Drawing_files___107387___Title.pdf
PDF 284 KB Posted
- Attached to
- Repair transient barracks, Warrior Base
- Solicitation number
- W91QVN17R0066
About this file
Drawing_total
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Drawing_files___107387___ARCH.pdf | ||
| Drawing_files___107387___ELEC.pdf | ||
| Drawing_files___107387___MECH.pdf | ||
| W91QVN17R0066_Final.docx | DOCX document | |
| Drawing_files___107387___CIVIL.pdf | ||
| Submittal_Register___107387.xls | XLS spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCHEDULE OF DRAWINGS
RING NO. REF. NO.REVISION STATUSDWG. NO. SHT. NO.REF. NO.
T - 1
RING NO.
CIVIL
C - 1
M - 1
M - 2
M - 3
MECHANICAL
ELECTRICAL
A - 1
A - 2
A - 3
ARCHITECTURAL
DESCRIPTION OF DRAWINGS
TITLE SHEET
DWG. NO. SHT. NO. DESCRIPTION OF DRAWINGS REVISION STATUS
TITLE SHEET
T-1
A - 4
M - 4
M - 5
M - 6
M - 7
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
E - 1
E - 2
E - 3
E - 4
E - 5
E - 6
M - 8
M - 9
M - 10
M - 11
LEGEND, GENERAL NOTES AND SCOPE OF WORKS
ELEVATIONS
GENERAL SECTIONS AND SCOPE OF WORKS
INTERIOR FINISH, DOOR/WINDOW & HARDWARE SCHEDULE
MECHANICAL MATERIAL INDICATIONS & SYMBOLS AND ABBEVIATIONS
1ST FLOOR LIGHTING PLAN AND LIGHTING FIXTURE DETAIL
2ND FLOOR LIGHTING PLAN AND LIGHTING FIXTURE SCHEDULE
REPAIR TRANSIENT LIVING QUARTER, BLDG NO. 261
FEWR NO 107387, WARRIOR BASE
BLDG NO. 261
REPAIR TRANSIENT LIVING QUARTER,
WARRIOR BASEYI, SC
107387
C - 2
C - 3
LOCATION PLAN AND GENERAL NOTES
SITE LAYOUT PLAN AND SCOPE OF WORK
MISC. DETAILS
FLOOR PLANS, FEB DETAIL AND GENERAL NOTES
GENERAL NOTES, NOTES AND SCOPE OF WORK
MECHANICAL EQUIPMENT SCHEDULE
EXISTING 1ST FLOOR REMOVAL PLAN
EXISTING 2ND FLOOR REMOVAL PLAN
1ST FLOOR HVAC PLAN (ENERGY RECOVERY VENTILATION)
2ND FLOOR HVAC PLAN (ENERGY RECOVERY VENTILATION)
1ST FLOOR HVAC PLAN (HEAT PUMP)
2ND FLOOR HVAC PLAN (HEAT PUMP)
PLUMBING PIPING PLANS AND NOTES
SUPPRESSION GENERAL NOTES
INDEX OF DRAWING, LEGEND & ABBREVIATION AND AUTOMATIC FIRE
1ST FLOOR FIRE PROTECTION PIPING PLAN
2ND FLOOR FIRE PROTECTION PIPING PLAN
AND FIRE PROTECTION REQUIREMENTS
MECH ROOM FIRE PROTECTION PIPING PARTIAL PLAN & ISOMETRIC DIAGRAM
DETAILS-1
DETAILS-2
M - 12
M - 13
M - 14
M - 15
M - 16
E - 7
E - 8
2ND FLOOR POWER PLAN, EXIST/NEW PNLBD "B2" LOAD SCHEDULE
FIRE ALARM/MASS NOTIFICATION SYSTEM DIAGRAM
SCHEDULE
1ST FLOOR POWER PLAN, EXIST/NEW PNLBD "MDPB" & "MPB" LOAD
PLAN
1ST FLOOR FIRE ALARM CONTROL & MASS NOTIFICATION SYSTEM
PLAN
2ND FLOOR FIRE ALARM CONTROL & MASS NOTIFICATION SYSTEM
E - 9
E - 10 EXTERIOR TEL DISTRIBUTION PLAN
1ST, 2ND FLOOR TEL PLAN & TELEPHONE SYSTEM DIAGRAM
File details come from the government source that posted it. Updated .