W91QVN18R0137

Section B - Supplies or Services and Prices

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Job

Replace fire alarm system and BT

FFP

WORK CLASS: K, Replace fire alarm system and Building Transceiver (BT) for buildings on west side of Camp Casey.

FOB: Destination

PURCHASE REQUEST NUMBER: 0011183002

PSC CD: Z2NZ

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Job

Replace fire alarm system and BT

WORK CLASS: L, Replace fire alarm system and Building Transceiver (BT) for buildings on west side of Camp Casey.

FOB: Destination

PURCHASE REQUEST NUMBER: 0011183002

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot

Estimated Cost for War Hazard is Zero(0) FOB: Destination

NET AMT

Section C - Descriptions and Specifications

TECHNICAL PROVISIONS - I

STATEMENT OF WORK

PROJECT NO TITLE LOCATION

185600Replace fire alarm system and BT for buildings Camp Casey
on west side of Camp Casey

1. DESCRIPTION: The work to be performed to replace fire alarm system and BT for buildings on west side of Camp Casey is described below and executed by one or more of the groups.

1.1. Work by Contractor: The contractor shall provide all labor, tools, equipment, supplies and any other resources necessary to accomplish the scope of work contained herein as indicated in the drawings and in accordance with the specifications.

1.2. Work by In-House Labor: Not applicable to this project.

1.3. Work by Troop Labor: Not applicable to this project.

2. PRINCIPAL FEATURES: This project includes the following principal features:

2.1. Schedule #I, Repair (K): All work shall be in accordance with the attached drawings and specifications.

2.1.1. Civil Work

2.1.1.1. Replace stone ditch with steel grating ditch. (Drawing No. C-2)

2.1.1.2. Replace 2.3m width concrete step including handrail with new. (Drawing No. C-2)

2.1.1.3. Restore solid sodding including top soil.

2.1.2. Architectural Work

2.1.2.1. Replace existing floor tile with new Polyvinyl Chloride Tile (PVCT) including Vinyl Cove Base (VCB) as shown on floor plan and interior finish schedule. The existing concrete flooring shall be smooth, true, level plane with all defects such as rough or scaling concrete, low spots, high spots, painting, and uneven surface shall have been corrected for new flooring. Provide leveling concrete for existing concrete slab with government approval. (Drawing No. A-1, A-4, A-5, A-7, A-8, A-13)

2.1.2.2. Replace existing ceiling with new acoustical ceiling tile including metal suspension systems as shown on interior finish schedule. (Drawing No. A-1, A-2, A-4, A-5, A-7, A-8, A-13)

2.1.2.3. Replace existing ceiling with new Gypsum Wall Board (GWB, normal, water resistant or 'X' type) ceiling including ceiling suspension system as shown on floor plans and finish schedule. (Drawing No. A-1, A-2, A-4, A-5, A-7, A-8, A-13)

2.1.2.4. Replace rain gutters and downspouts with new including concrete splash blocks as shown on floor plan and detail drawings. (Drawing No. A-1, A-2, A-3, A-4, A-7, A-9, A-10, A-11)

2.1.2.5. Replace existing Floor Ceramic Tile (FCT) and Glazed Ceramic Wall Tile (GCWT, full height) with new including waterproofing, mortar beds, and cement boards as shown on floor plans and detail drawings. (Drawing No. A-1, A-2, A-4, A-5, A-6, A-10, A-13)

2.1.2.6. Replace existing Fire extinguisher Cabinet (FEC) with new as shown on new floor plans and detail drawing. (Drawing No. A-1, A-2, A-4, A-5, A-11)

2.1.2.7. Replace interior and exterior signages with new for all rooms as shown on signage schedule. (Drawing No. A-1, A-2, A-3, A-4, A-5, A-15)

2.1.2.8. Paint all interior surfaces including ceiling and wall as shown on interior finish schedule.

2.1.2.9. Replace existing roof with new standing seam metal roofing including insulation, protected metal flashing, and galvanized metal roof liner panel as shown on roof plan and detail drawings. (Drawing No. A-1, A-2, A-3, A-4, A-7, A-8, A-9)

2.1.2.10. Replace existing metal shelf including mop rack with new in laundry room as shown on floor plan. (Drawing No. A-1, A-4, A-5, A-6)

2.1.2.11. Replace existing doors and door frames with new including new hardware sets as shown on new floor plans and door schedule. (Drawing No. A-1, A-3, A-4, A-5, A-14)

2.1.2.12. Replace existing wooden head, jamb and sill for all windows and wooden curtain box with new as shown on details. (Natural color, Oak) (Drawing No. A-1, A-3, A-4, A-5, A-7, A-11, A-14)

2.1.2.13. Replace existing window horizontal mini blinds with news, fireproof type. (Drawing No. A-1, A-3, A-4, A-5, A-7, A-11, A-14)

2.1.2.14. Replace existing windows including insect screen with new aluminum thermal breaker type blast windows including 8.75mm thickness clear laminated glass + 12mm thickness air space + 6mm thickness tinted low-e tempered glass (Solar Heat Gain Coefficient (SHGC): max 0.4 ) as shown on floor plans and window schedule. (Drawing No. A-1, A-3, A-4, A-5, A-7, A-11, A-14)

2.1.2.15. Replace existing kitchenette including base cabinet and upper cabinet as shown on floor plans and detail drawings. (Drawing No. A-1, A-4, A-5, A-7, A-12)

2.1.2.16. Replace existing shelve with new Stainless Steel (SST) shelve in laundry room. (Drawing No. A-1, A-4, A-5, A-6)

2.1.2.17. Replace existing chair rails with new in corridor as shown on detail drawing. (Drawing No. A-1, A-3, A-4, A-5, A-13)

2.1.2.18. Replace existing aluminum louvers with new as shown on floor plans and detail drawings. (Drawing No. A-1, A-3, A-4, A-5, A-7, A-11, A-14)

2.1.2.19. Replace existing all GWB walls with new including metal studs and sound proof insulations (Sound Transmission Coefficient (STC) 45) as shown on floor plans and detail drawings. (Drawing No. A-1, A-4, A-5, A-7, A-8, A-13)

2.1.2.20. Replace existing Exterior Insulation and Finish System (EIFS) on existing exterior Concrete Masonry Unit (CMU) wall with new including hard and detail meshes and finish coating as shown on floor plan and elevations. (Drawing No. A-1, A-3, A-4, A-9)

2.1.2.21. Paint all existing exterior exposed surfaces of other components such as CMU guard wall for chiller as shown on pictures.

2.1.2.22. Replace existing concrete stoops and steps with new as shown on floor plan and elevations. (Drawing No. A-1, A-3, A-4, A-5, A-7)

2.1.2.23. Replace wooden closet shelf and SST coat rod in each closet as shown on floor plan and detail drawings. (Drawing No. A-1, A-4, A-5, A-6, A-12)

2.1.2.24. Replace existing all toilet accessories with new as shown on floor plan and detail drawings. (Drawing No. A-1, A-4, A-5, A-6, A-10)

2.1.2.25. Replace existing access doors with new as shown on ceiling plan and detail drawings. (Drawing No. A-1, A-2, A-4, A-5, A-6)

2.1.2.26. Replace bulletin board and plexi-info holder with new as shown on ceiling plan and detail drawings. (Drawing No. A-1, A-3, A-4, A-5, A-15)

2.1.2.27. Remove existing asbestos containing materials as Asbestos Containing Material (ACM) removal notes.

- Joint vertical in Mech room, 1ea

- Gasket in Mech room, 1ea

- Pipe hanging in Mech room, 1ea

2.1.3. Mechanical Work

2.1.3.1. Heating, Ventilating, and Air Conditioning (HVAC) system

2.1.3.1.1. Replace existing hot water boiler, concrete pad, control, and associated water and fuel oil piping with new. (Drawing No. M-2, M-3, M-6, M-7, M-10)

2.1.3.1.2. Replace existing water chiller, valve box, and associated piping with new. (Drawing No. M-2, M-3, M-6, M-7, M-10)

2.1.3.1.3. Replace existing hot and chilled water circulation pump, expansion tank, air separator, and associated piping with new. (Drawing No. M-2, M-3, M-4, M-6, M-7, M-10)

2.1.3.1.4. Replace existing drain and hot and chilled water piping throughout the building with new. (Drawing No. M-2, M-5, M-6, M-7, M-10)

2.1.3.1.5. Replace existing fan coil units, outside air intake boxes, controls, and associated piping with new. (Drawing No. M-2, M-3, M-5, M-8)

2.1.3.1.6. Replace existing exhaust fans in the mechanical room with new. (Drawing No. M-2, M-3, M-6, M-9)

2.1.3.1.7. Replace existing bathroom exhaust fans and ducts with new. (Drawing No. M-2, M-3, M-5, M-9)

2.1.3.1.8. Replace existing mechanical room heating system with new hot water unit heaters. (Drawing No. M-2, M-4, M-6, M-8)

2.1.3.1.9. Replace existing roof gooseneck, split air conditioning, and range hood with new. (Drawing No. M-5, M-6, M-20)

2.1.3.1.10. All mechanical systems shall be tested, adjusted, and balanced by the contractor in strict accordance with applicable sections of division 15 - mechanical O&MA standard technical specifications for miscellaneous projects, Korea. The HVAC Testing, Adjusting, and Balancing (TAB) report shall be submitted to the project COR for government review and approval.

2.1.3.2. Plumbing work

2.1.3.2.1. Replace existing oil fired domestic hot water heater, storage tank, and circulation pumps with new oil fired domestic hot water heater, water circulation pumps, concrete pads, and associated water, controls, and fuel oil piping. (Drawing No. M-2, M-3, M-6, M-12, M-13)

2.1.3.2.2. Replace existing all domestic hot and cold water piping with new. (Drawing No. M-2, M-11, M-12, M-13, M-14)

2.1.3.2.3. Replace existing all sewer, vent, floor drain, and cleanout piping with new. (Drawing No. M-2, M-11, M-12, M-13, M-14)

2.1.3.2.4. Replace existing bathroom plumbing fixtures, including water closets, lavatories, and associated piping with new. (Drawing No. M-2, M-11, M-12, M-14)

2.1.3.2.5. Replace existing sink and valve box in the laundry room with new. (Drawing No. M-2, M-14)

2.1.3.2.6. Replace existing Back Flow Preventer (BFP) and Pressure Reducing Valve (PRV) assembly including pipe supports, hose bibb, and wall hydrant with new. (Drawing No. M-2, M-12, M-13)

2.1.4. Electrical Work

2.1.4.1. Replace existing lighting fixtures, exit lights, exterior lights, toggle switches, 3-way switches, wires and conduits with new for building No. 81. (Drawing No. E-1,E-2,E-3)

2.1.4.2. Replace existing panel boards, watthour meter including Current Transformer (CT)'s, enclosed circuit breaker, receptacles including cover plates, and associated wiring and conduits with new for building No. 81. (Drawing No. E-1,E-4,E-5,E-6)

2.1.4.3. Replace existing safety switch, magnetic motor starters, manual motor starter, junction boxes, control and power wires and conduits for mechanical HVAC system with new for building No. 81. (Drawing No. E-1,E-4,E-5,E-6)

2.1.4.4. Replace fire alarm control system with new addressable fire alarm control and mass notification system panel, manual pull station, smoke detector and relay module, building transmitter, antenna, visual and signal strobes (15 or 75 candela), microphone, speaker device, and associated wiring and conduit for building No. 81. (Drawing No. E-1,E-8,E-9)

2.1.4.5. Replace existing telephone system including telephone terminal board, telephone outlets w/cover plates, terminal blocks, accessories, and associated wire and conduit with new for building No. 81. (Drawing No. E-1,E-10,E-11,E-12)

2.1.4.6. Replace existing CATV cabinets and accessories, pull boxes, CATV outlets including cover plate and cable, and conduit with new for building No. 81. (Drawing No. E-1,E-10,E-11,E-12)

2.1.4.7. Replace existing exterior overhead secondary line, entrance cap and secondary racks, and accessories with new for building No. 81. (Drawing No. E-1,E-7)

2.1.4.8. Replace existing exterior underground telephone line and accessories with new for building No. 81. (Drawing No. E-1,E-7)

2.1.4.9. Remove and reinstall existing CCTV cameras and monitoring system including associated wiring and conduit for building No. 81.

2.1.4.10. Repair existing fire alarm control system with new fire alarm building transmitters sets (11 sets) and associated wiring and conduit for building No. 1, 17, 47, 48, 50, 62, 68, 72, 642, 654, 655 (11 buildings). (Drawing No. E-1,E-12,E-13)

2.1.5. Structural Work

2.1.5.1. Replace existing concrete slab with new including Non Frost Susceptible Material (NFSM). (Drawing No. S-2)

2.1.5.2. Replace existing concrete stoop with new. (Drawing No. S-2)

2.1.5.3. Replace existing CMU wall with 200mm thickness concrete wall. (Drawing No. S-2)

2.1.5.4. Replace existing steel roof framing including steel member with new. (Drawing No. S-2, S-3, S-4, S-5, S-6, S-7, S-8)

2.1.5.5. Replace existing concrete slab with mat concrete slab and NFSM. (Drawing No. S-2, S-4, S-5, S-6)

2.2. Schedule #II, New Construction (L): All work shall be in accordance with the attached drawings and specifications.

2.2.1. Civil Work

2.2.1.1. Install 150mm diameter Polyvinyl Chloride (PVC) water line including Post Indicator Valve (PIV).

2.2.2. Mechanical Work

2.2.2.1. Sprinkler work

2.2.2.1.1. Install fire protection system.

TECHNICAL PROVISIONS - II

TECHNICAL DETAIL SPECIFICATIONS

PROJECT NO TITLE LOCATION

185600Replace fire alarm system and BT for buildings Camp Casey
on west side of Camp Casey

GENERAL: The specification sections listed below are applicable to this project. The specifications are from the “Standard Technical Specifications for O&MA Projects, Korea, Revision 1” (2014 OMA SPECS, REVISION 1), dated 20151030, located on the http://www.usfk.mil/Portals/105/Documents/Contracting/NewContract/2014-OMA-SPECS_REVISION-1.pdf. The electronic version of the specifications is Acrobat® PDF format and can be read with the Acrobat Reader® software.

Changes to the Standard Technical Detail Specifications: None

TECHNICAL PROVISIONS - III

SPECIAL CONDITIONS

PROJECT NO TITLE LOCATION

185600Replace fire alarm system and BT for buildings Camp Casey
on west side of Camp Casey

1. The contractor shall have personnel on site for the sprinkler work and the fire alarm work upon Government's direction, who are certified by the National Institute for Certification in Engineering Technologies (NICET) Level III or equivalent. Equivalent Certificates in Korea are the followings which are issued by the Human Resource Development Service of Korea. If the contractor doesn’t have personnel who are certified by NICET, the contractor shall have two personnel that one is certified for (1) and the other for (2) below.

(1) Engineer Fire Fighting Facilities - Electrical (소방설비기사 -전기)

(2) Engineer Fire Fighting Facilities - Mechanical (소방설비기사 -기계)

2. Environmental Requirements in Contract

The Contractor shall perform work consistent with the relevant policy and objectives identified in Installation’s Environmental Management System (EMS). The Contractor shall perform work in a manner that conforms to all appropriate Environmental Management Programs and Operational Controls identified by Installation’s EMS, including pollution prevention, waste reduction, energy use, and natural resource protection. The Contractor shall provide monitoring and measurement information as necessary for the organization to address environmental performance relative to the environmental, energy, and transportation management goals. In addition, the Contractor shall advise their employees of their roles and responsibilities identified by the EMS and how these requirements affect their work performed under this contract. The Contractor is responsible for ensuring that the Contractor and any persons involved in the supervision or performance of the contract complete all required Environmental training.

In the event of any environmental nonconformance or noncompliance associated with the contracted services, the contractor shall take corrective and/or preventative actions. In the event of any noncompliance with any federal, state, or local environmental law, regulation or requirement, the Contractor shall immediately respond by taking all appropriate corrective actions and notifying the Contracting Officer’s Representative (COR) and the Environmental Office. For any nonconformance with the EMS, the Contractor shall take corrective action and initiate further preventative action, as required by the Environmental Office.

All on-site contractor personnel shall complete necessary safety and environmental training specified for the type of work conducted on-site. Upon contract award, the COR will notify the EMS Manager to arrange Environmental training for appropriate staff.

Additionally, when ordering supplies for use on Installation, all contractor personnel must favor energy-efficient, recycled or reclaimed material whenever practicable.

The responsibilities of all contractor personnel include:

(1) Comply with all applicable environmental laws, regulations and installation environmental policies.

(2) Control and prevent spills or hazardous substances releases IAW installation Spill Prevention Plan.

(3) Ensure dust, debris, materials, trash, etc., do not become air borne and travel off the project site.

(4) Do not remove, cut, deface, injure, or destroy land resources including trees, shrubs, vines, topsoil and land forms without approval, except in areas indicated on the drawings or specified to be cleared.

(5) Monitor all water areas affected by construction activities to prevent pollution of surface and ground waters. Do not apply toxic or hazardous chemicals to soil or vegetation unless otherwise indicated.

(6) Open burning is prohibited on the Government premises IAW installation environmental policy.

(7) Participate in installation’s recycling program.

(8) Reducing the amount of hazardous material and/or solvent used by purchasing fewer hazardous materials and by increasing the use of products with recycled content. Spills of hazardous or toxic materials must be immediately reported to the Contracting Officer and the Environmental Office. Storage, describing, packaging, labeling, marking and placarding of hazardous waste and hazardous material IAW applicable environmental laws, regulations and local environmental policies. Transport hazardous waste off Government property and dispose of it in compliance with National, Provincial, and/or Local requirements for solid waste disposal.

(9) Reducing the amount of solid waste from construction and demolition debris, and scrap metal sent to municipal and rubble landfills by reducing, reusing, and recycling. Handling, storage, and disposal of solid waste must be conducted to prevent contamination. Transport solid waste off Government property and dispose of it in compliance with National, Provincial, and/or Local requirements for solid waste disposal.

(10) Conserving energy and water usage by turning off lights and equipment when not in use and using only the necessary amount of water needed to complete the required tasks. Continuous conservation of our natural resources is a must.

(11) When potential cultural or historic items are inadvertently found during construction activities, immediately cease activities in the vicinity of the discovery and report the findings to the Environmental Office.

(12) Participate in installation’s Integrated Pest Management (IPM) program whenever practicable.

(13) Minimize interference with disturbance to, and damage to fish, wildlife, and plants including their habitat.

Section F - Deliveries or Performance

CLAUSES INCORPORATED BY FULL TEXT

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 180 calendar days including 90 days for procurement of US origin material after notice to proceed (NTP) is issued.

* The time stated for completion shall include final cleanup of the premises.

(End of clause)

Section G - Contract Administration Data

Section H - Special Contract Requirements

AT/OPSEC

ANTITERRORISM/OPERATIONS SECURITY REVIEW COVER SHEET

A. AT Level I Training. This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 20 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 10 calendar days after completion of training by all employees and subcontractor personnel. AT level I awareness training is available at the following website: http://jko.jten.mil.

B. Access and General Protection/Security Policy and Procedures. This standard language is for contractor employees with an area of performance within Army controlled installation, facility, or area. Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

B-a. For contractors that do not require CAC, but require access to a DoD facility or installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

C. iWATCH Training. This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 10 calendar days of contract award and within 10 calendar days of new employees commencing performance with the results reported to the COR NLT 10 calendar days after contract award.

D. Requirement for OPSEC Training. Per AR 530-1 Operations Security, the contractor employees must complete Level I OPSEC Awareness training. New employees must be trained within 30 calendar days of their reporting for duty and annually thereafter.

OPSEC training is available at the following website: http://cdsetrain.dtic.mil/opsec/

Section J - List of Documents, Exhibits and Other Attachments

LIST OF APPLICABLE CONTRACT DRAWINGS

PROJECT NO TITLE LOCATION

185600Replace fire alarm system and BT for buildings Camp Casey
on west side of Camp Casey

GENERAL: The work shall conform to the following contract drawings and OMA standard detail drawings, 2014 (dated 30 November 2015), issued by the Department of the Army, Installation Management Agency, Korea Region Office and located on http://www.usfk.mil/Portals/105/Documents/Contracting/NewContract/STANDARD-DETAIL-DRAWINGS-FOR-OMA-PROJECTS-KOREA_20151130.pdf, all of which form a part of the specifications.

Ring No.
Sheet No.
Description
Date
1
T-1
TITLE SHEET
13 APR 18

CIVIL

2
C-1
LOCATION PLAN AND GENERAL NOTES
13 APR 18
3
C-2
SITE LAYOUT PLAN AND SCOPE OF WORK
13 APR 18
4
C-3
MISC. DETAILS - 1
13 APR 18
5
C-4
MISC. DETAILS - 2
13 APR 18

STRUCTURAL

6
S-1
GENERAL NOTES, DESIGN DATA & TYPICALL DETAILS
13 APR 18
7
S-2
EXIST/REMOVAL GROUND FLOOR & ROOF FRAMING PLANS
13 APR 18
8
S-3
ROOF PURLIN LAYOUT PLAN
13 APR 18
9
S-4
CROSS SECTION-1
13 APR 18
10
S-5
CROSS SECTION-2
13 APR 18
11
S-6
CROSS SECTION-3
13 APR 18
12
S-7
DETAILS-1
13 APR 18
13
S-8
DETAILS-2
13 APR 18

ARCHITECTURAL

14
A-1
EXST & NEW GROUND FLOOR PLANS AND GENERAL NOTES
13 APR 18
15
A-2
ROOF PLAN AND CEILING PLAN
13 APR 18
16
A-3
ELEVATIONS
13 APR 18
17
A-4
SECTIONS, SCOPE OF WORKS AND ACM REMOVAL NOTES
13 APR 18
18
A-5
ENLARGED FLOOR PLAN
13 APR 18
19
A-6
TYPICAL PARTIAL PLANS AND INTERIOR ELEVATIONS
13 APR 18
20
A-7
WALL SECTIONS-1
13 APR 18
21
A-8
WALL SECTIONS-2
13 APR 18
22
A-9
ROOF DETAILS
13 APR 18
23
A-10
MISC DETAILS-1
13 APR 18
24
A-11
MISC DETAILS-2
13 APR 18
25
A-12
CABINET DETAILS AND SHELF DETAIL
13 APR 18
26
A-13
INTERIOR FINISH SCHEDULE, MATERIAL & COLOR SCHEDULE AND NOTES
13 APR 18
27
A-14
DOOR / WINDOW SCHEDULE, ELEVATIONS, HARDWARE SCHEDULE & NOTES
13 APR 18
28
A-15
SIGNAGE SCHEDULE AND DETAILS
13 APR 18

MECHANICAL

29
M-1
MECHANICAL MATERIAL INDICATIONS & SYMBOLS
13 APR 18
30
M-2
GENERAL NOTES & SCOPE OF WORK
13 APR 18
31
M-3
MECHANICAL EQUIPMENT SCHEDULE-1
13 APR 18
32
M-4
MECHANICAL EQUIPMENT SCHEDULE-2
13 APR 18
33
M-5
GROUND FLOOR HVAC PLAN
13 APR 18
34
M-6
MECH ROOM HVAC PARTIAL PLAN
13 APR 18
35
M-7
CHILLED/HOT WATER CONTROL DIAGRAM, SEQUENCE OF OPERATION, BOILER SYSTEM CONTROL EQUIPMENT SCHEDULE AND NOTE
13 APR 18
36
M-8
FAN COIL UNIT CONTROL DIAGRAM, SPLIT A/C UNIT CONTROL DIAGRAM AND UNIT HEATER CONTROL
13 APR 18
37
M-9
DOMESTIC HOT WATER SYSTEM CONTROL DIAGRAM, MECH RM VENT SYS CONTROL DIAGRAM AND EF-1 CONTROL CIRCUIT
13 APR 18
38
M-10
MECH ROOM HVAC PIPING ISOMETRIC DIAGRAM
13 APR 18
39
M-11
GROUND FLOOR PLUMBING PIPING PLAN-1 & 2, PLUMBING FIXTURE SCHEDULE AND NOTES
13 APR 18
40
M-12
BEDROOM, FLOOR HOT & COLD, WATER & SEWER PLUMBING PIPING PARTIAL PLAN AND NOTES
13 APR 18
41
M-13
MECH ROOM PLUMBING PIPING ISOMETRIC DIAGRAM
13 APR 18
42
M-14
TYP UNIT PLUMBING PIPING ISOMETRIC DIAGRAM - 1 & 2
13 APR 18
43
M-15
FIRE PROTECTION LEGEND & ABBREVIATION, AUTOMATIC FIRE SUPPRESSION GENERAL NOTES SPRINKLER Q'TY LIST AND NOTE
13 APR 18
44
M-16
NEW GROUND FLOOR FIRE PROTECTION CLASSIFICATION PLAN
13 APR 18
45
M-17
NEW GROUND FLOOR FIRE PROTECTION PIPING PLAN
13 APR 18
46
M-18
MECH ROOM FIRE PROTECTION PIPING PARTIAL PLAN AND FIRE PROTECTION REQUIREMENT
13 APR 18
47
M-19
TYP UNIT PLUMBING PIPING ISOMETRIC DIAGRAM - 1 & 2
13 APR 18
48
M-20
DETAILS – 2
13 APR 18
49
M-21
DETAILS – 3
13 APR 18
50
M-22
DETAILS – 4
13 APR 18
51
M-23
DETAILS – 5
13 APR 18
52
M-24
DETAILS - 6
13 APR 18

ELECTRICAL

53
E-1
LEGEND, GENERAL NOTES AND SCOPE OF WORK
13 APR 18
54
E-2
NEW GROUND FL LIGHTING PLAN & LIGHTING FIXTURE SCHEDULE
13 APR 18
55
E-3
NON-STANDARD LIGHTING FIXTURE DETAILS
13 APR 18
56
E-4
NEW GROUND FL POWER PLANS
13 APR 18
57
E-5
EXST / NEW POWER ONE-LINE DIAGRAM
13 APR 18
58
E-6
LOAD SCHEDULE & DETAIL
13 APR 18
59
E-7
NEW EXTERIOR ELEC & COMMUNICATION DISTRIBUTION PLAN
13 APR 18
60
E-8
NEW GROUND FL FIRE ALARM/MASS NOTIFICATION SYSTEM PLAN
13 APR 18
61
E-9
FIRE ALARM/MASS NOTIFICATION SYSTEM DIAGRAM
13 APR 18
62
E-10
NEW GROUND FL TEL/CATV SYSTEM PLAN
13 APR 18
63
E-11
TEL & CATV SYSTEM DIAGRAM
13 APR 18
64
E-12
BUILDING TRANSMITTER LOCATION LAYOUT PLAN
13 APR 18
65
E-13
BT SYSTEM BUILDING SCHEDULE TYPICAL FA ANTENNA MOUNTING DETAIL & BUILDING TRANSMITTER CONNECTION DIAGRAM
13 APR 18

SUBMITTAL REGISTER

NOTE 1. See the attachment.

NOTE 2. The Submittal Register in Section J above, identifies the documentation that will be made available for approval and review by the Government in the performance of this task order. It is the contractor's responsibility that this data is in compliance with the corresponding OMA specification that is referenced.

Section K - Representations, Certifications and Other Statements of Offerors

52.203-2 CERTIFICATE OF INDEPENDENT PRICE DETERMINATION (APR 1985)

(a) The offeror certifies that --

(1) The prices in this offer have been arrived at independently, without, for the purpose of restricting competition, any consultation, communication, or agreement with any other offeror or competitor relating to –

(i) Those prices,

(ii) The intention to submit an offer, or

(iii) The methods of factors used to calculate the prices offered:

(2) The prices in this offer have not been and will not be knowingly disclosed by the offeror, directly or indirectly, to any other offeror or competitor before bid opening (in the case of a sealed bid solicitation) or contract award (in the case of a negotiated solicitation) unless otherwise required by law; and

(3) No attempt has been made or will be made by the offeror to induce any other concern to submit or not to submit an offer for the purpose of restricting competition.

(b) Each signature on the offer is considered to be a certification by the signatory that the signatory --

(1) Is the person in the offeror's organization responsible for determining the prices offered in this bid or proposal, and that the signatory has not participated and will not participate in any action contrary to subparagraphs (a)(1) through (a)(3) of this provision; or

(2) (i) Has been authorized, in writing, to act as agent for the following principals in certifying that those principals have not participated, and will not participate in any action contrary to subparagraphs (a)(1) through (a)(3) of this provison ______________________________________________________ (insert full name of person(s) in the offeror's organization responsible for determining the prices offered in this bid or proposal, and the title of his or her position in the offeror's organization);

(ii) As an authorized agent, does certify that the principals named in subdivision (b)(2)(i) above have not participated, and will not participate, in any action contrary to subparagraphs (a)(1) through (a)(3) above; and

(iii) As an agent, has not personally participated, and will not participate, in any action contrary to subparagraphs (a)(1) through (a)(3) of this provision.

(c) If the offeror deletes or modifies subparagraph (a)(2) of this provision, the offeror must furnish with its offer a signed statement setting forth in detail the circumstances of the disclosure.

(End of Provision)

252.209-7999 Representation by Corporations Regarding an Unpaid Delinquent Tax Liability or a Felony Conviction under any Federal Law REPRESENTATION BY CORPORATIONS REGARDING AN UNPAID DELINQUENT TAX LIABILTIY OR A FELONY CONVICTION UNDER ANY FEDERAL LAW (DEVIATION 2012-00004) (JAN 2012)

1. In accordance with sections 8124 and 8125 of Division A of the Consolidated Appropriations Act, 2012, (Pub. L. 112-74) none of the funds made available by that Act may be used to enter into a contract with any corporation that-

(1) Has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability, where the awarding agency is aware of the unpaid tax liability, unless the agency has considered suspension or debarment of the corporation and made a determination that this further action is not necessary to protect the interests of the Government.

(2) Was convicted of a felony criminal violation under any Federal law within the preceding 24 months, where the awarding agency is aware of the conviction, unless the agency has considered suspension or debarment of the corporation and made a determination that this action is not necessary to protect the interests of the Government.

1. The Offeror represents that –

(1) It is ( ) is not ( ) a corporation that has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with authority responsible for collecting the tax liability,

(2) It is ( ) is not ( ) a corporation that was convicted of a felony criminal violation under a federal law within the preceding 24 months.

(End of provision)

5152.204-4032 REPRESENTATIONS AND CERTIFICATIONS

(a) SUBCONTRACTING:

If the offeror contemplates subcontracting, it must obtain prior written approval of subcontractor from the PCO or ACO, and list below: (1) the names and addresses of the subcontractor(s), (2) the type of subcontracting, and (3) the estimated price for each subcontract.

(b) AFFILIATED OFFERORS:

(1) Business concerns are affiliates of each other when, either directly or indirectly, one concern controls or has the power to control the other, or a third party controls or has the power to control both.

(2) Each offeror shall furnish, below, the following information:

(i) Whether the offeror has any affiliates;

(ii) The names and addresses of all affiliates of the offeror; and

(iii) The names and addresses of all persons and concerns exercising control or ownership of the offeror and any or all of its affiliates, and whether they are common officers, directors, stockholders holding controlling interest, or otherwise.

AFFILIATED CONCERNS. : (Name, location and, in detail, controlling interest in each)

(c) PRINCIPAL OWNER(S) OR STOCKHOLDER(S):

Each offeror shall list below the name(s) and address(es) of the principal owner(s) or stockholder(s) of the company and percentage of ownership. If a major portion is publicly traded and/or otherwise widely distributed, state that, with the percentage so affected.

(d) STANDARDS OF CONDUCT CERTIFICATION:

This is to certify that, to the best of my knowledge and belief, except as described below, no representative of this firm who deals with US Government employees on any aspect of this procurement is a former US Government employee, to include former US military personnel. I understand that this certification is continuing in nature and places a duty on me and my firm to notify the Contracting Officer of any additional individual(s) who fit the above description prior to the individual's assuming duties.

(i) Name ______________________________________________ Former rank/grade ____________________________________ Last US Government position ___________________________

(ii) Name ______________________________________________ Former rank/grade ____________________________________ Last US Government position ___________________________

(iii) Name ______________________________________________ Former rank/grade ____________________________________ Last US Government position ___________________________

Firm ____________________________________________________ Name _____________________________________________________ Signature __________________________________________________

Title _____________________________________________________ Date of Execution ____________________________________________

(e) TAXES:

(1) References:

(i) Contract clause entitled "FAR 52.229-06 Taxes—Foreign Fixed-Price Contracts (Jan 1991)."

(ii) US-ROK Status of Forces Agreement (SOFA), Articles IX and XVI.

(iii) ROK Customs Law, Law No. 1976, promulgated on 29 November 1967, as amended.

(iv) ROK Value Added Tax Law, Law No. 2934, promulgated on 22 December 1976 (effective date 1 July 1977), as amended.

(v) ROK Special Excise Tax Law, Law No. 2935, promulgated on 22 December 1976 (effective date 1 July 1977), as amended.

(2) Contractor shall state the types and estimated amount of taxes that would normally apply to such transactions but are excluded from this proposal.

(i) Customs Tax (except for ROK MND-funded contracts or delivery orders):

Name Number Cost/Unit of Item of Units w/o Tax % of Tax Tax/Unit Tax Total

This item will be imported specifically for this contract? Yes _____ No _____

(ii) Special Excise Tax:

Name Number Cost/Unit of Item of Units w/o Tax % of Tax Tax/Unit Tax Total

Name of item manufacturer

(iii) Value Added Tax (VAT):

Input VAT on materials purchased for this contract. 10% _____ Input VAT on transportation leased/rented for this contract.10% _____ Input VAT on equipment leased/rented for this contract. 10% _____ Input VAT on services purchased for this contract. 10% _____ Output VAT on total contract amount. 10% _____

(iv) Special Excise (Petroleum) Tax:

No. of U/P Liters w/o Tax Tax/Unit Total Tax Amount Regular Gasoline ________ (L) ________ w________ w_____________ Premium Gasoline ________ (L) ________ w________ w_____________ Diesel ________ (L) ________ w________ w_____________ Other ________ (L) ________ w________ w_____________

(v) Education Tax.

(3) Name of the oil company from which POL products will be purchased:

Oil Company: _________________________________________ (Name only)

(4) I certify by this submission that all supplies and services to be purchased for this contract have been proposed exclusive of Value Added Tax, applicable Customs Tax (except ROK MND-funded contracts and delivery orders), Special Excise Tax, and Education Tax.

Signed (Chop)

(f) CERTIFICATIONS AND REPRESENTATIONS

By submitting an offer, each offeror agrees to be bound by all certifications and representations in this solicitation. The Government reserves the right to require any and all certifications and representations to be completed and signed in hard copy by the successful offeror prior to contract award. Failure of an offeror to complete the certifications and representations within the time directed by the Contracting Officer may result in a determination that the contractor is not a responsible offeror for this acquisition.

Section L - Instructions, Conditions and Notices to Bidders

INSTRUCTION TO OFFEROR

SECTION L

1. GENERAL INSTRUCTIONS FOR PREPARATION OF PROPOSAL:

The Government intends to award without discussion, but reserves the right to conduct discussions if deemed necessary and to establish a competitive range for efficiency in accordance with FAR 52.215-1(f)(4).

Offeror(s) may, at the discretion of the Government, be asked to provide more information and clarification regarding their proposals. The Government may make a final determination as to whether an offer is acceptable or unacceptable solely based on the proposals as submitted, without requesting any further information. However, if it is deemed necessary the Government may, at its sole discretion, request additional information clarifying but not substantially changing any proposal as submitted.

2. SUBMISSION OF PROPOSAL:

i) FBO SUBMISSION REQUIRED: Offers shall be submitted to the Federal Business Opportunities (FBO) website (https://www.fbo.gov/), or if FBO is not available, email to chusong.yi2.ln@mail.mil with the evidence document such as screen shot. The FBO unavailability is limited to only FBO server problem not individual failure/problem. All questions should be emailed to chusong.yi2.ln@mail.mil within five (5) days after the solicitation is issued.

ii) CLOSING DATE: The electronic offer shall be submitted by 1500 hours on the closing date of RFP.

iii) SUBMISSION REQUIREMENTS

a) PRICING PROPOSAL: The pricing proposal must clearly indicate prices for each Contract Line Item Number in Section B - Supplies or Services and Prices.

b) DETAILED OFFER BREAKDOWN: The detailed offer breakdown must clearly identify all costs that can materially impact the statement of work.

c) SECTION K - Representations, Certifications and Other Statements of Offerors

SECTION K-TAXES: Offerors must complete all tax portions of SECTION K. The offeror shall review all expenses to ensure that all applicable taxes are excluded from the overall price. In addition, offerors shall propose exemptions of specific ROK taxes that are legitimate, attributable to the contract, and authorized by the applicable stated references.

SECTION K-OTHER: Offerors must complete all Non-Tax related portions of SECTION K.

iv) COMPLIANCE WITH SOLICITATION: Failure to submit the above requirements under SECTION L may be grounds for determining the proposal to be non-compliant. For example, if a detailed offer breakdown is not submitted, the contracting officer will be unable to find the offeror's pricing proposal acceptable and the offeror's proposal will be ineligible for award. Non-compliance will only be cured if the government holds discussions as detailed in SECTION L.

52.232-18 AVAILABILITY OF FUNDS (APR 1984)

Funds are not presently available for this contract. The Government's obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer.

(End of clause)

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) Date and Time: 30 May 18, 1030 hours
POC: So, Ki Chong, DSN: 730-3713, Cell: 010-2718-7476
Location: Room No. 424, Building No. 2409, Camp Casey

(End of provision)

"Anyone who wants to attend the site visit should notify CONTRACT SPECIALIST NO LATER THAN 29 May 2018, 1500 hours in advance. The site visit will be canceled if no one has notified."

5152.236-4011 CONSTRUCTION PRICE RANGE

Pursuant to FAR 36.204 the estimated price range is between $500,000 and $1,000,000.

Section M - Evaluation Factors for Award

BASIS OF AWARD

Electronic offers submitted by 1500 hours on the closing date of RFP shall be considered timely.

i) EVALUATION CRITERIA

The pricing proposal shall be evaluated to determine whether it is complete and reasonable. A complete and reasonable pricing proposal will be deemed acceptable.

The detailed offer breakdown will be used by the contracting officer to determine whether proposed prices are complete and reasonable. A detailed offer breakdown may be used by the contracting officer to determine whether an offeror is able to complete the requirements under the contract, and/or whether discussions will be conducted pursuant to instructions to the offerors.

ii) SECTION K - Representations, Certifications and Other Statements of Offerors

a. SECTION K-TAXES will be evaluated to determine whether it is complete. In addition, propose exemptions of specific ROK taxes will be evaluated to determine whether they are legitimate, attributable to the contract, authorized, and reasonable. A complete SECTION-K that only proposes exemptions of specific ROK taxes that are legitimate, attributable to the contract, necessary to complete the Task Order, do not improperly overstate any proposed tax exemption, authorized, and reasonable will be deemed acceptable.

b. SECTION K-OTHER will be evaluated to determine whether it is complete. A complete SECTION K-OTHER will be deemed acceptable.

BASIS FOR AWARD: Award shall be made to the responsible offeror submitting the lowest priced offer that is evaluated as acceptable for all evaluation criteria.