SCHEDULE OF DRAWINGS
RING NO. REF. NO.REVISION STATUSDWG. NO. SHT. NO.REF. NO.
T - 2
RING NO. DESCRIPTION OF DRAWINGS DWG. NO. SHT. NO. DESCRIPTION OF DRAWINGS REVISION STATUS
T-1
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
FEWR NO 186681, CAMP CASEY
C - 1 LOCATION MAP
A - 1
A - 2
ARCHITECTURAL
A - 3
A - 4
M - 1
M - 2
M - 3
MECHANICAL
GENERAL NOTES AND SCOPE OF WORK
MECHANICAL MATERIAL INDICATIONS & SYMBOLS AND ABBREVIATIONS
MECHANICAL EQUIPMENT SCHEDULE
M - 4
E - 1
E - 2
ELECTRICAL
E - 3
M - 5
A - 1
A - 2
A - 3
A - 4
EXISTING/REMOVAL FLOOR PLAN AND GENERAL NOTES
GROUND FLOOR PLAN & SCOPE OF WORK
ELEVATIONS
INTERIOR WALL SECTION
ENLARGED TOILET FLOOR PLAN & INTERIOR ELEVATIONS
ENLARGED FLOOR PLAN, INTERIOR ELEVATIONS AND DETAIL
MISC DETAILS
INTERIOR, EXTERIOR FINISH SCHEDULE AND MATERIAL & COLOR SCHEDULE
DOOR, WINDOW SCHEDULE AND HARDWARE SCHEDULE
SIGNAGE PLAN AND SCHEDULE
A - 5
A - 6
A - 7
A - 8
A - 9
A - 10
M - 1
M - 2
M - 3
MECHANICAL
GENERAL NOTES AND SCOPE OF WORK
MECHANICAL EQUIPMENT SCHEDULE
M - 4
VARIOUS BUILDINGS
REPAIR OPERATION FACILITIES IN AHA NO. 23
MECHANICAL MATERIAL INDICATIONS & SYMBOLS AND ABBREVIATIONS
REMOVAL FLOOR PLAN AND SPECIFIC NOTES
M - 5
M - 6
M - 7
HVAC FLOOR PLAN
AND WATER HAMMER ARRESTER SCHEDULE
PLUMBING PARTIAL FLOOR PLAN, PUMBING FIXTURE SCHEDULE, NOTES
DETAILS
ELECTRICAL
GROUND FLOOR PLAN, PICTURES & SCOPE OF WORK
ELEVATIONS
INTERIOR FINISH SCHEDULE, MATERIAL & COLOR SCHEDULE, AND DETAILS
NOTES AND ROLL UP DOOR NOTES
DOOR, WINDOW SCHEDULE, HARDWARE SCHEDULE, DOOR/WINDOW
REMOVAL FLOOR PLAN AND SPECIFIC NOTES
HVAC FLOOR PLAN
A - 1
A - 2
ARCHITECTURAL
A - 3
GROUND FLOOR PLAN, CROSS SECTION, PICTURES & SCOPE OF WORK
DETAILS
E - 1
ELECTRICAL
WINDOW SCHEDULE AND HARDWARE SCHEDULE
INTERIOR FINISH SCHEDULE, MATERIAL & COLOR SCHEDULE AND
(VARIOUS BUILDINGS)
REPAIR OPERATION FACILITES IN AHA 23
CAMP CASEYKWON, CH
186681
BLDG S-246, CP CASEY
BLDG S-247, CP CASEY
E - 1
E - 2
LEGEND, GENERAL NOTES AND SCOPE OF WORK
E - 3
NEW LIGHTING SYSTEM PLAN
LIGHTING FIXTURE DETAILS
E - 4 LIGHTING FIXTURE SCHEDULE
E - 5
E - 6
NEW POWER SYSTEM PLAN & NEW PANELBOARD "AB" LOAD SCHEDULE
NEW FIRE ALARM/MASS NOTIFICATION SYSTEM/TEL PLAN
GROUND FLOOR LIGHTING/POWER PLAN & SCOPE OF WORK
LIGHTING FIXTURE DETAILS AND SCHEDULE
NEW FIRE ALARM AND MNS SYSTEM PLAN FOR BUILDING S-247
BLDG S-237 & 238, CP CASEY
NEW LIGHTING SYSTEM PLAN, SCOPE OF WORK & LIGHTING DETAIL
A - 1
ARCHITECTURAL
GROUND FLOOR PLAN, PICTURES, DETAILS & SCOPE OF WORK
E - 1
ELECTRICAL
NEW LIGHTING SYSTEM PLAN, SCOPE OF WORK & LIGHTING DETAIL
BLDG S-232 & 245, CP CASEY
A - 1
ARCHITECTURAL
GROUND FLOOR PLAN, PICTURES, DETAILS & SCOPE OF WORK
E - 1
ELECTRICAL
BLDG S-228, CP CASEY
NEW LIGHTING SYSTEM PLAN FOR BUILDING S-228
T - 1
TITLE SHEET - 1
TITLE SHEET - 1
TITLE SHEET - 2
SCHEDULE OF DRAWINGS
RING NO. REF. NO.REVISION STATUSDWG. NO. SHT. NO.REF. NO.RING NO. DESCRIPTION OF DRAWINGS DWG. NO. SHT. NO. DESCRIPTION OF DRAWINGS REVISION STATUS
T-2
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
FEWR NO 186681, CAMP CASEY
VARIOUS BUILDINGS
REPAIR OPERATION FACILITIES IN AHA NO. 23
(VARIOUS BUILDINGS)
REPAIR OPERATION FACILITES IN AHA 23
CAMP CASEYKWON, CH
186681
A - 1
ARCHITECTURAL
GROUND FLOOR PLAN, PICTURES, DETAILS & SCOPE OF WORK
E - 1
ELECTRICAL
BLDG S-229, 230 & 233, CP CASEY
NEW LIGHTING SYSTEM PLAN FOR BUILDING S-229, 230 & 233
A - 1
ARCHITECTURAL
GROUND FLOOR PLAN, PICTURES, DETAILS & SCOPE OF WORK
E - 1
ELECTRICAL
BLDG S-231, CP CASEY
NEW LIGHTING SYSTEM PLAN FOR BUILDING S-231
TITLE SHEET - 2
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
ARCHITECTURAL
LAUNDRY
KSC
PEST
647667
WH-1
WH-2
DPW HQ
A
B
651A
833T
808 811
715 726
A B
A
B
1149 1151
A
B
A
B
A
B
A
B
2372A
2373T
A
C
A
B
A
B
2609T
2514 2540
8008T
2540T
1991 1963
A B
456A
463Z
549 546
8114T
560G
A
B
86M
48T
A
B
39 55
134 133
202A
258252
1785 235
FOOT BR
VEH BR
FOOT BR
VEH BR
VEH BR
VEH BR
VEH BR
VEH BR 1821
VEH BR
VEH BR
VEH BR
VEH BR
FOOT BR
VEH BR
VEH BR
FOOT BR
FOOT BR
VEH BR
VEH BR
VEH BR
FOOT BR
FOOT BR
VEH BR
VEH BR
VEH BR
VEH BR
FOOT BR
1158A
1158B
447A
F
F
497A
497B
458Z
A
B
A B
VEH BR
VEH BR
472?
455?
BARRIER
635A
2002B
A B
48A
A
B
A B
A
B
A
B
A
B
A
B
B A
S K
E T
B A
L L
C O
U R
T
706(707A)
(2298)
1071?
A B
1760?
VEH BR?
VEH BR?
BARRIER
F
LA
G
F O O T B A
LL
F
IE
LD
(S Y N T H E T
IC
U R F
A R E A
1919LIFT STATION
VEH BR
BARRIER
B
UTILITY
BLDG
65-A
12 CM
ST
STREAM
S T
S
P V C
227.5
J-4
ST
36 CM
.5
.9
W A
L L
W A
L L
W A
L L
WALL
W A
L L
WALL
228.4
ST
GAL275
.8
.5
S T
R C
6 PVC
ST
C M
S T
268.6
STREAM
DISCHARGE TO
65-A
12 CM
ST
STREAM
GRAVES
GRAVES
O.S.
O.S.
PARKING
TT
GATE 2
GATE 1
: BUILDING LOCATION
SCALE: NONE
LOCATION MAP, CP CASEY
#2299
FIRE STATION
C-1
BLDG S-228
BLDG S-229
BLDG S-230
BLDG S-231
BLDG S-232
BLDG S-233
11 BUILDINGS
LOCATION MAP
BLDG S-237
BLDG S-238
BLDG S-245
BLDG S-246
BLDG S-247
USAG Yongsan-Casey, KOREA
CAMP CASEY
(VARIOUS BUILDINGS)
REPAIR OPERATION FACILITIES IN AHA NO. 23
PROJECT NO. 186681,
(VARIOUS BUILDINGS)
REPAIR OPERATION FACILITIES IN AHA 23
CAMP CASEYKWON, CH
186681
File details come from the government source that posted it.