This is a Solicitation Questions and Answers document for a federal contract opportunity involving the manufacture of military hats (tri-corner hats). The contract is an IDIQ awarded by Mission and Installation Contracting Command at Fort Belvoir, Virginia, with anticipated ordering frequency of one to two delivery orders per year for quantities ranging from 25 to 300 items per order. The 120-day delivery timeline is firm for all order sizes and non-negotiable. Pricing may vary by ordering period, and an Economic Price Adjustment clause is not anticipated. Samples must be submitted by 10 March 2026 at 3:00 PM Eastern Time and shipped at no cost to the government to Fort Belvoir. There is no current incumbent; the previous contracts were awarded to G. Gedney Godwin with ceilings of $240,000 and $172,000.

Material specifications require Black 3XXX Beaver felt (30% fur, 70% felt) or equivalent high-quality felt that is stain resistant, water resistant, and color fast, with documentation of successful AATCC TM20-2021 testing required. Samples may be any of the 11 available sizes and must include a government-provided cockade attached with black flat cotton lacing measuring 3/16 inch through a punch hole (unfinished). Tolerances are strict, not exceeding 1/16 inch, and samples undergo only visual inspection with zero defect tolerance; rejected items are replaced. The contractor provides the cockade with instructions and pictures. Deliveries to Fort Myer cannot occur on weekends or Federal Holidays, and 24-hour advance notice to MSG Ross is required. Technical capability is significantly more important than price in evaluation, with no sub-factors, past performance considerations, site visits, or specific certifications required.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION QUESTIONS AND ANSWERS

27 February

Will I need to submit a sample hat for approval? Yes

If so, when does that need to be submitted? 10 March 2026 3:00pm eastern time

Do they need to be delivered in person rather than shipped? The sample hat should be shipped to Mission and Installation Contracting Command 9410 Jackson Loop Building 1425 Fort Belvoir, VA 22060-5134 at no cost to the government.

Is there an current incumbent for this contract? There is no current incumbent

What is the history of previous awards, including amounts? W91QV1-15-D-0017 was an IDIQ awarded to G. Gedney Godwin with a contract ceiling of $240,000; W91QV1-15-D- 0017 was an IDIQ awarded to G. Gedney Godwin with a contact ceiling of $172,000.

Which vendors were awarded in the past? I can find no vendors other than G. Gedney Godwin.

9 February

1. MATERIAL SPECIFICATIONS AND SOURCING

1.1. The SOW specifies "Black 3XXX Beaver felt or an equivalent high-quality felt material."

Can you please provide:

• The specific beaver felt grade or manufacturer currently used/preferred? Specifies Black 3XXX Beaver felt = 30% fur, 70% felt

• Performance standards or test methods to demonstrate equivalency for alternative materials? See below for test standards

• Any prohibited materials or manufacturing processes? Materials not containing 30% beaver fur or man-made synthetic fibers

1.2. For the requirement that materials be "stain resistant, water resistant, and color fast," are there specific:

• Test standards (e.g., AATCC, ASTM) that must be met? AATCC TM20-2021: Test Method of Fiber Analysis: Qualitative

• Certification or testing documentation required with the proposal? Yes. Solicitation has been amended to require documentation of successful test

2. SAMPLE REQUIREMENTS AND EVALUATION

2.1. For the required product sample:

• What size should be submitted? (The SOW lists 11 sizes) Any size listed is acceptable

• Should the sample include the government-provided cockade, or just the buttonhole placement? The solicitation has been amended that the contractor provides the cockade with instructions and pictures

• Will samples be physically tested (e.g., water resistance, shape retention) or only visually inspected? Visually inspected

2.2. The SOW states samples must meet "criteria specified in paragraphs 5 and 6." Can you clarify:

• Are there any specific tolerances for the measurements (e.g., ± 1/16 inch)? Strict precision not exceeding 1/16 inch

• Will minor deviations automatically disqualify a proposal, or will they be evaluated on a case-by-case basis? Samples must meet criteria specified in paragraphs 5 and 6

3. COCKADE AND HARDWARE SPECIFICATIONS

3.1. The amendment notes that "contractor is not providing cockades." Can you confirm:

• The exact buttonhole size and type (worked buttonhole vs. eyelet)? Neither buttonhole or eyelet, it is a punch hole (unfinished)

• The attachment method for the government-provided cockade (button, pin, other)? Black, flat cotton lacing measuring 3/16 inch

3.2. For the chin strap white wooden cylinder draw:

• Is there a specific wood type or finish required? No specific wood type, white paint

• Are there any safety or durability standards the wood must meet? No

4. QUALITY CONTROL AND INSPECTION

4.1. The SOW requires "samples for quality inspection before full order fulfillment." Does this mean:

• First article testing will be required for each delivery order? No

• Only the initial contract award requires pre-production samples? Yes

• If first article testing is required, what is the typical approval timeline? N/A

4.2. What are the acceptance criteria and rejection procedures?

• What percentage of defects is acceptable? 0%

• How are rejected items handled (replacement, credit)? Replacement

5. ORDERING AND DELIVERY PROCEDURES

5.1. For the IDIQ structure:

• How will delivery orders be placed (WAWF, email, other system)? Delivery Orders will be sent to the vendor via email

• Will there be a single ordering officer or multiple users authorized to place orders? The Contracting Officer will be the single ordering officer

• What is the anticipated ordering frequency (monthly, quarterly, as-needed)?

Anticipated ordering frequency is one or two delivery orders per year

5.2. The SOW specifies 120-day delivery after delivery order award. Is this timeline:

• Negotiable for larger quantity orders? No

• Firm for all order sizes (25-300 items)? Yes

5.3. For the size distribution:

• Is there historical data on the typical size distribution of orders? Typically, there are many more quantities of 7 5/8 and larger than 7 ½ and smaller

• Should contractors maintain inventory of all 11 sizes, or will orders specify required sizes with adequate lead time? Orders will specify which sizes are to be delivered

6. PRICING AND CONTRACT ADMINISTRATION

6.1. Should pricing be provided:

• As a single unit price for all five ordering periods? Unit prices may differ in different ordering periods

• With separate pricing for each ordering period? Each ordering period may have same or different pricing than the others

• With price adjustment mechanisms (e.g., economic price adjustment clause)? EPA clause is not anticipated

6.2. Are there any:

• Packaging and shipping requirements beyond standard commercial practices? No

• Special labeling or marking requirements per MIL-STD-129? No

• Specific carriers or shipping methods required? No

8. AMENDMENT AND HISTORICAL INFORMATION

8.1. Amendment 0001 updated the SOW from v20 Jan to v2 Feb. Can you confirm:

• Are there any other amendments expected before the submission deadline?

Amendments will be published on an as-needed basis. Additional amendments may result in an extension of the submission deadline.

• Are the images provided (TriCorner_Inside1.jpg, etc.) the only reference images, or are technical drawings available? The images are the only reference images

9. SECURITY AND ACCESS REQUIREMENTS

9.1. For delivery access to Fort Myer:

• What documentation is required for base access (driver's license, commercial delivery credentials, escort requirements)? Refer to https://home.army.mil/jbmhh/my-fort/all-services/access-gate-info

• Are there specific delivery windows or restrictions? Deliveries cannot occur on weekends or Federal Holidays

• How far in advance should coordination with MSG Ross occur beyond the 24-hour notice requirement? No additional coordination is required but may be made by the contractor

10. PROPOSAL SUBMISSION CLARIFICATIONS

10.1. For the proposal submission:

• Is there a page limit or preferred format for technical proposals? No

• Should past performance references be included? Past Performance is not an evaluation factor

• Are there any specific certifications (e.g., ISO 9001, AS9100) that would strengthen the technical evaluation? No

10.2. The solicitation states technical capability is "significantly more important than price." Can you provide:

• Specific technical evaluation sub-factors (e.g., manufacturing capability, quality control, past performance)? There are no sub-factors https://usg01.safelinks.protection.office365.us/?url=https%3A%2F%2Fhome.army.mil%2Fjbmhh%2Fmy-fort%2Fall-services%2Faccess-gate-info&data=05%7C02%7Cpaul.m.kilgore.mil%40army.mil%7C4720131fd3cf4ca9064708de64e376c7%7Cfae6d70f954b481192b60530d6f84c43%7C0%7C0%7C639059125292350623%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=hp4FxSBTBUdC2mgGNCotoZ5TTSeoBPpbagIpRbSTVSM%3D&reserved=0 https://usg01.safelinks.protection.office365.us/?url=https%3A%2F%2Fhome.army.mil%2Fjbmhh%2Fmy-fort%2Fall-services%2Faccess-gate-info&data=05%7C02%7Cpaul.m.kilgore.mil%40army.mil%7C4720131fd3cf4ca9064708de64e376c7%7Cfae6d70f954b481192b60530d6f84c43%7C0%7C0%7C639059125292350623%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=hp4FxSBTBUdC2mgGNCotoZ5TTSeoBPpbagIpRbSTVSM%3D&reserved=0

• Whether site visits to manufacturing facilities are part of the evaluation process? No