Drawing_files___107387___Title.pdf

PDF 284 KB Posted

Attached to
Repair transient barracks, Warrior Base
Solicitation number
W91QVN17R0066
Issued by

About this file

Drawing_total

View the file

Other files

File Type Posted
Drawing_files___107387___ARCH.pdf PDF
Drawing_files___107387___ELEC.pdf PDF
Drawing_files___107387___MECH.pdf PDF
W91QVN17R0066_Final.docx DOCX document
Drawing_files___107387___CIVIL.pdf PDF
Submittal_Register___107387.xls XLS spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE OF DRAWINGS

RING NO. REF. NO.REVISION STATUSDWG. NO. SHT. NO.REF. NO.

T - 1

RING NO.

CIVIL

C - 1

M - 1

M - 2

M - 3

MECHANICAL

ELECTRICAL

A - 1

A - 2

A - 3

ARCHITECTURAL

DESCRIPTION OF DRAWINGS

TITLE SHEET

DWG. NO. SHT. NO. DESCRIPTION OF DRAWINGS REVISION STATUS

TITLE SHEET

T-1

A - 4

M - 4

M - 5

M - 6

M - 7

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

E - 1

E - 2

E - 3

E - 4

E - 5

E - 6

M - 8

M - 9

M - 10

M - 11

LEGEND, GENERAL NOTES AND SCOPE OF WORKS

ELEVATIONS

GENERAL SECTIONS AND SCOPE OF WORKS

INTERIOR FINISH, DOOR/WINDOW & HARDWARE SCHEDULE

MECHANICAL MATERIAL INDICATIONS & SYMBOLS AND ABBEVIATIONS

1ST FLOOR LIGHTING PLAN AND LIGHTING FIXTURE DETAIL

2ND FLOOR LIGHTING PLAN AND LIGHTING FIXTURE SCHEDULE

REPAIR TRANSIENT LIVING QUARTER, BLDG NO. 261

FEWR NO 107387, WARRIOR BASE

BLDG NO. 261

REPAIR TRANSIENT LIVING QUARTER,

WARRIOR BASEYI, SC

107387

C - 2

C - 3

LOCATION PLAN AND GENERAL NOTES

SITE LAYOUT PLAN AND SCOPE OF WORK

MISC. DETAILS

FLOOR PLANS, FEB DETAIL AND GENERAL NOTES

GENERAL NOTES, NOTES AND SCOPE OF WORK

MECHANICAL EQUIPMENT SCHEDULE

EXISTING 1ST FLOOR REMOVAL PLAN

EXISTING 2ND FLOOR REMOVAL PLAN

1ST FLOOR HVAC PLAN (ENERGY RECOVERY VENTILATION)

2ND FLOOR HVAC PLAN (ENERGY RECOVERY VENTILATION)

1ST FLOOR HVAC PLAN (HEAT PUMP)

2ND FLOOR HVAC PLAN (HEAT PUMP)

PLUMBING PIPING PLANS AND NOTES

SUPPRESSION GENERAL NOTES

INDEX OF DRAWING, LEGEND & ABBREVIATION AND AUTOMATIC FIRE

1ST FLOOR FIRE PROTECTION PIPING PLAN

2ND FLOOR FIRE PROTECTION PIPING PLAN

AND FIRE PROTECTION REQUIREMENTS

MECH ROOM FIRE PROTECTION PIPING PARTIAL PLAN & ISOMETRIC DIAGRAM

DETAILS-1

DETAILS-2

M - 12

M - 13

M - 14

M - 15

M - 16

E - 7

E - 8

2ND FLOOR POWER PLAN, EXIST/NEW PNLBD "B2" LOAD SCHEDULE

FIRE ALARM/MASS NOTIFICATION SYSTEM DIAGRAM

SCHEDULE

1ST FLOOR POWER PLAN, EXIST/NEW PNLBD "MDPB" & "MPB" LOAD

PLAN

1ST FLOOR FIRE ALARM CONTROL & MASS NOTIFICATION SYSTEM

PLAN

2ND FLOOR FIRE ALARM CONTROL & MASS NOTIFICATION SYSTEM

E - 9

E - 10 EXTERIOR TEL DISTRIBUTION PLAN

1ST, 2ND FLOOR TEL PLAN & TELEPHONE SYSTEM DIAGRAM

File details come from the government source that posted it. Updated .