DRAWINGS (Civil )Repar Barracks.pdf
PDF 1 MB Posted
- Attached to
- Repair Barracks Bldg S-1115 Camp Casey
- Solicitation number
- W91QVN21R0063
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
- 1 100 0 100 200 300M
SCALE IN METERS
SCALE = 1 : 3,000
THIS PROJECT
N
CAMP CASEY
CIVIL
C-1
GENERAL NOTES :
SUBMISSION OF CONTRACT PROPOSAL.
DIMENSIONS AT THE PROJECT SITE ORIENTATION PRIOR TO
1. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS AND
PRIOR TO COMMENCING WORK ON THE PROJECT.
INDICATED BY THE COR AND SHALL BE APPROVED BY THE COR
UNDETAILED PORTION OF THE JOB INCLUDING OTHER AREAS
2. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR ANY
EXPENSE TO THE SATISFACTION OF THE CONTRACTING OFFICER.
DISMANTLING, DEMOLISHING, OR REMOVING AT THE CONTRACTOR'S
TO THEIR ORIGINAL CONDITIONS OF THE ITEMS DAMAGED BY
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR/RESTORATION
TO THE PROJECT CONTRACT.
TO ACCOMPLISH THE CIVIL SCOPE OF WORK AT NO ADDITIONAL COST
FORM ARE A PART OF THIS PROJECT. THE DETAILS WILL BE UTILIZED
OF THE REPLACEATION MANAGEMENT AGENCY, KOREA REGION OFFICE"
DRAWINGS, FOR OM&A PROJECTS, KOREA, OCTOBER 2003, DEPARTMENT
6. THE CIVIL STANDARD DRAWINGS SHOWN IN THE "STANDARD DETAIL
LOCATION PLAN
ITEMS WHICH WILL INTERFERE WITH THE REPLACEION OPERATIONS.
UNDER GROUND ROCK BASE, EXISTING UTILITY LINES, AND OTHER
CLEARED/REROUTED OF ALL NATURAL OBSTRUCTIONS, SUCH AS
5. THE SITE INDICATED ON THE DRAWINGS SHALL BE GRADED AND
ADDITIONAL COST.
EXISTING SITE CONDITIONS PRIOR TO START OF WORK AT NO
CHECK THE OTHER REPLACEION REQUIREMENTS IN MEETING THE
FOR GOOD SURFACE RUN-OFF DISCHARGE CONDITIONS AND ALSO
7. THE CONTRACTOR SHALL PERFORM TOPOGRAPHIC SURVEY TO VERIFY
CHOE, S M.
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
FORCE PROTECTION
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
AS SHOWN
12 CM
ST
ST
S T
P V C
.5
.9
W A
L L
GAL
6 PVC
ST
12 CM
ST
GRAVES
GRAVES
COVERED WITH TOP SOIL AND SOLID SODDED.
4. ALL UNPAVED AREAS WITHIN THE GRADING LIMIT LINES SHALL BE
REPRESENTATIVE.
A CLEAN CONDITION ACCEPTABLE TO THE OWNER OR OWNER'S
MATERIALS, EQUIPMENT AND DEBRIS AND LEAVE THE PREMISES IN
ALL TIMES AND AT COMPLETION OF WORK, REMOVE ALL SURPLUS
8. THE CONTRACTOR SHALL KEEP THE CONSTRUCTION AREA CLEAN AT
65-A
STREAM
227.5
J-4
ST
36 CM
W A
L L
W A
L L
WALL
W A
L L
WALL
228.4
ST
MATCH LINE 'C'
00-49341
3-48PN
00-49341
4-200PN
00-49341
4-200PN
01-49550
00-49341
LAUNDRY
KSC
PEST
647667
UTIL
B&G
WH-1
WH-2
DPW HQ
A
B
629 685
651A
833T
808 811
746 715 726
A B
00-49341
A
B
1149 1151
10291144
A
B
1918 1879
A
B
A
B
A
B
2372A
2373T
A C
2451 2400
A
B
A
B
2648 2605
2609T
2514 2540
8008T
2540T
26462645
1991 1963
A B
18331832
1962 1812
456A
CCTT
CCTT
SIMNET
463Z
SSSC
TSAK MILES 2000
549 546
8114T
560G
A B
86M
48T
A
B
39 55
134 133
186 192
202A
208 215 214
213 212
259 245
FOOT BR
VEH BR
FOOT BR
VEH BR
VEH BR
VEH BR
VEH BR
VEH BR 1821
VEH BR
VEH BR
VEH BR
VEH BR
FOOT BR
VEH BR
VEH BR
FOOT BR
FOOT BR
VEH BR
VEH BR
VEH BR
FOOT BR
FOOT BR
VEH BR
VEH BR
VEH BR
VEH BR
FOOT BR
1158A
1158B
RAILHEAD
.8
.5
S T
R C
T
M
S T
268.6
STREAM
DISCHARGE TO
65-A
STREAM
MATCH LINE 'C'
447A
F
F
497A
497B
458Z
2372?
QA00894-0J
QA00893-0J
QA00892-0J
ADMIN
EXER W/LAT
EXER W/LAT
QA00138-9J
QA01300-8J
00-54151 BUP 020122
00-54152 BUP 020122
00-54132 BUP 010801
00-54127 BUP 040430
00-54158 BUP 030104
00-54129 BUP 011109
00-54157 BUP AFTER 2026
00-54156 BUP 031030
00-54130 BUP 020330
00-54131 BUP 020929
00-54155 BUP 030506
03-57200 REPAIR 041007
99-47353
4-200PN
01-QA00604 BUP
XX-QA00606 BUP 0310XX
95-44142
4-184PN
95-44066
4-184PN
96-QA00466 BUP
95-44066
4-184PN
95-44066
4-184PN
95-44066
4-184PN
01-55893 BUP
99-QA00603 BUP
XX-QA00602 BUP 0310XX
99-47353
4-200PN
96-43269
4-184PN
97-44592
4-200PN
XX-QA00287 BUP
01-55894 BUP
99-51682
4-200PN
99-51820
3-48PN
97-44592
4-200PN
99-51682
4-200PN
99-51682
4-200PN
01-55882 BUP
A
B
A B
2022(?)
VEH BR
VEH BR
472?
455?
1839T
1840T
BARRIER
1564 1566
635A
2002B
A B
48A
A
B
A B
A B
A
B
A
B
A
B
174 Z
B A
S K
E T
B A
L L
O
U R
T
T E
N N I
U R
T
706(707A)
(2298)
1071?
A B
1760?
VEH BR?
VEH BR?
LOCATION PLAN AND GENERAL NOTES
243525
REPAIR BARRACKS S-1115
CIVIL
C-2
AS SHOWN
CHOE, S M.1
- 2
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
FORCE PROTECTION
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
LEGEND :
BUILDING
REMOVAL
CONC SIDEWALK/ PAD
TREE/ SHRUB
ELECTRICAL POLE
QTYNO. ITEM
REMOVAL SCHEDULE
REMOVAL PLAN
1 SIDEWALK
REMARK
208.0 SM
CAMP CASEY
1:250
0 8M642
SCALE: 1 / 250
WITH COR.
IN CASE OF DIFFERENT CONDITION, CONTRACTOR SHALL COORDINATE
2. CONTRACTOR SHALL CONFIRM THE UTILITIES BEFORE REMOVE.
THE CONTRACTOR SHALL VERIFY ACTUAL QUANTITIES.
1. QUANTITIES ARE REPLACED FOR THE CONTRACTOR'S CONVENIENCE,
NOTE:
REMOVAL PLAN
AC SURFACE COURSE
CON'C CURB
290.0 SM
127.0 LM
N
S -1115
BIN
TRASH
PUMP HOUSE
B
IK
E
S
H E
D
MECH ROOM
AC ROAD
TURF AREA
AC REMOVAL LIMIT LINE
REPAIR BARRACKS S-1115
243525
4 HANDRAIL
7.0 LM
CIVIL
AS SHOWN
CHOE, S M.
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
FORCE PROTECTION
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
SITE LAYOUT PLAN
- 4
SCOPE OF WORK
SCHEDULE #1 (REPAIR/MAINTENANCE)
CAMP CASEY
SCALE: 1 / 200
1:200
0 8M642
C-3
SITE LAYOUT PLAN AND SCOPE OF WORK
APPROX. 290.0 SM. SEE
REPLACE AC SURFACE COURSE,
APPROX. 215.0 SM. SEE
REPLACE 1.2M W SIDEWALK,
5.5
PARKING LINE, APPROX. 22.0 LM
PAINT 150MM THK REFLECTIVE WHITE
243525
N
S -1115
BIN
TRASH
PUMP HOUSE
B
IK
E
S
H E
D
MECH ROOM
AC ROAD
TURF AREA
CONSTRUCTION LIMIT LINE
CHILLER
APPROX. 40.0 LM. SEE
CON'C STEP AND BIKE SHED,
REPLACE HANDRAIL ON EXST
APPROX. 127.0 LM. SEE
REPLACE CON'C CURB W/ GRANITE CURB,
APPROX. 250.0 SM. SEE
RESTORE SOLID SODDING W/ TOP SOIL,
1. REPLACE CON'C CURB W/ GRANITE CURB.
2. REPLACE 1.2M W SIDEWALK.
3. REPLACE AC SURFACE COURSE.
4. PAINT 150MM THK REFLECTIVE WHITE PARKING LINE.
BIKE SHED.
5. REPLACE HANDRAIL ON EXST CON'C STEP AND
6. RESTORE SOLID SODDING W/ TOP SOIL.
REPAIR BARRACKS S-1115
SCALE: NONE
GRANITE CURB
SCALE: NONE
CON'C STEP W/ HANDRAIL
CIVIL
AS SHOWN
CHOE, S M.
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
FORCE PROTECTION
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
GRANITE CURB
CONCRETE 25-18-8
SUBGRADE
A
R
P
C P
A V
E M
E N
T
S E
C T
IO
N
SIDEWALK
COMPACTED BASE COURSE (NFSM)
MAX.
2,1
TYP
RISER
SEE TABLE
ABRASIVE AGGREGATE FINISH
HEAD CLEARANCE-"Y"
OF STEPS UNLESS OTHERWISE NOTED ON PLANS
HANDRAILS TO BE INSTALLED BOTH SIDES
WELLED ALL CONNECTION
SEE TABLE ON
DWG. NO. C0104
38mm STD. STEEL PIPE
,2
M A
X
SIDEWALK
BY CONTRACTING OFFICER TO CONFORM
PAINT HANDRAIL-COLOR TO BE CHOSEN
4 BARS @150 O.C.
13R
SEE DETAIL
4 BARS @300 O.C.
SEE DETAIL
SAFETY NOSING W/
CONC. STAIR
ABRASIVE SURFACE
ANCHOR PER
MFR STD.
SAFETY NOSING DETAILS
13 R
R
IS
E R 2
TREAD
EPOXY CAULKING
POST DETAIL
2A 2B
2A
2B
STOOP
DRILL & GROUT DOWEL
@ 300 OC
25mm DIA X 400mmL
1,200
W/ SEALANT
13mm JOINT FILLER
,2
M A
X
CAMP CASEY
C
EXISTING SUBGRADE
TACK COAT
EXISTING BASE COURSE
VARIES
TO REMAIN
TO REMAIN
NOT TO SCALE-
EXISTING PCC PAVEMENT
OVERLAY 40mmTHK. AC PAVEMENT
SCALE: NONE
SOLID SODDING
JOINT
SEALER
JOINT
FILLER
R=3
TYP
R=3
TYP
TRANSVERSE CONTRACTION JOINTS
SHALL BE SPACED SO THAT RATIO
OF SLAB LENGTH TO WIDTH WILL
NOT EXCEED 1.25. THE DEPTH OF
THE CONTRACTION JOINT WILL BE
AT LEAST ONE-FOURTH OF THE
SIDEWALK SLAB THICKNESS,BUT NOT
LESS THAN THE MAXIMUM NOMINAL
SIZE OF THE AGGREGATE USED.
PROVIDE EXP JOINTS AT MAX 9.0 M
INTERVALS FOR STRAIGHT SECTIONS,
AT ALL RETURNS OF WALKS,
AND WHERE WALKS ABUT OTHER
CONCRETE STRUCTURES.
BROOM
FINISH FIN GRADE
3A S E C T I O N
3B
EXPANSION JOINT
3C
CONTRACTION JOINT
COMPACTED
NON-FROST-SUSCEPTIBLE
MATERIAL BASE
0.06
#8-150X150 WWF
SCALE: NONE
SIDEWALK
BLANKET
SOLID SOD
50 THK MIN
TOP SOIL
100 THK MIN
COMPACTED SUBGRADE
SCARIFIED AND
MILLING & OVERLAY
REPAIR BARRACKS S-1115
243525
C-4
5 MISC. DETAILS
| 243525-C1 |
| 243525-C2 |
| 243525-C3 |
| 243525-C4 |
File details come from the government source that posted it. Updated .