0011227988

Repair Operation facilities in Ammunition Holding Area (AHA) No. 23 (Building No. 228, 229, 230, 231, 232, 233, 237, 238, 245, 246, 247) at Camp Casey (PROJECT# 186681)

1. This is a Request for Proposal (RFP) issued to existing General Construction Multiple Aw ard Indefinite Delivery Indefinite Quantity (IDIQ) holding contract number(s) listed below ; Contract Numbers W91QVN-18-D-0021, 0022, 0023, 0024, 0025, 0026, 0027, 0028, 0030, 0031, 0032, 0033, 0034, 0035, 0040, 0042, 0043, 0044, 0045, 0046, 0047, 0048, 0049, 0050, 0051 and 0162.

2. Site Visit: All MATOC contractors w ho intend to propose on this solicitation are strongly recommended to attend the Site Visit. See Section L for the schedule.

3. If the contractor is unable to submit the proposal in response to this solicitation, the Contractor shall submit the "NO OFFER LETTER" by date and time specif ied in this solicitation.

MR. OM, IK-CHUNG 315-730-4262

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

27-Aug-2018

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________150 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________Section F

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

YES X NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________05 Sep 2018 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, X is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______180 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

411TH CSB, KOREA - IMB

UNIT#15289

APO AP 96205

W91QVN

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

01:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: 724-6977 TEL: FAX:

W91QVN18R0249 25

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W91QVN18R0249

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job Repair Operation Facilities in AHA No.23

FFP

K WORK

PROJECT#: 186681

Repair Operation facilities in Ammunition Holding Area (AHA) No. 23 (Building No. 228, 229, 230, 231, 232, 233, 237, 238, 245, 246, 247) at Camp Casey See attached the Statement of Work, Submittal Register and Drawings.

FOB: Destination

PURCHASE REQUEST NUMBER: 0011227988

PSC CD: Z2AA

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0002 1 Lot War Hazard

FFP

Estimated Cost for War Hazard Losses is Zero (0) FOB: Destination

PSC CD: Z2AA

NET AMT

Section C - Descriptions and Specifications

STATEMENT OF WORK

TECHNICAL PROVISIONS - I

STATEMENT OF WORK

PROJECT NO TITLE LOCATION

186681 Repair operation facilities in AHA No. 23 Camp Casey

(Building No. 228, 229, 230, 231, 232, 233, 237, 238, 245, 246, 247)

1. DESCRIPTION: The work to be performed to repair operation facilities in AHA No. 23 is described below and executed by one or more of the groups.

1.1. Work by Contractor: The contractor shall provide all labor, tools, equipment, supplies and any other resources necessary to accomplish the scope of work contained herein as indicated in the drawings and in accordance with the specifications.

1.2. Work by In-House Labor: Not applicable to this project.

1.3. Work by Troop Labor: Not applicable to this project.

2. PRINCIPAL FEATURES: This project includes the following principal features:

2.1. Schedule #I, Repair (K): All work shall be in accordance with the attached drawings and specifications.

2.1.1. Building No. 246

2.1.1.1. Architectural Work

2.1.1.1.1. Replace existing floor tile with new Polyvinyl Chloride Tile (PVCT) including Vinyl Cove Base (VCB) as shown on floor plan and interior finish schedule. The existing concrete flooring shall be smooth, true, level plane with all defects such as rough or scaling concrete, low spots, high spots, painting, and uneven surface shall have been corrected for new flooring. Provide leveling concrete for existing concrete slab with government approval. (Drawing No. A-1,A-2,A-4,A-8)

2.1.1.1.2. Replace existing all Gypsum Wall Board (GWB) walls with new including metal studs and insulation as shown on floor plan, sections and detail drawings. (Drawing No. A-1,A-2,A-4,A-8)

2.1.1.1.3. Replace existing ceiling with new GWB (Normal, Water resistant or 'X' type) ceiling including ceiling suspension system as shown on floor plan and finish schedule. (Drawing No. A-1,A- 2,A-4,A-8)

2.1.1.1.4. Replace existing rain gutters and downspouts with new including concrete splash blocks as shown on floor plan and detail drawings. (Drawing No. A-1,A-2,A-3,A-7)

2.1.1.1.5. Replace existing Floor Ceramic Tile (FCT) and Glazed Ceramic Wall Tile (GCWT, Full height) with new including bond coats, plastering including metal lath, and cement boards as shown on floor plan and detail drawings. (Drawing No. A-1,A-2,A-4,A-5,A-8)

2.1.1.1.6. Replace existing ceiling with new acoustical ceiling tile including metal suspension systems as shown on interior finish schedule. (Drawing No. A-1,A-2,A-4,A-8)

2.1.1.1.7. Replace interior and exterior signages with new for all rooms as shown on signage schedule. (Drawing No. A-1,A-2,A-3,A-10)

2.1.1.1.8. Paint all interior surfaces including ceiling and wall as shown on interior finish schedule.

2.1.1.1.9. Apply acrylic fluid-applied waterproofing coating on existing roof as shown on floor plan and sections.

2.1.1.1.10. Replace existing doors and door frames with new including new hardware sets as shown on new floor plan and door schedule. (Drawing No. A-1,A-2,A-3,A-9)

2.1.1.1.11. Replace existing wooden sill for all windows with new as shown on floor plan and detail drawing. (Natural color, Oak) (Drawing No. A-1,A-2,A-3,A-9)

2.1.1.1.12. Replace existing window security bars with painting as shown on floor plan and elevations. (Drawing No. A-1,A-2,A-3,A-9)

2.1.1.1.13. Replace existing window horizontal mini blinds with news, fireproof type. (Drawing No. A- 1,A-2,A-3,A-9)

2.1.1.1.14. Replace existing windows including insect screen with new aluminum thermal breaker type blast windows including 8.75mm thickness clear laminated glass + 12mm thickness air space + 6mm thickness tinted low-e tempered glass (Solar Heat Gain Coefficient (SHGC): max 0.4) as shown on floor plan and window schedule. (Drawing No. A-1,A-2,A-3,A-9)

2.1.1.1.15. Replace existing all toilet accessories with new as shown on floor plan and detail drawings. (Drawing No. A-1,A-2,A-5)

2.1.1.1.16. Paint all existing exterior exposed Exterior Insulation and Finish System (EIFS), metal, woods, concrete surfaces, fascia, soffit, hand rails and other components of exterior surface of the building as shown on floor plan and exterior elevation.

2.1.1.1.17. Replace existing Fire Extinguisher Cabinet (FEC) with new as shown on new floor plan and detail drawing. (Drawing No. A-1,A-2,A-7)

2.1.1.1.18. Replace existing concrete slab with new for replacing mechanical piping work. (Drawing No. A-1,A-2)

2.1.1.1.19. Replace existing kitchenette including base cabinet and upper cabinet with new as shown on floor plan and elevation. (Drawing No. A-1,A-2,A-6)

2.1.1.1.20. Replace existing bulletin boards with new as shown on floor plan, elevations, and interior finish schedule. (Drawing No. A-1,A-2,A-4,A-8)

2.1.1.2. Mechanical Work

2.1.1.2.1. Replace existing oil type domestic hot water heater with electric type domestic hot water heater and associated piping. (Drawing No. M-2,M-3,M-4,M-5,M-6)

2.1.1.2.2. Replace existing electric unit heater with new. (Drawing No. M-2,M-3,M-4,M-5,M-6)

2.1.1.2.3. Replace existing roof exhaust fan, ceiling fans, control, and associated ducts with new.

(Drawing No. M-2,M-3,M-4,M-5,M-6)

2.1.1.2.4. Remove and reinstall existing heat pump system, control and associated piping.

2.1.1.2.5. Remove existing fuel oil storage tank, dike and associated oil piping.

2.1.1.2.6. Replace existing plumbing fixtures and associated hot water, cold water, sewer, and vent piping with new. (Drawing No. M-2,M-4,M-5,M-6)

2.1.1.3. Electrical Work

2.1.1.3.1. Replace existing lighting fixtures, exit lights, exterior lights, toggle switches, wires and conduits with new. (Drawing No. E-1, E-2, E-3, E-4)

2.1.1.3.2. Replace existing panel boards, receptacles including cover plates, associated wiring and conduits with new. (Drawing No. E-1, E-5)

2.1.1.3.3. Replace existing control and power wires and conduits for mechanical system with new.

(Drawing No. E-1, E-5)

2.1.1.3.4. Replace fire alarm control system with new addressable fire alarm control and mass notification system panel, manual pull station, smoke detector and relay module, building transmitter, antenna, visual and signal strobes , microphone, speaker device, and associated wiring and conduit.

(Drawing No. E-1,E-6)

2.1.1.3.5. Replace existing telecommunication system including telephone terminal cabinet, telephone outlets including cover plates, terminal blocks, accessories, and associated wire and conduit with new. (Drawing No. E-1,E-6)

2.1.2. Building No. 247

2.1.2.1. Architectural Work

2.1.2.1.1. Replace existing floor tile with new PVCT including VCB as shown on floor plan and interior finish schedule. The existing concrete flooring shall be smooth, true, level plane with all defects such as rough or scaling concrete, low spots, high spots, painting, and uneven surface shall have been corrected for new flooring. Provide leveling concrete for existing concrete slab with government approval. (Drawing No. A-1,A-3)

2.1.2.1.2. Replace rain gutters and downspouts with new including concrete splash blocks as shown on floor plan and detail drawings. (Drawing No. A-1,A-2,A-3)

2.1.2.1.3. Replace existing ceiling with new acoustical ceiling tile including metal suspension systems as shown on interior finish schedule. (Drawing No. A-1,A-3)

2.1.2.1.4. Replace exterior signages with new for all rooms as shown on detail drawing. (Drawing No. A-1,A-2,A-3)

2.1.2.1.5. Paint all interior surfaces including ceiling and wall as shown on interior finish schedule.

2.1.2.1.6. Replace existing doors and door frames with new including new hardware sets as shown on new floor plan and door schedule. (Drawing No. A-1,A-2,A-4)

2.1.2.1.7. Apply epoxy coating on existing concrete slab including non-slip abrasive grain finish as shown on floor plan, sections, and finish schedule.

2.1.2.1.8. Replace existing window horizontal mini blinds with news, fireproof type. (Drawing No. A- 1,A-2,A-4)

2.1.2.1.9. Replace existing windows including insect screen and security bar with new aluminum thermal breaker type blast windows including 8.75mm thickness clear laminated glass + 12mm thickness air space + 6mm thickness tinted low-e tempered glass (SHGC: max 0.4) as shown on floor plans and window schedule. (Drawing No. A-1,A-2,A-4)

2.1.2.1.10. Replace existing FEC with new as shown on new floor plans and detail drawing. (Drawing No. A-1)

2.1.2.1.11. Paint existing guard posts as shown on floor plan and elevations.

2.1.2.1.12. Apply acrylic fluid-applied waterproofing coating on existing roof as shown on floor plan and elevations.

2.1.2.1.13. Replace existing roll up doors with new thermal insulated galvanized steel roll up doors including motors, emergency manual chains, steel guide rails, casing hood and accessories as shown on floor plan, picture, door schedule and detail drawing. (Drawing No. A-1,A-2,A-4)

2.1.2.1.14. Paint all existing exterior exposed EIFS, Concrete Masonry Unit (CMU), metal, woods, concrete surfaces, fascia, soffit of the building as shown on floor plan and elevations.

2.1.2.1.15. Replace existing window security bars with painting as shown on floor plan, picture, and elevations. (Drawing No. A-1,A-2,A-4)

2.1.2.1.16. Replace existing louver as shown on floor plan, pictures and elevation. (Drawing No. A- 1,A-2,A-4)

2.1.2.2. Mechanical Work

2.1.2.2.1. Replace existing electric unit heater with new. (Drawing No. M-2,M-3,M-4,M-5)

2.1.2.2.2. Replace existing wall exhaust fan and control with new. (Drawing No. M-2,M-3,M-4,M-5)

2.1.2.2.3. Replace existing louver and motorized damper with new. (Drawing No. M-2,M-4,M-5)

2.1.2.3. Electrical Work

2.1.2.3.1. Replace existing lighting fixtures, exit lights, exterior lights, and toggle switches with new.

(Drawing No. E-1, E-2)

2.1.2.3.2. Replace existing receptacles including cover plates and manual motor starter with new.

(Drawing No. E-1, E-2)

2.1.2.3.3. Replace fire alarm control system with new addressable fire alarm control and mass notification system panel, manual pull station, smoke detector and relay module, building transmitter, antenna, visual and signal strobes , microphone, speaker device, and associated wiring and conduit.

(Drawing No. E-1, E-3)

2.1.3. Building No. 237 and 238

2.1.3.1. Architectural Work

2.1.3.1.1. Apply epoxy paint with non-slip grits on existing concrete pad as shown on floor plan, sections, and interior finish schedule.

2.1.3.1.2. Paint all interior surfaces including ceiling, wall and guard post as shown on floor plan, interior finish schedule and section.

2.1.3.1.3. Replace exterior signages with new as shown on floor plan, elevations and signage schedule. (Drawing No. A-1,A-2)

2.1.3.1.4. Replace existing doors and door frames with new including hardware sets as shown on floor plan and door schedule. (Drawing No. A-1,A-3)

2.1.3.1.5. Replace existing aluminum louver with new as shown on floor plan, section and door and window schedule. (Drawing No. A-1,A-3)

2.1.3.1.6. Paint all exterior surface as shown on floor plan and elevations.

2.1.3.1.7. Replace existing FEC with new as shown on floor plan and details. (Drawing No. A-1,A-2)

2.1.3.1.8. Apply acrylic fluid-applied waterproof coating on existing roof as shown on floor plan and elevations including repair minor damages of roof prior to finish.

2.1.3.1.9. Replace existing rain gutters and downspouts with new including concrete splash blocks as shown on floor plan, elevations, and detail drawings. (Drawing No. A-1,A-2)

2.1.3.1.10. Replace existing concrete ramp with new as shown on floor plan, section, and pictures.

(Drawing No. A-1)

2.1.3.1.11. Replace existing guard post (exterior only) with new as shown on floor plan, section, and pictures. (Drawing No. A-1)

2.1.3.2. Electrical Work

2.1.3.2.1. Replace existing lighting fixtures, exterior lights, toggle switches with new. (Drawing No. E- 1)

2.1.4. Building No. 232 and 245

2.1.4.1. Architectural Work

2.1.4.1.1. Replace exterior signages with new as shown on floor plan and signage detail. (Drawing No. A-1)

2.1.4.1.2. Paint all steel structures as shown on floor plan and pictures.

2.1.4.1.3. Apply acrylic fluid-applied waterproof coating on existing roof as shown on floor plan and elevations including repair minor damages of roof prior to finish.

2.1.4.1.4. Replace existing rain gutters with new as shown on floor plan, pictures and detail drawings. (Drawing No. A-1)

2.1.4.2. Electrical Work

2.1.4.2.1. Replace existing lighting fixtures, toggle switches with new. (Drawing No. E-1)

2.1.4.2.2. Replace existing power receptacle with new. (Drawing No. E-1)

2.1.5. Building No. 228

2.1.5.1. Architectural Work

2.1.5.1.1. Replace exterior signages with new as shown on floor plan and signage detail. (Drawing

2.1.5.1.2. Paint all steel structures as shown on floor plan and pictures.

2.1.5.1.3. Apply acrylic fluid-applied waterproof coating on existing roof as shown on floor plan and elevations including repair minor damages of roof prior to finish.

2.1.5.2. Electrical Work

2.1.5.2.1. Replace existing lighting fixtures, toggle switches with new. (Drawing No. E-1)

2.1.6. Building No. 229, 230, and 233

2.1.6.1. Architectural Work

2.1.6.1.1. Replace exterior signages with new as shown on floor plan and signage detail. (Drawing

2.1.6.1.2. Paint all steel structures as shown on floor plan and pictures.

2.1.6.1.3. Apply acrylic fluid-applied waterproof coating on existing roof as shown on floor plan and

2.1.6.2. Electrical Work

2.1.6.2.1. Replace existing lighting fixtures, toggle switches with new. (Drawing No. E-1)

2.1.7. Building No. 231

2.1.7.1. Architectural Work

2.1.7.1.1. Replace exterior signages with new as shown on floor plan and signage detail. (Drawing

2.1.7.1.2. Paint all steel structures as shown on floor plan and pictures.

2.1.7.1.3. Apply acrylic fluid-applied waterproof coating on existing roof as shown on floor plan and

2.1.7.2. Electrical Work

2.1.7.2.1. Replace existing lighting fixtures, toggle switches with new. (Drawing No. E-1)

2.1.7.2.2. Replace existing power receptacle with new. (Drawing No. E-1)

2.2. Schedule #II, New Construction (L): All work shall be in accordance with the attached drawings and specifications.

None

TECHNICAL PROVISIONS - II

TECHNICAL DETAIL SPECIFICATIONS

GENERAL: The specification sections listed below are applicable to this project. The specifications are from the “Standard Technical Specifications for O&MA Projects, Korea, Revision 1” (2014 OMA SPECS, REVISION 1), dated 20151030, located on the http://www.usfk.mil/Portals/105/Documents/Contracting/NewContract/2014-OMA-SPECS_REVISION- 1.pdf. The electronic version of the specifications is Acrobat® PDF format and can be read with the Acrobat Reader® software.

Changes to the Standard Technical Detail Specifications: None

TECHNICAL PROVISIONS - III

SPECIAL CONDITIONS

1. Material Approval Submittal: The contractor shall submit a shop drawing submittal schedule and the material approval request with all supporting documents to the COR within 7 days after receipt of NTP.

2. The contractor shall have personnel on site for the fire alarm work upon Government's direction, who are certified by the National Institute for Certification in Engineering Technologies (NICET) Level III or equivalent. Equivalent Certificate in Korea is the following which is issued by the Human Resource Development Service of Korea. If the contractor doesn’t have personnel who are certified by NICET, the contractor shall have personnel who are certified for (1) below.

(1) Engineer Fire Fighting Facilities - Electrical (소방설비기사 -전기)

3. Environmental Requirements in Contract

The Contractor shall perform work consistent with the relevant policy and objectives identified in Installation’s Environmental Management System (EMS). The Contractor shall perform work in a manner that conforms to all appropriate Environmental Management Programs and Operational Controls identified by Installation’s EMS, including pollution prevention, waste reduction, energy use, and natural resource protection. The Contractor shall provide monitoring and measurement information as necessary for the organization to address environmental performance relative to the environmental, energy, and transportation management goals. In addition, the Contractor shall advise their employees of their roles and responsibilities identified by the EMS and how these requirements affect their work performed under this contract. The Contractor is responsible for ensuring that the Contractor and any persons involved in the supervision or performance of the contract complete all required Environmental training.

In the event of any environmental nonconformance or noncompliance associated with the contracted services, the contractor shall take corrective and/or preventative actions. In the event of any noncompliance with any federal, state, or local environmental law, regulation or requirement, the Contractor shall immediately respond by taking all appropriate corrective actions and notifying the Contracting Officer’s Representative (COR) and the Environmental Office. For any nonconformance with the EMS, the Contractor shall take corrective action and initiate further preventative action, as required by the Environmental Office.

All on-site contractor personnel shall complete necessary safety and environmental training specified for the type of work conducted on-site. Upon contract award, the COR will notify the EMS Manager to arrange Environmental training for appropriate staff.

Additionally, when ordering supplies for use on Installation, all contractor personnel must favor energy-efficient, recycled or reclaimed material whenever practicable.

The responsibilities of all contractor personnel include:

(1) Comply with all applicable environmental laws, regulations and installation environmental policies.

(2) Control and prevent spills or hazardous substances releases IAW installation Spill Prevention

Plan.

(3) Ensure dust, debris, materials, trash, etc., do not become air borne and travel off the project site.

(4) Do not remove, cut, deface, injure, or destroy land resources including trees, shrubs, vines, topsoil and land forms without approval, except in areas indicated on the drawings or specified to be cleared.

(5) Monitor all water areas affected by construction activities to prevent pollution of surface and ground waters. Do not apply toxic or hazardous chemicals to soil or vegetation unless otherwise indicated.

(6) Open burning is prohibited on the Government premises IAW installation environmental policy.

(7) Participate in installation’s recycling program.

(8) Reducing the amount of hazardous material and/or solvent used by purchasing fewer hazardous materials and by increasing the use of products with recycled content. Spills of hazardous or toxic materials must be immediately reported to the Contracting Officer and the Environmental Office.

Storage, describing, packaging, labeling, marking and placarding of hazardous waste and hazardous material IAW applicable environmental laws, regulations and local environmental policies. Transport hazardous waste off Government property and dispose of it in compliance with National, Provincial, and/or Local requirements for solid waste disposal.

(9) Reducing the amount of solid waste from construction and demolition debris, and scrap metal sent to municipal and rubble landfills by reducing, reusing, and recycling. Handling, storage, and disposal of solid waste must be conducted to prevent contamination. Transport solid waste off Government property and dispose of it in compliance with National, Provincial, and/or Local requirements for solid waste disposal.

(10) Conserving energy and water usage by turning off lights and equipment when not in use and using only the necessary amount of water needed to complete the required tasks. Continuous conservation of our natural resources is a must.

(11) When potential cultural or historic items are inadvertently found during construction activities, immediately cease activities in the vicinity of the discovery and report the findings to the Environmental Office.

(12) Participate in installation’s Integrated Pest Management (IPM) program whenever practicable.

(13) Minimize interference with disturbance to, and damage to fish, wildlife, and plants including their habitat.

4. CONTRACT REQUIREMENTS PACKAGE ANTITERRORISM/OPERATIONS SECURITY REVIEW

COVER SHEET

After Notice to process is issued, COR shall take following action, Section IV. Standard Contract Language/Contract Clause Applicability and/or Additional SOW Language.

A. Access and general protection/security policy and procedures. This standard language is for contractor employees with an area of performance within Army controlled installation, facility, or area.

Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

A-a. For contractors that do not require CAC, but require access to a DoD facility or installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

B. For Contract Requiring Performance or Delivery in a Foreign Country, DFARS Clause 252.225- 7043, Antiterrorism/Force Protection for Defense Contractors Outside the US. The clause shall be used in solicitations and contracts that require performance or delivery in a foreign country. This clause applies to both contingencies and non-contingency support. The key AT requirement is for non-local national contractor personnel to comply with theater clearance requirements and allows the combatant commander to exercise oversight to ensure the contractor’s compliance with combatant commander and subordinate task force commander policies and directives.

Section G - Contract Administration Data

CLAUSES INCORPORATED BY FULL TEXT

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 150 days after Notice to proceed (NTP) is issed.

* The time stated for completion shall include final cleanup of the premises.

(End of clause)

Section J - List of Documents, Exhibits and Other Attachments

DRAWING INFORMATION

APPENDIX "A"

LIST OF APPLICABLE CONTRACT DRAWINGS

GENERAL: The work shall conform to the following contract drawings and OMA standard detail drawings, 2014 (dated 30 November 2015), issued by the Department of the Army, Installation Management Agency, Korea Region Office and located on http://www.usfk.mil/Portals/105/Documents/Contracting/NewContract/STANDARD-DETAIL-DRAWINGS- FOR-OMA-PROJECTS-KOREA_20151130.pdf, all of which form a part of the specifications.

Ring No. Sheet No. Description Date

1 T-1 TITLE SHEET - 1 20 JUL 18

2 T-2 TITLE SHEET - 2 20 JUL 18

3 C-1 LOCATION MAP 20 JUL 18

BUILDING NO. 246

ARCHITECTURAL

4 A-1 EXISTING/REMOVAL FLOOR PLAN AND GENERAL

NOTES

20 JUL 18

5 A-2 GROUND FLOOR PLAN & SCOPE OF WORK 20 JUL 18

6 A-3 ELEVATIONS 20 JUL 18

7 A-4 INTERIOR WALL SECTION 20 JUL 18

8 A-5 ENLARGED TOILET FLOOR PLAN & INTERIOR

ELEVATIONS

20 JUL 18

9 A-6 ENLARGED FLOOR PLAN, INTERIOR ELEVATIONS

AND DETAIL

20 JUL 18

10 A-7 MISC DETAILS 20 JUL 18

11 A-8 INTERIOR, EXTERIOR FINISH SCHEDULE AND

MATERIAL & COLOR SCHEDULE

20 JUL 18

12 A-9 DOOR, WINDOW SCHEDULE AND HARDWARE

SCHEDULE

20 JUL 18

13 A-10 SIGNAGE PLAN AND SCHEDULE 20 JUL 18

MECHANICAL

14 M-1 MECHANICAL MATERIAL INDICATIONS & SYMBOLS

AND ABBREVIATIONS

15 M-2 GENERAL NOTES AND SCOPE OF WORK 20 JUL 18

16 M-3 MECHANICAL EQUIPMENT SCHEDULE 20 JUL 18

17 M-4 REMOVAL FLOOR PLAN AND SPECIFIC NOTES 20 JUL 18

18 M-5 HVAC FLOOR PLAN 20 JUL 18

19 M-6 PLUMBING PARTIAL FLOOR PLAN, PUMBING

FIXTURE SCHEDULE, NOTES AND WATER HAMMER

ARRESTER SCHEDULE

20 M-7 DETAILS 20 JUL 18

ELECTRICAL

21 E-1 LEGEND, GENERAL NOTES AND SCOPE OF WORK 20 JUL 18

22 E-2 NEW LIGHTING SYSTEM PLAN 20 JUL 18

23 E-3 LIGHTING FIXTURE DETAILS 20 JUL 18

24 E-4 LIGHTING FIXTURE SCHEDULE 20 JUL 18

25 E-5 NEW POWER SYSTEM PLAN & NEW PANELBOARD

"AB" LOAD SCHEDULE

20 JUL 18

26 E-6 NEW FIRE ALARM/MASS NOTIFICATION SYSTEM/TEL

PLAN

BUILDING NO. 247

27 A-1 GROUND FLOOR PLAN, PICTURES & SCOPE OF

WORK

20 JUL 18

28 A-2 ELEVATIONS 20 JUL 18

29 A-3 INTERIOR FINISH SCHEDULE, MATERIAL & COLOR

SCHEDULE, AND DETAILS

20 JUL 18

30 A-4 DOOR, WINDOW SCHEDULE, HARDWARE

SCHEDULE, DOOR/WINDOW NOTES AND ROLL UP

DOOR NOTES

MECHANICAL

31 M-1 MECHANICAL MATERIAL INDICATIONS & SYMBOLS

AND ABBREVIATIONS

20 JUL 18

32 M-2 GENERAL NOTES AND SCOPE OF WORK 20 JUL 18

33 M-3 MECHANICAL EQUIPMENT SCHEDULE 20 JUL 18

34 M-4 REMOVAL FLOOR PLAN AND SPECIFIC NOTES 20 JUL 18

35 M-5 HVAC FLOOR PLAN 20 JUL 18

36 E-1 GROUND FLOOR LIGHTING/POWER PLAN & SCOPE

OF WORK

20 JUL 18

37 E-2 LIGHTING FIXTURE DETAILS AND SCHEDULE 20 JUL 18

38 E-3 NEW FIRE ALARM AND MNS SYSTEM PLAN FOR

BUILDING S-247

BUILDING NO. 237 AND 238

39 A-1 GROUND FLOOR PLAN, CROSS SECTION, PICTURES

& SCOPE OF WORK

20 JUL 18

40 A-2 DETAILS 20 JUL 18

41 A-3 INTERIOR FINISH SCHEDULE, MATERIAL & COLOR

SCHEDULE AND WINDOW SCHEDULE AND

HARDWARE SCHEDULE

42 E-1 NEW LIGHTING SYSTEM PLAN, SCOPE OF WORK &

LIGHTING DETAIL

BUILDING NO. 232 AND 245

43 A-1 GROUND FLOOR PLAN, PICTURES, DETAILS &

SCOPE OF WORK

44 E-1 NEW LIGHTING SYSTEM PLAN, SCOPE OF WORK &

LIGHTING DETAIL

BUILDING NO. 228

45 A-1 GROUND FLOOR PLAN, PICTURES, DETAILS &

46 E-1 NEW LIGHTING SYSTEM PLAN FOR BUILDING S-228 20 JUL 18

BUILDING NO. 229, 230, AND 233

47 A-1 GROUND FLOOR PLAN, PICTURES, DETAILS &

48 E-1 NEW LIGHTING SYSTEM PLAN FOR BUILDING S-229,

230 & 233

BUILDING NO. 231

49 A-1 GROUND FLOOR PLAN, PICTURES, DETAILS &

50 E-1 NEW LIGHTING SYSTEM PLAN FOR BUILDING S-231 20 JUL 18

Section K - Representations, Certifications and Other Statements of Offerors

52.203-2 CERTIFICATE OF INDEPENDENT PRICE DETERMINATION (APR 1985)

(a) The offeror certifies that --

(1) The prices in this offer have been arrived at independently, without, for the purpose of restricting competition, any consultation, communication, or agreement with any other offeror or competitor relating to –

(i) Those prices,

(ii) The intention to submit an offer, or

(iii) The methods of factors used to calculate the prices offered:

(2) The prices in this offer have not been and will not be knowingly disclosed by the offeror, directly or indirectly, to any other offeror or competitor before bid opening (in the case of a sealed bid solicitation) or contract award (in the case of a negotiated solicitation) unless otherwise required by law; and

(3) No attempt has been made or will be made by the offeror to induce any other concern to submit or not to submit an offer for the purpose of restricting competition.

(b) Each signature on the offer is considered to be a certification by the signatory that the signatory --

(1) Is the person in the offeror's organization responsible for determining the prices offered in this bid or proposal, and that the signatory has not participated and will not participate in any action contrary to subparagraphs (a)(1) through (a)(3) of this provision; or

(2) (i) Has been authorized, in writing, to act as agent for the following principals in certifying that those principals have not participated, and will not participate in any action contrary to subparagraphs (a)(1) through (a)(3) of this provison ______________________________________________________ (insert full name of person(s) in the offeror's organization responsible for determining the prices offered in this bid or proposal, and the title of his or her position in the offeror's organization);

(ii) As an authorized agent, does certify that the principals named in subdivision (b)(2)(i) above have not participated, and will not participate, in any action contrary to subparagraphs (a)(1) through (a)(3) above; and

(iii) As an agent, has not personally participated, and will not participate, in any action contrary to subparagraphs (a)(1) through (a)(3) of this provision.

(c) If the offeror deletes or modifies subparagraph (a)(2) of this provision, the offeror must furnish with its offer a signed statement setting forth in detail the circumstances of the disclosure.

(End of Provision)

52.209-11 REPRESENTATION BY CORPORATIONS REGARDING DELINQUENT TAX LIABILITY OR A

FELONY CONVICTION UNDER ANY FEDERAL LAW (FEB 2016)

(a) As required by sections 744 and 745 of Division E of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235), and similar provisions, if contained in subsequent appropriations acts, the Government will not enter into a contract with any corporation that--

(1) Has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability, where the awarding agency is aware of the unpaid tax liability, unless an agency has considered suspension or debarment of the corporation and made a determination that suspension or debarment is not necessary to protect the interests of the Government; or

(2) Was convicted of a felony criminal violation under any Federal law within the preceding 24 months, where the awarding agency is aware of the conviction, unless an agency has considered suspension or debarment of the corporation and made a determination that this action is not necessary to protect the interests of the Government.

(b) The Offeror represents that--

(1) It is [ ] is not [ ] a corporation that has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability; and

(2) It is [ ] is not [ ] a corporation that was convicted of a felony criminal violation under a Federal law within the preceding 24 months.

(End of provision)

252.209-7999 Representation by Corporations Regarding an Unpaid Delinquent Tax Liability or a Felony Conviction under any Federal Law

REPRESENTATION BY CORPORATIONS REGARDING AN UNPAID DELINQUENT TAX LIABILTIY

OR A FELONY CONVICTION UNDER ANY FEDERAL LAW (DEVIATION 2012-00004) (JAN 2012)

(a) In accordance with sections 8124 and 8125 of Division A of the Consolidated Appropriations Act, 2012, (Pub. L. 112-74) none of the funds made available by that Act may be used to enter into a contract with any corporation that-

(1) Has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability, where the awarding agency is aware of the unpaid tax liability, unless the agency has considered suspension or debarment of the corporation and made a determination that this further action is not necessary to protect the interests of the Government.

(2) Was convicted of a felony criminal violation under any Federal law within the preceding 24 months, where the awarding agency is aware of the conviction, unless the agency has considered suspension or debarment of the corporation and made a determination that this action is not necessary to protect the interests of the Government.

(b) The Offeror represents that –

(1) It is ( ) is not ( ) a corporation that has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with authority responsible for collecting the tax liability,

(2) It is ( ) is not ( ) a corporation that was convicted of a felony criminal violation under a federal law within the preceding 24 months.

(End of provision)

5152.204-4032 REPRESENTATIONS AND CERTIFICATIONS

(a) SUBCONTRACTING:

If the offeror contemplates subcontracting, it must obtain prior written approval of subcontractor from the PCO or ACO, and list below: (1) the names and addresses of the subcontractor(s), (2) the type of subcontracting, and (3) the estimated price for each subcontract.

(b) AFFILIATED OFFERORS:

(1) Business concerns are affiliates of each other when, either directly or indirectly, one concern controls or has the power to control the other, or a third party controls or has the power to control both.

(2) Each offeror shall furnish, below, the following information:

(i) Whether the offeror has any affiliates;

(ii) The names and addresses of all affiliates of the offeror; and

(iii) The names and addresses of all persons and concerns exercising control or ownership of the offeror and any or all of its affiliates, and whether they are common officers, directors, stockholders holding controlling interest, or otherwise.

AFFILIATED CONCERNS. : (Name, location and, in detail, controlling interest in each)

(c) PRINCIPAL OWNER(S) OR STOCKHOLDER(S):

Each offeror shall list below the name(s) and address(es) of the principal owner(s) or stockholder(s) of the company and percentage of ownership. If a major portion is publicly traded and/or otherwise widely distributed, state that, with the percentage so affected.

(d) STANDARDS OF CONDUCT CERTIFICATION:

This is to certify that, to the best of my knowledge and belief, except as described below, no representative of this firm who deals with US Government employees on any aspect of this procurement is a former US Government employee, to include former US military personnel. I understand that this certification is continuing in nature and places a duty on me and my firm to notify the Contracting Officer of any additional individual(s) who fit the above description prior to the individual's assuming duties.

(i) Name ______________________________________________ Former rank/grade ____________________________________ Last US Government position ___________________________

(ii) Name ______________________________________________ Former rank/grade ____________________________________ Last US Government position ___________________________

(iii) Name ______________________________________________ Former rank/grade ____________________________________ Last US Government position ___________________________

Firm ____________________________________________________ Name _____________________________________________________ Signature __________________________________________________

Title _____________________________________________________ Date of Execution ____________________________________________

(e) TAXES:

(1) References:

(i) Contract clause entitled "FAR 52.229-06 Taxes—Foreign Fixed-Price Contracts (Jan 1991)."

(ii) US-ROK Status of Forces Agreement (SOFA), Articles IX and XVI.

(iii) ROK Customs Law, Law No. 1976, promulgated on 29 November 1967, as amended.

(iv) ROK Value Added Tax Law, Law No. 2934, promulgated on 22 December 1976 (effective date 1 July 1977), as amended.

(v) ROK Special Excise Tax Law, Law No. 2935, promulgated on 22 December 1976 (effective date 1 July 1977), as amended.

(2) Contractor shall state the types and estimated amount of taxes that would normally apply to such transactions but are excluded from this proposal.

(i) Customs Tax (except for ROK MND-funded contracts or delivery orders):

Name Number Cost/Unit of Item of Units w/o Tax % of Tax Tax/Unit Tax Total

This item will be imported specifically for this contract? Yes _____ No _____

(ii) Special Excise Tax:

Name Number Cost/Unit of Item of Units w/o Tax % of Tax Tax/Unit Tax Total

Name of item manufacturer

(iii) Value Added Tax (VAT):

Input VAT on materials purchased for this contract. 10% _____ Input VAT on transportation leased/rented for this contract.10% _____ Input VAT on equipment leased/rented for this contract. 10% _____ Input VAT on services purchased for this contract. 10% _____ Output VAT on total contract amount. 10% _____

(iv) Special Excise (Petroleum) Tax:

No. of U/P Liters w/o Tax Tax/Unit Total Tax Amount Regular Gasoline ________ (L) ________ w________ w_____________ Premium Gasoline ________ (L) ________ w________ w_____________ Diesel ________ (L) ________ w________ w_____________ Other ________ (L) ________ w________ w_____________

(v) Education Tax.

(3) Name of the oil company from which POL products will be purchased:

Oil Company: _________________________________________ (Name only)

(4) I certify by this submission that all supplies and services to be purchased for this contract have been proposed exclusive of Value Added Tax, applicable Customs Tax (except ROK MND-funded contracts and delivery orders), Special Excise Tax, and Education Tax.

Signed (Chop)

(f) CERTIFICATIONS AND REPRESENTATIONS

By submitting an offer, each offeror agrees to be bound by all certifications and representations in this solicitation.

The Government reserves the right to require any and all certifications and representations to be completed and signed in hard copy by the successful offeror prior to contract award. Failure of an offeror to complete the certifications and representations within the time directed by the Contracting Officer may result in a determination that the contractor is not a responsible offeror for this acquisition.

Section L - Instructions, Conditions and Notices to Bidders

INSTRUCTION TO OFFEROR

1. GENERAL INSTRUCTIONS FOR PREPARATION OF PROPOSAL

a. The Government intends to award without discussion, but reserves the right to conduct discussions if deemed necessary and to establish a competitive range for efficiency in accordance with FAR 52.215- 1(f)(4).

b. Offeror(s) may, at the discretion of the Government, be asked to provide more information and clarification regarding their proposals. The Government may make a final determination as to whether an offer is acceptable or unacceptable solely based on the proposals as submitted, without requesting any further information. However, if it is deemed necessary the Government may, at its sole discretion, request additional information clarifying but not substantially changing any proposal as submitted.

2. SUBMISSION OF PROPSAL

a. FBO SUBMISSION REQUIRED: Offers shall be submitted to the Federal Business Opportunities (FBO) website (https://www.fbo.gov/), or if FBO is not available, email to ikchung.om2.ln@mail.mil with the evidence document such as screen shot. The FBO unavailability is limited to only FBO server problem not individual failure/ problem. All questions should be emailed to ikchung.om2.ln@mail.mil within five

(5) days after the solicitation is issued.

b. CLOSING DATE: The electronic offer shall be submitted by 1300 hrs on the closing date of RFP.

3. SUBMISSION REQUIREMENTS

a. PRICING PROPOSAL: The pricing proposal must clearly indicate prices for each Contract Line Item Number in Section B - Supplies or Services and Prices.

b. DETAILED OFFER BREAKDOWN: The detailed offer breakdown must clearly identify all costs that can materially impact the statement of work.

c. SECTION K - Representations, Certifications and Other Statements of Offerors

d. SECTION K-TAXES: Offerors must complete all tax portions of SECTION K. The offeror shall review all expenses to ensure that all applicable taxes are excluded from the overall price. In addition, offerors shall propose exemptions of specific ROK taxes that are legitimate, attributable to the contract, and authorized by the applicable stated references.

e. SECTION K-OTHER: Offerors must complete all Non-Tax related portions of SECTION K.

f. COMPLIANCE WITH SOLICITATION: Failure to submit the above requirements under SECTION L may be grounds for determining the proposal to be non-compliant. For example, if a detailed offer breakdown is not submitted, the contracting officer will be unable to find the offeror's pricing proposal acceptable and the offeror's proposal will be ineligible for award. Non-compliance will only be cured if the government holds discussions as detailed in SECTION L.

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for Date: 30 August 2018 (Thursday) Time: 10:00 am, Korea Standard Time

(c) Participants will meet at Location: Room# 424, Bldg# 2409, Camp Casey POC: Mr. So, Ki Chong / 0503-330-3713 (DSN) 730-3713

(d) Escort : Any Contractor who needs escort shall bring Korea identification card , passport or driver licence

(주민등록증, 여권 혹은 운전면허증) and contact to Mr. So, Ki Chong.

(e) Interested participants shall email the following information to Contract Specialist, Mr. Om, Ik Chung, ikchung.om2.ln@mail.mil NLT 1300 hours, 29 August 2018.

* Company Name & Name of Site Visit attendees

Government does not receive any information from interested site visit participants, the Government will cancel the Site Visit without notice.

5152.236-4011 CONSTRUCTION PRICE RANGE

Pursuant to FAR 36.204 the estimated price range is between $500,000 and $1,000,000.

Section M - Evaluation Factors for Award

BASISI OF AWARD

Electronic offers submitted by 1300 hours on the closing date of RFP shall be considered timely.

1. EVALUATION CRITERIA

a. The pricing proposal shall be evaluated to determine whether it is complete and reasonable. A complete and reasonable pricing proposal will be deemed acceptable.

b. The detailed offer breakdown will be used by the contracting officer to determine whether proposed prices are complete and reasonable. A detailed offer breakdown may be used by the contracting officer to determine whether an offeror is able to complete the requirements under the contract, and/or whether discussions will be conducted pursuant to instructions to the offerors.

c. SECTION K - Representations, Certifications and Other Statements of Offerors

d. SECTION K-TAXES will be evaluated to determine whether it is complete. In addition, propose exemptions of specific ROK taxes will be evaluated to determine whether they are legitimate, attributable to the contract, authorized, and reasonable. A complete SECTION-K that only proposes exemptions of specific ROK taxes that are legitimate, attributable to the contract, necessary to complete the Task Order, do not improperly overstate any proposed tax exemption, authorized, and reasonable will be deemed acceptable.

e. SECTION K-OTHER will be evaluated to determine whether it is complete. A complete SECTION K-OTHER will be deemed acceptable.

2. BASIS FOR AWARD: Award shall be made to the responsible offeror submitting the lowest priced offer that…