Drawing_files___107387___ARCH.pdf
PDF 872 KB Posted
- Attached to
- Repair transient barracks, Warrior Base
- Solicitation number
- W91QVN17R0066
About this file
Drawing_ARCH
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Drawing_files___107387___ELEC.pdf | ||
| Drawing_files___107387___Title.pdf | ||
| Drawing_files___107387___MECH.pdf | ||
| W91QVN17R0066_Final.docx | DOCX document | |
| Drawing_files___107387___CIVIL.pdf | ||
| Submittal_Register___107387.xls | XLS spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A-1
MANUFACTURES INDICATED.
PURPOSES ONLY. AND NOT INTENDED TO LIMIT SELECTIONS TO PRODUCTS OF THE
COLORS AND PATTERNS LISTED BY MANUFACTURES ARE FOR BIDDING IDENTIFICATION 1.
ADJACENT AREAS AS DIRECTED BY THE CONTRACTING OFFICER REPRESENTATIVE (COR).
CAUSED BY THIS PROJECT AND SHALL REPAIR THE DAMAGES TO MATCH UP TO
CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DAMAGES MADE TO EXISTING AREAS
FOR APPROVAL.
CONTRACTOR ACCORDING TO ACTUAL FIELD CONDITION AND SUBMITED TO COR
CONDITION. IN THAT CASE, SHOP DRAWINGS SHALL BE PREPARED AT THE SITE BY THE
SOME DETAILS SHOWN ON CONTRACT DRAWINGS MAY NOT COINCIDE WITH THE FIELD
8.
FOR APPROVAL.
CONTRACTOR SHALL SUBMIT MANUFACTURER'S INSTALLATION SHOP DRAWINGS TO COR
OFFICE, DPW. PER DIRECTION FROM THE INSPECTOR IN CHARGE OR COR
SALVAGE OR SERVICEABLE MATERIALS SHALL BE RETURNED TO SUPPLY OR STORAGE
2.
3.
4.
5.
6.
7.
CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER
IF THERE ARE ANY CONFLICTS WITHIN THE CONTRACT DOCUMENT. THE GENERAL
AND DIMENSIONS PRIOR TO COMMENCING ANY CONSTRUCTION OR RENOVATION.
THE CONTRACTOR SHALL BE RESPONSIBLE IN VERIFYING ALL EXISTING CONDITION
OF THE LOAD BEARING WALLS TO PREVENT COLLAPSE OF THE STRUCTURE
APPROPRIATE TEMPORARY SUPPORTS SHOULD BE CONSTRUCTED PRIOR TO DEMOLITION
9.
10.
11.
12.
13.
NUMBERS ARE FROM TM-5-807-7 AND FEDERAL STANDARD NO. 595b, COLORS.
COLOR OF MATERIALS & PAINTS SHALL BE SELECTED BY USING AGENCY AND COLOR
DETAILS AND GET APPROVAL FROM COR. BEFORE FABRICATION AND INSTALLATION.
CONTRACTOR SHALL PREPARE SHOP DRAWINGS FOR ALL DOOR/WINDOW
WALL : 2.00 SM. DEG K/W
ROOF : 5.64 SM. DEG K/W
R-VALUE :
ADDITIONAL COST TO THE GOVERNMENT.
EQUIPMENT, ETC), ELECTRICAL, TELEPHONE AND FIRE ALARM SYSTEM WITHOUT
THE INSTALLATION AND/OR REPLACEMENT OF MECHANICAL (PLUMBING, HEATING,
ITEMS, CUT, PATCH AND RESTORE WALLS, FLOORS AND CEILING WHERE REQUIRED FOR
THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVE/REINSTALL ANY OBSTRUCTED
GENERAL NOTES
23,700
5,6756,1756,1755,675
,7
,3
,0
,3
,7
3,000 3,000
1502,7872,7372,9756,4002,9752,7372,787150
11,85011,850
BEDROOM
BEDROOM
ROOM
MECH
23,700
5,6756,1756,1755,675
,7
,3
,0
,7
,3
11,85011,850
3,050
,3
,2
,3
,4
BEDROOM
BEDROOM
W1
D2 D2
W1 W1 W1
W1
W1
W1
W1
W1
W1W1
W1
D2
W1 W1 W1 W1
D2
D1
D1
,2
,3
,9
EXST CMU WALL
PAINT ON
EXST CMU WALL
PAINT ON
(TYP)
CANOPY ABOVE
D3
D1
EWC
EWC
107387
BLDG NO. 261
REPAIR TRANSIENT LIVING QUARTER,
WARRIOR BASEYI, SC
ARCHITECTURAL
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
SCALE: 1/100
1ST FLOOR PLAN
SCALE: 1/100
2ND FLOOR PLAN
A-3
A-3
A-3
A-3
A-2
A-2
A-2 A-2
A-2
A-2
A-2
A-2
AND GENERAL NOTES
FLOOR PLANS, FEB DETAIL
(TYP)
BLOCK UP
(TYP)
BLOCK UP
THE CONTRACT DOCUMENT OF THIS PROJECT.
STANDARD DETAIL DRAWINGS FOR O&MA PROJECT, KOREA, SHALL BE AS A PART OF
& INSULATION
W/METAL STUDS
REPLACE GWB
& INSULATION
W/METAL STUDS
REPLACE GWB
BY MFR
OR AHR BOLT
TOGGLE BOLT
BRACKET
ISOMETRIC
SCALE: N/A
FE BRACKET DETAIL
(NIC)
EXTINGUISHER,
FIRE
FEBFEB
FEB FEB
A-2
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
V A
R ,0
,3
V A
R ,0
,3
V A
R ,0
,3
V A
R ,0
,3
W/METAL DOOR FRAME (TYP)
INSULATED METAL DOOR
PAINT ON EXST EXTERIOR WALLS
ON EXST PROTECTED
METAL ROOF (TYP)
ACRYLIC WATERPROOFING
BLDG NO. 261
REPAIR TRANSIENT LIVING QUARTER,
WARRIOR BASEYI, SC
ARCHITECTURAL
107387
W/METAL DOOR FRAME (TYP)
INSULATED BLAST METAL DOOR
THERMAL BREAK TYPE (TYP)
BLAST AL. WINDOW,
SCALE: 1/100
FRONT ELEVATION
SCALE: 1/100
RIGHT SIDE ELEVATION
SCALE: 1/100
SCALE: 1/100
LEFT SIDE ELEVATIONREAR ELEVATION
W/METAL DOOR FRAME (TYP)
INSULATED BLAST METAL DOOR
INCL. HANDRAILS (TYP)
PAINT EXTERIOR STAIRS
INCL. HANDRAILS (TYP)
PAINT EXTERIOR STAIRS
REPAIR DOWNSPOUT (TYP)
PAINT ON EXST EXTERIOR WALLS
ON EXST PROTECTED
METAL ROOF (TYP)
ACRYLIC WATERPROOFING
ELEVATIONS
S-261
S-261
,3
,3
PAINT ON EXST EXTERIOR WALLS (TYP)
EXTERIOR WALL (TYP)
PAINT ON EXST
GL GL
GLGL
RAIN GUTTER (TYP)
REPAIR & PAINT
RAIN GUTTER (TYP)
REPAIR & PAINT
DOWNSPOUT (TYP)
REPAIR & PAINT
REPAIR & PAINT DOWNSPOUT (TYP)
SPLASH BLOCK (TYP)
CONC
ON EXST PROTECTED
METAL ROOF (TYP)
ACRYLIC WATERPROOFING
BUILDING IDENTIFICATION (TYP)
SPLASH BLOCK (TYP)
REPLACE CONC
SPLASH BLOCK (TYP)
REPLACE CONC
(TYP)
METAL EXTERIOR WALL
REPLACE PROTECTED
A-3
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
REPAIR / MAINTENANCE (K) WORKS
1.
2.
3.
4.
6.
7.
8.
9.
5.
10.
V A
R ,0
V A
R I E
S
ROOM
MECH
BEDROOM
BEDROOM
BEDROOM
BEDROOM
V A
R ,0
,3
ROOM
MECH
BEDROOM
BEDROOM
TO THE INTERIOR (TYP)
& STL COL EXPOSED
PAINT ON EXST WALL
CEILING (TYP)
STL MEMBERS ON THE
EXPOSED CEILING &
PAINT ON EXST ALL
WITH STEEL FRAME (TYP)
HOLLOW CORE DOOR
DOUBLE-ACTING STEEL
CEILING (TYP)
STL MEMBERS ON THE
EXPOSED CEILING &
PAINT ON EXST ALL
PAINT ON EXST CMU WALL (TYP)
11.
12.
FLOOR PLANS, ELEVATIONS AND DETAIL DRAWINGS.
REPLACE DETERIORATED EXISTING BUILDING IDENTIFICATIONS WITH NEW AS SHOWN ON
HARDWARE SETS AS SHOWN ON FLOOR PLANS AND DOOR SCHEDULE.
REPLACE DETERIORATED EXISTING DOORS AND DOOR FRAMES WITH NEW INCLUDING NEW
CEILING (TYP)
STL MEMBERS ON THE
EXPOSED CEILING &
PAINT ON EXST ALL
13.
TO THE INTERIOR (TYP)
& STL COL EXPOSED
PAINT ON ALL WALL
INSULATIONS (TYP)
METAL STUDS &
REPLACE GWB INCL.
INSULATIONS (TYP)
METAL STUDS &
REPLACE GWB INCL.
MINOR DAMAGES OF ROOF PRIOR TO FINISH WORK.
SURFACES AS PER MANUFACTURE'S RECOMMENDATION & SPECIFICATION INCLUDING REPAIR
APPLY ACRYLIC FLUID APPLIED WATERPROOFING ROOF COATING ON EXISTING ROOF FOR ALL
BLDG NO. 261
REPAIR TRANSIENT LIVING QUARTER,
WARRIOR BASEYI, SC
ARCHITECTURAL
107387
ON EXST PROTECTED
METAL ROOF (TYP)
ACRYLIC WATERPROOFING
PAINT ON EXST EXTERIOR WALLS
SCALE:
GENERAL SECTION-1
1/50
SCALE:
GENERAL SECTION-2
1/50
SCOPE OF WORKS
FINISH SCHEDULE.
PAINT ALL INTERIOR SURFACES INCLUDING EXPOSED STRUCTURE AS SHOWN ON INTERIOR
TYPE.
REPLACE DETERIORATED EXISTING WINDOW ROLL UP SCREEN BLINDS WITH NEWS, FIREPROOF
WINDOW SCHEDULE.
INSULATED GLASS AND PROTECTED METAL FLASHING AS SHOWN ON FLOOR PLANS AND
BLAST THERMAL BREAKER TYPE WINDOWS INCLUDING 26.75THK LOW-e / LAMINATED /
REPLACE DETERIORATED EXISTING WINDOWS INCL INSECT SCREEN WITH NEW ALUMINUM
AND SCOPE OF WORKS
GENERAL SECTIONS
AS SHOWN ON FLOOR PLANS AND INTERIOR FINISH SCHEDULES.
REPLACE DETERIORATED EXISTING GWB WALL WITH NEW INCL. METAL STUDS & INSULATION
ON EXST FLOOR (TYP)
EPOXY COATING
GL
GL
ON EXST FLOOR (TYP)
EPOXY COATING
LOW SPOTS, HIGH SPOTS, PAINTING, AND UNEVEN SURFACE SHALL HAVE BEEN CORRECTED.
BE SMOOTH, TRUE, LEVEL PLANE WITH ALL DEFECTS SUCH AS ROUGH OR SCALING CONCRETE,
ON FLOOR PLANS & INTERIOR FINISH SCHEDULE. THE EXISTING CONCRETE FLOORING SHALL
APPLY EPOXY COATING INCLUDING PRIMER ON EXISTING CONCRETE FLOOR AS SHOWN
REPLACE CONC SPLASH BLOCK WITH NEW AS SHOWN ON FLOOR PLANS AND ELEVATIONS.
MINOR REPAIR AS SHOWN ON FLOOR PLANS AND ELEVATIONS.
PAINT ON EXTERIOR WALL, RAIN GUTTER, DOWNSPOUTS AND METAL FLASHINGS INCLUDING
AS SHOWN ON FLOOR PLANS.
AND GUARDRAILS, AND REPLACE NON SLIP NOSINGS OF EXTERIOR STAIRS WITH NEW
PAINT AND MINOR REPAIR DETERIORATED EXISTING EXTERIOR STAIRS INCL. HANDRAILS
(TYP)
DUCT OPENINGS
GRILLE AND
BLOCK UP
& INSULATION
W/METAL STUDS
GWB
DRAWINGS.
PROTECTED METAL AND GWB AS SHOWN ON FLOOR PLANS, SECTIONS AND MECHANINCAL
BLOCK UP ALL GRILLE OPENINGS, LOUVER OPENINGS AND DUCT OPENINGS WITH CMU,
14.
DETAIL DRAWINGS.
REPLACE FIRE EXTINGUISHER BRACKET WITH NEW AS SHOWN ON FLOOR PLANS AND
(TYP)
PROTECTED LINER PANEL
W/INSULATION &
LOUVER OPENINGS
BLOCK UP
(TYP)
GRILLE, MECH DWG
900X600 TRANSFER
REPLACE DETERIORATED ALL EXISTING INTERIOR GRILLES WITH NEW.
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
A-4
ROOM NAMESROOM NOS
INTERIOR FINISH SCHEDULE
FLOOR BASE WALLS CEILING
REMARKS
FINISH COLOR FINISH COLOR FINISH COLOR FINISH COLOR HEIGHT
PAINT VAR
BEDROOM
MECH ROOM -
MAT'L
EXST
MAT'L
NEW
MAT'L
EXST
MAT'L
NEW
MAT'L
EXST
MAT'L
NEW
MAT'L
NEW
MAT'L
EXST
PAINT PT-1
(2 EA)
P L A N
DOOR
S E C T I O N
STEEL TUBE
WELDED TO
STEEL PLATE
50 x 50 x 6THK
EYEBOLT
HOOK &
DOOR
HOOK & EYEBOLT
STEEL TUBE
CONC)
GALV STEEL
80x80x3.2 THK
80x80x3.2 THK
WALL TYPE BUMPER L02101
GALV STEEL TUBE
(FILLED W/CONC)
PLATE WELDED TO
WALL TYPE BUMPER L02101
YELLOW STRIPS
BLACK BACKGROUND
TUBE (FILLED W/
1 DOOR STOP & HOLDER DETAILS
REMARKS
DOOR DIMENSION
WIDTH
MATERIAL
D1 A
DOOR
TYPE
DOOR
NOS.
ROUGH OPENING
WIDTH HEIGHT
HDW
SET
THICKHEIGHT NO (HR)
RATED
FIRE
LOUVERGLAZING
CUT
UNDER
FRAME
D2 B
STEEL STEEL
- - 1
DOOR
2133STEEL STEEL 1300 2200 1200 44.5 - -2
15001200ALGLASSD - -------
HDW-1
DOOR STOPS L02141
HARDWARE SCHEDULE AND DETAIL
DOOR/WINDOW SCHEDULE
DOOR/WINDOW ELEVATIONS
FINISH SCHEDULE NOTES :
SURFACE
ROOFING
FLASHING
FASCIA
SOFFIT
DOOR & FRAME
HANDRAIL
MATERIAL
STEEL
STEEL PIPE
COLOR
CHOCOLATE
COLOR NO.
20095
CHOCOLATE
CHOCOLATE
CHOCOLATE
CHOCOLATE
CHOCOLATE
20095
20095
20095
20095
20095
REMARKS
WALL
PROTECTED METAL
PROTECTED METAL
PROTECTED METAL
EXTERIOR COLOR SCHEDULE-1
FS 595B
FS 595B
FS 595B
FS 595B
FS 595B
FS 595B
BEDROOM101
BEDROOM
202 BEDROOM
MATERIAL & COLOR SCHEDULE
2.
1.
FOR SUBMITTAL REQUIREMENTS AND SPECIFIC ITEMS TO BE PAINTED.
SCHEDULE. SEE SPECIFICATION SECTION 09915 : EXTERIOR AND INTERIOR COLOR SCHEDULE
COLOR DESIGNATION SHALL BE AS INDICATED IN THE EXTERIOR AND INTERIOR FINISH COLOR
WITH THE CAMP CASEY EXTERIOR COLOR SCHEME AS APPROVED BY THE COR.
SELECTION OF EXTERIOR PAINT AND FACTORY APPLIED COLORS SHALL BE IN ACCORDANCE
EP-1
/VCB
STL ANGLE
/VCB
STL ANGLE
/VCB
STL ANGLE
/VCB
STL ANGLE
-/VCB
-/VCB
-/VCB
-/VCB
PAINT/F.F.
VCB-1
PT-2/
PAINT/F.F.
VCB-1
PT-2/
PAINT/F.F.
VCB-1
PT-2/
PAINT/F.F.
VCB-1
PT-2/
GWB/CMU
METAL/
PT-1
- - -CMU
GWB/CMU
METAL/
PAINT PT-1
PAINT PT-1
GWB/CMU
METAL/
PAINT PT-1
/GWB
METAL
EXP STL -
VARPAINT PT-1EXP STL -
VAR-
VARPAINT PT-1EXP STL -
VARPAINT PT-1EXP STL -
MANUFACTURERS STANDARD MUST APPROACH.
COLOR IS NOT REQUIRED. THE SELECTIONS SERVE ONLY TO INDICATE THE COLOR WHICH THE
INTENDED TO LIMIT SELECTIONS OF PRODUCTS. AN EXACT MATCH OF THE MANUFACTURERS
MANUFACTURERS' COLORS LISTED ARE FOR IDENTIFICATION PURPOSES ONLY AND ARE NOT
PROTECTED METAL CHOCOLATE 20095 FS 595B
CHOCOLATE 20095 FS 595BSTAIRS STEEL
CHOCOLATE 20095 FS 595B
3.
4.
WINDOW ALUMINUM
PROTECTED METAL
21331300 2200 1200 44.5
SPRING HINGE K81151
KICK PLATES J102
HDW-2
HINGES A5111 (NRP)
DOOR CLOSER C02021
THRESHOLD J13100
KICK PLATES J102
1 DOOR STOP & HOLDER
WEATHERSTRIP1
& HARDWARE SCHEDULE
INTERIOR FINISH, DOOR/WINDOW
EXIT DEVICE TYPE3 F08, LEVER
D3 C - -2133STEEL STEEL 1800 2200 1728 44.5 -3 --
WINDOW
LOUVER
HDW-3
HINGES A5111 (NRP)
LOCKSET, F-07
FLUSH BOLTS, L04081
ASTRAGAL
1 THRESHOLD, J13100
-/GWB/-
-/GWB/-
-/GWB/-
-/GWB/-
PUSH PLATES
3.
COORDINATING WITH THE USER FOR APPROVAL BY COR.
THE CONTRACTOR SHALL SUBMIT MASTER KEYING CHART,
APPROVAL
AND WINDOW SCHEDULE AND DETAIL DRAWING TO COR FOR
CONTRACTOR SHOULD SUBMIT SHOP DRAWING FOR ALL DOOR
CONNECTED TO STRUCTURE WITH ANCHOR BOLT AND WELDING.
ALL EXTERIOR DOOR FRAME AND WINDOW FRAME SHOULD BE
AND UFC 4-010-01, PAG B-9 & 10, PARA B-3.1 THRU B-3.1.4
ALL EXTERIOR DOOR, GLAZED WINDOW: SEE SEPC SECTION 08391; 4.
6.
HEAT GAIN AND FIRERATED.
WHITE OR LIGHT BEIGE TO MAXIMIZE REFLECTANCE AND MINIMIZE
BE EQUIPPED WITH HORIZONTAL MINI BLINDS. COLOR SHALL BE
WINDOWS IN ALL AREAS WHERE FUNCTIONALLY WARRANTED SHALL
1.
2.
FABRICATION AND INSTALLATION
SHALL BE APPROVED BY THE CONTRACTING OFFICER BEFORE
DOORS AND ALUMINUM WINDOWS AS ACTUAL SIZE, AND DRAWINGS
THE CONTRACTOR SHALL PREPARE SHOP DRAWINGS FOR ALL
DOOR & WINDOW NOTES
WINDOW BLIND SHOULD BE EQUIPPED TO ALL EXTERIOR WINDOWS.
( SHGC : MAX 0.4 )
+ 6 THK TINTED LOW-E TEMPERED GLASS
+ 12 THK AIR SPACE
: 8.75 THK CLEAR LAMINATED GLASS
TYPICAL INSULATED/LAMINATED GLASS FOR WINDOWS
(ANODIZED DARK BRONZE)
AL BLAST WINDOW
(THERMAL BREAK TYPE)
W/ INSECT SCREEN
- PEAK REFLECTED PRESSURE
: 40.6 KPA
- PEAK IMPULSE
: 210 KPA-MS
D
STL DOOR
THERMAL INSULATED
C
SCHEDULED
LOUVER AS
(TYP)
300X400
2EA OF
BLDG NO. 261
REPAIR TRANSIENT LIVING QUARTER,
WARRIOR BASEYI, SC
ARCHITECTURAL
107387
B
CORE DOOR
A
VISION
LIGHT
100150
THERMAL INSULATED
W/ METAL FRAME
- PEAK REFLECTED PRESSURE
: 40.6 KPA
- PEAK IMPULSE
: 210 KPA-MS
W/ METAL FRAME W/ METAL FRAME
5.
100X600 10T TEMPERED GLASS
USER AGENCY.
SELECTION OF INTERIOR PAINT AND FACTORY APPLIED COLORS SHALL BE APPROVED BY
URETHANE
URETHANE
URETHANE
URETHANE
COATING
COATING
COATING
COATING
REPAIR
EXST
STOOP
EXST CONC
EXST
50x50x6 THK STEEL
FLOOR MATERIAL/COLOR
BASE MATERIAL/COLOR
VCB-1
WALL MATERIAL/COLOR
PT-1
OR APPROVED EQUAL
LATEX/SEMIGLOSS
NOROO NR7066
PAINT COLOR
CEILING MATERIAL/COLOR
PT-2
OR APPROVED EQUAL
LATEX/SEMIGLOSS
NOROO NR9058
PAINT COLOR
PT-1
OR APPROVED EQUAL
LATEX/SEMIGLOSS
NOROO NR7066
PAINT COLOR
TILT AND TURNROLL UP SCREEN BLINDW1 STL HOLLOW
STL BLAST DOOR
EP-1
EPOXY
EPOXY EP-1
EPOXY EP-1
EPOXY EP-1
OR APPROVED EQUAL
NONSLIP GRIT
CLEANPOXY 3100
NOROO PAINT & COAT
EPOXY
EXST FOOTING
OR APPROVED EQUAL
DARK BROWN
LG HAUSYS, 3THK
VINYL COVE BASE
| 107387-Repair transient living quarter, bldg no. 261, WB-A-1 |
| 107387-Repair transient living quarter, bldg no. 261, WB-A-2 |
| 107387-Repair transient living quarter, bldg no. 261, WB-A-3 |
| 107387-Repair transient living quarter, bldg no. 261, WB-A-4 |
File details come from the government source that posted it. Updated .