ATTACHMENT 0001 Pricing Template Solid Waste.xlsx

XLSX spreadsheet 24 KB Posted

Attached to
ANC Solid Waste W91QV126RA018
Solicitation number
W91QV126RA018
Issued by

About this file

This is a Pricing Template for Municipal Solid Waste services at Arlington National Cemetery covering a 5-year contract period from November 29, 2026 through November 30, 2031, with an optional 6-month extension. The template requires offerors to provide unit pricing for eight waste stream categories: Municipal Solid Waste (MSW) at two locations with 40 cubic yard capacity each (collected Monday-Wednesday-Friday and Tuesday-Thursday-Saturday), Crushed Headstones at 10 or 20 cubic yards (weekly), Single Stream Recycling (SSR) at two locations with 8 cubic yard capacity each (collected Monday and Thursday), Construction Demolition Debris (CDD) at 10 cubic yards (monthly), and Scrap Metal at 10 cubic yards (monthly). Specific collection points include Patton Drive (MSW, headstones, and SSR), Spoils Yard/SEC61 (CDD), and B123 Employee Parking Lot (scrap metal). Offerors must complete the pricing template by entering unit costs for each waste stream, with the template automatically calculating base year costs, option year costs, and total contract value. The contract is designated as a Women Owned Small Business (WOSB) Set Aside with NAICS code 562111 and a small business size standard of $47.0 Million. A mandatory site visit is scheduled for June 23, 2026 from 10:00 AM to 11:30 AM at the ANC Welcome Center, with contractor attendance confirmation required by June 22, 2026.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pricing Template Pricing Template for Municiple Solid Waste (MSW) for Arlington National Cemetery

DescriptionQTY/UN ITTimeframe/ DurationREQ. UnitsCost per UnitTotal
MSW 140 yd329 Nov 2026- 30 Nov 2031
MSW 240 yd329 Nov 2026- 30 Nov 2031
HEADSTONES10 yd3 or 20 yd329 Nov 2026- 30 Nov 2031
SSR 18 yd329 Nov 2026- 30 Nov 2031
SSR 28 yd329 Nov 2026- 30 Nov 2031
CDD10 yd329 Nov 2026- 30 Nov 2031
SCRAP METAL10 yd329 Nov 2026- 30 Nov 2031
Phase-In/Out Period
Average Estimated
Base Year Cost$0.00
Base Year + Phase-In/Out Period$0.00
1st Option Year
2nd Option Year
3rd Option Year
4th Option Year
6-Month Extension (-8)
Total Contract
Estimated Cost$0.00
`
5.1.1 PATTON DRIVE:
1. Municipal Solid Waste (MSW) - 40 yd3 (M-W-F)
2. Municipal Solid Waste (MSW) - 40 yd3 (T-H-S)
3. Crushed Headstones - 10 yd3 or 20 yd3 (W)
4. Single Stream Recycling (SSR) - 8 yd3 (M)
5. Single Stream Recycling (SSR) - 8yd3 (H)
5.1.2 SPOILS YARD (SEC61):
1. Construction Demolition Debris (CDD) Waste - 10 yd3 (M)
5.1.3 B123 EMPLOYEE PARKING LOT:
1. Scrap Metal - 10 yd3 (Monthly)

File details come from the government source that posted it. Updated .