWITCH PROVIDED

BY CHILLER MFG. AND CONTRACTOR

INSTALLED

PANEL

CHILLER CONTROL

FS

DAMPER SHALL CLOSE.

TO ENERGIZE AQUASTAT.

BY-PASS DAMPER MOTOR TO MAINTAIN THE LEAVING AIR TEMP AT

AND ABOVE HEATING THERMOSTAT TC MODULATES THE FACE AND

CONTROL DIAG. FOR H.W.B. & WATER CHILLER

NOT TO SCALE

S

SMOKE

DETECTOR

TO HVAC SYSTEM

M

FOR OUTSIDE AIR

SA

OA

OUTSIDE AIR

INTAKE LOUVER

SYSTEM "ON-OFF"

SWITCH

OA MOTORIZED

DAMPER, N.C.,

EAC/H

C

ROOF EXHAUST

TC

SW

W/BIRDSCREEN

DUCT MOUNTED

COOLING THERMOSTAT

WITH AVERAGING ELEMENT,

EA

OA

AHU

FANS

AIR HANDLING UNIT

C /H

W R

C /H

W S

HEATING THERMOSTAT

WITH AVERAGING ELEMENT,

FR

T

FREEZESTAT

M

FACE & BY-PASS

DAMPER

(SPRING RETURN MOTOR)

N.O.

N.C.

AUTOMATIC CHANGEOVER SWITCH

STARTER

M

DUCT MOUNTED

STARTER

TH

EA

EA

R

AUX. CONTACT.

1PH, 120 VAC

H

C3

OFF

HAND

AUTO

OFF

HAND

MAG. MTR STARTER

FOR ROOF EXHAUST

FAN #F-4

FOR ROOF EXHAUST

FAN #F-5

MAG. MTR STARTER

R

C5

RED

OL

C4

N

OL

C2

1PH, 120 VAC

HEATING THERMOSTAT

DETECTOR AUX. CONTACT.

DM

DM

DUCT

H

R2AUTO

WB R

R1

B

DUCT

R1

TH.

R1

RED

AUX.

CONTACT.

AUTOMATIC

CHANGEOVER SW.

W

DUCT MTD. SMOKE

FREEZESTAT

BLACK

COOLING THERMOSTAT

RED

N

WR

TC.

R1

FACE & BY-PASS

DAMPER MOTOR

(MTD. IN RM. 435)

CONTROL RELAY.

CONTROL RELAY.

(MTD. IN MECH. RM.)

DAMPER MOTOR.

BR

R

R

O.A.

1PH, 120 VAC

ON-OFF

H

SD FZ

MAG. MTR STARTER

FOR AHU-1

3 OL'S

C3

RED

L

N

CONTROL WIRING DIAGRAM FOR AHU-1.

HOT / CHILLED WATER FLOW SYSTEM DIAGRAM AND SEQUENCE OF OPERATION

NOT TO SCALE

AIR HANDLING UNIT SYSTEM CONTROL DIAGRAM SEQUENCE OF OPERATION

SET AT 15.5 C WIRE

SET AT 21.1 C

M19

M19

SET AT 20 C.

SET AT 12.8 C

EF

CONTROL - 1

12.8 C(55 F) TC SHALL BE REVERSE ACTING.

20 C(68 F) TC SHALL BE DIRECT ACTING.

2. WHEN AUTOMATIC CHANGEOVER SWITCH SENSES 50 F PIPE TEMPERATURE

3. WHEN FREEZESTAT SENSES LEAVING AIR TEMP. BELOW 4.4 C (40 F). AHU

SET AT 4.4 C.

2. WHEN SMOKE DETECTOR SENSES SMOKE, AHU FAN MOTOR AND ROOF

2. WHEN AUTOMATIC CHANGEOVER SWITCH SENSES 60 F PIPE TEMPERATURE

CAMP CASEY

REPAIR BARRACKS, BLDG NO. S-1115

P.O.C

TO BE REMAINED

EXISTING BOILER

243525

To

(PT 1000W)

SENSOR

O.A TEMP

WINTER SEASON :

SUMMER SEASON :

3. OPEN H.W VALVES (V-1) AND CLOSE C.W. VALVES (V-2) MANUALLY.

PACKAGE CONTROL SHALL MAINTAIN BOILER HOT WATER SUPPLY TEMTERATURE AT 180°F (82.1°C).

2. SET EXISTING BOILER "HAND-AUTO" SWITCH TO AUTO POSITION, BOILER STARTS WHEN HP-1 IS ENERGIZED. BOILER

WHEN O.A. THERMOSTAT DROPS TO IT'S SETPOINT OF 60°F (15.5°C).

1. SET HOT WATER CIRCULATION PUMP HP-1 "HAND-OFF-AUTO" SWITCH TO "AUTO" POSITION, PUMP STARTS AND RUNS CONTINOUSLY

3. CLOSE H.W VALVES (V-1) AND OPEN C.W. VALVES (V-2) MANUALLY.

AT 44°F (6.7°C).

AND CP-1 IS ENERIGEZED. BUILT-IN CONTROL OF EXISTING WATER CHILLER SHALL MAINTAIN CHILLED WATER SUPPLY TEMPERATURE

2. EXISTING AIR COOLED LIQUID CHILLER IS ENERGIZED WHEN PIPELINE FLOW SWITCH (FS) CLOSES IT'S CONTACT UPON SENSING FLOW

WHEN O.A. THERMOSTAT RISES TO IT'S SETPOINT OF 70°F (21.1°C).

1. SET CHILLED WATER CIRCULATION PUMP CP-1 "HAND-OFF-AUTO" SWITCH TO "AUTO" POSITION, PUMP STARTS AND RUNS CONTINOUSLY

NOT TO SCALE

FAN COIL UNIT CONTROL DIAGRAM

SEQUENCE OF OPERATION

SWITCH(OFF-HIGH-MEDIUM-LOW)

UNIT MOUNTED 3-SPEED

SPACE THERMOSTAT

WALL MOUNTED

FACTORY PROVIDED

S.A

MAINTAIN ROOM TEMPERATURE AT 20 °C

SPACE HEATING THERMOSTAT SHALL CYCLE FCU FAN "ON" OR "OFF" TO

IN WINTER OPERATION :

MAINTAIN ROOM TEMPERATURE AT 23.9 °C

SPACE COOLING THERMOSTAT SHALL CYCLE FCU FAN "ON" OR "OFF" TO

IN SUMMER OPERATION :

OCCUPANT VIA 3-SPEED FAN SWITCH WALL MOUNTED.

PIPE MOUNTED CHANGEOVER SWITCH FAN OPERATION IS CONTROLLED BY

THE OPERATING MODE (HEATING OR COOLING) SHALL BE DETERMINED BY

FAN COIL UNIT :

T

CH

C

M19

M-20

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

MECHANICAL

CHONG,ST

C

C H

RA

SA

T

(TYPICAL)

CEILING MOUNTED

SPACE THERMOSTATS

INDICATED ON THE DRAWINGS. PANEL SHALL BE ENAMEL

FINISHED 14 GUAGE STEEL, NEMA 12 CONSTRUCTION.

AUTOMATIC VALVE(2-WAY PATTEN)

AUTOMATIC VALVE(3-WAY PATTERN)

THE MINIMUM NUMBER OF CONDUCTORS.

CONTROL WIRING, SLASHES INDICATE

AUTOMATIC TEMPERATURE CONTROLS

2. PROVIDE SUITABLE ENCLOSURES OR WEATHERPROOF METAL

COVERS FOR ALL INSTRUMENTS, MOTORS, WIRING, AND TUBING

PROVIDE ALL WIRING REQUIRED TO IMPLEMENT THE SEQUENCE

1. WIRING INDICATED IS SCHEMATIC. THE CONTRACTOR SHALL

4. PROVIDE AN AUTOMATIC TEMPERATURE CONTROL PANEL WHERE

NORMALLY OPENN.O.

HV-1 HEATING & VENTILATING UNIT #1

NOTES:

3. ALL WIRING SHALL BE IN ACCORDANCE WITH DIVISION

INSTALLED OUTSIDE THE BUILDING.

16 SPECIFICATION PROVISIONS.

OF OPERATION.

M

ATC

OPPOSED BLADE DAMPER

DAMPER MOTOR

VOLTS A.C.

PANEL MOUNTED DEVICE

VAC

M

M

TEMPERATURE CONTROLLER

N.O. CONTACT

N.C. CONTACT

SINGLE POLE DOUBLE THROW

NORMALLY CLOSED

T

SPD

N.C.

L E G E N D

SW

FACTORY PROVIDED WALL MOUNTED

3-SPEED SWITCH

FACTORY PROVIDED WALL MOUNTED

(OFF-HIGH-MEDIUM-LOW)

C H T

THE OPERATING MODE (HEATING OR COOLING) SHALL BE

DETERMINED BY A FACTORY SUPPLIED AUTOMATIC

FCU SEQUENCE OF OPERATION

FAN OPERATION IS CONTROLLED BY OCCUPANT VIA

IN SUMMER OPERATION ROOM THERMOSTAT SHALL CYCLE

IN WINTER OPERATION ROOM THERMOSTAT SHALL CYCLE

CHANGEOVER SWITCH.

3-SPEED FAN SWITCH MOUNTED ON WALL.

1.

FAN COIL UNIT

2. O.A. DAMPER SHALL OPEN WHENEVER HVU-2 IS CALLED TO RUN.

1. DURING OPERATING HOURS, HEATING THERMOSTAT DH MODULATES

AND MUD ROOM CEILING EXHAUST FAN SHALL BE DE-ENERGIZED.

3. THE MUD ROOM CEILING EXHAUST FAN SHALL BE INTERLOCKED WITH HVU-2.

B. HEATING

SEQUENCE OF OPERATION

1. TIMECLOCK SHALL BE SET IN ACCORDANCE WITH FACILITY

OPERATING SCHEDULE.

GENERALA.

CONTROL DIAG. FOR H.V.U. #2 & F-3.

BE SIMILAR.

DIFFERENTIAL, AND SUITABLE FOR 8 F.L.A. AT 120 VAC. T-2 & P-4 SHALL

REMOTE BULB THERMOSTAT T-1 SHALL CONTROL PUMP P-3 TO MAINTAIN

ITS SETPOINT. T-1 SHALL BE PROVIDED WITH A COPPER CAPILLARY.

SEQUENCE OF OPERATION

RECIRC. PUMP

DOMESTIC H.W.

T-2 AQUASTAT

COPPER WELL

CIRC. PUMP

DOMESTIC H.W.P

P

COPPER WELL

P

P

T-1

AQUASTAT

MIXING VALVE

THERMOSTATIC

BATHROOMS

MIXING VALVE

H.W. SENSOR

THEMOSTATIC

(BUILT IN CONTROL)

DOM H.W. HEATER

RELAYL4080

1PH 120VAC

H N

AS REQUIRED BY THE TEMPERING VALVE MANUFACTURER TO

FINAL PIPING CONFIGURATION FOR TEMPERING VALVE SHALL BE

INCORPORATE HOT WATER RECIRCULATION.

NOTE:

NOT TO SCALE

NOT TO SCALE

DOMESTIC HOT WATER SYSTEM CONTROL DIAGRAM

HEAT / VENT SYSTEM CONTROL DIAGRAM (FOR MUD ROOM)

NOT TO SCALE

CEILING MOUNTED FAN COIL UNIT CONTROL

M20

M20

M20

60 C TO LAUNDRY

43.3 C TO

SET AT 60 C

SET AT 38 C

T-1 SHALL HAVE A RANGE OF APPROX. -18 TO 71 C 1.7 TO 5.6 C ADJUSTABLE

THE FACE & BY-PASS DAMPER TO MAINTAIN THE S.A. AIR TEMP AT 12.8 C.

UNIT FAN TO MAINTAIN ROOM TEMPERATURE AT 25.5 C.(78 F)

UNIT FAN TO MAINTAIN ROOM TEMPERATURE AT 20 C.(68 F)

2. WHEN FREEZESTAT SENSES LEAVING AIR TEMP. BELOW 40 F. HVU FAN

CONTROL - 2

DAMPER, N.C.,

(SPRING RETURN MOTOR)

OUTSIDE AIR

INTAKE LOUVER

W/BIRDSCREEN

FOR MUD ROOM

FACE & BY-PASS

DAMPER, N.O.,

TO COIL FLOW

HEAT./VENT. UNIT

OA OA

HVU

M

M

H

C

T

OA MOTORIZED

7-DAY TIME CLOCK*

HEATING THERMOSTAT (T-2)

NIGHT SET-BACK

TC

FR

T N H

SA TO HVAC SYSTEM

FANS

CEILING EXHAUST

HEATING THERMOSTAT

FREEZESTAT

HWS

HWR

EA

EA

T D H

3M COPPER CAPILLARY,

W/REMOTE BULB

DIFFERENTIAL, 8FL A @120V.

WIRE TO MAKE ON FALL,

BULB IN MUD ROOM

TM

C

DM

DM

C

O.A. TH.

HAND

AUTO

OFF

H

C1

1PH, 120 VAC

HAND

OFF

AUTO

FREEZESTAT

O.A. TH.

TM

TNH FZ

MAG. MTR STARTER

EXHAUST FAN F-3

DRY TIME HEAT TH.

OL

L

RED

N

TDH

MAG. MTR STARTER

H.V.U. #2

FACE & BY-PASS

DAMPER MOTOR

DAMPER MOTOR

O.A.

OL

RED

L

H

1PH, 120 VAC

7-DAY TIMER

N

NIGHT SET BACK TH.

SET AT 12.8 C.

SET AT 7 C.

EF

SET AT 4.4 C.

CAMP CASEY

REPAIR BARRACKS, BLDG NO. S-1115

G

P.O.C

TO REMAIN

HOT WATER HEATER

EXISTING DOMESTIC

243525

M-21

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

MECHANICAL

CHONG,ST

ROOM THERMOSTAT, WIRE TO "MAKE ON FALL"

DEG.C., 8 F.L.A. AT 120 VAC.

T-3 SHALL CYCLE THE RESPECTIVE UNIT HEATER

MOTOR TO MAINTAIN ITS SET POINT.

SEQUENCE OF OPERATION

HWS

HWR

M

T H

HEATING THERMOSTAT

SET AT 50 DEG. F.

HORIZONTAL TYPE

UNIT HEATER

BALANCING

VALVE

HEAT THERMOSTAT

1PH 120VAC CKT NO. M-12

CONTROL DIAG. FOR UNIT HEATER (MECH. RM.)

O.L

L

H

RED

UNIT HEATER

IN MECH. RM.

UH

MTR STARTER

MAN.

N

HVU

OA

W/BIRDSCREEN

INTAKE LOUVER

OUTSIDE AIR

OA

M

(SPRING RETURN MOTOR)

OA MOTORIZED

DAMPER, N.C.,

C

T

H

FR

FREEZESTAT

E A

SA TO HVAC SYSTEM

EA

HWR

HWS

EA

EA

HEATING THERMOSTAT

T H

EAEAEA

FROM DRYER

EA

EA

CO DOOR

CEILING REGISTER

DAMPER

BACKDRAFT

CO DOOR

CO DOOR

M

FACE & BY-PASS

DAMPER, N.O.,

TO COIL FLOW

DUCT MOUNTED

EXHAUST FAN

FOR LAUNDRY AREA

EXHAUST AIR

GOOSENECK

SD

DETECTOR

SMOKE

EA

(TYPICAL)

TYPICAL

DUCT

C.O. DOOR

FREEZESTAT

DETECTOR

DUCT SMOKE

O.A. THERMOSTAT

TH

DM

DM

HEAT THERMOSTAT

FACE & BY-PASS

DAMPER MOTOR

MOTOR

O.A. DAMPER

L

H

SD

OFF

HAND

C1

AUTO

FZ

C

1PH, 120 VAC

PNL BOARD

"D"

CKT. NO.

MDF-4 C1

HAND

BA

OFF

AUTO

1C

NC

L

H.V.U. #1

MAG. MTR STARTER

3 OL'S

N

MAG. CONTACTOR

EXHAUST FAN F-2

MAG. MTR STARTER

C2

3 OL'S

RED

H

TIMER S.W.

1PH, 120 VAC

0-2HR

N

NOT TO SCALE

HEAT / VENT SYSTEM CONTROL DIAGRAM (FOR LAUNDRY ROOM)

NOT TO SCALE

MECH. RM. EXH. FAN CONTROL

T

TO F-6 MOTOR

STARTER

M

DAMPER MOTOR,

SPRING RETURN

O.A.

WALL

D-4, N.C.

T-2

WIRE TO MAKE ON RISE,

SET AT 29.4 DEG.C. MIN.

8 FLA CAPY. AT 120 VOLTS

CONTROL DIAG. FOR EXH. FAN (F-6)

VENT THERMOSTAT

DAMPER MOTOR

DM O.A.

1PH 120VAC CKT NO. M-2

H

A

H

W/A.O.H. SEL. SW

MAN. MTR STARTER

WALL EXH. FAN

F-6, IN MECH. RM.F

L

N

(MECH. RM.)

NOT TO SCALE

UNIT HEATER CONTROL

ROOM THERMOSTAT, WIRE TO "MAKE ON FALL"

DEG.C., 8 F.L.A. AT 120 VAC.

T-3 SHALL CYCLE THE RESPECTIVE UNIT HEATER

MOTOR TO MAINTAIN ITS SET POINT.

SEQUENCE OF OPERATION

HWS

HWR

M

T H

HEATING THERMOSTAT

SET AT 50 DEG. F.

HORIZONTAL TYPE

UNIT HEATER

BALANCING

VALVE

HEAT THERMOSTAT

1PH 120VAC CKT NO. M-12

CONTROL DIAG. FOR UNIT HEATER (MECH. RM.)

O.L

L

H

RED

UNIT HEATER

IN MECH. RM.

UH

MTR STARTER

MAN.

N

HEAT./VENT. UNIT

FOR LAUNDRY RM

HVU

OA

W/BIRDSCREEN

INTAKE LOUVER

OUTSIDE AIR

OA

M

(SPRING RETURN MOTOR)

OA MOTORIZED

DAMPER, N.C.,

C

T

H

FR

FREEZESTAT

E A

SA TO HVAC SYSTEM

EA

HWR

HWS

EA

EA

HEATING THERMOSTAT

T H

EAEAEA

FROM DRYER

EA

B

EA

CO DOOR

CEILING REGISTER

DAMPER

BACKDRAFT

CO DOOR

CO DOOR

M

DUCT MOUNTED

EXHAUST FAN

FOR LAUNDRY AREA

EXHAUST AIR

GOOSENECK

SD

DETECTOR

SMOKE

DRYER

DRYER

EA

(TYPICAL)

TYPICAL

DUCT

DRYER MFR (TYPICAL)

BACK DRAFT DAMPER BY

C.O. DOOR

CONTROL DIAG. FOR H.V.U. #1 & F-2.

FREEZESTAT

DETECTOR

DUCT SMOKE

O.A. THERMOSTAT

TH

DM

DM

HEAT THERMOSTAT

FACE & BY-PASS

DAMPER MOTOR

MOTOR

O.A. DAMPER

L

H

SD

OFF

HAND

C1

AUTO

FZ

C

1PH, 120 VAC

PNL BOARD

"D"

CKT. NO.

MDF-4 C1

HAND

BA

OFF

AUTO

1C

NC

L

H.V.U. #1

MAG. MTR STARTER

3 OL'S

N

MAG. CONTACTOR

EXHAUST FAN F-2

MAG. MTR STARTER

C2

3 OL'S

RED

H

TIMER S.W.

1PH, 120 VAC

0-2HR

N

NOT TO SCALE

HEAT / VENT SYSTEM CONTROL DIAGRAM (FOR LAUNDRY ROOM)

MECH. RM. EXH. FAN CONTROL

T

TO F-6 MOTOR

STARTER

M

DAMPER MOTOR,

SPRING RETURN

O.A.

WALL

D-4, N.C.

T-2

WIRE TO MAKE ON RISE,

SET AT 29.4 DEG.C. MIN.

8 FLA CAPY. AT 120 VOLTS

CONTROL DIAG. FOR EXH. FAN (F-6)

VENT THERMOSTAT

DAMPER MOTOR

DM O.A.

1PH 120VAC CKT NO. M-2

H

A

H

W/A.O.H. SEL. SW

MAN. MTR STARTER

WALL EXH. FAN

F-6, IN MECH. RM.F

L

N

(MECH. RM.)

NOT TO SCALE

UNIT HEATER CONTROL

SEQUENCE OF OPERATION

SPACE THERMOSTAT T-2 SHALL CONTROL FAN

F-6 TO MAINTAIN ITS SET POINT. WHEREVER F-3

IS ENERGIZED, D-4 SHALL OPEN.

NOT TO SCALE-

M21

M21

M21

100 FLEXIBLE100 FLEXIBLE

2. DURING OPERATING HOURS, S.A. HEATING THERMOSTAT TH MODULATES

THE FACE AND BY-PASS DAMPER MOTOR TO MAINTAIN THE ROOM AIR

1. SET SYSTEM SELECTOR SWITCH TO "HEAT" POSITION.

FAN SHALL BE DE-ENERGIZED.

1. THE CLOTHES DRYERS CAN NOT BE ENERGIZED UNLESS FAN

SEQUENCE OF OPERATION

HEATINGB.

VENTILATIONC.

A. GENERAL

3. NON-DURING OPERATING HOURS, SYSTEM SHALL BE DE-ENERGIZED.

2. WHEREVER HVU-1 IS CALLED TO RUN, ITS O.A. DAMPER SHALL OPEN.

SHALL BE DE-ENERGIZED AND THE O.A. DAMPER SHALL CLOSE.

IS ENERGIZED, SEE ELECTRICAL DRAWING.

2. DURING OPERATING HOURS, S.A. HEATING THERMOSTAT TH MODULATES

1. SET SYSTEM SELECTOR SWITCH TO "HEAT" POSITION.

1. THE CLOTHES DRYERS CAN NOT BE ENERGIZED UNLESS FAN

SEQUENCE OF OPERATION

HEATINGB.

VENTILATIONC.

A. GENERAL

3. NON-DURING OPERATING HOURS, SYSTEM SHALL BE DE-ENERGIZED.

2. WHEREVER HVU-1 IS CALLED TO RUN, ITS O.A. DAMPER SHALL OPEN.

IS ENERGIZED, SEE ELECTRICAL DRAWING.

1. WHEN SMOKE DETECTOR SENSES SMOKE H & V UNIT FAN MOTOR

3. HVU-1 SHALL BE INTERLOCKED WITH F-2.

1. WHEN SMOKE DETECTOR SENSES SMOKE H & V UNIT FAN MOTOR

3. HVU-1 SHALL BE INTERLOCKED WITH F-2.

TEMP. AT 20 C (68 F).

2. WHEN FREEZESTAT SENSES LEAVING AIR TEMP. BELOW 4.4 C (40 F). HVU

SET AT 20 C.

SET AT 4.4 C.

APROX 12.8 TO 35 DEG.C. RANGE, SET AT 12.8

EF

CONTROL - 3

EF

CAMP CASEY

REPAIR BARRACKS, BLDG NO. S-1115

243525

SET AT 50°F

THERMOSTAT

HEATING

SEQUENCE OF OPERATION

MOTOR TO MAINTAIN ITS SET POINT.

T-3 SHALL CYCLE THE RESPECTIVE UNIT HEATER

H N

L

RED

OL

UH

1PH 120VAC CKT NO. M-12

IN MECH. ROON

UNIT HEATER

STARTER

MOTOR

8 F.L.A. AT 120 VAC.

APROX. 12.8 TO 35°C. RANGE, SET AT 12.8°C.,

ROOM THERMOSTAT, WIRE TO "MAKE ON FALL"

M

SWITCH

"H-O-A"

THERMOSTAT

HEAT

HWR

HWS

VALVE

BALANCING

TH

NOT TO SCALENOT TO SCALE-

M21

ELEC. UNIT HEATER CONTROL

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

MECHANICAL

M-22

THE ACCURATE ENCLOSURE AREA SHOULD BE CALCULATED.

IN ORDER TO OBTAIN ACCURATE TEST RESULTS,

PRELIMINARY TESTING DAY'S WEATHER CONDITION

VERIFICATION OF PRE TEST SCHEDULE & CHECK THE

CONSTRUCTION CHECK.

CONSTRUCTION PERSONNEL WITH MEETING &

- DEPRESSURIZATION TEST

- PRESURIZATION TEST

PERFORM THE AIR LEAKAGE TEST

IN ACCORDANCE WITH TEST PROTOCOL

TESTING DAY'S WEATHER CONDITION.

CHECK BUILDING'S STATE & CHECK THE FINAL

PRELIMINARY TEST

- DEPRESSURIZATION TEST

- PRESURIZATION TEST

PERFORM THE AIR LEAKAGE TEST

IN ACCORDANCE WITH TEST PROTOCOL

TO COMFORM THE LEAK AREA

SUBMIT THE TEST REPORT

OF THE TEST LOCATION

DRAWINGS REVIEW AND DETERMINATION

PERSONNEL WITH MEETING

PRE TEST INSPECTION AND CONSTRUCTION

TEST SET UP

PRELIMINARY TEST

PRE TEST INSPECTION

FINAL TEST

TEST END

SUBMIT COMPLETE REPORT

SMOKE TEST

INFRARED THERMOGRAPHY TESTING,

SMOKE TEST

INFRARED THERMOGRAPHY TESTING,

1.

2.

AIR BARRIERS

THE AIR BARRIER SHALL BE CONTINOUS AROUND THE ENTIRE

BUILDING ENVELOPE.

SEAL THE FOLLOWING AIR LEAKAGE PATHWAYS AND GAPS:

THE AIR BARRIER SHALL BE INSTALLED HEREIN TO BRIDGE AND

ALL OTHER AIR LEAKAGE PATHWAYS IN THE BUILDING ENVELOPE

MASONRY TIES, SCREWS, BOLTS AND SIMILAR PENETRATIONS

PIPING, CONDUCT, DUCT AND SIMILAR PENETRATIONS

OPENINGS AND PENETRATIONS OF WINDOW AND DOOR FRAMES

SEISMIC AND EXPANSION JOINTS

CONNECTIONS OF THE WALLS TO THE FOUNDATIONS

CONNECTIONS OF THE WALLS TO THE ROOF AIR BARRIER

3.

TESTED IN ACCORDANCE WITH ASTM E2178.

NOT TO EXCEED 0.004cfm/sf @0.3" wg(0.02L/sm @75Pa) WHEN

AIR BARRIER FUNCTION MUST HAVE AN AIR PERMEANCE

AND SELF ADHESIVE AIR BARRIER MEMBRANE WITH

CONCRETE, WATER RESISTIVE BARRIER COAT, DAMPPROOFING

4.

OF THESE ASSEMBLES AND COMPONENTS.

OF ADJACENT ASSEMBLES, ALLOWING FOR THE RELATIVE MOVEMENT

AND SEALED IN A FLEXIBLE MANNER TO THE AIR BARRIER NATERIAL

THE AIR BARRIER MATERIAL OF EACH ASSEMBLY SHALL BE JOINED

5.

6.

7.

8.

PENETRATIONS OF THE AIR BARRIER MUST BE SEALED.

SERVICE LIFE OF THE ASSEMBLY.

THE AIR BARRIER MUST BE DURABLE TO LAST THE ANTICIPATED

INDICATED IN DRAWINGS.

SYSTEMS AND AT THE INTERFACE OF DISSIMILAR MATERIALS AS

COLUMNS, FLOOR SLABS AND FOUNDATION WALLS, ROOFING

AT TRANSITION AREA, SUCH AS TIE-IN TO STRUCTURAL BEAMS,

INSTALL SELF-ADHESIVE AIR BARRIER TRANSITION MEMBRANE

THE LOAD TO THE STRUCTURE.

THE BUILDING WITHOUT DISPLACEMENT OR DAMAGE, AND TRANSFER

MAXIMUM POSITIVE(75Pa) AIR PRESSURE TO BE PLACED ON

THE AIR BARRIER MUST BE SUPPORTED SO AS TO WITHSTAND THE

MECH ROOM AIR LEAKAGE TEST FLOW CHART

QUALIFICATION OF AIR LEAKAGE TESTING

1.

CONTRACTOR'S POINT - OF - CONTRACT INFORMATION.

INCLUDE BUILDING NAME, ADDRESS, AND NAME OF PRIME CONSTRUCTION CONTRACTOR AND

THAT THE AGENCY HAS TESTED WITHIN THE PAST 2 YEARS.

SUBMIT THE LIST OF AT LEAST TEN COMMERICAL/INDUSTRIAL FACILITIES WITH BUILDING ENVELOPES

TESTING COMMERICAL AND/OR INDUSTRIAL BUILDINGS.

FOR BUILDING AIR LEAKAGE TESTING, VERIFY 2 YEARS OF EXPERIENCE AS AN AGENCY IN PRESSURE

2.

3.

-. CERTIFICATE FOR THERMOGRAPHER LEVEL 1

-. CERTIFICATE FOR AIR BARRIER INSPECTION LEVEL 3

-. CERTIFICATE FOR AIR LEAKAGE TEST LEVEL 3

FOR THE ABOVE WORKS, A TESTING AGENCY SHOULD HAS THE BELOW CERIFICATE OR EQUIVALENT.

4. REFER TO "3S KOREA CO., LTD, TEL : 02-896-9474" OR APPROVED EQUAL.

IN THE INSTALLATION JOINING AN SEALING OF AIR BARRIER MATERIALS AND COMPONENTS.

THE AGENCY SHALL HAVE EXPERIENCE COORDINATING AND INSTRUCTING SUBCONTRACTORS INVOLVED IN JOINING AND SEALING VARIOUS COMPONENTS, AND SEALING OF PENETRATIONS OF AIR BARRIERS.

IN THE INSTALLATION OF AIR BARRIER MATERIALS AND ASSEMBLIES INCLUDING THE EXPERIENCE

FOR LEAKAGE DETECTION AND REPAIR WORK, THE AGENCY SHALL HAVE 2 YEARS EXPERIENCE

5. REFER TO "SINJI E-TEC CO., LTD, TEL : 031-312-8731" OR APPROVED EQUAL.

MECH ROOM AIR LEAKAGE TEST FLOW

CHART, AIR BARRIERS AND QUALIFICATION

OF AIR LEAKAGE TESTING

- M22

CHONG, ST CAMP CASEY

REPAIR BARRACKS, BLDG NO. S-1115

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

M-23

MECHANICAL

CHONG,ST

FIRE PROTECTION LEGEND & ABBREVIATION,

AUTOMATIC FIRE SUPPRESSION GENERAL

NOTES, SPRINKLER Q'TY LIST AND NOTE

SP

D

FIRE PROTECTION LEGEND & ABBREVIATION

SPRINKLER

MAIN SUPPLY SPRINKLER

PENDENT SPRINKLER(K=5.6)

UPRIGHT SPRINKLER(K=5.6)

CUTTING POINT

CAP

FIRE DEPARTMENT CONNECTION

(2-WAY SHOWN)

VALVES

CHECK VALVE

FITTING

WALL MOUNTED TEST HEADER

CONNECTION, TOP

ELBOW, 90

ELBOW, TURNED UP

ELBOW, TURNED DOWN

TEE

TEE, OUTLET UP

TEE, OUTLET DOWN

CONNECTION, BOTTOM

RISER

TEST VALVE

DRAIN VALVE

TYPICALTYP.

NO

EXST EXISTING

ABBREVIATIONS

MAX MAXIMUM

MIN MINIMUM

DRAIN PIPE

NUMBER

DRAWINGDWG

CONN

CONT CONTINUE/CONTINUATION

CONNECTION

RM ROOM

W/ WITH

W/O WITHOUT

SCH SCHEDULE

RESIDENTIAL PENDENT SPRINKLER(K=4.9)

UPRIGHT SPRINKLER(K=8.0)

SIDEWALL SPRINKLER(K=5.6)

OS&Y GATE VALVE(N.O.)

W/TAMPER SWITCH

OS&Y GATE VALVE(N.C.)

W/TAMPER SWITCH

9. ELEVATOR FIRE SPRINKLER SHALL BE IN ACCORDANCE WITH UFC 3-600-01

AUTOMATIC FIRE SUPPRESSION(S) GENERAL NOTES:

1. THE CONTRACTOR SHALL PROVIDE AND INSTALL AN AUTOMATIC WET PIPE SPRINKLER SYSTEM

TO FULLY PROTECT THIS FACILITY. THE FIRE SPRINKLER SYSTEM SHOWN THESE DRAWING IS

PERFORMANCE BASED WHICH MEANS CONCEPTUAL REQUIREMENT ONLY. THE SPRINKLER

CONTRACTOR SHALL SUBMIT A COMPLETE FIRE SPRINKLER SYSTEM SHOPDRAWINGS BASED ON

NFPA 13 AND SPECIFICATION REQUIREMENTS AND SUBMIT FOR APPROVAL PRIOR TO

INSTALLATION. THE EQUIPMENT SHOWN ARE SUGGESTED LOCATIONS HOWEVER FINAL LAYOUT

SHALL BE IN ACCORDANCE WITH APPLICABLE CODES, MANUFACTURER'S RECOMMENDATIONS, AND

EQUIPMENT LISTINGS. CONTRACTOR SHALL COORDINATE SPRINKLER HEADS LOCATIONS WITH,

CEILING PANELS, LIGHTING FIXTURES, AND HVAC AIR DEVICES. ALL EQUIPMENT SHALL BE UL

LISTED AND FM APPROVED IN ACCORDANCE WITH NFPA 13 AND THE PROJECT SPECIFICATION.

2. THE CONTRACTOR SHALL CONDUCT WATER SUPPLY HYDRANT TEST FOR THIS PROJECT BASED

ON NFPA 291 REQUIREMENTS AND UTILIZE THIS DATA TO DESIGN THE SPRINKLER SYSTEM.

THE HYDRANT LOCATIONS, FLOW TESTS, AND DATE SHALL BE INDICATED ON THE

SHOPDRAWINGS. AUTOMATIC SPRINKLER PROTECTION SYSTEM IS REQUIRED TO PROTECT THIS

ENTIRE FACILITY. A MINIMUM 10% SAFETY FACTOR IS REQUIRED BETWEEN THE AVAILABLE

WATER SUPPLY AND THE SPRINKLER SYSTEM DEMAND.

INSTALLED IN THE HORIZONTAL POSITION.

7. ALL AUTOMATIC SPRINKLER DRAIN VALVES FOR FIRE DEPARTMENT CONNECTIONS SHALL BE

BE INSTALLED ON THE EXTERIOR.

DRAINS, BUT MUST TERMINATE TO THE BUILDING EXTERIOR. SPRINKLER RISERS SHALL NOT

AND MAINTENANCE. TEST DRAINS ARE NOT TO BE TERMINATED AT WALL SINKS OR FLOOR

6. PROVIDE MINIMUM 1M X 2M SPACE FOR EACH FIRE SPRINKLER RISER FOR INSTALLATION

AS-BUILT DRAWINGS FOR THIS PROJECT.

CONTRACTOR SHALL CONFORM TO THE SYMBOLS INDICATED IN NFPA 170 TO DEVELOP THE

22-"PLANS AND CALCULATIONS" PRIOR TO SPRINKLER PIPING INSTALLATION. THE

5. CONTRACTOR SHALL SUBMIT HYDRAULIC CALCULATIONS AS REQUIRED BY NFPA 13 CHAPTER

4. FIRE PROTECTION PLANS SHOWN ARE USED FOR COST ESTIMATE PURPOSE ONLY.

WITH O-RINGS ARE NOT PERMITTED.

BRACING CALCULATION IN ACCORDANCE WITH NFPA 13 REQUIREMENTS; SPRINKLERS

3. PROVIDE EARTHQUAKE PROTECTION (SWAY BRACING), END OF BRANCH LINE AND SEISMIC

8. FLEXIBLE COUPLINGS SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 13

10. ALL PIPING, SANITARY, VENT, WASTE, PLUMBING, OTHER PIPING, POWER OR CONTROL CIRCUTS, OR DUCT SHALL PENETRATE ANY STAIR OR EXIT PASSAGEWAY ENCLOSURE UNLESS IT SERVES

AN APPLIANCE WITHIN THE ENCLOSURE AND DEAD ENDS IN THE ENCLOSURE.

SPRINKLER Q'TY LIST

SPRINKLER HEAD TYPE

US/(METRIC)

"K" FACTOR

SIZE

A R E ASYMBOL

LIVING/SLEEPING

THREAD

SPRINKLER Q'TY LIST

RESIDENTIAL PENDENT TYPE SPRINKLER HEAD 4.9/(68)1/2" NPT

TOTAL

MECH ROOM, STORAGE, COMMQUICK RESPONSE UPRIGHT TYPE SPRINKLER HEAD 8.0/(115)3/4" NPT

1075.6/(80)1/2" NPTQUICK RESPONSE PENDENT TYPE SPRINKLER HEAD

TOTAL NUMBER OF SPRINKLER OF SYSTEM 560

CORRIDOR, MULTI PURPOSE ROOM, JAN, LOBBY, TOILET, CLOSET, MUD ROOM, CQ ROOM, KITCHEN, LOUNGE, GAME ROOM

VERIFYING ACTUAL QUANTITIES BASED ON THE CONTRACT DOCUMENT REQUIRMENTS.

1. QUANTITIES ARE SHOWN FOR ESTIMATING PURPOSE ONLY, THE CONTRACTOR SHALL BE RESPONSIBLE FOR

NOTE

5.6/(80)1" NPTQUICK RESPONSE DRY SIDEWALL TYPE SPRINKLER HEAD VEST 9

58.0/(115)3/4" NPTQUICK RESPONSE PENDENT TYPE SPRINKLER HEAD LAUNDRY, COMM

CAMP CASEY

M24

MECH ROOM FIRE PROTECTION PIPING PARTIAL PLAN

SCALE : 1 / 25

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

M-24

MECHANICAL

CHONG,ST

N.O.

N.O.

TS

TS TSN.O.

TS

N.C.

W/2-65mm HOSE VALVE

100mm X 2-65mm TEST HOSE HEADER

W/20mm BALL DRIP VALVE

FOR BACKFLOW PREVENTER FLOW TEST

150mm BACKFLOW PREVENTER

UL/FM APPROVED ASSEMBLY

150mm ALARM CHECK VALVE

WATER MOTOR ALARM GONG

W/TAMPER SWITCH

150mm OS & Y GATE VALVE

W/TAMPER SWITCH

100mm OS & Y GATE VALVE

WET SPRINKLER

4.1 LPM/SM (0.10 GPM/SF)

RESIDENTIAL

950 LPM (250 GPM)

MAX. 4.9 M (16 FT)

MAX. 4 HEADS

MIN. 2.4 M (8 FT)

60 MIN.

ORDINARY TEMPERATURE RATING

TYPE OF SYSTEM

SPRINKLER

SPRINKLER TYPE

MAX. COVERAGE PER

BETWEEN SPRINKLERS

MAX. & MIN. SPACE OF

RATING*

SPRINKLER TEMPERATURE

DESCRIPTION

HAZARD

FIRE PROTECTION REQUIREMENTS

DESIGN DENSITY

DURATION OF SUPPLY

HOSE STREAM

DESIGN AREA

APPLICATION AREA

WET SPRINKLER

8.2 LPM/SM (0.20 GPM/SF)

QUICK RESPONSE

12.07 SM (130 SF)

950 LPM (250 GPM)

MAX. 4.6 M (15 FT)

230 SM (2500 SF)

MIN. 1.8 M (6 FT)

60 MIN.

INTERMEDIATE TEMPERATURE RATING

ORDINARY TEMPERATURE RATING

RESIDENTIAL

OCCUPANCY

ORDINARY HAZARD

OCCUPANCY

MECH ROOM, COMM,

LIVING/SLEEPING

SPRINKLER NOZZLE

K-FACTOR OF

(8.0)

(4.9)

ORDINARY TEMPERATURE RATING

REFER TO PARA 9-7.3, UFC 3-600-01*

WET SPRINKLER

4.1 LPM/SM (0.10 GPM/SF)

QUICK RESPONSE

20.90 SM (225 SF)

950 LPM (250 GPM)

MAX. 4.6 M (15 FT)

140 SM (1500 SF)

MIN. 1.8 M (6 FT)

60 MIN.

ORDINARY TEMPERATURE RATING

VEST, EXERCISE ROOM, MUD ROOM,

ORDINARY TEMPERATURE RATING

LIGHT HAZARD

OCCUPANCY

STAIR-1, LOUNGE, ISSUE ROOM,

CLOSET, KITCHEN, GAME ROOM

(5.6)

4.9M X 4.9M

(16FT X 16FT)

CONCRETE SPLASH BLOCK

LOBBY, JAN, CORRIDOR, TOILET,

FROM FIRE PUMP BUILDING

MECH. ROOM

STORAGE, LAUNDRY

m m

MECH ROOM FIRE PROTECTION PIPING

PARTIAL PLAN AND FIRE PROTECTION

REQUIREMENTS

CAMP CASEY

M25 SCALE : 1 / 100

1ST FLOOR FIRE PROTECTION PIPING PLAN

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

M-25

MECHANICAL

CHONG,ST

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

MECH ROOM

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

ROOM

MULTI PURPOSE

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

CORRIDOR

VEST

STAIR-2

UP

CORRIDOR

LOBBY

COMM

JAN

COMM

STAIR-1

CLOSET

ROOM

VEST

CQ

MUD ROOM

LAUNDRY

STORAGE

STORAGE

STAIR-3

UP

VEST

25 2525

25 32 25

25 5

150 150 150 150 150 150 150 150 150 150

TOILET

65,150

D SP DST

DST

DST

150 150150 150

0 5

PENDENT TYPE SPRINKLER HEAD

15mm QUICK RESPONSE CONCEALED

UPRIGHT TYPE SPRINKLER HEAD

20mm QUICK RESPONSE

DRY SIDEWALL TYPE SPRINKLER HEAD

15mm QUICK RESPONSE

PENDENT TYPE SPRINKLER HEAD

15mm RESIDENTIAL CONCEALED

PENDENT TYPE SPRINKLER HEAD

20mm QUICK RESPONSE CONCEALED

100mm X 65mm X 65mm

FIRE DEPARTMENT CONNECTION

W/20mm BALL DRIP VALVE

65mm HOSE VALVE

FLOOR CONTROL VALVE

1ST FL. FIRE PROTECTION PIPING PLAN

CAMP CASEY

M26 SCALE : 1 / 100

2ND & 3RD FLOOR FIRE PROTECTION PIPING PLAN

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

M-26

MECHANICAL

CHONG,ST

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

2ND FL : KITCHEN

3RD FL : LOUNGE

STAIR-1

328UP

COMM

JAN

CORRIDOR

232 332

STAIR-2

VEST

DN UP

STAIR-3

VEST

UP DN

STORAGE

STORAGE

25 25

150 150 150

150 150 150 150

25253225

150150150

150150150

150150 15

253240

65,150

D SP

D

65,150

SP

DST

DST

DST

DST

DST

DST

150 150

253240 2

5 2

PENDENT TYPE SPRINKLER HEAD

15mm QUICK RESPONSE CONCEALED

UPRIGHT TYPE SPRINKLER HEAD

20mm QUICK RESPONSE

DRY SIDEWALL TYPE SPRINKLER HEAD

15mm QUICK RESPONSE

PENDENT TYPE SPRINKLER HEAD

15mm RESIDENTIAL CONCEALED

65mm HOSE VALVE

FLOOR CONTROL VALVE

2ND & 3RD FL. FIRE PROTECTION

PIPING PLAN

CAMP CASEY

M27 SCALE : 1 / 100

4TH FLOOR FIRE PROTECTION PIPING PLAN

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

M-27

MECHANICAL

CHONG,ST

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/ STAIR-3

UP DN

VEST

DN

VEST

UP

STAIR-2

JAN

COMM

STAIR-1

DN

CORRIDOR

STORAGE

STORAGE

4TH FL : GAME ROOM

25 25

150 150 150

150 150 150

25253225

150150150

150150150

150150150

DST

DST

DST

D

65,150

SP

324050

150 150

PENDENT TYPE SPRINKLER HEAD

15mm QUICK RESPONSE CONCEALED

UPRIGHT TYPE SPRINKLER HEAD

20mm QUICK RESPONSE

SIDEWALL TYPE SPRINKLER HEAD

15mm QUICK RESPONSE

PENDENT TYPE SPRINKLER HEAD

15mm RESIDENTIAL CONCEALED

PENDENT TYPE SPRINKLER HEAD

20mm QUICK RESPONSE CONCEALED

65mm HOSE VALVE

FLOOR CONTROL VALVE

4TH FL. FIRE PROTECTION PIPING PLAN

CAMP CASEY

SPRINKLER ALARM CHECK VALVE & MAIN RISER

M28 - M28

SWAY BRACING2

- M28

3 MAIN RISER CONNECTION(TYPICAL)

- M28

4 FIRE DEPT SIAMESE CONNECTION

- M28

5 SYSTEM TEST CONNECTION

ON WET PIPE SYSTEM

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

M-28

MECHANICAL

CHONG,ST

AND SPIGOT PIECE

DUCTILE IRON FLANGE

AND SPIGOT PIIPE

RODS NOT LESS

THAN 20Ø

DUCTILE IRON BELL

SERVICE

FROM FIRE

MAIN

G.L

GENERAL NOTE :

OR LEAVING THE SUBJECT BUILDINGS.

THIS DETAIL SHALL BE UTILIZED WHERE

.FIRE MAIN SERVICE LINES ARE ENTERINE

STEEL PIPE

THRUST BLOCK

CONC.

FL

BITUMASTIC COATED

BITUMASTIC COATED

W/TAMPER SWITCH

GATE VALVE

OS & Y

FIRST

PIPE SUPPORT

14 16

SEE

M10

FIRE DEPT CONNECTION

VALVE

BALL DROP

PER NFPA 13

FLEXIBLE COUPLING

FOR EARTH QUAKE

(WITH TAMPER SWITCH)

SUPERVISORY VALVE

WATER MOTOR ALARM DRAIN

PRESSURE SWITCH

PIPE SUPPORT

RISER TO SPRINKLER SYSTEM

RETARDING CHAMBER

WATER MOTOR ALARM GONG

MAIN DRAIN AND TEST VALVE

SWAY BRACING PER NFPA 13 FOR

FLEXIBLE COUPLERS PER NFPA 13

DESCRIPTION

ALARM CHECK VALVE

(2-REQUIRED)

PRESSURE GAGE

ZONE 1 EARTHQUAKE

ITEM

FOR EARTH QUAKE

VALVE

BALL DROP

PIPE

O N

I C T

E N

AU

O

F

IR

E

DEPT C

TOSPK

N

R

CONNECTION

FIRE DEPT

CLAPPER

SWIVEL

2-1/2" NS OR BS

EASE - OFF

HOSE COUPLING

PLUG

THREAD

MAIN DRAIN

PIPE EXTENDS THROUGH WALL TO OUTSIDE.

2. THE TEST VALVE SHOULD BE LOCATED AT AN

ACCESSIBLE POINT AND PREFERABLY NOT

OVER 7FT (2.1M) ABOVE THE FLOOR.

PIPE IN WARM ROOM BEYOND VALVE WHERE

1. NOT LESS THAN 4FT (1.2M) OF EXPOSED TEST

NOTES :

ACCESSIBLE LOCATION

TEST VALVE IN READILY

SEE NOTE

BRANCH LINE

P.G.

CONC

SLAB

SWAY BRACE FITTINGS

SCHEDULE 40 PIPE

PIPE CLAMP

SPRINKLER

CROSSMAIN

EXPANSION BOLT (TYP)

CONC

SLAB

SWAY BRACE FITTINGS

SCHEDULE 40 PIPE

SPRINKLER

CROSS MAIN

EXPANSION BOLT

PIPE CLAMP

* PIPE SIZE SHALL BE DETERMINED BY CALCULATIONS

PRESSURE RELIEF VALVE13

O N

I C T

E N

ST

O

F

IR

E

DEPT C

AN PIP

N

E D

OS & Y GATE VALVE14

TAMPER SWITCH15

BACKFLOW PREVENTER16

TEST VALVE HEADER17

FIRST SUPPORT W/CROSS BRACING

DETAILS - 1

CAMP CASEY

M-29

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

MECHANICAL

CHONG,ST

TRAPEZE HANGERS

SEE SPECIFICATION FOR INSULATION THICKNESS

CONCEALED

ALUMINUM LOCK-TYPE BANDS

10 W x 0.5 THK @300 O.C.

ALUMINUM JACKET

80 JACKET STRIP OR

VAPOR-BARRIER JACKET

VAPOR-BARRIER COATING

80 JACKET STRIP

(MIN. 40 JACKET OVERLAP)

CG - CELLULAR GLASS

MF - MINERAL FIBER

HOT PIPE LINE

COLD PIPE LINE

PIPING

AREA

ITEM

A B C D

INSULATION

PIPE

E

F

G

NOTE :

H

3. HEATED OIL PIPE LINE

PIPE INSULATION DETAIL

SHALL BE OVERLAPPED

COLD WATER PIPE LINE

4. A/C CONDENSATE DRAIN

5. REFRIGERATION SUCTION

1. STEAM & CONDENSATE

2. HOT WATER HEATING

1. MAKE-UP WATER

2. CHILLED WATER

HOT PIPE LINE

3. DUAL TEMP WATER

DOWN TO SHED WATER

LONGITUDINAL JOINTS

D

C

A

E F G H BA C ED F G H

EXPOSED

MF

OVERLAP (40)

A B C ED F

EXPORSED

WEATHER

G H

CLASS II ADHESIVE

VAPOR-BARRIER JACKET

CLINCHING STAPLE @ 100 OC

B

CG OR

MF

HANGER LOOPS

SCREWS MAY BE

OMITTED IF

STRAPS

HANGER

STRAP HANGERS

25MIN

FOR LOAD

SIZE BOLT(S)

INSULATION

SCREWS

SEE NOTE 1

REINFORCEMENT MAY BE USED FOR ATTACHMENT IF IT QUALIFIES

DISTANCE IS NOT EXCEED 60INCHES UNLESS FOOT OF STRAP IS

50 x 50 x 6

50 x 50 x 5

50 x 50 x 3

40 x 40 x 3

25 x 25 x 3

TRAPEZE SHELF

HANGER SIZES FOR RECTANGULAR DUCT

DUCT HANGER DETAIL

DO NOT EXCEED ALLOWABLE LOAD LIMITS.

NOTES :

OVER 2425

2,125 THRU 2,400

1,525 THRU 2,100

1,075 THRU 1,500

775 THRU 1,050

475 THRU 750

UP THRU 450

OF DUCT

DIMENSION

LONGEST

SEE NOTE 2

LOAD CAPACITY)

(VERIFY UPPER TRAPEZE

ALTERNATIVE LOCATION

NUTS

OR ANGLE

STRAP

ROD

ANGLES

PLACED UNDER A BOTTOM REINFORCEMENT.

FOR BOTH DUTIES.

2.

1.

40 x 16 GA

25 x 16 GA

25 x 18 GA

25 x 22 GA

HANGERS

STARP

15 DIA

10 DIA

RODS

HANGER

ANGLES

2,400

SPACING

3,000

MAXIMUM

CLASS II ADHESIVE (LESS THAN 600 DUCT) AROUND ENTIRE PERIMETER OF THE

ALL FOUR SIDE OF DUCT 300 APART

AND NOT MORE THAN 80 FROM THE

EDGES OF THE INSULATION JOINT.

APPLYING TWO COATS OF VAPOR-

BARRIER COATING WITH GLASS CLOTH

EMBEDDED BETWEEN COATS.(WHEN FIELD

APPLY VAPOR-BARRIER JACKET)

CLASS II ADHESIVE UNDER

THE 100 OVERLAP.

DUCT IN

AREA

ITEM

MORE THAN 80 FROM DUCT CORNER.

CLASS II ADHESIVE UNDER

100 OC WITH TYPE II VAPOR-BARRIER COATING

VAPOR-BARRIER JACKET

F

FLEXIBLE TYPE

THE 50 OVERLAP.

E

D

C

DUCT INSULATION

RIGID TYPE

DUCT IN 300 WIDTH STRIPS ON 150 ON CENTER

BOTTOM/SIDES 400 OC AND NOT

600 LARGE DUCT

A

B

CONCEALED

DUCT

INSULATION

FASTENER

ADHESIVEA

B

C

EXPOSED

VAPOR-BARRIER JACKETF

STAPLE

OVERLAPD

E

DUCTWORK DETAILS

SINGLE VANE WITH

20mm TRAILING EDGE

RUNNER TYPE 2

SP=40

R=50

FLAT

R

WELD RUNNER TO DUCT

WELD EVERY 6TH VANE TO RUNNER(OVER 1,000 FPM)

OR RUN A TIE ROD THROUGH THE CENTER VANE.

DUCT TURNING VANE DETAIL

ACCEPTABLE ON DESIGNER

APPROVAL.

BOLT, SCREW, OR

SEE NOTES ON FIG.2-4

OTHER RUNNERS MAY BE

SINGLE VANE SCHEDULE

LARGE

SMALL

SIZES OR SPACINGS

USED. OTHER VANE

RUNNER TYPE 1

DOUBLE WALL VANES

FREE AREA BETWEEN

APPROXIMATES ELBOW

INLET AREA.

22 GA

32 MIN

SP

112.5

R

OR

GASP

FL

O

W

SP R

SP

113 81

C lps x Y=X

SD

A lps B cmh

X

NOTE; ABOVE APPLY TO SUPPLY AND RETURN

W

SD

YX

W

Y

D

FOR D OF 300 OR MORE

USE VANED ELBOW

D LESS THAN 300

R=D Y

R1=(X+Y)/2

R2=X+Y

X OR W LESS THAN 300

Y

R1

Y

R

D

R2=X+Y

R1=(X+Y)/2

SD

W2

R2=W1+W2

X

R

TURNING VANES (TYP.)

RETURN ONLY

Y

BRANCH TAKEOFFS

C 300 OR MORE

MANUAL DAMPER

X OR Y LESS THAN 300

R1=(W1+W2)/2

SPLITTER DAMPER (TYP.)

PROVIDE VE WHEN COIL OR DIFFUSER IS

1,500 OR LESS FROM BRANCH TAKEOFF.

A lpsC lp s x Y=X C lps

SD

A lps B lps

W

W

X W

R=W

W

NOTE; SEE SMACNA DUCT MANUAL

C LESS THAN 300

(1985) FIGS. 2-7

C lp s A lps

PREFERRED OFFSET

FULL RADIUS WHERE POSSIBLE

OFFSETS

FROM RECTANGULAR MAIN

ROUND DUCT TAKEOFF

10 DIA

10 DIA

10 DIA

25 x 22 GA

25 x 18 GA

25 x 16 GA

25 x 25 x 3

40 x 40 x 3

3,000

3,000

3,000

2,400

2,400

DETAILS - 2

CAMP CASEY

REPAIR BARRACKS, BLDG NO. S-1115

M29 M29 M29

M29 M29

CEILING DIFFUSER

NOTE: S = SIDE OPPOSITE HINGES

FOLDED CORNER

PIN AND WASHER

TO BE COATED WITH ADHESIVE

ALL TRANSVERSE EDGES

25-15 x 25-15 x 3SCREW)

2"

DETAIL

SPACING BETWEEN

MALE PIECE-SNAP LOCK

"BOTTOMS"

APPROX 50

FLEXIBLE CONNECTION & ANGLE FLANGE CONNECTION

MIN 100

CASING

EQUIPMENT

WITH UL 214)

TACK WELD

FABRIC (COMPLY

FIBROUS GLASS

HEAD @100 OC

RIVET, SOLID FLAT

STEEL SHT (TYP)

U-STRAP 20GA. GALV

B

UP TO 12.5 M/S

12.5 TO 30 M/S

ATTACHED BY SCREWS, RIVETS OR WELDS.)

BE FORMED ON DUCT OR BE CHANNEL OR ZEE

NOSING ON EVERY LEADING EDGE. (NOSING MAY

WHEN VELOCITY ABOVE 20 M/S USE METAL

INTERVALS ARE APPROXIMATE.

MAXIMUM SPACING FOR FASTENERS ACTUAL

LINING

VELOCITY

1.NOTE :

2.

2"

(TYPICAL 1,200 OR 1,500)

DUCT SECTION

ALTERNATE

C

B

A

DIMENSIONS

10015080

A

E

DUCT LINING

@100 OC(OR METAL

6DIA x 25 LG

BOLT & NUT

STEEL ANGLE (TYP)

GASKET MIN 6 THK

SIZE

300 x 300

100 x 100

600 x 600

400 x 500

AND LESS

STATIC

50 WG

FRAME

LOCKS

1-S

1-S

2-S

2-S

LAPPED AND BUTTED CORNER

(FASTENER)

HINGES

C

B

E

C

B

C

DUCT ACCESS DOOR

PIANO HINGE

BUTT HINGE OR

HINGE POS.2

DOOR

TYPE 2

TYPE1

NO.NO.

FASTENER

HINGE POS.3

2. TURNING VANES SHALL BE INSTALLED IN ALL SQUARE ELBOWS.

CONSTRUCTION STANDARDS BY SMACNA, INDUSTRIAL VENTILATION BY ACGIH, ASHRAE

OTHER DUCT WORK DETAILS NOT SHOWN SHALL CONFORM TO HVAC DUCT

AND WALL OR CEILING, AND WALL REGISTERS SHALL BE INSTALLED AT LEAST 6 SPACE

SPONGE-RUBBER GASKETS SHALL BE PROVIDED BETWEEN DIFFUSERS OR REGISTERS

THE DUCT, THE DUCT SHALL BE EXTENDED 150 TO 300 BEYOND THE OPENING OF THE

WHEN A SUPPLY AIR REGISTER OR GRILLE OR DIFFUSER IS LOCATED AT THE END OF

UNLESS OTHERWISE SPECIFIED, ROOM THERMOSTAT SHALL BE INSTALLED 1,500 ABOVE FL.

INCHES BELOW THE CEILING.

HANDBOOKS, AND NFPA 90-A.

REGISTER OR GRILLE OR DIFFUSER.

3.

6.

5.

4.

E

WHERE DUCTS ARE INSTALLED ABOVE CEILING, ACCESS PANELS SHALL BE PROVIDED

GENERAL NOTES :

IN CEILING FOR DUCT ACCESS DOORS, DAMPERS, ETC.

BACKDOOR

1.

DOOR

(REQ'D 2)

FASTENER

GASKET

APPROVED

FASTENER

DUCT

DUCT

DOOR

GASKET

METAL GAGE

RECTANGULAR DUCTWORK

25 THICK DUCT LINER, OR

INSULATION W/VAPOR

TEE-BAR CEILING

VARRIER

THERMAL INSULATION

SAME SIZE AS CEILING

DIFFUSER NECK SIZE

DUCTWORK W/EXTERNAL

VAPOR SEAL

INSULATION

VAPOR SEAL

(OR FLEXIBLE DUCT AS

INDICATED)

EXTERNAL THERMAL

DETAIL NOTES;

OPPOSED BLADE DAMPER

EQUALIZING DEFLECTOR

NOMINALLY

1 REFER TO PLAN DRAWINGS AND AIR DEVICE SCHEDULE FOR DIFFUSER TYPE.

PROVIDE FRAME TYPE TO SUIT CEILING SPECIFIED, REFER TO AIR DEVICE SCHEDULE

2 REFER TO ARCHITECTURAL DWGS. FOR CEILING TYPE.

ANTI-SMUDGING

600x600 LAY-IN 3-CONE

CEILING DIFFUSER WITH

M-30

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

MECHANICAL

CHONG,ST

DETAILS - 3

M30 -

M30 -

M30

M30

CAMP CASEY

100 THRU 125

PIPE SIZE

HANGER ROD SCHEDULE

CLEVIS HANGER

TRAPEZE & CLEVIS HANGER

65 THRU 80

UP TO 50

PIPE SIZE

PIPE

ROD SIZE

15 DIA

10 DIA

CLEVIS HANGER

HEAVY DUTY HANGER ROD

ROD SIZE

16 DIA

STEEL SADDLE

INSULATION

VAPOR BARRIER

SUPPORT NUT

LOCKING NUT

CROSS SECTION IS SPECIFIED

FLANGE/AIRFLOW ORIENTATION.

(I.E.:FLANGED). SPECIFY THE

WHEN A NON-SYMETRICAL FRAME

VALVE BOX DETAIL

NOTE:

MULLION TYP

OPTIONAL

JAMB LINKAGE

AND JAMB SEALS

U.L. LISTED TYPE "B" DAMPER.

INSTALLATION INSTRUCTIONS.

SLEEVE SHALL BE FURNISHED BY FIRE DAMPER

ENTIRE INSTALLATION SHALL BE IN ACCORDANCE

WITH THE FIRE DAMPER MANUFACTURERS

INSTALLATION INSTRUCTIONS, AND SMACNA

STANDARDS AND FIRE DAMPER MANUFACTURER

BREAKAWAY CONNECTIONS PER SMACNA

INSTALLATION SHALL MEET THE SMACNA

MANUFACTURER. SLEEVE CONSTRUCTION AND

SECURE DAMPER TO SLEEVE PER

FOR SUPPLY AIR DUCTWORK.

DAMPER INSTALLATION GUIDE FOR HVAC

THE PROVISIONS OF NOTE 4 HEREIN.

LOCATION SHALL SUIT PROJECT CONDITION AND

MATERIAL SHALL BE FIBERGLASS AS SPECIFIED

INSULATE AND VAPOR SEAL ENTIRE DAMPER

INSTALLATION (SUPPLY DUCTWORK) TO PREVENT

CONDENSATION PER SMACNA "FIRE, SMOKE AND

RADIATION DAMPER INSTALLATION GUIDE FOR

HVAC SYSTEM"-1986 FIGURE 19. INSULATION

MANUFACTURERS INSTALLATION INSTRUCTIONS.

STANDARDS (FIRE, SMOKE AND RADIATION

TYPICAL HORIZONTAL FIRE DAMPER DETAIL

FIRE PARTITION

TO WALL

DUCT

INSULATED WHERE

DUCT IS INSULATED

ACCESS DOOR

(TYP) DO NOT SCURE

STEEL ANGLE FRAME

TO SLEEVE

SECURE DAMPER

SHEET METAL SCREW

HEX HEAD SELF-TAPPING

2SLEEVE

FUSIBLE

FIRE

LINK

DEMPER

(CURTAIN

TYPE)

EXPANSION

CLEARANCE

(ALL 4 SIDES)

SYSTEMS-1986)

STANDARDS.

NOTES:

FIRE DAMPER DETAILS

LINKAGE

STANDARD FACE

AT BLADE EDGES

OFFSET-LEG SEALS

SILICONE-RUBBER

SHAFT W/DOUBLE-SEALED

15 DAMPER PIN-LOCK

BEARINGS

(SEE OPTIONS BELOW)

COUNTERWEIGHT

ADJUSTABLE

BLADES

ON " CENTERS

1.95mm THICK

25 (TYP)

100(TYP.)

BACKDRAFT DAMPER DETAIL

CONC PIPE

25 DRAIN VALVE

CRUSHED STONE

(TYP OF 2)

1000 REINFORCED

W

C

W

C

D

S R

SYSTEM

CONN TO BLDG

LIFTING HANDLE

FIN GRADE

WATER CHILLER

CONN TO AIR COOLED

OF SMALLEST PIPE ON TRAPEZE.

NOTE : FOR TRAPEZE HANGER TAKE SPACING

HANGER ROD SPACING

WELD

SPACING

PIPE SIZE

MAX ALLOWABLE

CONC BEAM

ROD SIZE

10 DIA.

15 DIA.

100 THRU 125

PIPE SIZE

ANCH BOLT.

P

PIPE SIZE

65 THRU 80

UP TO 50

L 15 x 200 x 200

HANGER ROD SCHEDULE

BOLT PIPE ROLLERS TO ANGLE (TYP)

16 DIA

ROD SIZE

TRAPEZE HANGER

ANGLE

SUPPORT NUT

PIPE SADDLE AT

LEAST 300 LONG

MIN 600

NOTE

INSULATION

VAPOR BARRIER

HANGER ROD (TYP)

NO INSULATION

16 GAGE STEEL

ROOF STRUCTURE MEMBER FOR TOP FLOOR

300 LONG

PIPE SADDLE

CONNECTION TO CONCRETE FLOOR W/CONCRETE ANCHORS OR TO

ROLLER

PIPE

STAND

(TYP)

LENGTH AS REQ'D

(NOT VAPOR BARRIER)

INSULATION (TYP)

LOCKING

WALL CAP DETAIL

METAL SCREEN FRAME

BOLT & NUT

ANGLE IRON REINFORCING

WHERE REQUIRED

SCREEN

R

WATERPROOF

SEAMS AND JOINTS

ANGLE RIVETED OR

TACK WELDED

AS REQUIRED

15 SCREEN

450 MIN.

(HEAVY

SNOW AREA)

R= W

D U C

T SIZE +

25%

FLASHING

SEE ARCH. DETAIL

M

IN

IN

ROOF

ROOF GOOSENECK (RECTANGULAR DUCT)

2,100

2,400

2,700

3,000

3,300

3,600

3,900

M-31

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

MECHANICAL

CHONG,ST

DETAILS - 4

M31 -

M31 -

M31

M31 -

M31 -

M31

CAMP CASEY

WATER CHILLER PIPING DIAGRAM

CHS

CHR

NEMA 4 ENCLOSURE

AIR COOLED

WATER CHILLER

FLOW SWITCH W/

FLEXIBLE PIPIE

CONNECTOR

INSULATE & VAPOR SEAL ANCHORS EQUAL TO THAT SPECIFIED FOR THE PIPING

PIPE ANCHOR SCHEDULE

PUMP

BEDPLATE

ANCHOR BOLT

BASE MOUNTED CHW/HW CIRC PUMP

CHILLED & HEATING COILS PIPING ARRANGEMENT

AND COIL CONNECTIONS ONLY. BALANCING VALVE SHALL BE SIZED

PIPE SIZES AS SHOWN ON PLANS REDUCE AT CONTROL VALVES,

FOR A MAXIMUM 1.5M'PD.

(NOTE: FOR LARGER THAN

50 , USE GATE VALVE)

VALVE/SHUT-OFF

CALIBRATED

BALANCING

NOTE :

BALL VALVE(TYP)

SUPPLY

RETURN

COIL

THERMOMETER

15 MANUAL

(TYP)

AIR VENT

DRAIN VALVE

FLOW

AIR

PG

PG

SIDE

NOTE

PIPE

U-BOLT

SPLIT SCRD COUPLING

PIPE

WELD

" A "

(TYP OF 3)

50x50x5

L-ANGLE

TO PUMP

AIR-VENT

FLANGE

150 x 275

PETCOCK

SUCTION

FROM PUMP

DISCHARGE

FOR RESPECTIVE PIPING SERVICE

PIPING AND FEEDER SHALL BE INSULATED AS SPECIFIED1

CHEMICAL SHOT FEEDER DETAIL

25 DRAIN VALVE

t

WITH REDUCER OR 275

FOR 25 PIPE.

BLIND-FLANGE DRILLED

50 x 275 REDUCING FLANGE

FIN FL

FOR 25 PIPE AND AIR VENT

50 x 275 REDUCING FLANGE

BLIND-FLANGE DRILLED

WITH REDUCER OR 275

FILL FUNNEL

INLET VALVE

80 UP

SIGHT GLASS

TO SUPPORT

HOSE & DRAIN VALVE

SEE FRONT ELEVATION

SIDE ELEVATION

50 PIPE LEG

WLEDED TO ELBOW

DIFFUSER

SUCTION

GATE VALVE

SUCTION

PIPE ANCHOR

SECTION

80 X 80 X 10

50 X 50 X 6

ANGLE SIZE

" A "

STEEL ANGLE

INSULATION

U-BOLT

PIPE

COUPLING

STEEL ANGLE

INSULATION

SPLIT SCRD

WELD

U-BOLT

UNION(TYP)

NOTES : 1. VALVES SHOWN SHALL BE FACTORY PROVIDED

COOLING & HEATING COIL DETAIL (FOR FAN COIL UNIT)

(TYPICAL)

SHOWN ON PROJECT PLANS

FRONT ELEVATION

SOLID CONC BASE CONSTRUCT

FROM DIMENSION GIVEN ON

APPROVED SHOP DWGS FOR PUMP

150(MIN)

NEOPRENE PAD

MOTOR

PRESS GAGE

ANCHOR BOLT

6 SHUT-OFF COCK

FLEXIBLE CONNECTION

INCREASER

(TYP)

(TYP)

CALIBRATED TRIPLE

115 DIAL 0-60PSI

DUTY VALVE

DISCHARGE

TRIPLE DUTY

SUCTION

VALVE

DISCHARGE

CALIBRATED

COOLINGBALANCING VALVE

VALVE PACKAGED.

COIL SECTION

RETURN

CALIBRATED

CH/HWR

SUPPLY

CH/HWS

CHILLED WATER

PIPE SIZE SHALL BE AS

BALL VALVE

FCU BOUNDARY

50 X 50 X 6

65 X 65 X 6

65 X 65 X 10

65 X 65 X 10

BELOW GRADE

MH503

VALVE BOX SEE

ABOVE GRADE

150 x 275

FLANGE

M-32

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

MECHANICAL

CHONG,ST

DETAILS - 5

M32 -

M32 -

M32

M32 -

M32 -

M26

CAMP CASEY

PLAN

SUB EXHAUST

TYPICAL AIR HANDLING UNIT CONDENSATE

D1 = UNIT FAN OPERATING NEGATIVE PRESSURE PLUS 2"

SIDE VIEW

RISER

EXHAUST DUCT

BATH ROOM MAIN

AIR DUCT (150x100)

BATH ROOM MAIN

SUB EXHAUST

EXHAUST DUCT

RISER

TYPE-1

UNION

MANUAL AIR

VENT

AV

SUPPLY MAIN

RETURN MAIN

(HORIZONTAL DISCHARGE TYPE)

HOT WATER PIPING TO UNIT HEATER

GATE VALVE

PIPE CAP

STRAINER

UNION

PIPE CAP

UNION

TYPE-2

STRAINER

FLOOR DRAIN

DRAIN TO NEAR

GATE VALVE

UNIT

HEATER

UNIT

HEATER

UNION

RETURN MAIN

SUPPLY MAIN

HOT WATER

HOT WATER

MANUAL AIR

VENT

PIT

CH

DOW

N

AV

HOT WATER

HOT WATER

DEVICE SHOWN ON

D2 = EQUAL TO "D1".

THE PLUMBING

DRAIN PIPING DETAIL

DRAWINGS

(BUT NO LESS THAN 40)

DRAIN LINE SIZE

OF AHU CONNECTION

(BUT NO LESS THAN 40)

CLEAN OUT PLUG

THREADED

TOWARDS DRAINAGE

PITCH DOWN

OF AHU CONNECTION

DRAIN LINE SIZE

D2

D1

VALVE AND SHUT-OFF

CALIBRATED BALANCING

VALVE AND SHUT-OFF

CALIBRATED BALANCING

FROM EXHAUST

GRILLE

FROM EXHAUST

GRILLE

PIPE SLEEVE-THRU FLOOR WITH

WATERPROOFING

SEALANT #2

PIPE SLEEVE - THRU INTERIOR WALL

INTERIOR WALL

CEILING

RUBBER OR

MATERIAL

PLASTIC)

METAL BAND

BACK UP

SEALANT #2

(CLOSED CELL

FLEXIBLE FOAM

AHU DRAIN PAN

(TYP)

SLEEVE

PIPE

ALL AROUND

BACK UP MATERIAL

SEALANT #2

PIPE WITHOUT INSULATION

WATERPROOFING

PIPE WITH

L

MIN 7 CLEARANCE

INSULATION

PIPE WITHOUT

INSULATION7

C

INSULATION

METAL JACKET

SLEEVE

4 LBS/SF LEAD OR

16 OUNCE COPPEER

FLASHING

FLEXIBLE FOAM

(CLOSED CELL

RUBBER OR

PLASTIC)

BACK UP

MATERIAL

PIPE WITH INSULATION

LC

METAL JACKER

FLOOR

P

IP

E

METAL BAND

AIR DUCT (150x100)

BATH ROOM EXHAUST DUCT RISER DETAIL

ANCHOR

BOLT & NUT

ISOLATOR

VIBRATION

SEE DETAIL "A"

WATER CHILLER

150150

PAD SIZE(INCH)

LENGTH

3350 -80

50 CLR

FOR

CHILLER UNIT

4# @ 1300 OC

80 CLR

2" CLR

2400 - 150

WIDTH

REMARKS

GRAVEL FILL

WATER CHILLER

FIN GRADE

25 CHAMFER

SEE DETAIL "A"

300 THK COMPACTED

CHILLER PAD DETAIL

NOTE ; 1. THE PAD SHOULD BE AT LEAST 6 INCHES LARGER

ALL AROUND THAN THE UNIT.

NOTE ; SUPPORT PIPE BOTH SIDE OF WALL SO THAT NO

WALL FAN POWER ROOF FAN

RECOMMENDED BY MFG.

SCREWS SIZE & Q'TY AS

OUT SIDE

DAMPER

BACK DRAFT

WALL VENTILATOR

CONC. WALL

B Y

F

G

CURB HT.

300 MIN.

MIN. 2 EACH SIDE

BY FAN MFR.,

RECOMMENDED

LAGBOLTS AS

POWER ROOF VENTILATOR

INSTALLATION OF GRAVITY ROOF FANS(VENTILATORS)

NOTE;

DIVISION 7 WORK

INSULATED ROOF CURVE,

EXHAUST DUCT WORK

WHERE SCHEDULED.

BACKDRAFT DAMPER

SEE ARCH. DWGS.

WOOD BLOCKING,

SEE ARCH. DWGS.

ROOF CONSTR.

SEE ARCH. DWGS.

(SPECIFIED IN DIVISION 7)

FLASHING

WOOD NAILER

ALL AROUND

GASKET SEAL

WEIGHT RESTS AT POINT OF SLEEVE

2. ACTUAL SIZE OF PAD SHALL BE COORDINATED WITH MFR

SHALL BE SIMILAR.

M-33

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

MECHANICAL

CHONG,ST

"D

"D 1"

DETAILS - 6

M33 -

M33 -

M33 -

M33

M33 -

M33 -

M33 -

M33

CAMP CASEY

JUTE PACKING

SUPPLY

FROM BRANCH

FOR LOCATION AND

STAINLESS STEEL FLUSH TYPE ACCESS COVER PLATE

FLOOR CLEANOUT

2.CHROMIUM-PLATED BRONZE, NICKEL BRONZE,NICKEL BRASS OR

NOTES : 1.WATER-PROOF MEMBRANE IS NOT REQUIRED IN SLAB ON GRADE.

Y-BRANCH

CAST IRON

PIPE

WATER-PROOF MEMBRANE

FINISH/TILE FLOOR

WHEN NOT THRE RUN

PLUG Y-BRANCH

1/8 BEND

AREA/PIT DRAIN

DRAINS

DRAIN AND BACKWATER VALVE

SEE NOTE-2

SEE NOTE-2

FILL/BED

SEE NOTE-1

SLAB

STRUCTURAL

SEE NOTE-1

CEMENT

THREADED PLUG

TYPE

SEE NOTE-1

OUTLET SIZE

FLOOR/SHOWER DRAIN

SEE NOTE-2

A

MEMBRANE

TO LAST

FIXTURE

WATER HAMMER ARRESTOR

HEIGHT

B

C

A

DIMENSION SHALL BE

DIAMETER

12-32

33-60

CAPACITY(FU)

FIXTURE UNIT

1-11

SIZE

DISPLACEMENT

HYDRAULIC DISPLACEMENT

PRESSURE PNEMATIC

COPPER ADAPTOR

20 OR 25 SEE DWGS

SCORIATED COVER

SEE NOTE-2

BACK FLOW PREVENTER & PRESSURE REDUCING STATION

WATER-PROOF MEMBRANE

ADJUSTABLE HOUSING

TWO PIECE THREADED

REDUCING TEE (TYP)

COCK (TYP OF 2)

6 SHUT-OFF

(TYP OF 3)

GATE VALVE

TYPE BACK-FLOW PREVENTER

REDUCED PRESSURE PRINCIPLE

CW

STRAINER

WATER SERVICE MAIN

4. DRAINS SHALL HAVE A CAST IRON BODY AND SEEPAGE PAN AND

1. WATER-PROOF MEMBERANE ARE NOT REQUIRED IN SLAB ON GRADE.

WATER-PROOF MEMBRANE

A CHROMIUM PLATED BRONZE, NICKEL BRONZE OR NICKEL BRASS STRAINER.

EXTERIOR THRUST BLOCK

PROVIDE STEEL HARNESS THRUST

RESTRAINT RODS FROM ELL TO

NEOPRENE GASKET

LEAD CAULKING

FINISH FLOOR

PRESSURE REDUCING

VALVE

REDUCER

DRAINS SHALL BE CONNECTED TO CAST IRON P-TRAP.

2. NEOPRENE RUBBER GASKET COMPRESSION TYPE JOINT.

3.

CEMENT

FILL/BED

SLAB

STRUCTURAL

FINISH/TILE FLOOR

WALL SLEEVE

BELOW FROST LINE

( TYP OF 2 )

PRESSURE GAGE

TO SYSTEM

UNION (TYP)

GLOBE VALVE

NON FREEZE TYPE WALL

POLISHED BRONZE BOX

20 HOSE CONNECTION

HYDRANT

GRADE

WALL CLAMP

KEY HANDLE

OUTSIDE WALL

SHUT-OFF COCK

PRESSURE GAUGE

TYPICAL

FLOW CONTROL

COPPER SHELL

FLOOR

FINISH/TILE

CEMENT

SLAB

WATER-PROOF

STRUCTURAL

FILL/BED

ORIFICE

PIPE SLEEVE THRU FLOOR

CAULK

H E

IG

H T

DIAMETER

FLUID

BELLOWS

CUSHION

TYPICAL IN LINE PUMP PIPING DETAIL

SUCTION

AS CLOSE TO FLOOR AS

POSSIBLE

GATE VALVE

UNION

15 HOSE BIBB W20

HOSE THREAD

BRASS CASING

PIPE SOCKET

DISCHARGE

SWING CHECK VALVE

SHUT-OFF VALVE

61-113D

VARIED DEPEND UPON

MFR

M-34

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .