M-19
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
MECHANICAL
CHONG,ST
SEQUENCE OF OPERATION
AHU-1 SEQUENCE OF OPERATION
AND BELOW THE COOLING THERMOSTAT TC MODULATES THE FACE AND
BY-PASS DAMPER MOTOR TO MAINTAIN THE LEAVING AIR TEMP AT
1. WHEN AHU-1 MOTOR RUNS, FAN MOTOR AUXILLARY CONTACT CLOSES
FAN F-5 SHALL BE DE-ENERGIZED AND THE O.A. DAMPER SHALL CLOSE.
COOLING AND HEATING
1. THE AIR HANDLING UNIT MOTOR SHALL BE MANUALLY ENERGIZED AND
FAN AND ROOF EXHAUST FAN SHALL BE DE-ENERGIZED AND THE O.A.
GENERALA.
B.
RUN CONTINUOUSLY. WHEN THE UNIT IS CALLED TO RUN,
MAKE UP
ASSEMBLY
BACK FLOW PREVENTER
SET AT 0.84KG/CM
PRESSURE REDUCING VALVE
H W
S
OUTDOOR AIR THERMOSTAT
W/REMOTE BULB
SUNSHIELD
H
AIR COOLED
WATER CHILLER
CIRC.PUMP
CHILLED/HOT WATER
CHEMICAL FEEDER
CHR
CHS
C H
S
H W
R
C H
R
AS
WC
E.A.
AIR SEPARATOR
P
C/HWR
C/HWS
FROM/TO BLDG. HEATING
AND COOLING SYSTEM
ET CHILLED/HOT WATER
EXPANSION TANK1
THE OUTSIDE AIR DAMPER SHALL OPEN.
WHEN THE OUTSIDE AIR DAMPER IS OPEN, A DAMPER MOUNTED END
TO BE ENERGIZED.
SWITCH SHALL CLOSE ALLOWING THE MOTOR STARTER HOLDING COIL
4. THE TOILET EXHAUST FANS SHALL BE ELECTRICALLY INTERLOCKED WITH
AHU-1.
HWS
HWR
PIPING LINE
COLD WATER
CIRC.PUMP
HOT WATER P
SYSTEM ZONE
TO HEATING
0-100 DEG. RANGE
TO MAKE ON FALL IN TEMP
V-1
V-1
V-2 V-2
TO
SUNSHIELD
OT
C
OUTDOOR AIR THERMOSTAT
W/ REMOTE BULB
WIRE TO MAKE ON RISE
RANGE)
IN TEMP(0-100 DEG. C
STARTER
STARTER
CHILLER FLOW SWITCH PROVIDED
BY CHILLER MFG. AND CONTRACTOR
INSTALLED
PANEL
CHILLER CONTROL
FS
DAMPER SHALL CLOSE.
TO ENERGIZE AQUASTAT.
BY-PASS DAMPER MOTOR TO MAINTAIN THE LEAVING AIR TEMP AT
AND ABOVE HEATING THERMOSTAT TC MODULATES THE FACE AND
CONTROL DIAG. FOR H.W.B. & WATER CHILLER
NOT TO SCALE
S
SMOKE
DETECTOR
TO HVAC SYSTEM
M
FOR OUTSIDE AIR
SA
OA
OUTSIDE AIR
INTAKE LOUVER
SYSTEM "ON-OFF"
SWITCH
OA MOTORIZED
DAMPER, N.C.,
EAC/H
C
ROOF EXHAUST
TC
SW
W/BIRDSCREEN
DUCT MOUNTED
COOLING THERMOSTAT
WITH AVERAGING ELEMENT,
EA
OA
AHU
FANS
AIR HANDLING UNIT
C /H
W R
C /H
W S
HEATING THERMOSTAT
WITH AVERAGING ELEMENT,
FR
T
FREEZESTAT
M
FACE & BY-PASS
DAMPER
(SPRING RETURN MOTOR)
N.O.
N.C.
AUTOMATIC CHANGEOVER SWITCH
STARTER
M
DUCT MOUNTED
STARTER
TH
EA
EA
R
AUX. CONTACT.
1PH, 120 VAC
H
C3
OFF
HAND
AUTO
OFF
HAND
MAG. MTR STARTER
FOR ROOF EXHAUST
FAN #F-4
FOR ROOF EXHAUST
FAN #F-5
MAG. MTR STARTER
R
C5
RED
OL
C4
N
OL
C2
1PH, 120 VAC
HEATING THERMOSTAT
DETECTOR AUX. CONTACT.
DM
DM
DUCT
H
R2AUTO
WB R
R1
B
DUCT
R1
TH.
R1
RED
AUX.
CONTACT.
AUTOMATIC
CHANGEOVER SW.
W
DUCT MTD. SMOKE
FREEZESTAT
BLACK
COOLING THERMOSTAT
RED
N
WR
TC.
R1
FACE & BY-PASS
DAMPER MOTOR
(MTD. IN RM. 435)
CONTROL RELAY.
CONTROL RELAY.
(MTD. IN MECH. RM.)
DAMPER MOTOR.
BR
R
R
O.A.
1PH, 120 VAC
ON-OFF
H
SD FZ
MAG. MTR STARTER
FOR AHU-1
3 OL'S
C3
RED
L
N
CONTROL WIRING DIAGRAM FOR AHU-1.
HOT / CHILLED WATER FLOW SYSTEM DIAGRAM AND SEQUENCE OF OPERATION
NOT TO SCALE
AIR HANDLING UNIT SYSTEM CONTROL DIAGRAM SEQUENCE OF OPERATION
SET AT 15.5 C WIRE
SET AT 21.1 C
M19
M19
SET AT 20 C.
SET AT 12.8 C
EF
CONTROL - 1
12.8 C(55 F) TC SHALL BE REVERSE ACTING.
20 C(68 F) TC SHALL BE DIRECT ACTING.
2. WHEN AUTOMATIC CHANGEOVER SWITCH SENSES 50 F PIPE TEMPERATURE
3. WHEN FREEZESTAT SENSES LEAVING AIR TEMP. BELOW 4.4 C (40 F). AHU
SET AT 4.4 C.
2. WHEN SMOKE DETECTOR SENSES SMOKE, AHU FAN MOTOR AND ROOF
2. WHEN AUTOMATIC CHANGEOVER SWITCH SENSES 60 F PIPE TEMPERATURE
CAMP CASEY
REPAIR BARRACKS, BLDG NO. S-1115
P.O.C
TO BE REMAINED
EXISTING BOILER
243525
To
(PT 1000W)
SENSOR
O.A TEMP
WINTER SEASON :
SUMMER SEASON :
3. OPEN H.W VALVES (V-1) AND CLOSE C.W. VALVES (V-2) MANUALLY.
PACKAGE CONTROL SHALL MAINTAIN BOILER HOT WATER SUPPLY TEMTERATURE AT 180°F (82.1°C).
2. SET EXISTING BOILER "HAND-AUTO" SWITCH TO AUTO POSITION, BOILER STARTS WHEN HP-1 IS ENERGIZED. BOILER
WHEN O.A. THERMOSTAT DROPS TO IT'S SETPOINT OF 60°F (15.5°C).
1. SET HOT WATER CIRCULATION PUMP HP-1 "HAND-OFF-AUTO" SWITCH TO "AUTO" POSITION, PUMP STARTS AND RUNS CONTINOUSLY
3. CLOSE H.W VALVES (V-1) AND OPEN C.W. VALVES (V-2) MANUALLY.
AT 44°F (6.7°C).
AND CP-1 IS ENERIGEZED. BUILT-IN CONTROL OF EXISTING WATER CHILLER SHALL MAINTAIN CHILLED WATER SUPPLY TEMPERATURE
2. EXISTING AIR COOLED LIQUID CHILLER IS ENERGIZED WHEN PIPELINE FLOW SWITCH (FS) CLOSES IT'S CONTACT UPON SENSING FLOW
WHEN O.A. THERMOSTAT RISES TO IT'S SETPOINT OF 70°F (21.1°C).
1. SET CHILLED WATER CIRCULATION PUMP CP-1 "HAND-OFF-AUTO" SWITCH TO "AUTO" POSITION, PUMP STARTS AND RUNS CONTINOUSLY
NOT TO SCALE
FAN COIL UNIT CONTROL DIAGRAM
SEQUENCE OF OPERATION
SWITCH(OFF-HIGH-MEDIUM-LOW)
UNIT MOUNTED 3-SPEED
SPACE THERMOSTAT
WALL MOUNTED
FACTORY PROVIDED
S.A
MAINTAIN ROOM TEMPERATURE AT 20 °C
SPACE HEATING THERMOSTAT SHALL CYCLE FCU FAN "ON" OR "OFF" TO
IN WINTER OPERATION :
MAINTAIN ROOM TEMPERATURE AT 23.9 °C
SPACE COOLING THERMOSTAT SHALL CYCLE FCU FAN "ON" OR "OFF" TO
IN SUMMER OPERATION :
OCCUPANT VIA 3-SPEED FAN SWITCH WALL MOUNTED.
PIPE MOUNTED CHANGEOVER SWITCH FAN OPERATION IS CONTROLLED BY
THE OPERATING MODE (HEATING OR COOLING) SHALL BE DETERMINED BY
FAN COIL UNIT :
T
CH
C
M19
M-20
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
MECHANICAL
CHONG,ST
C
C H
RA
SA
T
(TYPICAL)
CEILING MOUNTED
SPACE THERMOSTATS
INDICATED ON THE DRAWINGS. PANEL SHALL BE ENAMEL
FINISHED 14 GUAGE STEEL, NEMA 12 CONSTRUCTION.
AUTOMATIC VALVE(2-WAY PATTEN)
AUTOMATIC VALVE(3-WAY PATTERN)
THE MINIMUM NUMBER OF CONDUCTORS.
CONTROL WIRING, SLASHES INDICATE
AUTOMATIC TEMPERATURE CONTROLS
2. PROVIDE SUITABLE ENCLOSURES OR WEATHERPROOF METAL
COVERS FOR ALL INSTRUMENTS, MOTORS, WIRING, AND TUBING
PROVIDE ALL WIRING REQUIRED TO IMPLEMENT THE SEQUENCE
1. WIRING INDICATED IS SCHEMATIC. THE CONTRACTOR SHALL
4. PROVIDE AN AUTOMATIC TEMPERATURE CONTROL PANEL WHERE
NORMALLY OPENN.O.
HV-1 HEATING & VENTILATING UNIT #1
NOTES:
3. ALL WIRING SHALL BE IN ACCORDANCE WITH DIVISION
INSTALLED OUTSIDE THE BUILDING.
16 SPECIFICATION PROVISIONS.
OF OPERATION.
M
ATC
OPPOSED BLADE DAMPER
DAMPER MOTOR
VOLTS A.C.
PANEL MOUNTED DEVICE
VAC
M
M
TEMPERATURE CONTROLLER
N.O. CONTACT
N.C. CONTACT
SINGLE POLE DOUBLE THROW
NORMALLY CLOSED
T
SPD
N.C.
L E G E N D
SW
FACTORY PROVIDED WALL MOUNTED
3-SPEED SWITCH
FACTORY PROVIDED WALL MOUNTED
(OFF-HIGH-MEDIUM-LOW)
C H T
THE OPERATING MODE (HEATING OR COOLING) SHALL BE
DETERMINED BY A FACTORY SUPPLIED AUTOMATIC
FCU SEQUENCE OF OPERATION
FAN OPERATION IS CONTROLLED BY OCCUPANT VIA
IN SUMMER OPERATION ROOM THERMOSTAT SHALL CYCLE
IN WINTER OPERATION ROOM THERMOSTAT SHALL CYCLE
CHANGEOVER SWITCH.
3-SPEED FAN SWITCH MOUNTED ON WALL.
1.
FAN COIL UNIT
2. O.A. DAMPER SHALL OPEN WHENEVER HVU-2 IS CALLED TO RUN.
1. DURING OPERATING HOURS, HEATING THERMOSTAT DH MODULATES
AND MUD ROOM CEILING EXHAUST FAN SHALL BE DE-ENERGIZED.
3. THE MUD ROOM CEILING EXHAUST FAN SHALL BE INTERLOCKED WITH HVU-2.
B. HEATING
SEQUENCE OF OPERATION
1. TIMECLOCK SHALL BE SET IN ACCORDANCE WITH FACILITY
OPERATING SCHEDULE.
GENERALA.
CONTROL DIAG. FOR H.V.U. #2 & F-3.
BE SIMILAR.
DIFFERENTIAL, AND SUITABLE FOR 8 F.L.A. AT 120 VAC. T-2 & P-4 SHALL
REMOTE BULB THERMOSTAT T-1 SHALL CONTROL PUMP P-3 TO MAINTAIN
ITS SETPOINT. T-1 SHALL BE PROVIDED WITH A COPPER CAPILLARY.
SEQUENCE OF OPERATION
RECIRC. PUMP
DOMESTIC H.W.
T-2 AQUASTAT
COPPER WELL
CIRC. PUMP
DOMESTIC H.W.P
P
COPPER WELL
P
P
T-1
AQUASTAT
MIXING VALVE
THERMOSTATIC
BATHROOMS
MIXING VALVE
H.W. SENSOR
THEMOSTATIC
(BUILT IN CONTROL)
DOM H.W. HEATER
RELAYL4080
1PH 120VAC
H N
AS REQUIRED BY THE TEMPERING VALVE MANUFACTURER TO
FINAL PIPING CONFIGURATION FOR TEMPERING VALVE SHALL BE
INCORPORATE HOT WATER RECIRCULATION.
NOTE:
NOT TO SCALE
NOT TO SCALE
DOMESTIC HOT WATER SYSTEM CONTROL DIAGRAM
HEAT / VENT SYSTEM CONTROL DIAGRAM (FOR MUD ROOM)
NOT TO SCALE
CEILING MOUNTED FAN COIL UNIT CONTROL
M20
M20
M20
60 C TO LAUNDRY
43.3 C TO
SET AT 60 C
SET AT 38 C
T-1 SHALL HAVE A RANGE OF APPROX. -18 TO 71 C 1.7 TO 5.6 C ADJUSTABLE
THE FACE & BY-PASS DAMPER TO MAINTAIN THE S.A. AIR TEMP AT 12.8 C.
UNIT FAN TO MAINTAIN ROOM TEMPERATURE AT 25.5 C.(78 F)
UNIT FAN TO MAINTAIN ROOM TEMPERATURE AT 20 C.(68 F)
2. WHEN FREEZESTAT SENSES LEAVING AIR TEMP. BELOW 40 F. HVU FAN
CONTROL - 2
DAMPER, N.C.,
(SPRING RETURN MOTOR)
OUTSIDE AIR
INTAKE LOUVER
W/BIRDSCREEN
FOR MUD ROOM
FACE & BY-PASS
DAMPER, N.O.,
TO COIL FLOW
HEAT./VENT. UNIT
OA OA
HVU
M
M
H
C
T
OA MOTORIZED
7-DAY TIME CLOCK*
HEATING THERMOSTAT (T-2)
NIGHT SET-BACK
TC
FR
T N H
SA TO HVAC SYSTEM
FANS
CEILING EXHAUST
HEATING THERMOSTAT
FREEZESTAT
HWS
HWR
EA
EA
T D H
3M COPPER CAPILLARY,
W/REMOTE BULB
DIFFERENTIAL, 8FL A @120V.
WIRE TO MAKE ON FALL,
BULB IN MUD ROOM
TM
C
DM
DM
C
O.A. TH.
HAND
AUTO
OFF
H
C1
1PH, 120 VAC
HAND
OFF
AUTO
FREEZESTAT
O.A. TH.
TM
TNH FZ
MAG. MTR STARTER
EXHAUST FAN F-3
DRY TIME HEAT TH.
OL
L
RED
N
TDH
MAG. MTR STARTER
H.V.U. #2
FACE & BY-PASS
DAMPER MOTOR
DAMPER MOTOR
O.A.
OL
RED
L
H
1PH, 120 VAC
7-DAY TIMER
N
NIGHT SET BACK TH.
SET AT 12.8 C.
SET AT 7 C.
EF
SET AT 4.4 C.
CAMP CASEY
REPAIR BARRACKS, BLDG NO. S-1115
G
P.O.C
TO REMAIN
HOT WATER HEATER
EXISTING DOMESTIC
243525
M-21
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
MECHANICAL
CHONG,ST
ROOM THERMOSTAT, WIRE TO "MAKE ON FALL"
DEG.C., 8 F.L.A. AT 120 VAC.
T-3 SHALL CYCLE THE RESPECTIVE UNIT HEATER
MOTOR TO MAINTAIN ITS SET POINT.
SEQUENCE OF OPERATION
HWS
HWR
M
T H
HEATING THERMOSTAT
SET AT 50 DEG. F.
HORIZONTAL TYPE
UNIT HEATER
BALANCING
VALVE
HEAT THERMOSTAT
1PH 120VAC CKT NO. M-12
CONTROL DIAG. FOR UNIT HEATER (MECH. RM.)
O.L
L
H
RED
UNIT HEATER
IN MECH. RM.
UH
MTR STARTER
MAN.
N
HVU
OA
W/BIRDSCREEN
INTAKE LOUVER
OUTSIDE AIR
OA
M
(SPRING RETURN MOTOR)
OA MOTORIZED
DAMPER, N.C.,
C
T
H
FR
FREEZESTAT
E A
SA TO HVAC SYSTEM
EA
HWR
HWS
EA
EA
HEATING THERMOSTAT
T H
EAEAEA
FROM DRYER
EA
EA
CO DOOR
CEILING REGISTER
DAMPER
BACKDRAFT
CO DOOR
CO DOOR
M
FACE & BY-PASS
DAMPER, N.O.,
TO COIL FLOW
DUCT MOUNTED
EXHAUST FAN
FOR LAUNDRY AREA
EXHAUST AIR
GOOSENECK
SD
DETECTOR
SMOKE
EA
(TYPICAL)
TYPICAL
DUCT
C.O. DOOR
FREEZESTAT
DETECTOR
DUCT SMOKE
O.A. THERMOSTAT
TH
DM
DM
HEAT THERMOSTAT
FACE & BY-PASS
DAMPER MOTOR
MOTOR
O.A. DAMPER
L
H
SD
OFF
HAND
C1
AUTO
FZ
C
1PH, 120 VAC
PNL BOARD
"D"
CKT. NO.
MDF-4 C1
HAND
BA
OFF
AUTO
1C
NC
L
H.V.U. #1
MAG. MTR STARTER
3 OL'S
N
MAG. CONTACTOR
EXHAUST FAN F-2
MAG. MTR STARTER
C2
3 OL'S
RED
H
TIMER S.W.
1PH, 120 VAC
0-2HR
N
NOT TO SCALE
HEAT / VENT SYSTEM CONTROL DIAGRAM (FOR LAUNDRY ROOM)
NOT TO SCALE
MECH. RM. EXH. FAN CONTROL
T
TO F-6 MOTOR
STARTER
M
DAMPER MOTOR,
SPRING RETURN
O.A.
WALL
D-4, N.C.
T-2
WIRE TO MAKE ON RISE,
SET AT 29.4 DEG.C. MIN.
8 FLA CAPY. AT 120 VOLTS
CONTROL DIAG. FOR EXH. FAN (F-6)
VENT THERMOSTAT
DAMPER MOTOR
DM O.A.
1PH 120VAC CKT NO. M-2
H
A
H
W/A.O.H. SEL. SW
MAN. MTR STARTER
WALL EXH. FAN
F-6, IN MECH. RM.F
L
N
(MECH. RM.)
NOT TO SCALE
UNIT HEATER CONTROL
ROOM THERMOSTAT, WIRE TO "MAKE ON FALL"
DEG.C., 8 F.L.A. AT 120 VAC.
T-3 SHALL CYCLE THE RESPECTIVE UNIT HEATER
MOTOR TO MAINTAIN ITS SET POINT.
SEQUENCE OF OPERATION
HWS
HWR
M
T H
HEATING THERMOSTAT
SET AT 50 DEG. F.
HORIZONTAL TYPE
UNIT HEATER
BALANCING
VALVE
HEAT THERMOSTAT
1PH 120VAC CKT NO. M-12
CONTROL DIAG. FOR UNIT HEATER (MECH. RM.)
O.L
L
H
RED
UNIT HEATER
IN MECH. RM.
UH
MTR STARTER
MAN.
N
HEAT./VENT. UNIT
FOR LAUNDRY RM
HVU
OA
W/BIRDSCREEN
INTAKE LOUVER
OUTSIDE AIR
OA
M
(SPRING RETURN MOTOR)
OA MOTORIZED
DAMPER, N.C.,
C
T
H
FR
FREEZESTAT
E A
SA TO HVAC SYSTEM
EA
HWR
HWS
EA
EA
HEATING THERMOSTAT
T H
EAEAEA
FROM DRYER
EA
B
EA
CO DOOR
CEILING REGISTER
DAMPER
BACKDRAFT
CO DOOR
CO DOOR
M
DUCT MOUNTED
EXHAUST FAN
FOR LAUNDRY AREA
EXHAUST AIR
GOOSENECK
SD
DETECTOR
SMOKE
DRYER
DRYER
EA
(TYPICAL)
TYPICAL
DUCT
DRYER MFR (TYPICAL)
BACK DRAFT DAMPER BY
C.O. DOOR
CONTROL DIAG. FOR H.V.U. #1 & F-2.
FREEZESTAT
DETECTOR
DUCT SMOKE
O.A. THERMOSTAT
TH
DM
DM
HEAT THERMOSTAT
FACE & BY-PASS
DAMPER MOTOR
MOTOR
O.A. DAMPER
L
H
SD
OFF
HAND
C1
AUTO
FZ
C
1PH, 120 VAC
PNL BOARD
"D"
CKT. NO.
MDF-4 C1
HAND
BA
OFF
AUTO
1C
NC
L
H.V.U. #1
MAG. MTR STARTER
3 OL'S
N
MAG. CONTACTOR
EXHAUST FAN F-2
MAG. MTR STARTER
C2
3 OL'S
RED
H
TIMER S.W.
1PH, 120 VAC
0-2HR
N
NOT TO SCALE
HEAT / VENT SYSTEM CONTROL DIAGRAM (FOR LAUNDRY ROOM)
MECH. RM. EXH. FAN CONTROL
T
TO F-6 MOTOR
STARTER
M
DAMPER MOTOR,
SPRING RETURN
O.A.
WALL
D-4, N.C.
T-2
WIRE TO MAKE ON RISE,
SET AT 29.4 DEG.C. MIN.
8 FLA CAPY. AT 120 VOLTS
CONTROL DIAG. FOR EXH. FAN (F-6)
VENT THERMOSTAT
DAMPER MOTOR
DM O.A.
1PH 120VAC CKT NO. M-2
H
A
H
W/A.O.H. SEL. SW
MAN. MTR STARTER
WALL EXH. FAN
F-6, IN MECH. RM.F
L
N
(MECH. RM.)
NOT TO SCALE
UNIT HEATER CONTROL
SEQUENCE OF OPERATION
SPACE THERMOSTAT T-2 SHALL CONTROL FAN
F-6 TO MAINTAIN ITS SET POINT. WHEREVER F-3
IS ENERGIZED, D-4 SHALL OPEN.
NOT TO SCALE-
M21
M21
M21
100 FLEXIBLE100 FLEXIBLE
2. DURING OPERATING HOURS, S.A. HEATING THERMOSTAT TH MODULATES
THE FACE AND BY-PASS DAMPER MOTOR TO MAINTAIN THE ROOM AIR
1. SET SYSTEM SELECTOR SWITCH TO "HEAT" POSITION.
FAN SHALL BE DE-ENERGIZED.
1. THE CLOTHES DRYERS CAN NOT BE ENERGIZED UNLESS FAN
SEQUENCE OF OPERATION
HEATINGB.
VENTILATIONC.
A. GENERAL
3. NON-DURING OPERATING HOURS, SYSTEM SHALL BE DE-ENERGIZED.
2. WHEREVER HVU-1 IS CALLED TO RUN, ITS O.A. DAMPER SHALL OPEN.
SHALL BE DE-ENERGIZED AND THE O.A. DAMPER SHALL CLOSE.
IS ENERGIZED, SEE ELECTRICAL DRAWING.
2. DURING OPERATING HOURS, S.A. HEATING THERMOSTAT TH MODULATES
1. SET SYSTEM SELECTOR SWITCH TO "HEAT" POSITION.
1. THE CLOTHES DRYERS CAN NOT BE ENERGIZED UNLESS FAN
SEQUENCE OF OPERATION
HEATINGB.
VENTILATIONC.
A. GENERAL
3. NON-DURING OPERATING HOURS, SYSTEM SHALL BE DE-ENERGIZED.
2. WHEREVER HVU-1 IS CALLED TO RUN, ITS O.A. DAMPER SHALL OPEN.
IS ENERGIZED, SEE ELECTRICAL DRAWING.
1. WHEN SMOKE DETECTOR SENSES SMOKE H & V UNIT FAN MOTOR
3. HVU-1 SHALL BE INTERLOCKED WITH F-2.
1. WHEN SMOKE DETECTOR SENSES SMOKE H & V UNIT FAN MOTOR
3. HVU-1 SHALL BE INTERLOCKED WITH F-2.
TEMP. AT 20 C (68 F).
2. WHEN FREEZESTAT SENSES LEAVING AIR TEMP. BELOW 4.4 C (40 F). HVU
SET AT 20 C.
SET AT 4.4 C.
APROX 12.8 TO 35 DEG.C. RANGE, SET AT 12.8
EF
CONTROL - 3
EF
CAMP CASEY
REPAIR BARRACKS, BLDG NO. S-1115
243525
SET AT 50°F
THERMOSTAT
HEATING
SEQUENCE OF OPERATION
MOTOR TO MAINTAIN ITS SET POINT.
T-3 SHALL CYCLE THE RESPECTIVE UNIT HEATER
H N
L
RED
OL
UH
1PH 120VAC CKT NO. M-12
IN MECH. ROON
UNIT HEATER
STARTER
MOTOR
8 F.L.A. AT 120 VAC.
APROX. 12.8 TO 35°C. RANGE, SET AT 12.8°C.,
ROOM THERMOSTAT, WIRE TO "MAKE ON FALL"
M
SWITCH
"H-O-A"
THERMOSTAT
HEAT
HWR
HWS
VALVE
BALANCING
TH
NOT TO SCALENOT TO SCALE-
M21
ELEC. UNIT HEATER CONTROL
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
MECHANICAL
M-22
THE ACCURATE ENCLOSURE AREA SHOULD BE CALCULATED.
IN ORDER TO OBTAIN ACCURATE TEST RESULTS,
PRELIMINARY TESTING DAY'S WEATHER CONDITION
VERIFICATION OF PRE TEST SCHEDULE & CHECK THE
CONSTRUCTION CHECK.
CONSTRUCTION PERSONNEL WITH MEETING &
- DEPRESSURIZATION TEST
- PRESURIZATION TEST
PERFORM THE AIR LEAKAGE TEST
IN ACCORDANCE WITH TEST PROTOCOL
TESTING DAY'S WEATHER CONDITION.
CHECK BUILDING'S STATE & CHECK THE FINAL
PRELIMINARY TEST
- DEPRESSURIZATION TEST
- PRESURIZATION TEST
PERFORM THE AIR LEAKAGE TEST
IN ACCORDANCE WITH TEST PROTOCOL
TO COMFORM THE LEAK AREA
SUBMIT THE TEST REPORT
OF THE TEST LOCATION
DRAWINGS REVIEW AND DETERMINATION
PERSONNEL WITH MEETING
PRE TEST INSPECTION AND CONSTRUCTION
TEST SET UP
PRELIMINARY TEST
PRE TEST INSPECTION
FINAL TEST
TEST END
SUBMIT COMPLETE REPORT
SMOKE TEST
INFRARED THERMOGRAPHY TESTING,
SMOKE TEST
INFRARED THERMOGRAPHY TESTING,
1.
2.
AIR BARRIERS
THE AIR BARRIER SHALL BE CONTINOUS AROUND THE ENTIRE
BUILDING ENVELOPE.
SEAL THE FOLLOWING AIR LEAKAGE PATHWAYS AND GAPS:
THE AIR BARRIER SHALL BE INSTALLED HEREIN TO BRIDGE AND
ALL OTHER AIR LEAKAGE PATHWAYS IN THE BUILDING ENVELOPE
MASONRY TIES, SCREWS, BOLTS AND SIMILAR PENETRATIONS
PIPING, CONDUCT, DUCT AND SIMILAR PENETRATIONS
OPENINGS AND PENETRATIONS OF WINDOW AND DOOR FRAMES
SEISMIC AND EXPANSION JOINTS
CONNECTIONS OF THE WALLS TO THE FOUNDATIONS
CONNECTIONS OF THE WALLS TO THE ROOF AIR BARRIER
3.
TESTED IN ACCORDANCE WITH ASTM E2178.
NOT TO EXCEED 0.004cfm/sf @0.3" wg(0.02L/sm @75Pa) WHEN
AIR BARRIER FUNCTION MUST HAVE AN AIR PERMEANCE
AND SELF ADHESIVE AIR BARRIER MEMBRANE WITH
CONCRETE, WATER RESISTIVE BARRIER COAT, DAMPPROOFING
4.
OF THESE ASSEMBLES AND COMPONENTS.
OF ADJACENT ASSEMBLES, ALLOWING FOR THE RELATIVE MOVEMENT
AND SEALED IN A FLEXIBLE MANNER TO THE AIR BARRIER NATERIAL
THE AIR BARRIER MATERIAL OF EACH ASSEMBLY SHALL BE JOINED
5.
6.
7.
8.
PENETRATIONS OF THE AIR BARRIER MUST BE SEALED.
SERVICE LIFE OF THE ASSEMBLY.
THE AIR BARRIER MUST BE DURABLE TO LAST THE ANTICIPATED
INDICATED IN DRAWINGS.
SYSTEMS AND AT THE INTERFACE OF DISSIMILAR MATERIALS AS
COLUMNS, FLOOR SLABS AND FOUNDATION WALLS, ROOFING
AT TRANSITION AREA, SUCH AS TIE-IN TO STRUCTURAL BEAMS,
INSTALL SELF-ADHESIVE AIR BARRIER TRANSITION MEMBRANE
THE LOAD TO THE STRUCTURE.
THE BUILDING WITHOUT DISPLACEMENT OR DAMAGE, AND TRANSFER
MAXIMUM POSITIVE(75Pa) AIR PRESSURE TO BE PLACED ON
THE AIR BARRIER MUST BE SUPPORTED SO AS TO WITHSTAND THE
MECH ROOM AIR LEAKAGE TEST FLOW CHART
QUALIFICATION OF AIR LEAKAGE TESTING
1.
CONTRACTOR'S POINT - OF - CONTRACT INFORMATION.
INCLUDE BUILDING NAME, ADDRESS, AND NAME OF PRIME CONSTRUCTION CONTRACTOR AND
THAT THE AGENCY HAS TESTED WITHIN THE PAST 2 YEARS.
SUBMIT THE LIST OF AT LEAST TEN COMMERICAL/INDUSTRIAL FACILITIES WITH BUILDING ENVELOPES
TESTING COMMERICAL AND/OR INDUSTRIAL BUILDINGS.
FOR BUILDING AIR LEAKAGE TESTING, VERIFY 2 YEARS OF EXPERIENCE AS AN AGENCY IN PRESSURE
2.
3.
-. CERTIFICATE FOR THERMOGRAPHER LEVEL 1
-. CERTIFICATE FOR AIR BARRIER INSPECTION LEVEL 3
-. CERTIFICATE FOR AIR LEAKAGE TEST LEVEL 3
FOR THE ABOVE WORKS, A TESTING AGENCY SHOULD HAS THE BELOW CERIFICATE OR EQUIVALENT.
4. REFER TO "3S KOREA CO., LTD, TEL : 02-896-9474" OR APPROVED EQUAL.
IN THE INSTALLATION JOINING AN SEALING OF AIR BARRIER MATERIALS AND COMPONENTS.
THE AGENCY SHALL HAVE EXPERIENCE COORDINATING AND INSTRUCTING SUBCONTRACTORS INVOLVED IN JOINING AND SEALING VARIOUS COMPONENTS, AND SEALING OF PENETRATIONS OF AIR BARRIERS.
IN THE INSTALLATION OF AIR BARRIER MATERIALS AND ASSEMBLIES INCLUDING THE EXPERIENCE
FOR LEAKAGE DETECTION AND REPAIR WORK, THE AGENCY SHALL HAVE 2 YEARS EXPERIENCE
5. REFER TO "SINJI E-TEC CO., LTD, TEL : 031-312-8731" OR APPROVED EQUAL.
MECH ROOM AIR LEAKAGE TEST FLOW
CHART, AIR BARRIERS AND QUALIFICATION
OF AIR LEAKAGE TESTING
- M22
CHONG, ST CAMP CASEY
REPAIR BARRACKS, BLDG NO. S-1115
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
M-23
MECHANICAL
CHONG,ST
FIRE PROTECTION LEGEND & ABBREVIATION,
AUTOMATIC FIRE SUPPRESSION GENERAL
NOTES, SPRINKLER Q'TY LIST AND NOTE
SP
D
FIRE PROTECTION LEGEND & ABBREVIATION
SPRINKLER
MAIN SUPPLY SPRINKLER
PENDENT SPRINKLER(K=5.6)
UPRIGHT SPRINKLER(K=5.6)
CUTTING POINT
CAP
FIRE DEPARTMENT CONNECTION
(2-WAY SHOWN)
VALVES
CHECK VALVE
FITTING
WALL MOUNTED TEST HEADER
CONNECTION, TOP
ELBOW, 90
ELBOW, TURNED UP
ELBOW, TURNED DOWN
TEE
TEE, OUTLET UP
TEE, OUTLET DOWN
CONNECTION, BOTTOM
RISER
TEST VALVE
DRAIN VALVE
TYPICALTYP.
NO
EXST EXISTING
ABBREVIATIONS
MAX MAXIMUM
MIN MINIMUM
DRAIN PIPE
NUMBER
DRAWINGDWG
CONN
CONT CONTINUE/CONTINUATION
CONNECTION
RM ROOM
W/ WITH
W/O WITHOUT
SCH SCHEDULE
RESIDENTIAL PENDENT SPRINKLER(K=4.9)
UPRIGHT SPRINKLER(K=8.0)
SIDEWALL SPRINKLER(K=5.6)
OS&Y GATE VALVE(N.O.)
W/TAMPER SWITCH
OS&Y GATE VALVE(N.C.)
W/TAMPER SWITCH
9. ELEVATOR FIRE SPRINKLER SHALL BE IN ACCORDANCE WITH UFC 3-600-01
AUTOMATIC FIRE SUPPRESSION(S) GENERAL NOTES:
1. THE CONTRACTOR SHALL PROVIDE AND INSTALL AN AUTOMATIC WET PIPE SPRINKLER SYSTEM
TO FULLY PROTECT THIS FACILITY. THE FIRE SPRINKLER SYSTEM SHOWN THESE DRAWING IS
PERFORMANCE BASED WHICH MEANS CONCEPTUAL REQUIREMENT ONLY. THE SPRINKLER
CONTRACTOR SHALL SUBMIT A COMPLETE FIRE SPRINKLER SYSTEM SHOPDRAWINGS BASED ON
NFPA 13 AND SPECIFICATION REQUIREMENTS AND SUBMIT FOR APPROVAL PRIOR TO
INSTALLATION. THE EQUIPMENT SHOWN ARE SUGGESTED LOCATIONS HOWEVER FINAL LAYOUT
SHALL BE IN ACCORDANCE WITH APPLICABLE CODES, MANUFACTURER'S RECOMMENDATIONS, AND
EQUIPMENT LISTINGS. CONTRACTOR SHALL COORDINATE SPRINKLER HEADS LOCATIONS WITH,
CEILING PANELS, LIGHTING FIXTURES, AND HVAC AIR DEVICES. ALL EQUIPMENT SHALL BE UL
LISTED AND FM APPROVED IN ACCORDANCE WITH NFPA 13 AND THE PROJECT SPECIFICATION.
2. THE CONTRACTOR SHALL CONDUCT WATER SUPPLY HYDRANT TEST FOR THIS PROJECT BASED
ON NFPA 291 REQUIREMENTS AND UTILIZE THIS DATA TO DESIGN THE SPRINKLER SYSTEM.
THE HYDRANT LOCATIONS, FLOW TESTS, AND DATE SHALL BE INDICATED ON THE
SHOPDRAWINGS. AUTOMATIC SPRINKLER PROTECTION SYSTEM IS REQUIRED TO PROTECT THIS
ENTIRE FACILITY. A MINIMUM 10% SAFETY FACTOR IS REQUIRED BETWEEN THE AVAILABLE
WATER SUPPLY AND THE SPRINKLER SYSTEM DEMAND.
INSTALLED IN THE HORIZONTAL POSITION.
7. ALL AUTOMATIC SPRINKLER DRAIN VALVES FOR FIRE DEPARTMENT CONNECTIONS SHALL BE
BE INSTALLED ON THE EXTERIOR.
DRAINS, BUT MUST TERMINATE TO THE BUILDING EXTERIOR. SPRINKLER RISERS SHALL NOT
AND MAINTENANCE. TEST DRAINS ARE NOT TO BE TERMINATED AT WALL SINKS OR FLOOR
6. PROVIDE MINIMUM 1M X 2M SPACE FOR EACH FIRE SPRINKLER RISER FOR INSTALLATION
AS-BUILT DRAWINGS FOR THIS PROJECT.
CONTRACTOR SHALL CONFORM TO THE SYMBOLS INDICATED IN NFPA 170 TO DEVELOP THE
22-"PLANS AND CALCULATIONS" PRIOR TO SPRINKLER PIPING INSTALLATION. THE
5. CONTRACTOR SHALL SUBMIT HYDRAULIC CALCULATIONS AS REQUIRED BY NFPA 13 CHAPTER
4. FIRE PROTECTION PLANS SHOWN ARE USED FOR COST ESTIMATE PURPOSE ONLY.
WITH O-RINGS ARE NOT PERMITTED.
BRACING CALCULATION IN ACCORDANCE WITH NFPA 13 REQUIREMENTS; SPRINKLERS
3. PROVIDE EARTHQUAKE PROTECTION (SWAY BRACING), END OF BRANCH LINE AND SEISMIC
8. FLEXIBLE COUPLINGS SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 13
10. ALL PIPING, SANITARY, VENT, WASTE, PLUMBING, OTHER PIPING, POWER OR CONTROL CIRCUTS, OR DUCT SHALL PENETRATE ANY STAIR OR EXIT PASSAGEWAY ENCLOSURE UNLESS IT SERVES
AN APPLIANCE WITHIN THE ENCLOSURE AND DEAD ENDS IN THE ENCLOSURE.
SPRINKLER Q'TY LIST
SPRINKLER HEAD TYPE
US/(METRIC)
"K" FACTOR
SIZE
A R E ASYMBOL
LIVING/SLEEPING
THREAD
SPRINKLER Q'TY LIST
RESIDENTIAL PENDENT TYPE SPRINKLER HEAD 4.9/(68)1/2" NPT
TOTAL
MECH ROOM, STORAGE, COMMQUICK RESPONSE UPRIGHT TYPE SPRINKLER HEAD 8.0/(115)3/4" NPT
1075.6/(80)1/2" NPTQUICK RESPONSE PENDENT TYPE SPRINKLER HEAD
TOTAL NUMBER OF SPRINKLER OF SYSTEM 560
CORRIDOR, MULTI PURPOSE ROOM, JAN, LOBBY, TOILET, CLOSET, MUD ROOM, CQ ROOM, KITCHEN, LOUNGE, GAME ROOM
VERIFYING ACTUAL QUANTITIES BASED ON THE CONTRACT DOCUMENT REQUIRMENTS.
1. QUANTITIES ARE SHOWN FOR ESTIMATING PURPOSE ONLY, THE CONTRACTOR SHALL BE RESPONSIBLE FOR
NOTE
5.6/(80)1" NPTQUICK RESPONSE DRY SIDEWALL TYPE SPRINKLER HEAD VEST 9
58.0/(115)3/4" NPTQUICK RESPONSE PENDENT TYPE SPRINKLER HEAD LAUNDRY, COMM
CAMP CASEY
M24
MECH ROOM FIRE PROTECTION PIPING PARTIAL PLAN
SCALE : 1 / 25
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
M-24
MECHANICAL
CHONG,ST
N.O.
N.O.
TS
TS TSN.O.
TS
N.C.
W/2-65mm HOSE VALVE
100mm X 2-65mm TEST HOSE HEADER
W/20mm BALL DRIP VALVE
FOR BACKFLOW PREVENTER FLOW TEST
150mm BACKFLOW PREVENTER
UL/FM APPROVED ASSEMBLY
150mm ALARM CHECK VALVE
WATER MOTOR ALARM GONG
W/TAMPER SWITCH
150mm OS & Y GATE VALVE
W/TAMPER SWITCH
100mm OS & Y GATE VALVE
WET SPRINKLER
4.1 LPM/SM (0.10 GPM/SF)
RESIDENTIAL
950 LPM (250 GPM)
MAX. 4.9 M (16 FT)
MAX. 4 HEADS
MIN. 2.4 M (8 FT)
60 MIN.
ORDINARY TEMPERATURE RATING
TYPE OF SYSTEM
SPRINKLER
SPRINKLER TYPE
MAX. COVERAGE PER
BETWEEN SPRINKLERS
MAX. & MIN. SPACE OF
RATING*
SPRINKLER TEMPERATURE
DESCRIPTION
HAZARD
FIRE PROTECTION REQUIREMENTS
DESIGN DENSITY
DURATION OF SUPPLY
HOSE STREAM
DESIGN AREA
APPLICATION AREA
WET SPRINKLER
8.2 LPM/SM (0.20 GPM/SF)
QUICK RESPONSE
12.07 SM (130 SF)
950 LPM (250 GPM)
MAX. 4.6 M (15 FT)
230 SM (2500 SF)
MIN. 1.8 M (6 FT)
60 MIN.
INTERMEDIATE TEMPERATURE RATING
ORDINARY TEMPERATURE RATING
RESIDENTIAL
OCCUPANCY
ORDINARY HAZARD
OCCUPANCY
MECH ROOM, COMM,
LIVING/SLEEPING
SPRINKLER NOZZLE
K-FACTOR OF
(8.0)
(4.9)
ORDINARY TEMPERATURE RATING
REFER TO PARA 9-7.3, UFC 3-600-01*
WET SPRINKLER
4.1 LPM/SM (0.10 GPM/SF)
QUICK RESPONSE
20.90 SM (225 SF)
950 LPM (250 GPM)
MAX. 4.6 M (15 FT)
140 SM (1500 SF)
MIN. 1.8 M (6 FT)
60 MIN.
ORDINARY TEMPERATURE RATING
VEST, EXERCISE ROOM, MUD ROOM,
ORDINARY TEMPERATURE RATING
LIGHT HAZARD
OCCUPANCY
STAIR-1, LOUNGE, ISSUE ROOM,
CLOSET, KITCHEN, GAME ROOM
(5.6)
4.9M X 4.9M
(16FT X 16FT)
CONCRETE SPLASH BLOCK
LOBBY, JAN, CORRIDOR, TOILET,
FROM FIRE PUMP BUILDING
MECH. ROOM
STORAGE, LAUNDRY
m m
MECH ROOM FIRE PROTECTION PIPING
PARTIAL PLAN AND FIRE PROTECTION
REQUIREMENTS
CAMP CASEY
M25 SCALE : 1 / 100
1ST FLOOR FIRE PROTECTION PIPING PLAN
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
M-25
MECHANICAL
CHONG,ST
SLEEPING
LIVING/
SLEEPING
LIVING/
SLEEPING
LIVING/
SLEEPING
LIVING/
SLEEPING
LIVING/
SLEEPING
LIVING/
SLEEPING
LIVING/
SLEEPING
LIVING/
SLEEPING
LIVING/
SLEEPING
LIVING/
SLEEPING
LIVING/
SLEEPING
LIVING/
SLEEPING
LIVING/
SLEEPING
LIVING/
MECH ROOM
SLEEPING
LIVING/
SLEEPING
LIVING/
SLEEPING
LIVING/
SLEEPING
LIVING/
ROOM
MULTI PURPOSE
SLEEPING
LIVING/
SLEEPING
LIVING/
SLEEPING
LIVING/
SLEEPING
LIVING/
CORRIDOR
VEST
STAIR-2
UP
CORRIDOR
LOBBY
COMM
JAN
COMM
STAIR-1
CLOSET
ROOM
VEST
CQ
MUD ROOM
LAUNDRY
STORAGE
STORAGE
STAIR-3
UP
VEST
25 2525
25 32 25
25 5
150 150 150 150 150 150 150 150 150 150
TOILET
65,150
D SP DST
DST
DST
150 150150 150
0 5
PENDENT TYPE SPRINKLER HEAD
15mm QUICK RESPONSE CONCEALED
UPRIGHT TYPE SPRINKLER HEAD
20mm QUICK RESPONSE
DRY SIDEWALL TYPE SPRINKLER HEAD
15mm QUICK RESPONSE
PENDENT TYPE SPRINKLER HEAD
15mm RESIDENTIAL CONCEALED
PENDENT TYPE SPRINKLER HEAD
20mm QUICK RESPONSE CONCEALED
100mm X 65mm X 65mm
FIRE DEPARTMENT CONNECTION
W/20mm BALL DRIP VALVE
65mm HOSE VALVE
FLOOR CONTROL VALVE
1ST FL. FIRE PROTECTION PIPING PLAN
CAMP CASEY
M26 SCALE : 1 / 100
2ND & 3RD FLOOR FIRE PROTECTION PIPING PLAN
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
M-26
MECHANICAL
CHONG,ST
SLEEPING
LIVING/
SLEEPING
LIVING/
SLEEPING
LIVING/
SLEEPING
LIVING/
SLEEPING
LIVING/
SLEEPING
LIVING/
SLEEPING
LIVING/
SLEEPING
LIVING/
SLEEPING
LIVING/
SLEEPING
LIVING/
SLEEPING
LIVING/
SLEEPING
LIVING/
SLEEPING
LIVING/
SLEEPING
LIVING/
SLEEPING
LIVING/
SLEEPING
LIVING/
SLEEPING
LIVING/
SLEEPING
LIVING/
SLEEPING
LIVING/
SLEEPING
LIVING/
SLEEPING
LIVING/
SLEEPING
LIVING/
SLEEPING
LIVING/
SLEEPING
LIVING/
SLEEPING
LIVING/
SLEEPING
LIVING/
2ND FL : KITCHEN
3RD FL : LOUNGE
STAIR-1
328UP
COMM
JAN
CORRIDOR
232 332
STAIR-2
VEST
DN UP
STAIR-3
VEST
UP DN
STORAGE
STORAGE
25 25
150 150 150
150 150 150 150
25253225
150150150
150150150
150150 15
253240
65,150
D SP
D
65,150
SP
DST
DST
DST
DST
DST
DST
150 150
253240 2
5 2
PENDENT TYPE SPRINKLER HEAD
15mm QUICK RESPONSE CONCEALED
UPRIGHT TYPE SPRINKLER HEAD
20mm QUICK RESPONSE
DRY SIDEWALL TYPE SPRINKLER HEAD
15mm QUICK RESPONSE
PENDENT TYPE SPRINKLER HEAD
15mm RESIDENTIAL CONCEALED
65mm HOSE VALVE
FLOOR CONTROL VALVE
2ND & 3RD FL. FIRE PROTECTION
PIPING PLAN
CAMP CASEY
M27 SCALE : 1 / 100
4TH FLOOR FIRE PROTECTION PIPING PLAN
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
M-27
MECHANICAL
CHONG,ST
SLEEPING
LIVING/
SLEEPING
LIVING/
SLEEPING
LIVING/
SLEEPING
LIVING/
SLEEPING
LIVING/
SLEEPING
LIVING/
SLEEPING
LIVING/
SLEEPING
LIVING/
SLEEPING
LIVING/
SLEEPING
LIVING/
SLEEPING
LIVING/
SLEEPING
LIVING/
SLEEPING
LIVING/
SLEEPING
LIVING/
SLEEPING
LIVING/
SLEEPING
LIVING/
SLEEPING
LIVING/
SLEEPING
LIVING/
SLEEPING
LIVING/
SLEEPING
LIVING/
SLEEPING
LIVING/
SLEEPING
LIVING/
SLEEPING
LIVING/
SLEEPING
LIVING/
SLEEPING
LIVING/
SLEEPING
LIVING/ STAIR-3
UP DN
VEST
DN
VEST
UP
STAIR-2
JAN
COMM
STAIR-1
DN
CORRIDOR
STORAGE
STORAGE
4TH FL : GAME ROOM
25 25
150 150 150
150 150 150
25253225
150150150
150150150
150150150
DST
DST
DST
D
65,150
SP
324050
150 150
PENDENT TYPE SPRINKLER HEAD
15mm QUICK RESPONSE CONCEALED
UPRIGHT TYPE SPRINKLER HEAD
20mm QUICK RESPONSE
SIDEWALL TYPE SPRINKLER HEAD
15mm QUICK RESPONSE
PENDENT TYPE SPRINKLER HEAD
15mm RESIDENTIAL CONCEALED
PENDENT TYPE SPRINKLER HEAD
20mm QUICK RESPONSE CONCEALED
65mm HOSE VALVE
FLOOR CONTROL VALVE
4TH FL. FIRE PROTECTION PIPING PLAN
CAMP CASEY
SPRINKLER ALARM CHECK VALVE & MAIN RISER
M28 - M28
SWAY BRACING2
- M28
3 MAIN RISER CONNECTION(TYPICAL)
- M28
4 FIRE DEPT SIAMESE CONNECTION
- M28
5 SYSTEM TEST CONNECTION
ON WET PIPE SYSTEM
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
M-28
MECHANICAL
CHONG,ST
AND SPIGOT PIECE
DUCTILE IRON FLANGE
AND SPIGOT PIIPE
RODS NOT LESS
THAN 20Ø
DUCTILE IRON BELL
SERVICE
FROM FIRE
MAIN
G.L
GENERAL NOTE :
OR LEAVING THE SUBJECT BUILDINGS.
THIS DETAIL SHALL BE UTILIZED WHERE
.FIRE MAIN SERVICE LINES ARE ENTERINE
STEEL PIPE
THRUST BLOCK
CONC.
FL
BITUMASTIC COATED
BITUMASTIC COATED
W/TAMPER SWITCH
GATE VALVE
OS & Y
FIRST
PIPE SUPPORT
14 16
SEE
M10
FIRE DEPT CONNECTION
VALVE
BALL DROP
PER NFPA 13
FLEXIBLE COUPLING
FOR EARTH QUAKE
(WITH TAMPER SWITCH)
SUPERVISORY VALVE
WATER MOTOR ALARM DRAIN
PRESSURE SWITCH
PIPE SUPPORT
RISER TO SPRINKLER SYSTEM
RETARDING CHAMBER
WATER MOTOR ALARM GONG
MAIN DRAIN AND TEST VALVE
SWAY BRACING PER NFPA 13 FOR
FLEXIBLE COUPLERS PER NFPA 13
DESCRIPTION
ALARM CHECK VALVE
(2-REQUIRED)
PRESSURE GAGE
ZONE 1 EARTHQUAKE
ITEM
FOR EARTH QUAKE
VALVE
BALL DROP
PIPE
O N
I C T
E N
AU
O
F
IR
E
DEPT C
TOSPK
N
R
CONNECTION
FIRE DEPT
CLAPPER
SWIVEL
2-1/2" NS OR BS
EASE - OFF
HOSE COUPLING
PLUG
THREAD
MAIN DRAIN
PIPE EXTENDS THROUGH WALL TO OUTSIDE.
2. THE TEST VALVE SHOULD BE LOCATED AT AN
ACCESSIBLE POINT AND PREFERABLY NOT
OVER 7FT (2.1M) ABOVE THE FLOOR.
PIPE IN WARM ROOM BEYOND VALVE WHERE
1. NOT LESS THAN 4FT (1.2M) OF EXPOSED TEST
NOTES :
ACCESSIBLE LOCATION
TEST VALVE IN READILY
SEE NOTE
BRANCH LINE
P.G.
CONC
SLAB
SWAY BRACE FITTINGS
SCHEDULE 40 PIPE
PIPE CLAMP
SPRINKLER
CROSSMAIN
EXPANSION BOLT (TYP)
CONC
SLAB
SWAY BRACE FITTINGS
SCHEDULE 40 PIPE
SPRINKLER
CROSS MAIN
EXPANSION BOLT
PIPE CLAMP
* PIPE SIZE SHALL BE DETERMINED BY CALCULATIONS
PRESSURE RELIEF VALVE13
O N
I C T
E N
ST
O
F
IR
E
DEPT C
AN PIP
N
E D
OS & Y GATE VALVE14
TAMPER SWITCH15
BACKFLOW PREVENTER16
TEST VALVE HEADER17
FIRST SUPPORT W/CROSS BRACING
DETAILS - 1
CAMP CASEY
M-29
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
MECHANICAL
CHONG,ST
TRAPEZE HANGERS
SEE SPECIFICATION FOR INSULATION THICKNESS
CONCEALED
ALUMINUM LOCK-TYPE BANDS
10 W x 0.5 THK @300 O.C.
ALUMINUM JACKET
80 JACKET STRIP OR
VAPOR-BARRIER JACKET
VAPOR-BARRIER COATING
80 JACKET STRIP
(MIN. 40 JACKET OVERLAP)
CG - CELLULAR GLASS
MF - MINERAL FIBER
HOT PIPE LINE
COLD PIPE LINE
PIPING
AREA
ITEM
A B C D
INSULATION
PIPE
E
F
G
NOTE :
H
3. HEATED OIL PIPE LINE
PIPE INSULATION DETAIL
SHALL BE OVERLAPPED
COLD WATER PIPE LINE
4. A/C CONDENSATE DRAIN
5. REFRIGERATION SUCTION
1. STEAM & CONDENSATE
2. HOT WATER HEATING
1. MAKE-UP WATER
2. CHILLED WATER
HOT PIPE LINE
3. DUAL TEMP WATER
DOWN TO SHED WATER
LONGITUDINAL JOINTS
D
C
A
E F G H BA C ED F G H
EXPOSED
MF
OVERLAP (40)
A B C ED F
EXPORSED
WEATHER
G H
CLASS II ADHESIVE
VAPOR-BARRIER JACKET
CLINCHING STAPLE @ 100 OC
B
CG OR
MF
HANGER LOOPS
SCREWS MAY BE
OMITTED IF
STRAPS
HANGER
STRAP HANGERS
25MIN
FOR LOAD
SIZE BOLT(S)
INSULATION
SCREWS
SEE NOTE 1
REINFORCEMENT MAY BE USED FOR ATTACHMENT IF IT QUALIFIES
DISTANCE IS NOT EXCEED 60INCHES UNLESS FOOT OF STRAP IS
50 x 50 x 6
50 x 50 x 5
50 x 50 x 3
40 x 40 x 3
25 x 25 x 3
TRAPEZE SHELF
HANGER SIZES FOR RECTANGULAR DUCT
DUCT HANGER DETAIL
DO NOT EXCEED ALLOWABLE LOAD LIMITS.
NOTES :
OVER 2425
2,125 THRU 2,400
1,525 THRU 2,100
1,075 THRU 1,500
775 THRU 1,050
475 THRU 750
UP THRU 450
OF DUCT
DIMENSION
LONGEST
SEE NOTE 2
LOAD CAPACITY)
(VERIFY UPPER TRAPEZE
ALTERNATIVE LOCATION
NUTS
OR ANGLE
STRAP
ROD
ANGLES
PLACED UNDER A BOTTOM REINFORCEMENT.
FOR BOTH DUTIES.
2.
1.
40 x 16 GA
25 x 16 GA
25 x 18 GA
25 x 22 GA
HANGERS
STARP
15 DIA
10 DIA
RODS
HANGER
ANGLES
2,400
SPACING
3,000
MAXIMUM
CLASS II ADHESIVE (LESS THAN 600 DUCT) AROUND ENTIRE PERIMETER OF THE
ALL FOUR SIDE OF DUCT 300 APART
AND NOT MORE THAN 80 FROM THE
EDGES OF THE INSULATION JOINT.
APPLYING TWO COATS OF VAPOR-
BARRIER COATING WITH GLASS CLOTH
EMBEDDED BETWEEN COATS.(WHEN FIELD
APPLY VAPOR-BARRIER JACKET)
CLASS II ADHESIVE UNDER
THE 100 OVERLAP.
DUCT IN
AREA
ITEM
MORE THAN 80 FROM DUCT CORNER.
CLASS II ADHESIVE UNDER
100 OC WITH TYPE II VAPOR-BARRIER COATING
VAPOR-BARRIER JACKET
F
FLEXIBLE TYPE
THE 50 OVERLAP.
E
D
C
DUCT INSULATION
RIGID TYPE
DUCT IN 300 WIDTH STRIPS ON 150 ON CENTER
BOTTOM/SIDES 400 OC AND NOT
600 LARGE DUCT
A
B
CONCEALED
DUCT
INSULATION
FASTENER
ADHESIVEA
B
C
EXPOSED
VAPOR-BARRIER JACKETF
STAPLE
OVERLAPD
E
DUCTWORK DETAILS
SINGLE VANE WITH
20mm TRAILING EDGE
RUNNER TYPE 2
SP=40
R=50
FLAT
R
WELD RUNNER TO DUCT
WELD EVERY 6TH VANE TO RUNNER(OVER 1,000 FPM)
OR RUN A TIE ROD THROUGH THE CENTER VANE.
DUCT TURNING VANE DETAIL
ACCEPTABLE ON DESIGNER
APPROVAL.
BOLT, SCREW, OR
SEE NOTES ON FIG.2-4
OTHER RUNNERS MAY BE
SINGLE VANE SCHEDULE
LARGE
SMALL
SIZES OR SPACINGS
USED. OTHER VANE
RUNNER TYPE 1
DOUBLE WALL VANES
FREE AREA BETWEEN
APPROXIMATES ELBOW
INLET AREA.
22 GA
32 MIN
SP
112.5
R
OR
GASP
FL
O
W
SP R
SP
113 81
C lps x Y=X
SD
A lps B cmh
X
NOTE; ABOVE APPLY TO SUPPLY AND RETURN
W
SD
YX
W
Y
D
FOR D OF 300 OR MORE
USE VANED ELBOW
D LESS THAN 300
R=D Y
R1=(X+Y)/2
R2=X+Y
X OR W LESS THAN 300
Y
R1
Y
R
D
R2=X+Y
R1=(X+Y)/2
SD
W2
R2=W1+W2
X
R
TURNING VANES (TYP.)
RETURN ONLY
Y
BRANCH TAKEOFFS
C 300 OR MORE
MANUAL DAMPER
X OR Y LESS THAN 300
R1=(W1+W2)/2
SPLITTER DAMPER (TYP.)
PROVIDE VE WHEN COIL OR DIFFUSER IS
1,500 OR LESS FROM BRANCH TAKEOFF.
A lpsC lp s x Y=X C lps
SD
A lps B lps
W
W
X W
R=W
W
NOTE; SEE SMACNA DUCT MANUAL
C LESS THAN 300
(1985) FIGS. 2-7
C lp s A lps
PREFERRED OFFSET
FULL RADIUS WHERE POSSIBLE
OFFSETS
FROM RECTANGULAR MAIN
ROUND DUCT TAKEOFF
10 DIA
10 DIA
10 DIA
25 x 22 GA
25 x 18 GA
25 x 16 GA
25 x 25 x 3
40 x 40 x 3
3,000
3,000
3,000
2,400
2,400
DETAILS - 2
CAMP CASEY
REPAIR BARRACKS, BLDG NO. S-1115
M29 M29 M29
M29 M29
CEILING DIFFUSER
NOTE: S = SIDE OPPOSITE HINGES
FOLDED CORNER
PIN AND WASHER
TO BE COATED WITH ADHESIVE
ALL TRANSVERSE EDGES
25-15 x 25-15 x 3SCREW)
2"
DETAIL
SPACING BETWEEN
MALE PIECE-SNAP LOCK
"BOTTOMS"
APPROX 50
FLEXIBLE CONNECTION & ANGLE FLANGE CONNECTION
MIN 100
CASING
EQUIPMENT
WITH UL 214)
TACK WELD
FABRIC (COMPLY
FIBROUS GLASS
HEAD @100 OC
RIVET, SOLID FLAT
STEEL SHT (TYP)
U-STRAP 20GA. GALV
B
UP TO 12.5 M/S
12.5 TO 30 M/S
ATTACHED BY SCREWS, RIVETS OR WELDS.)
BE FORMED ON DUCT OR BE CHANNEL OR ZEE
NOSING ON EVERY LEADING EDGE. (NOSING MAY
WHEN VELOCITY ABOVE 20 M/S USE METAL
INTERVALS ARE APPROXIMATE.
MAXIMUM SPACING FOR FASTENERS ACTUAL
LINING
VELOCITY
1.NOTE :
2.
2"
(TYPICAL 1,200 OR 1,500)
DUCT SECTION
ALTERNATE
C
B
A
DIMENSIONS
10015080
A
E
DUCT LINING
@100 OC(OR METAL
6DIA x 25 LG
BOLT & NUT
STEEL ANGLE (TYP)
GASKET MIN 6 THK
SIZE
300 x 300
100 x 100
600 x 600
400 x 500
AND LESS
STATIC
50 WG
FRAME
LOCKS
1-S
1-S
2-S
2-S
LAPPED AND BUTTED CORNER
(FASTENER)
HINGES
C
B
E
C
B
C
DUCT ACCESS DOOR
PIANO HINGE
BUTT HINGE OR
HINGE POS.2
DOOR
TYPE 2
TYPE1
NO.NO.
FASTENER
HINGE POS.3
2. TURNING VANES SHALL BE INSTALLED IN ALL SQUARE ELBOWS.
CONSTRUCTION STANDARDS BY SMACNA, INDUSTRIAL VENTILATION BY ACGIH, ASHRAE
OTHER DUCT WORK DETAILS NOT SHOWN SHALL CONFORM TO HVAC DUCT
AND WALL OR CEILING, AND WALL REGISTERS SHALL BE INSTALLED AT LEAST 6 SPACE
SPONGE-RUBBER GASKETS SHALL BE PROVIDED BETWEEN DIFFUSERS OR REGISTERS
THE DUCT, THE DUCT SHALL BE EXTENDED 150 TO 300 BEYOND THE OPENING OF THE
WHEN A SUPPLY AIR REGISTER OR GRILLE OR DIFFUSER IS LOCATED AT THE END OF
UNLESS OTHERWISE SPECIFIED, ROOM THERMOSTAT SHALL BE INSTALLED 1,500 ABOVE FL.
INCHES BELOW THE CEILING.
HANDBOOKS, AND NFPA 90-A.
REGISTER OR GRILLE OR DIFFUSER.
3.
6.
5.
4.
E
WHERE DUCTS ARE INSTALLED ABOVE CEILING, ACCESS PANELS SHALL BE PROVIDED
GENERAL NOTES :
IN CEILING FOR DUCT ACCESS DOORS, DAMPERS, ETC.
BACKDOOR
1.
DOOR
(REQ'D 2)
FASTENER
GASKET
APPROVED
FASTENER
DUCT
DUCT
DOOR
GASKET
METAL GAGE
RECTANGULAR DUCTWORK
25 THICK DUCT LINER, OR
INSULATION W/VAPOR
TEE-BAR CEILING
VARRIER
THERMAL INSULATION
SAME SIZE AS CEILING
DIFFUSER NECK SIZE
DUCTWORK W/EXTERNAL
VAPOR SEAL
INSULATION
VAPOR SEAL
(OR FLEXIBLE DUCT AS
INDICATED)
EXTERNAL THERMAL
DETAIL NOTES;
OPPOSED BLADE DAMPER
EQUALIZING DEFLECTOR
NOMINALLY
1 REFER TO PLAN DRAWINGS AND AIR DEVICE SCHEDULE FOR DIFFUSER TYPE.
PROVIDE FRAME TYPE TO SUIT CEILING SPECIFIED, REFER TO AIR DEVICE SCHEDULE
2 REFER TO ARCHITECTURAL DWGS. FOR CEILING TYPE.
ANTI-SMUDGING
600x600 LAY-IN 3-CONE
CEILING DIFFUSER WITH
M-30
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
MECHANICAL
CHONG,ST
DETAILS - 3
M30 -
M30 -
M30
M30
CAMP CASEY
100 THRU 125
PIPE SIZE
HANGER ROD SCHEDULE
CLEVIS HANGER
TRAPEZE & CLEVIS HANGER
65 THRU 80
UP TO 50
PIPE SIZE
PIPE
ROD SIZE
15 DIA
10 DIA
CLEVIS HANGER
HEAVY DUTY HANGER ROD
ROD SIZE
16 DIA
STEEL SADDLE
INSULATION
VAPOR BARRIER
SUPPORT NUT
LOCKING NUT
CROSS SECTION IS SPECIFIED
FLANGE/AIRFLOW ORIENTATION.
(I.E.:FLANGED). SPECIFY THE
WHEN A NON-SYMETRICAL FRAME
VALVE BOX DETAIL
NOTE:
MULLION TYP
OPTIONAL
JAMB LINKAGE
AND JAMB SEALS
U.L. LISTED TYPE "B" DAMPER.
INSTALLATION INSTRUCTIONS.
SLEEVE SHALL BE FURNISHED BY FIRE DAMPER
ENTIRE INSTALLATION SHALL BE IN ACCORDANCE
WITH THE FIRE DAMPER MANUFACTURERS
INSTALLATION INSTRUCTIONS, AND SMACNA
STANDARDS AND FIRE DAMPER MANUFACTURER
BREAKAWAY CONNECTIONS PER SMACNA
INSTALLATION SHALL MEET THE SMACNA
MANUFACTURER. SLEEVE CONSTRUCTION AND
SECURE DAMPER TO SLEEVE PER
FOR SUPPLY AIR DUCTWORK.
DAMPER INSTALLATION GUIDE FOR HVAC
THE PROVISIONS OF NOTE 4 HEREIN.
LOCATION SHALL SUIT PROJECT CONDITION AND
MATERIAL SHALL BE FIBERGLASS AS SPECIFIED
INSULATE AND VAPOR SEAL ENTIRE DAMPER
INSTALLATION (SUPPLY DUCTWORK) TO PREVENT
CONDENSATION PER SMACNA "FIRE, SMOKE AND
RADIATION DAMPER INSTALLATION GUIDE FOR
HVAC SYSTEM"-1986 FIGURE 19. INSULATION
MANUFACTURERS INSTALLATION INSTRUCTIONS.
STANDARDS (FIRE, SMOKE AND RADIATION
TYPICAL HORIZONTAL FIRE DAMPER DETAIL
FIRE PARTITION
TO WALL
DUCT
INSULATED WHERE
DUCT IS INSULATED
ACCESS DOOR
(TYP) DO NOT SCURE
STEEL ANGLE FRAME
TO SLEEVE
SECURE DAMPER
SHEET METAL SCREW
HEX HEAD SELF-TAPPING
2SLEEVE
FUSIBLE
FIRE
LINK
DEMPER
(CURTAIN
TYPE)
EXPANSION
CLEARANCE
(ALL 4 SIDES)
SYSTEMS-1986)
STANDARDS.
NOTES:
FIRE DAMPER DETAILS
LINKAGE
STANDARD FACE
AT BLADE EDGES
OFFSET-LEG SEALS
SILICONE-RUBBER
SHAFT W/DOUBLE-SEALED
15 DAMPER PIN-LOCK
BEARINGS
(SEE OPTIONS BELOW)
COUNTERWEIGHT
ADJUSTABLE
BLADES
ON " CENTERS
1.95mm THICK
25 (TYP)
100(TYP.)
BACKDRAFT DAMPER DETAIL
CONC PIPE
25 DRAIN VALVE
CRUSHED STONE
(TYP OF 2)
1000 REINFORCED
W
C
W
C
D
S R
SYSTEM
CONN TO BLDG
LIFTING HANDLE
FIN GRADE
WATER CHILLER
CONN TO AIR COOLED
OF SMALLEST PIPE ON TRAPEZE.
NOTE : FOR TRAPEZE HANGER TAKE SPACING
HANGER ROD SPACING
WELD
SPACING
PIPE SIZE
MAX ALLOWABLE
CONC BEAM
ROD SIZE
10 DIA.
15 DIA.
100 THRU 125
PIPE SIZE
ANCH BOLT.
P
PIPE SIZE
65 THRU 80
UP TO 50
L 15 x 200 x 200
HANGER ROD SCHEDULE
BOLT PIPE ROLLERS TO ANGLE (TYP)
16 DIA
ROD SIZE
TRAPEZE HANGER
ANGLE
SUPPORT NUT
PIPE SADDLE AT
LEAST 300 LONG
MIN 600
NOTE
INSULATION
VAPOR BARRIER
HANGER ROD (TYP)
NO INSULATION
16 GAGE STEEL
ROOF STRUCTURE MEMBER FOR TOP FLOOR
300 LONG
PIPE SADDLE
CONNECTION TO CONCRETE FLOOR W/CONCRETE ANCHORS OR TO
ROLLER
PIPE
STAND
(TYP)
LENGTH AS REQ'D
(NOT VAPOR BARRIER)
INSULATION (TYP)
LOCKING
WALL CAP DETAIL
METAL SCREEN FRAME
BOLT & NUT
ANGLE IRON REINFORCING
WHERE REQUIRED
SCREEN
R
WATERPROOF
SEAMS AND JOINTS
ANGLE RIVETED OR
TACK WELDED
AS REQUIRED
15 SCREEN
450 MIN.
(HEAVY
SNOW AREA)
R= W
D U C
T SIZE +
25%
FLASHING
SEE ARCH. DETAIL
M
IN
IN
ROOF
ROOF GOOSENECK (RECTANGULAR DUCT)
2,100
2,400
2,700
3,000
3,300
3,600
3,900
M-31
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
MECHANICAL
CHONG,ST
DETAILS - 4
M31 -
M31 -
M31
M31 -
M31 -
M31
CAMP CASEY
WATER CHILLER PIPING DIAGRAM
CHS
CHR
NEMA 4 ENCLOSURE
AIR COOLED
WATER CHILLER
FLOW SWITCH W/
FLEXIBLE PIPIE
CONNECTOR
INSULATE & VAPOR SEAL ANCHORS EQUAL TO THAT SPECIFIED FOR THE PIPING
PIPE ANCHOR SCHEDULE
PUMP
BEDPLATE
ANCHOR BOLT
BASE MOUNTED CHW/HW CIRC PUMP
CHILLED & HEATING COILS PIPING ARRANGEMENT
AND COIL CONNECTIONS ONLY. BALANCING VALVE SHALL BE SIZED
PIPE SIZES AS SHOWN ON PLANS REDUCE AT CONTROL VALVES,
FOR A MAXIMUM 1.5M'PD.
(NOTE: FOR LARGER THAN
50 , USE GATE VALVE)
VALVE/SHUT-OFF
CALIBRATED
BALANCING
NOTE :
BALL VALVE(TYP)
SUPPLY
RETURN
COIL
THERMOMETER
15 MANUAL
(TYP)
AIR VENT
DRAIN VALVE
FLOW
AIR
PG
PG
SIDE
NOTE
PIPE
U-BOLT
SPLIT SCRD COUPLING
PIPE
WELD
" A "
(TYP OF 3)
50x50x5
L-ANGLE
TO PUMP
AIR-VENT
FLANGE
150 x 275
PETCOCK
SUCTION
FROM PUMP
DISCHARGE
FOR RESPECTIVE PIPING SERVICE
PIPING AND FEEDER SHALL BE INSULATED AS SPECIFIED1
CHEMICAL SHOT FEEDER DETAIL
25 DRAIN VALVE
t
WITH REDUCER OR 275
FOR 25 PIPE.
BLIND-FLANGE DRILLED
50 x 275 REDUCING FLANGE
FIN FL
FOR 25 PIPE AND AIR VENT
50 x 275 REDUCING FLANGE
BLIND-FLANGE DRILLED
WITH REDUCER OR 275
FILL FUNNEL
INLET VALVE
80 UP
SIGHT GLASS
TO SUPPORT
HOSE & DRAIN VALVE
SEE FRONT ELEVATION
SIDE ELEVATION
50 PIPE LEG
WLEDED TO ELBOW
DIFFUSER
SUCTION
GATE VALVE
SUCTION
PIPE ANCHOR
SECTION
80 X 80 X 10
50 X 50 X 6
ANGLE SIZE
" A "
STEEL ANGLE
INSULATION
U-BOLT
PIPE
COUPLING
STEEL ANGLE
INSULATION
SPLIT SCRD
WELD
U-BOLT
UNION(TYP)
NOTES : 1. VALVES SHOWN SHALL BE FACTORY PROVIDED
COOLING & HEATING COIL DETAIL (FOR FAN COIL UNIT)
(TYPICAL)
SHOWN ON PROJECT PLANS
FRONT ELEVATION
SOLID CONC BASE CONSTRUCT
FROM DIMENSION GIVEN ON
APPROVED SHOP DWGS FOR PUMP
150(MIN)
NEOPRENE PAD
MOTOR
PRESS GAGE
ANCHOR BOLT
6 SHUT-OFF COCK
FLEXIBLE CONNECTION
INCREASER
(TYP)
(TYP)
CALIBRATED TRIPLE
115 DIAL 0-60PSI
DUTY VALVE
DISCHARGE
TRIPLE DUTY
SUCTION
VALVE
DISCHARGE
CALIBRATED
COOLINGBALANCING VALVE
VALVE PACKAGED.
COIL SECTION
RETURN
CALIBRATED
CH/HWR
SUPPLY
CH/HWS
CHILLED WATER
PIPE SIZE SHALL BE AS
BALL VALVE
FCU BOUNDARY
50 X 50 X 6
65 X 65 X 6
65 X 65 X 10
65 X 65 X 10
BELOW GRADE
MH503
VALVE BOX SEE
ABOVE GRADE
150 x 275
FLANGE
M-32
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
MECHANICAL
CHONG,ST
DETAILS - 5
M32 -
M32 -
M32
M32 -
M32 -
M26
CAMP CASEY
PLAN
SUB EXHAUST
TYPICAL AIR HANDLING UNIT CONDENSATE
D1 = UNIT FAN OPERATING NEGATIVE PRESSURE PLUS 2"
SIDE VIEW
RISER
EXHAUST DUCT
BATH ROOM MAIN
AIR DUCT (150x100)
BATH ROOM MAIN
SUB EXHAUST
EXHAUST DUCT
RISER
TYPE-1
UNION
MANUAL AIR
VENT
AV
SUPPLY MAIN
RETURN MAIN
(HORIZONTAL DISCHARGE TYPE)
HOT WATER PIPING TO UNIT HEATER
GATE VALVE
PIPE CAP
STRAINER
UNION
PIPE CAP
UNION
TYPE-2
STRAINER
FLOOR DRAIN
DRAIN TO NEAR
GATE VALVE
UNIT
HEATER
UNIT
HEATER
UNION
RETURN MAIN
SUPPLY MAIN
HOT WATER
HOT WATER
MANUAL AIR
VENT
PIT
CH
DOW
N
AV
HOT WATER
HOT WATER
DEVICE SHOWN ON
D2 = EQUAL TO "D1".
THE PLUMBING
DRAIN PIPING DETAIL
DRAWINGS
(BUT NO LESS THAN 40)
DRAIN LINE SIZE
OF AHU CONNECTION
(BUT NO LESS THAN 40)
CLEAN OUT PLUG
THREADED
TOWARDS DRAINAGE
PITCH DOWN
OF AHU CONNECTION
DRAIN LINE SIZE
D2
D1
VALVE AND SHUT-OFF
CALIBRATED BALANCING
VALVE AND SHUT-OFF
CALIBRATED BALANCING
FROM EXHAUST
GRILLE
FROM EXHAUST
GRILLE
PIPE SLEEVE-THRU FLOOR WITH
WATERPROOFING
SEALANT #2
PIPE SLEEVE - THRU INTERIOR WALL
INTERIOR WALL
CEILING
RUBBER OR
MATERIAL
PLASTIC)
METAL BAND
BACK UP
SEALANT #2
(CLOSED CELL
FLEXIBLE FOAM
AHU DRAIN PAN
(TYP)
SLEEVE
PIPE
ALL AROUND
BACK UP MATERIAL
SEALANT #2
PIPE WITHOUT INSULATION
WATERPROOFING
PIPE WITH
L
MIN 7 CLEARANCE
INSULATION
PIPE WITHOUT
INSULATION7
C
INSULATION
METAL JACKET
SLEEVE
4 LBS/SF LEAD OR
16 OUNCE COPPEER
FLASHING
FLEXIBLE FOAM
(CLOSED CELL
RUBBER OR
PLASTIC)
BACK UP
MATERIAL
PIPE WITH INSULATION
LC
METAL JACKER
FLOOR
P
IP
E
METAL BAND
AIR DUCT (150x100)
BATH ROOM EXHAUST DUCT RISER DETAIL
ANCHOR
BOLT & NUT
ISOLATOR
VIBRATION
SEE DETAIL "A"
WATER CHILLER
150150
PAD SIZE(INCH)
LENGTH
3350 -80
50 CLR
FOR
CHILLER UNIT
4# @ 1300 OC
80 CLR
2" CLR
2400 - 150
WIDTH
REMARKS
GRAVEL FILL
WATER CHILLER
FIN GRADE
25 CHAMFER
SEE DETAIL "A"
300 THK COMPACTED
CHILLER PAD DETAIL
NOTE ; 1. THE PAD SHOULD BE AT LEAST 6 INCHES LARGER
ALL AROUND THAN THE UNIT.
NOTE ; SUPPORT PIPE BOTH SIDE OF WALL SO THAT NO
WALL FAN POWER ROOF FAN
RECOMMENDED BY MFG.
SCREWS SIZE & Q'TY AS
OUT SIDE
DAMPER
BACK DRAFT
WALL VENTILATOR
CONC. WALL
B Y
F
G
CURB HT.
300 MIN.
MIN. 2 EACH SIDE
BY FAN MFR.,
RECOMMENDED
LAGBOLTS AS
POWER ROOF VENTILATOR
INSTALLATION OF GRAVITY ROOF FANS(VENTILATORS)
NOTE;
DIVISION 7 WORK
INSULATED ROOF CURVE,
EXHAUST DUCT WORK
WHERE SCHEDULED.
BACKDRAFT DAMPER
SEE ARCH. DWGS.
WOOD BLOCKING,
SEE ARCH. DWGS.
ROOF CONSTR.
SEE ARCH. DWGS.
(SPECIFIED IN DIVISION 7)
FLASHING
WOOD NAILER
ALL AROUND
GASKET SEAL
WEIGHT RESTS AT POINT OF SLEEVE
2. ACTUAL SIZE OF PAD SHALL BE COORDINATED WITH MFR
SHALL BE SIMILAR.
M-33
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
MECHANICAL
CHONG,ST
"D
"D 1"
DETAILS - 6
M33 -
M33 -
M33 -
M33
M33 -
M33 -
M33 -
M33
CAMP CASEY
JUTE PACKING
SUPPLY
FROM BRANCH
FOR LOCATION AND
STAINLESS STEEL FLUSH TYPE ACCESS COVER PLATE
FLOOR CLEANOUT
2.CHROMIUM-PLATED BRONZE, NICKEL BRONZE,NICKEL BRASS OR
NOTES : 1.WATER-PROOF MEMBRANE IS NOT REQUIRED IN SLAB ON GRADE.
Y-BRANCH
CAST IRON
PIPE
WATER-PROOF MEMBRANE
FINISH/TILE FLOOR
WHEN NOT THRE RUN
PLUG Y-BRANCH
1/8 BEND
AREA/PIT DRAIN
DRAINS
DRAIN AND BACKWATER VALVE
SEE NOTE-2
SEE NOTE-2
FILL/BED
SEE NOTE-1
SLAB
STRUCTURAL
SEE NOTE-1
CEMENT
THREADED PLUG
TYPE
SEE NOTE-1
OUTLET SIZE
FLOOR/SHOWER DRAIN
SEE NOTE-2
A
MEMBRANE
TO LAST
FIXTURE
WATER HAMMER ARRESTOR
HEIGHT
B
C
A
DIMENSION SHALL BE
DIAMETER
12-32
33-60
CAPACITY(FU)
FIXTURE UNIT
1-11
SIZE
DISPLACEMENT
HYDRAULIC DISPLACEMENT
PRESSURE PNEMATIC
COPPER ADAPTOR
20 OR 25 SEE DWGS
SCORIATED COVER
SEE NOTE-2
BACK FLOW PREVENTER & PRESSURE REDUCING STATION
WATER-PROOF MEMBRANE
ADJUSTABLE HOUSING
TWO PIECE THREADED
REDUCING TEE (TYP)
COCK (TYP OF 2)
6 SHUT-OFF
(TYP OF 3)
GATE VALVE
TYPE BACK-FLOW PREVENTER
REDUCED PRESSURE PRINCIPLE
CW
STRAINER
WATER SERVICE MAIN
4. DRAINS SHALL HAVE A CAST IRON BODY AND SEEPAGE PAN AND
1. WATER-PROOF MEMBERANE ARE NOT REQUIRED IN SLAB ON GRADE.
WATER-PROOF MEMBRANE
A CHROMIUM PLATED BRONZE, NICKEL BRONZE OR NICKEL BRASS STRAINER.
EXTERIOR THRUST BLOCK
PROVIDE STEEL HARNESS THRUST
RESTRAINT RODS FROM ELL TO
NEOPRENE GASKET
LEAD CAULKING
FINISH FLOOR
PRESSURE REDUCING
VALVE
REDUCER
DRAINS SHALL BE CONNECTED TO CAST IRON P-TRAP.
2. NEOPRENE RUBBER GASKET COMPRESSION TYPE JOINT.
3.
CEMENT
FILL/BED
SLAB
STRUCTURAL
FINISH/TILE FLOOR
WALL SLEEVE
BELOW FROST LINE
( TYP OF 2 )
PRESSURE GAGE
TO SYSTEM
UNION (TYP)
GLOBE VALVE
NON FREEZE TYPE WALL
POLISHED BRONZE BOX
20 HOSE CONNECTION
HYDRANT
GRADE
WALL CLAMP
KEY HANDLE
OUTSIDE WALL
SHUT-OFF COCK
PRESSURE GAUGE
TYPICAL
FLOW CONTROL
COPPER SHELL
FLOOR
FINISH/TILE
CEMENT
SLAB
WATER-PROOF
STRUCTURAL
FILL/BED
ORIFICE
PIPE SLEEVE THRU FLOOR
CAULK
H E
IG
H T
DIAMETER
FLUID
BELLOWS
CUSHION
TYPICAL IN LINE PUMP PIPING DETAIL
SUCTION
AS CLOSE TO FLOOR AS
POSSIBLE
GATE VALVE
UNION
15 HOSE BIBB W20
HOSE THREAD
BRASS CASING
PIPE SOCKET
DISCHARGE
SWING CHECK VALVE
SHUT-OFF VALVE
61-113D
VARIED DEPEND UPON
MFR
M-34
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .