W91QVN17R0066_Final.docx

DOCX document 70 KB Posted

Attached to
Repair transient barracks, Warrior Base
Solicitation number
W91QVN17R0066
Issued by

About this file

RFP No. W91QVN17R0066

View the file

Other files

File Type Posted
Drawing_files___107387___ARCH.pdf PDF
Drawing_files___107387___ELEC.pdf PDF
Drawing_files___107387___Title.pdf PDF
Drawing_files___107387___MECH.pdf PDF
Drawing_files___107387___CIVIL.pdf PDF
Submittal_Register___107387.xls XLS spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W91QVN-17-R-0066

Section B - Supplies or Services and Prices

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Job

Work Class: K

FFP

Repair transient barracks, Bldg #261, Warrior Base, FEWR #107387 FOB: Destination

PURCHASE REQUEST NUMBER: 0010982774

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Job

Estimated Cost for Work Hazard

FFP

is Zero(0).

FOB: Destination

NET AMT

SUBJECT TO THE AVAILABILITY OF END-OF YEAR FUNDS (SAEF)

"FUNDS ARE NOT PRESENTLY AVAILABLE FOR THIS ACQUISITION. NO CONTRACT AWARD WILL BE MADE UNTIL APPROPRIATED FUNDS ARE MADE AVAILABLE."

Section C - Descriptions and Specifications

TECHNICAL PROVISIONS - I

STATEMENT OF WORK

PROJECT NO TITLE LOCATION

107387 Repair transient barracks, building No. 261 Warrior Base

1. DESCRIPTION: The work to be performed to repair transient barracks, building No. 261 is described below and executed by one or more of the groups.

1.1. Work by Contractor: The contractor shall provide all labor, tools, equipment, supplies and any other resources necessary to accomplish the scope of work contained herein as indicated in the drawings and in accordance with the specifications.

1.2. Work by In-House Labor: Not applicable to this project..

1.3. Work by Troop Labor: Not applicable to this project.

2. PRINCIPAL FEATURES: This project includes the following principal features:

2.1. Schedule #I, Repair (K): All work shall be in accordance with the attached drawings and specifications.

2.1.1. Civil Work

2.1.1.1. Replace 150mm diameter Polyvinyl Chloride (PVC) water line including Post Indicator Valve (PIV) and guard post.

2.1.1.2. Remove existing fuel supply and return line connected to building No. 261.

2.1.1.3. Replace solid sodding.

2.1.2. Architectural Work

2.1.2.1. Apply epoxy coating including primer on existing concrete floor as shown on floor plans and interior finish schedule. The existing concrete flooring shall be smooth, true, level plane with all defects such as rough or scaling concrete, low spots, high spots, painting, and uneven surface shall have been corrected.

2.1.2.2. Apply acrylic fluid applied waterproofing roof coating on existing roof for all surfaces as per manufacture's recommendation and specification including repair minor damages of roof prior to finish work.

2.1.2.3. Replace existing Gypsum Wall Board (GWB) wall with new including metal studs and insulation as shown on floor plans and interior finish schedules.

2.1.2.4. Paint on exterior wall, rain gutter, downspouts, and metal flashings including minor repair as shown on floor plans and elevations.

2.1.2.5. Paint all interior surfaces including exposed structure as shown on interior finish schedule.

2.1.2.6. Replace existing doors and door frames with new including new hardware sets as shown on floor plans and door schedule.

2.1.2.7. Replace existing window roll up screen blinds with news, fireproof type.

2.1.2.8. Replace existing windows including insect screen with new aluminum blast thermal breaker type windows including 26.75mm thick low-e / laminated / insulated glass and protected metal flashing as shown on floor plans and window schedule.

2.1.2.9. Replace all existing interior grilles with new.

2.1.2.10. Paint existing steel handrails and guardrails including sanding and primer in all stairs.

2.1.2.11. Replace existing building identifications with new as shown on floor plans, elevations and detail drawings.

2.1.2.12. Block up all grille openings, louver openings and duct openings with Concrete Masonry Unit (CMU), protected metal and GWB as shown on floor plans, sections and mechanical drawings.

2.1.2.13. Paint and minor repair existing exterior stairs including handrails and guardrails, and replace non slip nosing of exterior stairs with new as shown on floor plans.

2.1.2.14. Replace fire extinguisher bracket with new as shown on floor plans and detail drawings.

2.1.3. Mechanical Work

2.1.3.1. HVAC system

2.1.3.1.1. Replace existing heating boiler, air cooled condensing unit, air handling unit and duct with split type heat pump units including conc. pad, energy recovery ventilations, ductwork and diffusers with new.

2.1.3.1.2. Replace existing electric unit heater with new.

2.1.3.2. Plumbing system

2.1.3.2.1. Replace existing electric water cooler with new.

2.1.3.2.2. Replace existing all cold water piping with new.

2.1.3.2.3. Replace existing Back Flow Preventer (BFP) and Pressure Reducing Valve (PRV) assembly, including pipe supports and hose bibb with new.

2.1.3.3. Sprinkler work

2.1.3.3.1. Replace existing fire protection system with new wet type sprinkler system and associated piping with new.

2.1.4. Electrical Work

2.1.4.1. Replace existing lighting fixtures, exit lights, exterior lights, toggle switches, 3-way switches, wires and conduits with new.

2.1.4.2. Repair exist panelboard "LB" and lighting contactors for bay area lights..

2.1.4.3. Replace existing receptacles and cover plates, circuit breakers, and associated wiring and conduit with new.

2.1.4.4. Replace existing safety switches, junction boxes, control system, wires and conduits for HVAC system with new.

2.1.4.5. Replace fire alarm control system with new addressable fire alarm control and mass notification system panel, manual pull station, smoke and heat detectors and addressable module, building transmitter, antenna, visual signal strobes, microphone, speaker device, local operating console and associated wiring and conduit.

2.1.4.6. Replace exterior telecommunication line, telephone terminal cabinet including accessories, telephone outlets including cover plates and associated wiring and conduit.

2.2. Schedule #II, New Construction (L): None

TECHNICAL PROVISIONS - II

TECHNICAL DETAIL SPECIFICATIONS

PROJECT NO TITLE LOCATION

107387 Repair transient barracks, building No. 261 Warrior Base

GENERAL: The specification sections listed below are applicable to this project. The specifications are from the “Standard Technical Specifications for O&MA Projects, Korea, Revision 1” (2014 OMA SPECS, REVISION 1), dated 20151030, located on the http://www.usfk.mil/Portals/105/Documents/Contracting/NewContract/2014-OMA-SPECS_REVISION-1.pdf. The electronic version of the specifications is Acrobat® PDF format and can be read with the Acrobat Reader® software.

Changes to the Standard Technical Detail Specifications: None

TECHNICAL PROVISIONS - III

SPECIAL CONDITIONS

PROJECT NO TITLE LOCATION

107387 Repair transient barracks, building No. 261 Warrior Base

1. The contractor shall have personnel on site for the sprinkler work and the fire alarm work upon Government's direction, who are certified by the National Institute for Certification in Engineering Technologies (NICET) Level III or equivalent. Equivalent Certificates in Korea are the followings which are issued by the Human Resource Development Service of Korea. If the contractor doesn’t have personnel who are certified by NICET, the contractor shall have two personnel that one is certified for (1) and the other for (2) below.

(1) Engineer Fire Fighting Facilities - Electrical (소방설비기사 -전기)

(2) Engineer Fire Fighting Facilities - Mechanical (소방설비기사 -기계)

2. Environmental Requirements in Contract

The Contractor shall perform work consistent with the relevant policy and objectives identified in Installation’s Environmental Management System (EMS). The Contractor shall perform work in a manner that conforms to all appropriate Environmental Management Programs and Operational Controls identified by Installation’s EMS, including pollution prevention, waste reduction, energy use, and natural resource protection. The Contractor shall provide monitoring and measurement information as necessary for the organization to address environmental performance relative to the environmental, energy, and transportation management goals. In addition, the Contractor shall advise their employees of their roles and responsibilities identified by the EMS and how these requirements affect their work performed under this contract. The Contractor is responsible for ensuring that the Contractor and any persons involved in the supervision or performance of the contract complete all required Environmental training.

In the event of any environmental nonconformance or noncompliance associated with the contracted services, the contractor shall take corrective and/or preventative actions. In the event of any noncompliance with any federal, state, or local environmental law, regulation or requirement, the Contractor shall immediately respond by taking all appropriate corrective actions and notifying the Contracting Officer’s Representative (COR) and the Environmental Office. For any nonconformance with the EMS, the Contractor shall take corrective action and initiate further preventative action, as required by the Environmental Office.

All on-site contractor personnel shall complete necessary safety and environmental training specified for the type of work conducted on-site. Upon contract award, the COR will notify the EMS Manager to arrange Environmental training for appropriate staff.

Additionally, when ordering supplies for use on Installation, all contractor personnel must favor energy-efficient, recycled or reclaimed material whenever practicable.

The responsibilities of all contractor personnel include:

(1) Comply with all applicable environmental laws, regulations and installation environmental policies.

(2) Control and prevent spills or hazardous substances releases IAW installation Spill Prevention Plan.

(3) Ensure dust, debris, materials, trash, etc., do not become air borne and travel off the project site.

(4) Do not remove, cut, deface, injure, or destroy land resources including trees, shrubs, vines, topsoil and land forms without approval, except in areas indicated on the drawings or specified to be cleared.

(5) Monitor all water areas affected by construction activities to prevent pollution of surface and ground waters. Do not apply toxic or hazardous chemicals to soil or vegetation unless otherwise indicated.

(6) Open burning is prohibited on the Government premises IAW installation environmental policy.

(7) Participate in installation’s recycling program.

(8) Reducing the amount of hazardous material and/or solvent used by purchasing fewer hazardous materials and by increasing the use of products with recycled content. Spills of hazardous or toxic materials must be immediately reported to the Contracting Officer and the Environmental Office. Storage, describing, packaging, labeling, marking and placarding of hazardous waste and hazardous material IAW applicable environmental laws, regulations and local environmental policies. Transport hazardous waste off Government property and dispose of it in compliance with National, Provincial, and/or Local requirements for solid waste disposal.

(9) Reducing the amount of solid waste from construction and demolition debris, and scrap metal sent to municipal and rubble landfills by reducing, reusing, and recycling. Handling, storage, and disposal of solid waste must be conducted to prevent contamination. Transport solid waste off Government property and dispose of it in compliance with National, Provincial, and/or Local requirements for solid waste disposal.

(10) Conserving energy and water usage by turning off lights and equipment when not in use and using only the necessary amount of water needed to complete the required tasks. Continuous conservation of our natural resources is a must.

(11) When potential cultural or historic items are inadvertently found during construction activities, immediately cease activities in the vicinity of the discovery and report the findings to the Environmental Office.

(12) Participate in installation’s Integrated Pest Management (IPM) program whenever practicable.

(13) Minimize interference with disturbance to, and damage to fish, wildlife, and plants including their habitat.

3. CONTRACT REQUIREMENTS PACKAGE ANTITERRORISM/OPERATIONS SECURITY REVIEW COVER SHEET

After Notice to process is issued, COR shall take following action, Section IV. Standard Contract Language/Contract Clause Applicability and/or Additional SOW Language.

A. AT Level I Training. This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 20 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 10 calendar days after completion of training by all employees and subcontractor personnel. AT level I awareness training is available at the following website: http://jko.jten.mil.

B. Access and General Protection/Security Policy and Procedures. This standard language is for contractor employees with an area of performance within Army controlled installation, facility, or area. Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

B-a. For contractors that do not require CAC, but require access to a DoD facility or installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

C. iWATCH Training. This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 10 calendar days of contract award and within 10 calendar days of new employees commencing performance with the results reported to the COR NLT 10 calendar days after contract award.

D. Requirement for OPSEC Training. Per AR 530-1 Operations Security, the contractor employees must complete Level I OPSEC Awareness training. New employees must be trained within 30 calendar days of their reporting for duty and annually thereafter.

OPSEC training is available at the following website: http://cdsetrain.dtic.mil/opsec/

Section F - Deliveries or Performance

CLAUSES INCORPORATED BY FULL TEXT

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 150 calendar days including 90 calendar days for procurement of US origin materials after notice to proceed (NTP) is issued. The time stated for completion shall include final cleanup of the premises.

(End of clause)

Section J - List of Documents, Exhibits and Other Attachments

SUBMITTAL REGISTER

Note1. See the updated document in FBO.

Note2. The submittal register in Section J, identifies the documentation that will be made available for approval and review by the Government in the performance of this task order. It is the contractor's responsibility that this data is in compliance with the corresponding OMA specification that is referenced.

LIST OF APPLICABLE CONTRACT DRAWINGS

PROJECT NO TITLE LOCATION

107387 Repair transient barracks, building No. 261 Warrior Base

GENERAL: The work shall conform to the following contract drawings and OMA standard detail drawings, 2014 (dated 30 November 2015), issued by the Department of the Army, Installation Management Agency, Korea Region Office and located on http://www.usfk.mil/Portals/105/Documents/Contracting/NewContract/STANDARD-DETAIL-DRAWINGS-FOR-OMA-PROJECTS-KOREA_20151130.pdf, all of which form a part of the specifications.

Ring No.
Sheet No.
Description
Date
1
T-1
TITLE SHEET

12 JAN 17

CIVIL

2
C-1
LOCATION PLAN AND GENERAL NOTES
12 JAN 17
3
C-2
SITE LAYOUT PLAN AND SCOPE OF WORK
12 JAN 17
4
C-3
MISC. DETAILS
12 JAN 17

ARCHITECTURAL

5
A-1
FLOOR PLANS, FEB DETAIL AND GENERAL NOTES
12 JAN 17
6
A-2
ELEVATIONS
12 JAN 17
7
A-3
GENERAL SECTIONS AND SCOPE OF WORKS
12 JAN 17
8
A-4
INTERIOR FINISH, DOOR/WINDOW & HARDWARE SCHEDULE
12 JAN 17

MECHANICAL

9
M-1
MECHANICAL MATERIAL INDICATIONS & SYMBOLS AND ABBEVIATIONS
12 JAN 17
10
M-2
GENERAL NOTES, NOTES AND SCOPE OF WORK
12 JAN 17
11
M-3
MECHANICAL EQUIPMENT SCHEDULE
12 JAN 17
12
M-4
EXISTING 1ST FLOOR REMOVAL PLAN
12 JAN 17
13
M-5
EXISTING 2ND FLOOR REMOVAL PLAN
12 JAN 17
14
M-6
1ST FLOOR HVAC PLAN (ENERGY RECOVERY VENTILATION)
12 JAN 17

A-1

15
M-7
2ND FLOOR HVAC PLAN (ENERGY RECOVERY VENTILATION)
12 JAN 17
16
M-8
1ST FLOOR HVAC PLAN (HEAT PUMP)
12 JAN 17
17
M-9
2ND FLOOR HVAC PLAN (HEAT PUMP)
12 JAN 17
18
M-10
PLUMBING PIPING PLANS AND NOTES
12 JAN 17
19
M-11
INDEX OF DRAWING, LEGEND & ABBREVIATION AND AUTOMATIC FIRE SUPPRESSION GENERAL NOTES
12 JAN 17
20
M-12
1ST FLOOR FIRE PROTECTION PIPING PLAN
12 JAN 17
21
M-13
2ND FLOOR FIRE PROTECTION PIPING PLAN
12 JAN 17
22
M-14
MECH ROOM FIRE PROTECTION PIPING PARTIAL PLAN & ISOMETRIC DIAGRAM AND FIRE PROTECTION REQUIREMENTS
12 JAN 17
23
M-15
DETAILS-1
12 JAN 17
24
M-16
DETAILS-2

12 JAN 17

ELECTRICAL

25
E-1
LEGEND, GENERAL NOTES AND SCOPE OF WORKS
12 JAN 17
26
E-2
1ST FLOOR LIGHTING PLAN AND LIGHTING FIXTURE DETAIL
12 JAN 17
27
E-3
2ND FLOOR LIGHTING PLAN AND LIGHTING FIXTURE SCHEDULE
12 JAN 17
28
E-4
1ST FLOOR POWER PLAN, EXIST/NEW PNLBD "MDPB" & "MPB" LOAD SCHEDULE
12 JAN 17
29
E-5
2ND FLOOR POWER PLAN, EXIST/NEW PNLBD "B2" LOAD SCHEDULE
12 JAN 17
30
E-6
1ST FLOOR FIRE ALARM CONTROL & MASS NOTIFICATION SYSTEM PLAN
12 JAN 17
31
E-7
2ND FLOOR FIRE ALARM CONTROL & MASS NOTIFICATION SYSTEM PLAN
12 JAN 17
32
E-8
FIRE ALARM/MASS NOTIFICATION SYSTEM DIAGRAM
12 JAN 17
33
E-9
1ST, 2ND FLOOR TEL PLAN & TELEPHONE SYSTEM DIAGRAM
12 JAN 17
34
E-10
EXTERIOR TEL DISTRIBUTION PLAN
12 JAN 17

Section K - Representations, Certifications and Other Statements of Offerors

52.203-2 CERTIFICATE OF INDEPENDENT PRICE DETERMINATION (APR 1985)

(a) The offeror certifies that --

(1) The prices in this offer have been arrived at independently, without, for the purpose of restricting competition, any consultation, communication, or agreement with any other offeror or competitor relating to –

(i) Those prices,

(ii) The intention to submit an offer, or

(iii) The methods of factors used to calculate the prices offered:

(2) The prices in this offer have not been and will not be knowingly disclosed by the offeror, directly or indirectly, to any other offeror or competitor before bid opening (in the case of a sealed bid solicitation) or contract award (in the case of a negotiated solicitation) unless otherwise required by law; and

(3) No attempt has been made or will be made by the offeror to induce any other concern to submit or not to submit an offer for the purpose of restricting competition.

(b) Each signature on the offer is considered to be a certification by the signatory that the signatory --

(1) Is the person in the offeror's organization responsible for determining the prices offered in this bid or proposal, and that the signatory has not participated and will not participate in any action contrary to subparagraphs (a)(1) through (a)(3) of this provision; or

(2) (i) Has been authorized, in writing, to act as agent for the following principals in certifying that those principals have not participated, and will not participate in any action contrary to subparagraphs (a)(1) through (a)(3) of this provison ______________________________________________________ (insert full name of person(s) in the offeror's organization responsible for determining the prices offered in this bid or proposal, and the title of his or her position in the offeror's organization);

(ii) As an authorized agent, does certify that the principals named in subdivision (b)(2)(i) above have not participated, and will not participate, in any action contrary to subparagraphs (a)(1) through (a)(3) above; and

(iii) As an agent, has not personally participated, and will not participate, in any action contrary to subparagraphs (a)(1) through (a)(3) of this provision.

(c) If the offeror deletes or modifies subparagraph (a)(2) of this provision, the offeror must furnish with its offer a signed statement setting forth in detail the circumstances of the disclosure.

(End of Provision)

Section L - Instructions, Conditions and Notices to Bidders

1. GENERAL INSTRUCTIONS FOR PREPARATION OF PROPOSAL:

a. The Government intends to award without discussion, but reserves the right to conduct discussions if deemed necessary and to establish a competitive range for efficiency in accordance with FAR 52.215-1(f)(4).

b. Offeror(s) may, at the discretion of the Government, be asked to provide more information and clarification regarding their proposals. The Government may make a final determination as to whether an offer is acceptable or unacceptable solely based on the proposals as submitted, without requesting any further information. However, if it is deemed necessary the Government may, at its sole discretion, request additional information clarifying but not substantially changing any proposal as submitted.

2. SUBMISSION OF PROPOSAL:

a. Offers shall be submitted to the Federal Business Opportunities (FBO) website (https://www.fbo.gov/), or if FBO is not available, email to suok.yun.ln@mail.mil with the evidence document such as screen shot. The FBO unavailability is limited to ONLY FBO server problem not individual failure/problem. All questions should be emailed to suok.yun.ln@mail.mil within four (4) days after the solicitation is issued. The electronic offer shall be submitted by the closing date & time of RFP.

b. The PRICING PROPOSAL with the detailed cost breakdown shall be submitted by the closing date & time of RFP through https://www.fbo.gov/. The cost breakdown should clearly identify all the significant costs associated with the level of effort prescribed in the statement of work. Any omission of such data may result in the offeror not being considered for award.

c. Section K : Offerors must complete all portions of Section K and submit it through https://www.fbo.gov/ by the closing date & time of RFP. The offeror shall review all expenses to ensure that all applicable taxes are excluded from the overall price. In addition, any proposed exemption of a specific ROK tax shall be legitimate, attributable to the contract, and authorized by the applicable stated references.

Failure to submit the above requirements may be grounds for determining the proposal to be non-compliant and not eligible to be considered for award.

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for--

a. Date & Time: 24 Feb 2017 at 0900 hours

b. POC: Mr. So, Ki Chong, DSN:730-3713

c. Location: Bldg#617, Cp Casey.

(End of provision)

252.209-7999 Representation by Corporations Regarding an Unpaid Delinquent Tax Liability or a Felony Conviction under any Federal Law REPRESENTATION BY CORPORATIONS REGARDING AN UNPAID DELINQUENT TAX LIABILTIY OR A FELONY CONVICTION UNDER ANY FEDERAL LAW (DEVIATION 2012-00004) (JAN 2012)

1. In accordance with sections 8124 and 8125 of Division A of the Consolidated Appropriations Act, 2012, (Pub. L. 112-74) none of the funds made available by that Act may be used to enter into a contract with any corporation that-

(1) Has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability, where the awarding agency is aware of the unpaid tax liability, unless the agency has considered suspension or debarment of the corporation and made a determination that this further action is not necessary to protect the interests of the Government.

(2) Was convicted of a felony criminal violation under any Federal law within the preceding 24 months, where the awarding agency is aware of the conviction, unless the agency has considered suspension or debarment of the corporation and made a determination that this action is not necessary to protect the interests of the Government.

1. The Offeror represents that –

(1) It is ( ) is not ( ) a corporation that has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with authority responsible for collecting the tax liability,

(2) It is ( ) is not ( ) a corporation that was convicted of a felony criminal violation under a federal law within the preceding 24 months.

(End of provision)

5152.236-4011 CONSTRUCTION PRICE RANGE

Pursuant to FAR 36.204 the estimated price range is between $ 500,000and $ 1,000,000.

Section M - Evaluation Factors for Award

BASIS OF AWARD

Award shall be made to the responsible offeror submitting the lowest priced, technically acceptable offer and completed Section K that satisfies all terms and conditions of this solicitation. The Government reserves the right to make a technical acceptability determination without any discussion with the offeror. The tax exemptions stated in Section K will be reviewed by the contracting officer for reasonableness and necessity to complete the Task Order. The contracting officer may reject a proposal if the offeror appears to improperly overstate any proposed tax exemptions.