17-D-0001_Camp_Humphreys_Trash_Removal_and_Disposal.pdf
PDF 458 KB Posted
- Solicitation number
- W91QVN-16-R-0064
About this file
Removal/Disposal Services of Trash/Garbage and Bulk USAG-Camp Humphreys.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_03.pdf | ||
| W91QVN-16-R-0064.pdf | ||
| Amendment02.pdf | ||
| Amendment_01.doc | DOC document | |
| Solicitation_(8.12).doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W91QVN-16-R-0064 12-Aug-2016
b. TELEPHONE NUMBER
02-7914-3287
8. OFFER DUE DATE/LOCAL TIME
01:00 PM 09 Sep 2016
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
X
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.010-5221-3613
W91QVN9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
W91QVN-17-D-0001 06-Oct-2016
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
MS. KIM, KUM-OK
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
X
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
0010811693
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
MRS. NAN SPACE / SUPERVISORY CONTRACT SPECIALIS
KRW879,327,400.00
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED ORX
SMALL BUSINESS
17a.CONTRACTOR/ CODE 1S94F FACILITY
OFFEROR CODE
411TH CONTRACTING SUPPORT BRIGADE, KOREA
RCC YONGSAN, UNIT #15289
APO AP 96205-5289
UNITED STATES OF AMERICA (THE)
YONGMA SERVICE CORPORATION
HANJUN KWON
121 SINNAE-DONG, JUNGNANG-GU
SEOUL 131130
KOREA (THE REPUBLIC OF)
AFAS-K, 8TH ARMY G8
ATTN: ACCOUNTS PAYABLE BRANCH
UNIT# 15236
APO AP 96205-5236
UNITED STATES OF AMERICA (THE)
18a. PAYMENT WILL BE MADE BY CODE W56GBU
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
W91QVNCODE15. DELIVER TO CODE WT4KBR 16. ADMINISTERED BY
Net 30 Days
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
411TH CSB, KOREA - SERVICE TEAM
POC: MS. KIM, KUM-OK
TEL: 02-7914-3287
KUMOK.KIM2.LN@MAIL.MIL
APO AP 96205-5289
UNITED STATES OF AMERICA (THE)
W3BH USA GARRISON HUMPHREYS
W3BH USA GARRISON HUMPHREYS
STOCK RECORD DPW
UNIT 15716
APO AP 96271-5716
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$38,500,000
NAICS:
562111
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL: nan.s.space.civ@mail.mil
724-7656TEL:
31c. DATE SIGNED
06-Oct-2016
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF86
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W91QVN-17-D-0001
Section SF 30 - BLOCK 14 CONTINUATION PAGE
PERIOD OF PERFORMANCE
Phase-in 06 Oct 2016 – 31 Oct 2016 Base Period 01 Nov 2016 – 30 Sep 2017 1st Option Year 01 Oct 2017 – 30 Sep 2018 2nd Option Year 01 Oct 2018 – 30 Sep 2019 3rd Option Year 01 Oct 2019 – 30 Sep 2020 4th Option Year 01 Oct 2020 – 30 Sep 2021
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 11 Months KRW60,485,800.00 KRW665,343,800.00
REMOVAL AND DISPOSAL OF TRASH & GARBAGE
FFP
Six (6) days a Week (Monday thru Saturday) in accordance with Sections 5.1.1.
and 5.1.3. and Appendices A, C, and E of the PWS. Base Year: 1 Nov 16 thru 30 Sep 17.
FOB: Destination
PURCHASE REQUEST NUMBER: 0010811693
NET AMT KRW665,343,800.00
0002 11 Months KRW7,200,000.00 KRW79,200,000.00
REMOVAL AND DISPOSAL OF FOOD WASTE
FFP
Twice a day (NLT 09:30 and 14:30), seven (7) days a Week (Monday thru Sunday) in accordance with Section 5.1.2. and Appendix B of the PWS. Base Year: 1 Nov 16 thru 30 Sep 17.
NET AMT KRW79,200,000.00
0003 11 Months KRW-3,336,000.00 KRW-36,696,000.00
REFUND TO THE GOVERNMENT FOR RECYCLE
FFP
In accordance with Technical Exhibit 3 of the PWS. Base Option Year: 1 Nov 16 thru 30 Sep 17
NET AMT KRW-36,696,000.00
ITEM NO SUPPLIES/SERVICES ESTIMATED
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
0004 1,540 Each KRW10,890.00 KRW16,770,600.00
DUMPSTERS
FFP
Requirement Portion. 2.5 ton or 5 CM trash dumpsters in accordance with Para
4.2. of the PWS. Base Year: 1 Nov 16 thru 30 Sep 17. (140 each x 11 months).
ESTIMATED
NET AMT
KRW16,770,600.00
UNIT UNIT PRICE ESTIMATED AMOUNT
0005 330 Each KRW26,240.00 KRW8,659,200.00
SLIDING TYPE DUMPSTERS
FFP
Requirement Portion. Sliding type dumpsters in accordance with Para 4.2. of the PWS. Base Year: 1 Nov 16 thru 30 Sep 17. (30 each x 11 months).
KRW8,659,200.00
UNIT UNIT PRICE ESTIMATED AMOUNT
0006 KRW0.00
FIELD TRAINING EXERCISE (FTX) SUPPORT
FFP
REQUIREMENT ITEMS in accordance with Section 5.2. of the PWS.
KRW0.00
0006AA 400 Days KRW8,100.00 KRW3,240,000.00
ON BASE AND WITHIN 10 KM (ONE WAY) FROM
FFP
Tent city and Field Training Site in accordance with Section 5.2.1.1. of the PWS.
NET AMT KRW3,240,000.00
0006AB 600 Days KRW20,400.00 KRW12,240,000.00
OFF-BASE TRAINING SITE OVER 10 KM
FFP
To 80 Km (one way) from Camp Humphreys in accordance with Section 5.2.1.1.
of the PWS.
NET AMT KRW12,240,000.00
0006AC 1,800 Days KRW36,800.00 KRW66,240,000.00
OFF-BASE TRAINING SITE OVER 80 KM
FFP
To 160 Km (one way) from Camp Humphreys in accordance with Section 5.2.1.1.
of the PWS.
NET AMT KRW66,240,000.00
0006AD 50 Days KRW61,600.00 KRW3,080,000.00
OFF-BASE TRAINING SITE OVER
FFP
160 KM (one way) from Camp Humphreys In accordance with Section 5.2.1.1. of the PWS.
NET AMT KRW3,080,000.00
0007 3,500 Days KRW5,600.00 KRW19,600,000.00
LEASE TRASH DUMPSTER FOR EXERCISE
FFP
Support. Requirement Portion. In accordance with Para 5.2.1.3. of the PWS.
NET AMT KRW19,600,000.00
0008 470 Ton Miles KRW32,400.00 KRW15,228,000.00
REMOVAL OF WOOD, CUT TRESS, LIMBS,
FFP
Branches. Requirement Portion. In accordance with 5.2.2. of the PWS. Base Year: 1 Nov 16 thru 30 Sep 17
NET AMT KRW15,228,000.00
0009 KRW0.00
BULK ITEMS
FFP
Requirement Portion. In accordance with 5.2.3. of the PWS. Base Year: 1 Nov 16 thru 30 Sep 17
NET AMT KRW0.00
0009AA 200 Each KRW3,105.00 KRW621,000.00
BULK ITEMS
FFP
In accordance with 5.2.3. of the PWS and TE 4.
NET AMT KRW621,000.00
0009AB 200 Each KRW7,840.00 KRW1,568,000.00
DISPOSAL FEE
FFP
NOT TO EXCEED KRW 15,000 for Single Items based on the Actual Provided Receipt.
NET AMT KRW1,568,000.00
0010 700 Ton Miles KRW25,200.00 KRW17,640,000.00
IAW YONGSAN RELOCATION PLAN
FFP
Additional Trash and Garbage Removal and Disposal.
NET AMT KRW17,640,000.00
0011 110 Each KRW54,480.00 KRW5,992,800.00
IAW YONGSAN RELOCATION PLAN
FFP
Lease Trash Dumpsters.
NET AMT KRW5,992,800.00
0012 1 Each NSP
ESTIMATED COST FOR WAR HAZARD LOSSES IS
FFP
Zero
0013 1 Each KRW600,000.00 KRW600,000.00
ACCOUNTING FOR CONTRACT SERVICES
FFP
The Department of Army requires Contractor Manpower Reporting (CMR) by 31 October of each calendar year during the life of the contract in accordance with Para 5.3. of the Performance Work Statement (PWS) herein.
NET AMT KRW600,000.00
1001 12 Months KRW67,744,090.00 KRW812,929,080.00
OPTION REMOVAL AND DISPOSAL OF TRASH & GARBAGE
FFP
Six (6) days a Week (Monday thru Saturday) in accordance with Sections 5.1.1.
and 5.1.3. and Appendices A, C, and E of the PWS. 1st Option Year: 1 Oct 17 thru 30 Sep 18.
NET AMT KRW812,929,080.00
1002 12 Months KRW7,200,000.00 KRW86,400,000.00
OPTION REMOVAL AND DISPOSAL OF FOOD WASTE
FFP
Twice a day (NLT 09:30 and 14:30), seven (7) days a Week (Monday thru Sunday) in accordance with Section 5.1.2. and Appendix B of the PWS. 1st Option Year: 1 Oct 17 thru 30 Sep 18..
NET AMT KRW86,400,000.00
1003 12 Months KRW-4,032,000.00 KRW-48,384,000.00
OPTION REFUND TO THE GOVERNMENT FOR RECYCLE
FFP
In accordance with Technical Exhibit 3 of the PWS. 1st Option Year: 1 Oct 17 thru 30 Sep 18
NET AMT KRW-48,384,000.00
1004 1,680 Each KRW10,890.00 KRW18,295,200.00
OPTION DUMPSTERS
FFP
Requirement Portion. 2.5 ton or 5 CM trash dumpsters in accordance with Para
4.2. of the PWS. 1st Option Year: 1 Oct 17 thru 30 Sep 18. (235 each x 12 months).
NET AMT KRW18,295,200.00
1005 360 Each KRW26,240.00 KRW9,446,400.00
OPTION SLIDING TYPE DUMPSTERS
FFP
Requirement Portion. Sliding type dumpsters n accordance with Para 4.2. of the PWS. 1st Option Year: 1 Oct 17 thru 30 Sep 18. (30 each x 12 months).
NET AMT KRW9,446,400.00
1006 KRW0.00
OPTION FIELD TRAINING EXERCISE (FTX) SUPPORT
FFP
REQUIREMENT ITEMS in accordance with Section 5.2 of the PWS. 1st Option Year: 1 Oct 17 thru 30 Sep 18.
1006AA 520 Days KRW8,100.00 KRW4,212,000.00
OPTION ON BASE AND WITHIN 10 KM (ONE WAY) FROM
FFP
Tent city and Field Training Site in accordance with Section 5.2.1.1. of the PWS.
NET AMT KRW4,212,000.00
1006AB 780 Days KRW20,400.00 KRW15,912,000.00
OPTION OFF-BASE TRAINING SITE OVER 10 KM
FFP
To 80 Km (one way) from Camp Humphreys in accordance with Section 5.2.1.1.
of the PWS.
NET AMT KRW15,912,000.00
1006AC 2,340 Days KRW36,800.00 KRW86,112,000.00
OPTION OFF-BASE TRAINING SITE OVER 80 KM
FFP
To 160 Km (one way) from Camp Humphreys in accordance with Section 5.2.1.1.
NET AMT KRW86,112,000.00
1006AD 65 Days KRW61,600.00 KRW4,004,000.00
OPTION OFF-BASE TRAINING SITE OVER
FFP
160 KM (one way) from Camp Humphreys In accordance with Section 5.2.1.1. of the PWS.
NET AMT KRW4,004,000.00
1007 4,550 Days KRW5,600.00 KRW25,480,000.00
OPTION TRASH DUMPSTER FOR EXERCISE SUPPORT
FFP
Requirement Portion. In accordance with Para 5.2.1.3. of the PWS. 1st Option Year: 1 Oct 17 thru 30 Sep 18.
NET AMT KRW25,480,000.00
1008 611 Ton Miles KRW32,400.00 KRW19,796,400.00
OPTION REMOVAL OF WOOD, CUT TRESS, LIMBS,
FFP
Branches. Requirement Portion. In accordance with 5.2.2. of the PWS. 1st Option Year: 1 Oct 17 thru 30 Sep 18.
NET AMT KRW19,796,400.00
1009 KRW0.00
OPTION BULK ITEMS
FFP
Requirement Portion. In accordance with 5.2.3. of the PWS. 1st Option Year: 1 Oct 17 thru 30 Sep 18.
1009AA 200 Each KRW3,105.00 KRW621,000.00
OPTION BULK ITEMS
FFP
In accordance with 5.2.3. of the PWS and TE 4.
1009AB 200 Each KRW7,840.00 KRW1,568,000.00
OPTION DISPOSAL FEE
FFP
NOT TO EXCEED KRW15,000 for Single Items based on the Actual Provided Receipt.
1010 7,242 Ton Miles KRW20,160.00 KRW145,998,720.00
OPTION IAW YONGSAN RELOCATION PLAN
FFP
Additional Trash and Garbage Removal and Disposal.
NET AMT KRW145,998,720.00
1011 1,140 Each KRW43,580.00 KRW49,681,200.00
OPTION IAW YONGSAN RELOCATION PLAN
FFP
Lease Trash Dumpsters.
NET AMT KRW49,681,200.00
1012 1 Each NSP
OPTION ESTIMATED COST FOR WAR HAZARD LOSSES IS
FFP
Zero.
1013 1 Each KRW600,000.00 KRW600,000.00
OPTION ACCOUNTING FOR CONTRACT SERVICES
FFP
The Department of Army requires Contractor Manpower Reporting (CMR) by 31 October of each calendar year during the life of the contract in accordance with Para 5.3. of the Performance Work Statement (PWS) herein.
2001 12 Months KRW72,018,490.00 KRW864,221,880.00
OPTION REMOVAL AND DISPOSAL OF TRASH & GARBAGE
FFP
Six (6) days a Week (Monday thru Saturday) in accordance with Sections 5.1.1.
and 5.1.3. and Appendices A, C, and E of the PWS. 2nd Option Year: 1 Oct 18 thru 30 Sep 19.
NET AMT KRW864,221,880.00
2002 12 Months KRW7,920,000.00 KRW95,040,000.00
OPTION REMOVAL AND DISPOSAL OF FOOD WASTE
FFP
Twice a day (NLT 09:30 and 14:30), seven (7) days a Week (Monday thru Sunday) in accordance with Section 5.1.2. and Appendix B of the PWS. 2nd Option Year:
1 Oct 18 thru 30 Sep 19.
NET AMT KRW95,040,000.00
2003 12 Months KRW-4,233,600.00 KRW-50,803,200.00
OPTION REFUND TO THE GOVERNMENT FOR RECYCLE
FFP
In accordance with Technical Exhibit 3 of the PWS. 2nd Option Year: 1 Oct 18 thru 30 Sep 19
NET AMT KRW-50,803,200.00
2004 1,680 Each KRW10,890.00 KRW18,295,200.00
OPTION DUMPSTERS
FFP
Requirement Portion. 2.5 ton or 5 CM trash dumpsters in accordance with Para
4.2. of the PWS. 2nd Option Year: 1 Oct 18 thru 30 Sep 19. (140 each x 12
2005 360 Each KRW26,240.00 KRW9,446,400.00
OPTION SLIDING TYPE DUMPSTERS
FFP
Requirement Portion. Sliding type dumpsters in accordance with Para 4.2. of the PWS. 2nd Option Year: 1 Oct 18 thru 30 Sep 19. (30 each x 12 months).
2006 KRW0.00
OPTION FIELD TRAINING EXERCISE (FTX) SUPPORT
FFP
REQUIREMENT ITEMS in accordance with Section 5.2 of the PWS. 2nd Option Year: 1 Oct 18 thru 30 Sep 19.
2006AA 520 Days KRW8,100.00 KRW4,212,000.00
OPTION ON BASE AND WITHIN 10 KM (ONE WAY) FROM
FFP
Tent city and Field Training Site in accordance with Section 5.2.1.1 of the PWS.
NET AMT KRW4,212,000.00
2006AB 780 Days KRW20,400.00 KRW15,912,000.00
OPTION OFF-BASE TRAINING SITE OVER 10 KM
FFP
To 80 Km (one way) from Camp Humphreys in accordance with Section 5.2.1.1.
NET AMT KRW15,912,000.00
2006AC 2,340 Days KRW36,800.00 KRW86,112,000.00
OPTION OFF-BASE TRAINING SITE OVER 80 KM
FFP
To 160 Km (one way) from Camp Humphreys in accordance with Section 5.2.1.1.
NET AMT KRW86,112,000.00
2006AD 65 Days KRW61,600.00 KRW4,004,000.00
OPTION OFF-BASE TRAINING SITE OVER
FFP
160 KM (one way) from Camp Humphreys In accordance with Section 5.2.1.1. of
NET AMT KRW4,004,000.00
2007 4,550 Days KRW5,600.00 KRW25,480,000.00
OPTION TRASH DUMPSTER FOR EXERCISE SUPPORT
FFP
Requirement Portion. In accordance with Para 5.2.1.3. of the PWS. 2nd Option Year: 1 Oct 18 thru 30 Sep 19.
NET AMT KRW25,480,000.00
2008 611 Ton Miles KRW32,400.00 KRW19,796,400.00
OPTION REMOVAL OF WOOD, CUT TRESS, LIMBS,
FFP
Branches. Requirement Portion. In accordance with 5.2.2. of the PWS. 2nd Option Year: 1 Oct 18 thru 30 Sep 19.
NET AMT KRW19,796,400.00
2009 KRW0.00
OPTION BULK ITEMS
FFP
Requirement Portion. In accordance with 5.2.3. of the PWS. 2nd Option Year: 1 Oct 18 thru 30 Sep 19.
2009AA 200 Each KRW3,105.00 KRW621,000.00
OPTION BULK ITEMS
FFP
2009AB 200 Each KRW7,840.00 KRW1,568,000.00
OPTION DISPOSAL FEE
FFP
NOT TO EXCEED KRW 15,000 for Single Items based on the Actual Provided
2010 11,000 Ton Miles KRW18,000.00 KRW198,000,000.00
OPTION IAW YONGSAN RELOCATION PLAN
FFP
NET AMT KRW198,000,000.00
2011 2,000 Each KRW21,700.00 KRW43,400,000.00
OPTION IAW YONGSAN RELOCATION PLAN
FFP
NET AMT KRW43,400,000.00
2012 1 Each NSP
OPTION ESTIMATED COST FOR WAR HAZARD LOSSES IS
FFP
Zero
2013 1 Each KRW600,000.00 KRW600,000.00
OPTION ACCOUNTING FOR CONTRACT SERVICES
FFP
The Department of Army requires Contractor Manpower Reporting (CMR) by 31 October of each calendar year during the life of the contract in accordance with
3001 12 Months KRW73,911,080.00 KRW886,932,960.00
OPTION REMOVAL AND DISPOSAL OF TRASH & GARBAGE
FFP
Six (6) days a Week (Monday thru Saturday) in accordance with Sections 5.1.1.
and 5.1.3. and Appendices A, C, and E of the PWS. 3rd Option Year: 1 Oct 19 thru 30 Sep 20.
NET AMT KRW886,932,960.00
3002 12 Months KRW8,078,400.00 KRW96,940,800.00
OPTION REMOVAL AND DISPOSAL OF FOOD WASTE
FFP
Twice a day (NLT 09:30 and 14:30), seven (7) days a Week (Monday thru Sunday) in accordance with Section 5.1.2. and Appendix B of the PWS. 3rd Option Year:
1 Oct 19 thru 30 Sep 20.
NET AMT KRW96,940,800.00
3003 12 Months KRW-4,445,280.00 KRW-53,343,360.00
OPTION REFUND TO THE GOVERNMENT FOR RECYCLE
FFP
In accordance with Technical Exhibit 3 of the PWS. 3rd Option Year: 1 Oct 19 thru 30 Sep 20
NET AMT KRW-53,343,360.00
3004 1,680 Each KRW10,890.00 KRW18,295,200.00
OPTION DUMPSTERS
FFP
Requirement Portion. 2.5 ton or 5 CM trash dumpsters in accordance with Para
4.2. of the PWS. 3rd Option Year: 1 Oct 19 thru 30 Sep 20. (140 each x 12
3005 360 Each KRW26,240.00 KRW9,446,400.00
OPTION SLIDING TYPE DUMPSTERS
FFP
Requirement Portion. Sliding type dumpsters in accordance with Para 4.2. of the PWS. 3rd Option Year: 1 Oct 19 thru 30 Sep 20. (30 each x 12 months).
3006 KRW0.00
OPTION FIELD TRAINING EXERCISE (FTX) SUPPORT
FFP
REQUIREMENT ITEMS in accordance with Section 5.2 of the PWS. 3rd Option Year: 1 Oct 19 thru 30 Sep 20.
3006AA 546 Days KRW8,100.00 KRW4,422,600.00
OPTION ON BASE AND WITHIN 10 KM (ONE WAY) FROM
FFP
NET AMT KRW4,422,600.00
3006AB 819 Days KRW20,400.00 KRW16,707,600.00
OPTION OFF-BASE TRAINING SITE OVER 10 KM
FFP
To 80 Km (one way) from Camp Humphreys in accordance with Section 5.2.1.1.
NET AMT KRW16,707,600.00
3006AC 2,457 Days KRW36,800.00 KRW90,417,600.00
OPTION OFF-BASE TRAINING SITE OVER 80 KM
FFP
To 160 Km (one way) from Camp Humphreys in accordance with Section 5.2.1.1.
NET AMT KRW90,417,600.00
3006AD 68 Days KRW61,600.00 KRW4,188,800.00
OPTION OFF-BASE TRAINING SITE OVER
FFP
160 KM (one way) from Camp Humphreys In accordance with Section 5.2.1.1. of
NET AMT KRW4,188,800.00
3007 3,500 Days KRW5,600.00 KRW19,600,000.00
OPTION LEASE TRASH DUMPSTER FOR EXERCISE
FFP
Support. Requirement Portion. In accordance with Para 5.2.1.3. of the PWS. 3rd Option Year: 1 Oct 19 thru 30 Sep 20.
NET AMT KRW19,600,000.00
3008 642 Ton Miles KRW32,400.00 KRW20,800,800.00
OPTION REMOVAL OF WOOD, CUT TRESS, LIMBS,
FFP
Branches. Requirement Portion. In accordance with 5.2.2. of the PWS. 3rd Option Year: 1 Oct 19 thru 30 Sep 20.
NET AMT KRW20,800,800.00
3009 KRW0.00
OPTION BULK ITEMS
FFP
Requirement Portion. In accordance with 5.2.3. of the PWS. 3rd Option Year: 1 Oct 19 thru 30 Sep 20.
3009AA 200 Each KRW3,105.00 KRW621,000.00
OPTION BULK ITEMS
FFP
3009AB 200 Each KRW7,840.00 KRW1,568,000.00
OPTION DISPOSAL FEE
FFP
NOT TO EXCEED KRW 15,000 for Single Items based on the Actual Provided
3010 13,200 Ton Miles KRW18,000.00 KRW237,600,000.00
OPTION IAW YONGSAN RELOCATION PLAN
FFP
NET AMT KRW237,600,000.00
3011 2,200 Each KRW21,700.00 KRW47,740,000.00
OPTION IAW YONGSAN RELOCATION PLAN
FFP
NET AMT KRW47,740,000.00
3012 1 Each NSP
OPTION ESTIMATED COST FOR WAR HAZARD LOSSES IS
FFP
3013 1 Each KRW600,000.00 KRW600,000.00
OPTION ACCOUNTING FOR CONTRACT SERVICES
FFP
The Department of Army requires Contractor Manpower Reporting (CMR) by 31 October of each calendar year during the life of the contract in accordance with
4001 12 Months KRW79,662,630.00 KRW955,951,560.00
OPTION REMOVAL AND DISPOSAL OF TRASH & GARBAGE
FFP
Six (6) days a Week (Monday thru Saturday) in accordance with Sections 5.1.1.
and 5.1.3. and Appendices A, C, and E of the PWS. 4th Option Year: 1 Oct 20 thru 30 Sep 21.
NET AMT KRW955,951,560.00
4002 12 Months KRW8,482,320.00 KRW101,787,840.00
OPTION REMOVAL AND DISPOSAL OF FOOD WASTE
FFP
Twice a day (NLT 09:30 and 14:30), seven (7) days a Week (Monday thru Sunday) in accordance with Section 5.1.2. and Appendix B of the PWS. 4th Option Year:
1 Oct 20 thru 30 Sep 21.
NET AMT KRW101,787,840.00
4003 12 Months KRW-6,034,100.00 KRW-72,409,200.00
OPTION REFUND TO THE GOVERNMENT FOR RECYCLE
FFP
In accordance with Technical Exhibit 3 of the PWS. 4th Option Year: 1 Oct 20 thru 30 Sep 21
NET AMT KRW-72,409,200.00
4004 1,680 Each KRW10,890.00 KRW18,295,200.00
OPTION DUMPSTERS
FFP
Requirement Portion. 2.5 ton or 5 CM trash dumpsters in accordance with Para
4.2. of the PWS. 4th Option Year: 1 Oct 20 thru 30 Sep 21. (140 each x 12
4005 360 Each KRW26,240.00 KRW9,446,400.00
OPTION SLIDING TYPE DUMPSTERS
FFP
Requirement Portion. Sliding type dumpsters in accordance with Para 4.2. of the PWS. 4th Option Year: 1 Oct 20 thru 30 Sep 21. (30 each x 12 months).
4006 KRW0.00
OPTION FIELD TRAINING EXERCISE (FTX) SUPPORT
FFP
REQUIREMENT ITEMS in accordance with Section 5.2 of the PWS. 4th Option Year: 1 Oct 20 thru 30 Sep 21.
4006AA 573 Days KRW8,100.00 KRW4,641,300.00
OPTION ON BASE AND WITHIN 10 KM (ONE WAY) FROM
FFP
NET AMT KRW4,641,300.00
4006AB 860 Days KRW20,400.00 KRW17,544,000.00
OPTION OFF-BASE TRAINING SITE OVER 10 KM
FFP
To 80 Km (one way) from Camp Humphreys in accordance with Section 5.2.1.1.
NET AMT KRW17,544,000.00
4006AC 2,580 Days KRW36,800.00 KRW94,944,000.00
OPTION OFF-BASE TRAINING SITE OVER 80 KM
FFP
To 160 Km (one way) from Camp Humphreys in accordance with Section 5.2.1.1.
NET AMT KRW94,944,000.00
4006AD 70 Days KRW61,600.00 KRW4,312,000.00
OPTION OFF-BASE TRAINING SITE OVER
FFP
160 KM (one way) from Camp Humphreys In accordance with Section 5.2.1.1. of
NET AMT KRW4,312,000.00
4007 5,017 Days KRW5,600.00 KRW28,095,200.00
OPTION LEASE TRASH DUMPSTER FOR EXERCISE
FFP
Support. Requirement Portion. In accordance with Para 5.2.1.3. of the PWS. 4th Option Year: 1 Oct 20 thru 30 Sep 21.
NET AMT KRW28,095,200.00
4008 674 Ton Miles KRW32,400.00 KRW21,837,600.00
OPTION REMOVAL OF WOOD, CUT TRESS, LIMBS,
FFP
Branches. Requirement Portion. In accordance with 5.2.2. of the PWS. 4th Option Year: 1 Oct 20 thru 30 Sep 21.
NET AMT KRW21,837,600.00
4009 KRW0.00
OPTION BULK ITEMS
FFP
Requirement Portion. In accordance with 5.2.3. of the PWS. 4th Option Year: 1 Oct 20 thru 30 Sep 21.
4009AA 200 Each KRW3,105.00 KRW621,000.00
OPTION BULK ITEMS
FFP
4009AB 200 Each KRW7,840.00 KRW1,568,000.00
OPTION DISPOSAL FEE
FFP
NOT TO EXCEED KRW 15,000 for Single Items based on the Actual Provided
4010 13,200 Ton Miles KRW18,000.00 KRW237,600,000.00
OPTION IAW YONGSAN RELOCATION PLAN
FFP
NET AMT KRW237,600,000.00
4011 2,200 Each KRW21,700.00 KRW47,740,000.00
OPTION IAW YONGSAN RELOCATION PLAN
FFP
NET AMT KRW47,740,000.00
4012 1 Each NSP
OPTION ESTIMATED COST FOR WAR HAZARD LOSSES IS
FFP
4013 1 Each KRW600,000.00 KRW600,000.00
OPTION ACCOUNTING FOR CONTRACT SERVICES
FFP
The Department of Army requires Contractor Manpower Reporting (CMR) by 31 October of each calendar year during the life of the contract in accordance with
PERFORMANCE WORK STATEMENT
PERFORMANCE WORK STATEMENT (PWS)
Removal and Disposal Services of Trash, Garbage and Bulk Items for
USAG-Humphreys
PART I
GENERAL INFORMATION
1. GENERAL: This is a non-personal services contract to provide Removal and Disposal Services of Trash, Garbage and Bulk items, USAG-Humphreys. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
1.1. Description of Services/Introduction: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform Removal and Disposal Services of Trash, Garbage and Bulk items, USAG-Humphreys as defined in this Performance Work Statement (PWS), section 5 except for those items specified as government furnished property and services. The Contractor shall perform to the standards in this contract.
1.2. Background: There are approximately 150 each dumpsters, 100 each trash containers and 50 bus stops trash pick-up points be completely cleaned for USAG-Humphreys. All equipment listed in Attachment A. Notification will be provided to the Contractor in a timely manner, if allowable, when such increases or decreases occur. The Contractor shall perform to the terms and conditions of this contract to complete Removal and Disposal services provided.
1.3. Objectives: The Government is committed to provide a safe and timely removal of trash from the Garrison. A large volume of trash is generated on a daily basis, 365 days a year. The timely removal of this trash is critical to maintaining proper Life, Health and Safety standards for the Soldiers, Soldiers’ families, employees and visitors.
The objective is for the Contractor to maintain a proper Life, Health and Safety standards for the Soldiers, Soldiers’ families, employees and visitors thru a timely removal of this trash. This will allow units to maintain their operation temp morale, and quality of life.
1.4. Scope: The Contractor shall provide all labor, supervision, tools, equipment, transportation, and any other necessary resources to perform trash and garbage removal and disposal from Camp Humphreys and local training areas in accordance with all terms and condition of this contract. And bulk items pick-up items that are owned by residents which will be gathered at the lay down area from the Army Family Housing units. During the life of this contract some or all of the contract requirements may be reduced due to the planned relocation of US. Forces from Areas I and II to Camp Humphreys (Pyongtaek) starting in 2017.
1.5. Period of Performance: The period of performance shall be for one (1) 12-month Base Period, which consists of a 30-day Phase In period and eleven (11) months of service and four (4) 12-month Option Periods.
Phase-in: 1 Oct 2016 - 31 Oct 2016 Base Year: 1 Nov 2016 - 30 Sep 2017 1st Option Year: 1 Oct 2017 - 30 Sep 2018 2nd Option Year: 1 Oct 2018 - 30 Sep 2019 3rd Option Year: 1 Oct 2019 - 30 Sep 2020
4th Option Year: 1 Oct 2020 - 30 Sep 2021
1.6. General Information
1.6.1. Recognized Holidays: The Contractor shall perform services even on holidays with some exceptions of 1 January, the day of Lunar New Year and the next day, the day of Chu-Sok and the next day, and 25 December.
1.6.1.1. U.S. Government legal holidays are as follows:
(1) 1 January (New Year's Day)
(2) 3rd Monday, January (Dr. King’s Birthday)
(3) 3rd Monday, February (President's Day)
(4) Last Monday, May (Memorial Day)
(5) 4 July (Independence Day)
(6) 1st Monday, September (Labor Day)
(7) 2nd Monday, October (Columbus Day)
(8) 11 November (Veterans' Day)
(9) 4th Thursday, November (Thanksgiving Day)
(10) 25 December (Christmas Day)
1.6.1.2. ROK legal holidays are as follows:
(1) 1 and 2 January (New Year)
(2) Lunar New Year (31 December, 1 and 2 January on the Lunar Calendar)
(3) 1 March (Independence Movement Day)
(4) 1 May (Labor Day)
(5) 5 May (Children's Day)
(6) Buddha's Birthday (8 April on the Lunar calendar)
(7) 6 June (Memorial Day)
(8) 17 July (Constitution Day)
(9) 15 August (Liberation Day)
(10) Chu-Suk (14, l5 and 16 August on the Lunar Calendar)
(11) 3 October (National Foundation Day)
(12) 25 December (Christmas Day)
1.6.2. Hours of Operation: The Contractor is responsible for conducting business, between the hours of 0600 to 1730, Monday through Sunday including US and Korean legal holidays during the contract period. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons.
1.6.3. Place of Performance: The work to be performed under this contract will be at the locations listed in Technical Exhibit (TE) #4.
1.6.4. Quality Control Program (QCP): The Contractor shall develop and maintain an effective QCP to ensure services are performed in accordance with (IAW) this PWS. The QCP must be forwarded to and accepted by the KO. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of deficiencies. The Contractor’s QCP is the means by which the Contractor assures that the work complies with the requirement of the contract. The Offeror shall submit a copy of a comprehensive written QCP with the proposal.
The final QCP shall be submitted to the Contracting Officer (KO) and Contracting Officer’s Representative (COR) within 30 days after contract award. After acceptance of the QCP the Contractor shall receive the contracting officer’s acceptance in writing of any proposed change to the QCP.
1.6.5. Quality Assurance: The Government shall evaluate the Contractor's performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
1.6.6. Type of Contract: The Government will award a Hybrid Contract with Firm Fixed Price CLIN and Requirement CLIN.
1.6.7. Security Requirements: Contractor personnel or any representative of the Contractor entering USAG Humphreys shall abide by all security regulations imposed by the local installation commander at all times and shall be subject to security checks. Contractor personnel and property shall be subject to search and seizure upon entering the confines of above installations, while on, and upon leaving the confines of USAG Humphreys.
1.6.8. Contractor Qualification
1.6.8.1. License: The Offeror shall be licensed and registered by the ROK Government to remove, transport and dispose of the trash/garbage and bulk items under this contract. The Contractor shall possess current and valid all required licenses for Plant Household Waste collection and transportation and Plant Discharge Facility Waste or Intermediate/Synthesis/Final Treatment of Facility waste for the business categories (or subjects) of Plant Household Waste and Plant Discharge Facility Waste (사업장생활계폐기물 과 사업장배출시설계폐기물이 영업대상에 포함된 폐기물수집 및 운반업 허가증 또는 사업장 폐기물 중간/종합/최종 처리업 허가증) and temporary trash holding Storage by the ROK Government throughout the contract period to perform the work specified hereinafter.
The contractor shall submit all current licenses with submittal of proposal and annually provide copies of all licenses to COR. The Contractor shall notify the COR immediately of any change relating to the status of the licenses. The
Contractor shall be responsible to be in compliance with all ROK and Pyongtaek City Environmental Sanitary Department rules and regulations for each license throughout the contract period.
1.6.8.2. Contractor staffing plan and equipment plan: The Offeror shall submit the staffing plan and equipment plan against the contract with the proposal.
1.6.8.3. Staffing plan: The Offeroror shall submit his staffing plans for the Trash Removal Service Contract according to the work scope described. It shall show the number of personnel with their functions in every necessary field to include management. Additionally, the Plan must depict the changes that are planned in the option years as the requirements are expected to have significant changes. Contractor’s employees shall provide skilled, trained and qualified personnel in picking up, segregating and disposing of trash and garbage as required under this contract.
1.6.8.4. Equipment plan: The Offeror shall submit his equipment plan for the Trash Removal Service Contract according to the performance work statement. The Contractor shall provide the evidence that all dumpsters, vehicles and equipment are in his possession or ability to secure required equipment in time for full performance.
1.6.9. Post Award Conference/Periodic Progress Meetings: The Contractor shall attend post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation (FAR) Subpart 42.5. The KO and Contracting Officer’s Representative (COR) shall meet periodically with the contractor to review the contractor's performance. At these meetings the KO will apprise the Contractor of how the Government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues.
1.6.10. Contracting Officer’s Representative (COR): The COR Tracking Tool (Contracting Officer Representative Tracking (CORT) Tool), https://wawf.eb.mil/cort/cort.xhtml for nomination, tracking, documentation, and management of CORs will be used. The COR will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: Assure that the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including Government drawings, designs, and specifications; monitor Contractor's performance and notifies both the KO and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.
1.6.11. Key Personnel: The Offeror shall submit key personnel plan against the contract with his proposal. The following personnel are considered key personnel by the Government: Contract Manager (CM) and Alternate Contract Manager (ACM) for the performance of on-post area, the performance of segregation area and the performance of delivery to Landfill. The Offeror shall provide a CM and ACM list who shall be responsible for the related area of the performance of the work. The CM shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. The CM or ACM shall be available between 8:00 AM to 5:00 PM, Monday through Friday except Federal holidays.
1.6.11.1. Contract Managers (CM) and Alternate Contract Manager (ACM): The Contractor shall provide a CM or ACM who shall be responsible for the performance of the work. During normal duty hours (08:00-17:00 hrs), Monday thru Friday, the CM or ACM shall respond within 30 minutes from the time notified by the COR to meet on the installation at the location specified by the COR. After duty hours and including weekends, the CM or ACM shall respond within four (4) hours from the time notified by the COR to meet on the installation at the location specified by the COR. The CM and ACM shall be required to understand and communicate in English. The CM and ACM shall have at least two (2) years of experience as a CM within the last five (5) years in Removal and Disposal Services of Trash, Garbage and Bulk items.
1.6.11.2. Contract Managers (CM) and Alternate Contract Manager (ACM) Language Requirements.
Personnel working on this contract shall have the ability at an intermediate level of daily conversing in, being understood and understand English as exemplified in their written and verbal skills in their functional duties in the performance of services as required by this contract. If the Government, at its sole discretion, determines that the language skills of a Contractor employee does not meet the language proficiency skills required of the position, the Government reserves the right to require the Contractor to provide a new Contract employee that does possess the required language proficiency skills required of the position, at no additional cost to the Government.
1.6.12. Identification of Contractor Employees: All contract personnel attending meetings, answering Government telephones, and working in other situations where their Contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed while on post at USAG Humphreys, the contractor personnel shall present a professional appearance and be easily recognizable as contractor employees. Identification of all contractor employees and visiting workers shall be accomplished by wearing distinctive clothing and or individual photo badges or escort badges bearing the name of the company and the word “Trash Removal”. The distinctive clothing and individual photo badges or escort badges shall be provided at the contractor’s own expense.
1.6.13. Contractor Personnel Conduct: Contractor personnel’s conduct shall not reflect discredit upon the Government. The Contractor shall ensure that personnel present a professional appearance. The Contractor’s employees shall observe and comply with all local policies and procedures concerning fire, safety, environmental protection, sanitation, security, and possession of firearms or other lethal or illegal weapons or substance. The Contractor is responsible for ensuring that any contractor employees providing services under this contract conduct themselves and perform services in a professional, safe, and responsible manner. The Contractor shall remove from the job site any employee for reasons of misconduct or security. In accordance with DOD Directive 5500.7-R, “Joint Ethics Regulation”, Contractor employees must avoid improperly influenced in the execution of their duties under the contract. Particular attention should be paid to acceptance of gifts/ gratuities, and on non-disclosure of sensitive or classified information. The Contractor shall ensure employee conduct complies with 41 U.S. C 423 relative to release of acquisition related information or actions or discussions which may prejudice future competitions. The Contractor shall ensure no contractor employees conduct political related activities or events on the installation.
1.6.14. Reserved.
1.6.15. Organizational Conflict of Interest: Contractor and subcontractor personnel performing work under this contract may receive, have access to, or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.), or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the KO, and in the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.6.16. Base Passes: Upon notice of award the Contractor shall obtain all the passes and necessary vehicle permits required for entry by authorized Contractor personnel in accordance with base policy, point of contact information for this action will be provided up on contract award.
1.6.17. Escort Privileges: The CM and ACM shall be the only two authorized escort privileges. This privilege is only for employees working on this contract or those providing supporting roles under emergency conditions and only during hours stated under this contract for collection, segregation and disposal of trash and garbage. It is the escort’s responsibility to ensure he/she maintains full control of all individuals at all times.
1.6.18. Phase In Plan: The Contractor shall clearly demonstrate how the contractor will prepare for 100% full performance in accordance with the PWS and transition. The contractor shall include all general and administrative
(G&A) functions and pre-hiring activities normally accomplished by contractor prior to physical phase-in performance at no additional cost to the Government. The contractor shall describe in detail how the contractor will provide required training and implementation on all reports, services, suspense dates, a time phased and milestone driven schedule of key events and procedures needed to assure readiness and 100% full performance under the contract by the end of the one (1) month phase-in period. The approach must be designed to ensure successful transition to full performance of work by the conclusion of the phase in period. If unable to meet any task timeline, you will notify the KO and COR.
1.6.19. Antiterrorism (AT) and Operations Security (OPSEC)
1.6.19.1. AT Level I Training: This provision is for contractor employees with an area of performance within an Army controlled installation, facility, or area. All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities, and controlled access areas shall complete AT Level I awareness training within 50 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee to the COR or to the KO, if a COR is not assigned within 50 calendar days after completion of training by all employees and subcontractor personnel.
1.6.19.2. Access and General Protection/Security Policy and Procedures: This standard language text is for contractor employees with an area of performance within an Army controlled installation, facility, or area.
Contractor and all associated sub-contractors’ employees shall comply with applicable installation, facility, and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshall Office, Director of Emergency Services, or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
1.6.20. Emergency Services
1.6.20.1. The Contractor shall have competent personnel trained and capable of dealing with minor personnel injuries. The Contractor or their employees shall immediately notify their supervisor of any accident requiring emergency medical treatment. The Contractor will, in turn, notify the KO or COR within 30 minutes of the incident.
1.6.20.2. Emergency medical treatment and services for Contractor personnel is the responsibility of the Contractor.
1.6.21. ENVIRONMENTAL CONTROL: Compliance with Laws and Regulations. The contractor shall comply with all applicable ROK Environmental laws, regulations and requirements regarding environmental. In the case of environmental laws/regulations/requirements change during the contract period, the contractor shall comply with such law/regulation as changed.
1.6.22. Safety Plan: The plan shall clearly describe the contractor’s safety training and safety methods and practices such as standardized procedures to monitor performance, identify discrepancies, and take corrective action to prevent re-occurrences of any safety issues. The safety plan shall be confirmed by Contracting Officer’s Representative (COR) then accepted by KO within 5 working days if there is any changes after award.
1.6.23. Management Plan: The plan shall include a profile of the management team (including the key personnel stated in para 1.6.11) that identifies the key management people in the company, the function each team member will fill, and each person’s skills that qualify him or her for the position. Additionally, the Contractor shall submit an organizational chart that identifies personnel and configuration of maintenance teams of adequate size and qualifications which reflects the capability to manage and perform the solicitation requirements. The management plan shall be confirmed by Contracting Officer’s Representative (COR) then accepted by KO within 5 working days if there is any changes after award.
PART 2
DEFINITIONS, ACRONYMS, AND ABBREVIATIONS
2. DEFINITIONS AND ACRONYMS:
2.1. Definitions
2.1.1. General Trash: Trash/refuse and waste materials generated by the normal activities of household. This category of trash includes, scrap metals, glasses, floor sweeping materials, papers, cardboards, beverage cans, bottles, sawdust, ashes, bagged leaves, bagged grass cutting, tree branches, used furniture vinyl, carpets, rugs, sponges, styrofoam, plastic products and similar materials which are allowed to be dumped at landfill, incinerated or recycled.
2.1.2. Garbage: Garbage to include food waste and other associated items generated from food preparation at the dining facilities. This includes condemned foodstuffs, fats, and bones and may also include grounded garbage. The Contractor shall not resell or use for human consumption.
2.1.3. Bulk Items: Used materials of Car seats, Strollers, Chairs, small furniture, cribs Mattress, Box spring, etc) generated by AFH occupants.
2.1.4. Recyclable Items: Items that have a monetary value when collected and sold. For the purpose of this document the following are considered to be recyclable items: Aluminum, Waste Iron/scrap metal, Waste Paper (to include Cardboard), Waste Plastic and Glass.
2.1.5. Unduly Severe Weather: Extremely intense storm systems which could include rain, hail, sleet or snow which prevent the normal operation of equipment or machinery.
2.1.6. Hazardous Waste/Industrial Waste: Any waste materials identified in the 40 CFR part 361.30 and/or Federal Statute or by the ROK Government Environmental Law and Regulations.
2.1.7. Defect: A service output that does not meet the standard of performance specified in the contract for that service.
2.1.8. Lot Size: The total number of service outputs in a surveillance period.
2.1.9. Lay down Area: An area designated to collect waste produced by DPW and or any other Government Agent.
2.1.10. Performance Requirement: The point that divides acceptable and unacceptable performance of a task according to the performance requirement summary and the Inspection of Services clause. It is the number or percentage of defects that is deemed acceptable.
2.1.11. Performance Requirements Summary (PRS): A listing of the service outputs under the contract that are to be evaluated on a regular basis, the surveillance methods to be used for these outputs, and the performance requirement of the listed outputs.
2.1.12. Quality Assurance: A planned and systematic pattern of all actions necessary to provide confidence that technical requirements are established; products and services conform to established technical requirements; and satisfactory performance is achieved. Quality assurance refers to actions by the government.
2.1.13. Quality Assurance Surveillance Plan (QASP): A plan describing how the agency will survey, observe, test, sample, evaluate and document the contractor’s performance in meeting critical performance standards identified in the contract.
2.1.14. Quality Control: Those actions taken by a Contractor to control the production of outputs to ensure that they conform to the contract requirements. The Contractor shall establish and maintain a Quality Control Plan (QCP) that ensures the requirements of the contract are met.
2.1.15. Inspection(s): Examining and testing supplies or services (including, when appropriate raw materials, components, and intermediate assemblies) to determine whether they conform to contract requirements.
2.1.16. Cannibalize. Remove parts from Government property for use or for installation on other Government property.
2.1.17. Contractor. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
2.1.18. Contractor Acquired Property. Property acquired, fabricated, or otherwise provided by the contractor for performing a contract and to which the Government has title.
2.1.19. Contracting Officer (KO). A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
2.1.20. Contracting Officer’s Representative (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.1.21. Defective Service. A service output that does not meet the standard of performance associated with the Performance Work Statement.
2.1.22. Deliverable. Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.
2.1.23. Equipment. A tangible item that is functionally complete for its intended purpose, durable, nonexpendable, and needed for the performance of a contract. Equipment is not intended for sale, and does not ordinarily lose its identity or become a component part of another article when put into use.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .