SOLICITATION,_W91QV1-16-R-0117_CONSOLIDATED_CHEMICALS.pdf
PDF 366 KB Posted
- Attached to
- CONSOLIDATED CHEMICALS
- Solicitation number
- W91QV1-16-R-0117
About this file
Solicitation Number, W91QV1-16-R-0117 is for Directorate of Public Works, Fort Detrick, MD for Consolidated Chemicals.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_4.pdf | ||
| Amendment_3_10_March_2017.pdf | ||
| Questions_and_Answers,_Consolidated_Chemicals_10_March_2017.pdf | ||
| Amendment_2.pdf | ||
| Amendment_1,_W91QV1-16-R-0117-P0001.pdf | ||
| Excel_Spreadsheet_Price_Model.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W91QV1-16-R-0117 31-Jan-2017
b. TELEPHONE NUMBER
703-806-2176
8. OFFER DUE DATE/LOCAL TIME
05:00 PM 16 Mar 2017
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA X ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W91QV19. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
DIANDRA J GREEN
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
0010923016
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED ORX
SMALL BUSINESS
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
MICC FORT BELVOIR
9410 JACKSON LOOP
FORT BELVOIR, VA VA 22060-5134
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
NAICS:
325998
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF70
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W91QV1-16-R-0117
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job Boiler Plant Chemicals
FFP
Please see extended descriptions of Chemicals Schedule in Attachment: A IAW SOW. Deliver chemicals to 190 Miller Drive, Fort Detrick, MD 21702.
FOB: Destination
PURCHASE REQUEST NUMBER: 0010923016
NET AMT
0002 1 Job Incinerator Plant Chemicals
FFP
Please see extended descriptions of Chemicals Schedule in Attachment: A IAW SOW. Deliver chemicals to 393 Beasley Drive, Fort Detrick, MD 21702.
0003 1 Job Electrical Power Plant Chemicals
FFP
Please see extended descriptions of Chemicals Schedule in Attachment: A IAW SOW. Deliver chemicals to 1673 Nelsons St., Fort Detrick, MD 21702.
0004 1 Job Cooling Towers/Boilers
FFP
Please see extended descriptions of Chemicals Schedule in Attachment: A IAW SOW. Deliver chemicals to 9250 Amber Meadows Drive, Fort Detrick, MD 21702.
0005 1 Job Indoor & Outdoor Pool
FFP
Please see extended descriptions of Chemicals Schedule in Attachment: A IAW SOW. Deliver chemicals for Indoor Pool to 1507 Porter St, Fort Detrick, MD 21702. Deliver chemicals for Outdoor to, 841 Sultan Drive, Fort Detrick, MD 21702.
0006 1 Job Steam Sterilization Plant (SSP)
FFP
Please see extended descriptions of Chemicals Schedule in Attachment: A IAW SOW. Deliver chemicals to 375 Beasley Drive, Fort Detrick, MD 21702.
0007 1 Job Water Treatment Plant
FFP
Please see extended descriptions of Chemicals Schedule in Attachment: A IAW SOW. Deliver chemicals to 1930 North Market St., Fort Detrick, MD 21702.
0008 1 Job Cooling Tower Water Treatment
FFP
Please see extended descriptions of Chemicals Schedule in Attachment: A IAW SOW. Deliver chemicals to 393 Beasley St., Fort Detrick, MD 21702.
1001 1 Job OPTION Boiler Plant Chemicals
FFP
Please see extended descriptions of Chemicals Schedule in Attachment: A IAW SOW. Deliver chemicals to 190 Miller Drive, Fort Detrick, MD 21702.
1002 1 Job OPTION Incinerator Plant Chemicals
FFP
Please see extended descriptions of Chemicals Schedule in Attachment: A IAW SOW. Deliver chemicals to 393 Beasley Drive, Fort Detrick, MD 21702.
1003 1 Job OPTION Electrical Power Plant Chemicals
FFP
Please see extended descriptions of Chemicals Schedule in Attachment: A IAW SOW. Deliver chemicals to 1673 Nelsons St., Fort Detrick, MD 21702.
1004 1 Job OPTION Cooling Towers/Boilers
FFP
Please see extended descriptions of Chemicals Schedule in Attachment: A IAW SOW. Deliver chemicals to 9250 Amber Meadows Drive, Fort Detrick, MD 21702.
1005 1 Job OPTION Indoor & Outdoor Pool
FFP
Please see extended descriptions of Chemicals Schedule in Attachment: A IAW SOW. Deliver chemicals for Indoor Pool to 1507 Porter St, Fort Detrick, MD 21702. Deliver chemicals for Outdoor to, 841 Sultan Drive, Fort Detrick, MD 21702.
1006 1 Job OPTION Steam Sterilization Plant (SSP)
FFP
Please see extended descriptions of Chemicals Schedule in Attachment: A IAW SOW. Deliver chemicals to 375 Beasley Drive, Fort Detrick, MD 21702.
1007 1 Job OPTION Water Treatment Plant
FFP
Please see extended descriptions of Chemicals Schedule in Attachment: A IAW
1008 1 Job OPTION Cooling Tower Water Treatment
FFP
Please see extended descriptions of Chemicals Schedule in Attachment: A IAW
2001 1 Job OPTION Boiler Plant Chemicals
FFP
Please see extended descriptions of Chemicals Schedule in Attachment: A IAW SOW. Deliver chemicals to 190 Miller Drive, Fort Detrick, MD 21702.
2002 1 Job OPTION Incinerator Plant Chemicals
FFP
Please see extended descriptions of Chemicals Schedule in Attachment: A IAW SOW. Deliver chemicals to 393 Beasley Drive, Fort Detrick, MD 21702.
2003 1 Job OPTION Electrical Power Plant Chemicals
FFP
Please see extended descriptions of Chemicals Schedule in Attachment: A IAW SOW. Deliver chemicals to 1673 Nelsons St., Fort Detrick, MD 21702.
2004 1 Job OPTION Cooling Towers/Boilers
FFP
Please see extended descriptions of Chemicals Schedule in Attachment: A IAW SOW. Deliver chemicals to 9250 Amber Meadows Drive, Fort Detrick, MD 21702.
2005 1 Job OPTION Indoor & Outdoor Pool Chemicals
FFP
Please see extended descriptions of Chemicals Schedule in Attachment: A IAW SOW. Deliver chemicals for Indoor Pool to 1507 Porter St, Fort Detrick, MD 21702. Deliver chemicals for Outdoor to, 841 Sultan Drive, Fort Detrick, MD 21702.
2006 1 Job OPTION Steam Sterilization Plant (SSP)
FFP
Please see extended descriptions of Chemicals Schedule in Attachment: A IAW SOW. Deliver chemicals to 375 Beasley Drive, Fort Detrick, MD 21702.
2007 1 Job OPTION Water Treatment Plant Chemcials
FFP
Please see extended descriptions of Chemicals Schedule in Attachment: A IAW SOW. Deliver chemicals to 1930 North Market St., Fort Detrick, MD 21702.P
2008 1 Job OPTION Cooling Tower Water Treatment Chemicals
FFP
Please see extended descriptions of Chemicals Schedule in Attachment: A IAW
3001 1 Job OPTION Boiler Plant Chemicals
FFP
Please see extended descriptions of Chemicals Schedule in Attachment: A IAW SOW. Deliver chemicals to 190 Miller Drive, Fort Detrick, MD 21702.
3002 1 Job OPTION Incinerator Plant Chemicals
FFP
Please see extended descriptions of Chemicals Schedule in Attachment: A IAW SOW. Deliver chemicals to 393 Beasley Drive, Fort Detrick, MD 21702.
3003 1 Job OPTION Electrical Power Plant Chemicals
FFP
Please see extended descriptions of Chemicals Schedule in Attachment: A IAW SOW. Deliver chemicals to 1673 Nelsons St., Fort Detrick, MD 21702.
3004 1 Job OPTION Cooling Towers/Boilers Chemicals
FFP
Please see extended descriptions of Chemicals Schedule in Attachment: A IAW SOW.Deliver chemicals to 9250 Amber Meadows Drive, Fort Detrick, MD 21702.
3005 1 Job OPTION Indoor & Outdoor Pool Chemicals
FFP
Please see extended descriptions of Chemicals Schedule in Attachment: A IAW SOW. Deliver chemicals to 9250 Veterans Drive, Fort Detrick, MD 21702.
3006 1 Job OPTION Steam Sterilization Plant (SSP) Chemcial
FFP
Please see extended descriptions of Chemicals Schedule in Attachment: A IAW SOW. Deliver chemicals to 9250 Veterans Drive, Fort Detrick, MD 21702.
3007 1 Job OPTION Water Treatment Plant Chemicals
FFP
Please see extended descriptions of Chemicals Schedule in Attachment: A IAW
3008 1 Job OPTION Cooling Tower Water Treatment Chemicals
FFP
Please see extended descriptions of Chemicals Schedule in Attachment: A IAW
4001 1 Job OPTION Boiler Plant Chemicals
FFP
Please see extended descriptions of Chemicals Schedule in Attachment: A IAW SOW. Deliver chemicals to 190 Miller Drive, Fort Detrick, MD 21702.
4002 1 Job OPTION Incinerator Plant Chemicals
FFP
Please see extended descriptions of Chemicals Schedule in Attachment: A IAW SOW. Deliver chemicals to 393 Beasley Drive, Fort Detrick, MD 21702.
4003 1 Job OPTION Electrical Power Plant Chemicals
FFP
Please see extended descriptions of Chemicals Schedule in Attachment: A IAW SOW. Deliver chemicals to 1673 Nelson Street, Fort Detrick, MD 21702.
4004 1 Job OPTION Cooling Towers/Boilers Chemicals
FFP
Please see extended descriptions of Chemicals Schedule in Attachment: A IAW SOW. Deliver chemicals to 9250 Amber Meadows Drive, Fort Detrick, MD 21702.
4005 1 Job OPTION Indoor & Outdoor Pool Chemicals
FFP
Please see extended descriptions of Chemicals Schedule in Attachment: A IAW SOW. Deliver chemicals for Indoor Pool to 1507 Porter St, Fort Detrick, MD 21702. Deliver chemicals for Outdoor to, 841 Sultan Drive, Fort Detrick, MD 21702.
4006 1 Job OPTION Steam Sterilization Plant (SSP) Chemical
FFP
ease see extended descriptions of Chemicals Schedule in Attachment: A IAW SOW. Deliver chemicals to 375 Beasley Drive, Fort Detrick, MD 2170
4007 1 Job OPTION Water Treatment Plant Chemicals
FFP
Please see extended descriptions of Chemicals Schedule in Attachment: A IAW
4008 1 Job OPTION Cooling Tower Water Treatment Chemicals
FFP
Please see extended descriptions of Chemicals Schedule in Attachment: A IAW
STATEMENT OF WORK
Statement of Work (SOW)
Directorate of Public Works
Chemical Supply Contract for the Fort Detrick Boiler Plant, Incinerator, Power Plants, Cooling Towers, WTP, Pools & SSP
Buildings 190, 375, 393, 841, 1507, 1125, 9250 & 1673 of Fort Detrick Maryland
1. OBJECTIVE
To provide for the efficient ordering and supply of chemicals to the Boiler Plant, Incinerator Plant, Power Plants, Cooling Towers, Water Treatment Plant, Pools & Steam Sterilization Plant in an expedient, stabilized, steadfast fashion ensuring chemicals are always in supply and available to carry out the daily missions of the Plants. The contractor shall order from the manufacturer and arrange for delivery to the locations specified herein the chemicals listed in this scope and attached technical exhibit.
2. SCOPE
2.1. BOILER PLANT BUILDING 190
The contractor shall be able to provide the following supplies and services to the Fort Detrick Boiler Plant in order to carry out the mission critical functions of the plant.
2.1.1 Plant Delivery Requirements
- All supplies shall be delivered to 190 Miller Drive, Fort Detrick MD 21702
- Contractor shall provide all labor, supervision, transportation and tools for transferring and handling chemicals to the final destination.
- Contractor shall provide Material Safety Data Sheets (MSDS) for all chemicals delivered.
- Chemicals must be able to integrate with existing systems without requiring the shutdown of the plant in order to introduce a new or equivalent chemical.
2.1.2 Plant Operations Chemical Requirements
The following chemicals are for water treatment of the boilers. Delivery quantities and total annual quantities are listed in Table TE1-1 in Technical Exhibit 1.
- Scale Inhibitor Copolymer: A copolymer used to control hardness and minimize scale build-up on heat transfer surfaces.
- Sulfite Oxygen Scavenger: A powdered sulfite compound, 100% soluble in water, used to scavenge oxygen from the boiler feedwater. 95-100% sodium sulfite.
- Condensate Water Treatment: A non-gunking optifilm inhibitor that forms a barrier that protects the condensate piping system from corrosion due to dissolved oxygen and carbon dioxide. Solution of Polyoxyethylated Oleic Acid and water. .
- Caustic Soda: 50% solution of sodium hydroxide.
- Sulfuric Acid: A 66 Deg Technical, 93.2% solution of sulfuric acid.
All test chemicals and equipment used by plant personnel to perform daily chemical concentration tests shall be included in the cost of the basic required chemicals.
2.2 INCINERATOR/REFUSE PLANT BUILDING 393
The contracted chemical company must be able to provide the following services to the Fort Detrick Incinerator Plant in order to carry out the mission critical functions of the plant:
2.2.1 Plant Delivery Requirements
- Contractor shall deliver supplies to the Incinerator Plant, 393 Beasley Drive, Fort Detrick, MD 21702
- Must provide and dispense bulk delivered chemicals to on-site Government holding tanks. Contractor shall maintain the on-site tanks.
- Contractor must provide all labor, supervision, transportation and tools for transferring and handling chemicals.
- Contractor shall provide Material Safety Data Sheets (MSDS) for each chemical delivered.
- Chemicals and delivery systems must be able to integrate with existing systems without requiring the shutdown of the plant.
2.2.2 Plant Operations Chemical Requirements
The following items are required for the daily operation of the Incinerator Plant. Delivery quantities and total annual quantities are listed in Table TE1-2 in Technical Exhibit 1.
- Caustic Soda Solution: 50% solution of sodium hydroxide.
- Cooling Tower Water Treatment: Aqueous blend of polyacrylic acid, sodium molybdate (85), potassium hydroxide (5%), phosphonate and tolytriazole, 1-hydroxyethylidene-1,1-diphosponic acid (5%).
- Cooling Tower Water Biocide: Sodium hydroxide (1-5%), balance water
- Sulfite Oxygen Scavenger: A powdered sulfite compound, 100% soluble in water, used to scavenge oxygen from the boiler feedwater. 95-100% sodium sulfite.
- Boiler Water Treatment Solution: Hydroxyethanedisphophonic Acid (1-5%), acrylic polymer (1-5%), sodium hydroxide (1-5%), sodium Hexametaphosphate (5-25%), Polyalkylene Glycol (0.1%) and balance water.
- Scale Inhibitor Copolymer: A copolymer used to control hardness and minimize scale build-up on heat transfer surfaces.
Water/Glycol Based Hydraulic Fluid: must be water/glycol hydraulic fluid, sold as hydraulic fluid, and able to resist combustion under extreme conditions; even when sprayed directly on a high heat source..
2.2.3 Additional Supplies Critical to Plant Operations
See Table TE1-1 for delivery quantities and total annual quantities.
- 24” x 24” x 2” Pleated Air Filters (MERV 8). Delivered in a lot of 396 filters.
- 24” x 20” x 2” Pleated Air Filters (MERV 8). Delivered in a lot of 144 filters.
- 24”x24”x15” 12 Pocket Filters (MERV 9). Delivered in a lot of 50 filters.
2.3 ELECTRICAL POWER PLANT BLDG. #1673
The contracted chemical company must be able to provide the following supplies to the Fort Detrick Electrical Power Plant at building 1673 in order to carry out the mission critical functions of the plant:
2.3.1 Plant Delivery Requirements
- Contractor shall deliver chemicals to 1673 Nelson St., Fort Detrick, MD 21702
- Perform inspections to ensure product is being used correctly.
- Contractor must provide all labor, supervision, transportation and tools for transferring and handling chemicals. This includes transferring chemicals from shipment drums to Government owned chemical containers.
- Provide and maintain proper chemicals for three (3) 300 ton chillers and cooling towers.
- Provide and maintain proper chemicals for four (4) low pressure steam boilers.
- Must be able to deliver chemicals as required to the power plant before the chemical tank runs out.
- Contractor shall provide Material Safety Data Sheets (MSDS) for each of the chemicals.
- Chemicals and delivery systems must be able to integrate with existing systems without requiring the shutdown of the plant.
2.3.2 Plant Operations Chemical Requirements
Contractor shall provide the following chemicals or equivalent for boilers. Delivery quantities and total annual quantities are located in Table TE1-3 in Technical Exhibit 1.
- Sulfite Oxygen Scavenger: A powdered sulfite compound, 100% soluble in water, used to scavenge oxygen from the boiler feedwater. 95-100% sodium sulfite.
- Scale Inhibitor Copolymer: A copolymer used to control hardness and minimize scale build-up on heat transfer surfaces
Contractor shall provide the following chemicals or equivalent for chillers and cooling towers:
- Water Tower Corrosion Inhibitor, Acrylate Terpolymner (10-20%), Chlorotolyltriazole Sodium Salt (1- 5%), Sodium Hydroxide (1-5%), Maleic Acid (1-5%).
- Broad Spectrum Microbiocide. Proprietary Halogenated Complex (strong oxidizer), (15-40%), Sodium Sulphamidate (15-40%), Sodium Hydroxide (7-13%).
2.4 COOLING TOWER & BOILER CHEMICALS
The contracted chemical company must be able to provide the following supplies to Fort Detrick Cooling Towers & Boilers Post Wide in order to carry out the mission critical functions of the Fort Detrick Cooling Towers & Boilers Post Wide.
2.4.1 Delivery Requirements
- Contractor shall deliver chemicals to 9250 Amber Meadows Drive, Fort Detrick, MD 21702
- Contractor must provide all labor, supervision, transportation and tools for transferring and handling chemicals.
- Must provide MSDS sheets for chemicals delivered.
2.4.2 Chemical Requirements
Contractor shall deliver the following chemicals. Delivery quantities and total annual quantities are located in Table TE1-4 in Technical Exhibit 1.
- Algaecide: Any Industrial Grade algaecide suitable for cooling tower use. Concentrated water treatment product that inhibits and controls slime and algae formation in cooling tower water systems.
- Bromine/Chlorine Biocide Pellets: 1-bromo-3-chloro-5,5-dimethly hydantoin in 20 gram pellets.
- Boiler Internal Water Treatment/Scale Inhibitor: A copolymer used to control hardness and minimize scale build-up on heat transfer surfaces.
- Boiler Oxygen Scavenger: Diethylhydroxylamine based oxygen scavenger.
- Cooling Tower Water Treatment: Water treatment chemical to inhibit corrosion and scale deposition on cooling tower and connected components.
2.5 Indoor & Outdoor Pools
The contracted chemical company must be able to provide the following services to the Fort Detrick Indoor & Outdoor Pools in order to carry out the mission critical functions of the Indoor & Outdoor Pools.
2.5.1 Delivery Requirements
- Contractor shall deliver chemicals to 9250 Amber Meadows Drive, Fort Detrick, MD 21702
- Contractor shall provide all labor, supervision, transportation and tools for transferring and handling
- Contractor shall provide Material Safety Data Sheets (MSDS) for chemicals delivered.
2.5.2 Chemical Requirements
The contractor shall supply the following chemicals for the Indoor and Outdoor pools. The chemicals shall be delivered in the quantities and schedule as outlined in tables TE1-5 in Technical Exhibit 1.
2.5.2.1 Indoor Pool Building 1507, Outdoor Pool Building 841
- Bulk Liquid Chlorine: 12% to 16% Chlorine, sodium hypochlorite solution.
- Carbon Dioxide: 99.9% pure
- Diatomaceous Earth: Suitable as pool water filter media.
- Cyanuric Acid: 1,3,5-triazine-2,4,6-triol.
- Pool Water Free Chlorine Testing Reagents: Reagent 1 is a water based solution of dipotassium hydrogenphosphate 5-10%, disodium hydrogenorthophosphate 5-10% and balance water. Reagent 2 is a water based solution of proprietary phosphorus based organic acid 5-10%. Reagents must be compatible with Government-Owned Taylor colorimeter.
- Muriatic Acid: 32% Hydrochloric Acid concentration
- Bleach: 5% to 8% sodium hypochlorite solution.
- Shock: 68% hypochlorite solution
- Granular Shock: sodium dichloro-s-triazinetrione dehydrate, 99%
- Coliform Testing agent: Coliform testing agent based on o-nitrophenyl/β-D-galactopyranoside and 4 methyl-umbelliferyl/β-D-glucuronide for testing of coliform and E. coli presence in water samples.
Methodology must be listed in US EPA manual of Standard Methods for Examination of Water and Wastewater.
- Comparator: Liquid color and fluorescence reference used for distinguishing threshold positive results from negative results.
- Sterile Sample Bottles: 120mL sample bottles.
2.6 STEAM STERILIZATION PLANT (SSP) CHEMICALS, BUILDING 375
The contracted chemical company must be able to provide the following services to the Fort Detrick Steam Sterilization Plant (SSP) Building 375, in order to carry out the mission of the SSP.
2.6.1 Delivery Requirements
- Contractor shall deliver chemicals to 375 Beasley Drive, Fort Detrick, MD 21702
- Contractor shall provide all labor, supervision, transportation and tools for transferring and handling
2.6.2 Chemical Requirements
The contractor shall supply the following chemicals for the Steam Sterilization Plant. The chemicals shall be delivered in the quantities and schedule as outlined in tables TE1-6 in Technical Exhibit 1.
2.6.2.1 Building 375 Steam Sterilization Plant
- Bleach: 5% to 8% sodium hypochlorite solution.
- Coliform Testing agent: Coliform testing agent based on o-nitrophenyl/β-D-galactopyranoside and 4 methyl-umbelliferyl/β-D-glucuronide for testing of coliform and E. coli presence in water samples.
Methodology must be listed in US EPA manual of Standard Methods for Examination of Water and Wastewater. Delivered to Building 375.
2.7 WATER TREATMENT PLANT
The contractor shall furnish the following chemical supplies in a timely manner in order to support the operations of the Water Treatment Plant.
2.7.1 General Delivery Requirements
- Contractor shall deliver chemicals to Fort Detrick Water Treatment Plant, 1930 North Market St. Ext., Frederick MD 21702
- Contractor shall provide all labor, supervision, transportation and tools for transferring and handling chemicals.
- Contractor shall be able to transfer all bulk chemicals to Government holding tanks.
2.7.2 Chemical Requirements
The contractor shall supply the following chemicals for the Water Treatment Plant. The chemicals shall be delivered in the quantities and schedule as outlined in table TE1-7 in Technical Exhibit 1.
2.7.2.1 Powder Activated Carbon
100% Activated Carbon, CAS # 7440-44-0. Chemical shall meet AWWA Standard B-600 and ANSI/ NSF 60 (latest revision). No less than 90% of the carbon shall pass through a No. 325 sieve.
2.7.2.2 Potassium Permanganate
AWWA Grade (as inorganic manganese compound containing 33-35% min.), 97% Minimum, CAS # 7722-64-
7. The potassium permanganate supplied under this contract shall be in accordance with AWWA Standard B- 603 (latest revision) and shall meet the purity requirements of ANSI / NSF 60 (latest revision). The chemical shall be a free flowing grade, granular, crystalline material suitable for feed in volumetric dry feeder. This product shall not form clumps.
2.7.2.3 Poly-Aluminum Chloride
33% Polyaluminum Hydroxychlorosulfate (CAS # 39290-78-3), 67% Water (CAS # 7732-18-5). The poly-aluminum chloride supplied under this contract shall be in accordance with AWWA Standard B-408 (latest revision) and shall meet the purity requirements of ANSI/ NSF 60 (latest revision). The aluminum concentration, expressed as % AL2SO3, shall be greater than 12%. Basicity shall be greater than 70%. The sulfates, expressed as % SO4, shall be 1.7% minimum. The poly-aluminum chloride shall be completely water soluble. Weight is approximately 10.5 lbs/gallon. A Certificate of Analysis of the lot from which the shipment was made shall be supplied with each shipment.
2.7.2.4 Liquid Chlorine Gas
The liquid chlorine supplied under this contract shall be in accordance with AWWA Standard B-301 (latest revision) and shall meet the purity requirements of ANSI/ NSF 60 (latest revision). The chlorine shall be a minimum of 99.5% pure by volume as obtained from vaporized liquid chlorine and shall be suitable for water treatment.
2.7.2.5 Hydro-Fluorosilicic Acid
1% Hydrogen Fluoride (CAS # 7664-39-3), 23% Hexafluorosilicic Acid (CAS # 16961-83-4), delivered to plant holding tank. The hydro-fluorosilicic acid supplied under this contract shall be in accordance with AWWA Standard B-703 (latest revision) and shall meet the purity requirements of ANSI/ NSF 60 (latest revision). The manufacturer / supplier shall, when requested, furnish the Government with a sworn affidavit stating that the material conforms in all details with the requirements of the aforementioned standards. A Certificate of Analysis of the lot from which the shipment was made shall be supplied with each shipment. The hydro-fluorosilicic acid shall contain between 23% - 25% H2SiF6 by weight.
2.7.2.6 Caustic Soda
25% Sodium Hydroxide (CAS # 1310-73-2), and 75% Water (CAS # 7732-18-5), delivered to holding tanks at the Fort Detrick Water Treatment Plant.. The caustic soda provided in this contract shall be in accordance with AWWA Standard B-501 (latest revision) and shall meet the purity requirements of ANSI / NSF 60 (latest revision).
2.7.2.7 Aluminum Sulfate (Liquid)
50% Water (CAS # 7732-18-5) and 50% Aluminum Sulfate (CAS # 233-135-0), delivered to holding tanks at the Fort Detrick Water Treatment Plant. The liquid aluminum sulfate supplied under this contract shall be in accordance with the applicable AWWA Standard B-403 (latest revision) and shall meet the purity requirements of ANSI/ NSF 60 (latest revision). This shall mean that the content of free sulfuric acid found when tested shall be zero. The material shall be neutral to basic. The liquid aluminum sulfate shall contain not less than 8.0% water soluble aluminum oxide and not more than 0.35% water soluble iron. The material shall be free of chips, dirt, grit, and all other foreign material. The liquid aluminum sulfate shall not contain more than 0.2% of material insoluble in distilled water. The liquid aluminum sulfate shall be of such clarity that it will not hinder readings of flow measuring devices.
2.7.2.8 Liquid Zinc Orthophosphate (Proprietary Product #: CP1236) 34-38% Inorganic Phosphates, 55% Water (CAS # 7732-18-5). The liquid zinc orthophosphate supplied under this contract shall be in accordance with AWWA Standard B-506-06 (latest revision) and shall meet the purity requirements of ANSI/ NSF 60 (latest revision). The phosphate concentration, expressed as % PO4 by weight, shall be in the range of 34% to 38%. The zinc concentration, expressed as % Zn by weight, shall be in the range of 12.2% to 12.8%. A Certificate of Analysis of the lot from which the shipment was made shall be supplied with each shipment.
2.7.2.9 Anionic Coagulant Aid Polymer ( MAGNAFLOC LT27 or APPROVED equivalent).
A Material / Safety Data Sheet (M/SDS) must accompany the bid. A Certificate of Analysis shall accompany each and every delivery of dry anionic polymer. Typical Certificate of Analysis are NOT acceptable. A sample Certificate of Analysis must accompany bid. Dry anionic polymer must be certified as meeting or exceeding Standard No. 60 as issued by the National Sanitation Foundation (NSF). The Contractor will provide a letter stating that this product meets ANSI / NSF Standard 60. The agency providing this certification must be accredited to provide such certification, and does not have to be affiliated with NSF. Should the product is being sold under a different name, then that name must also be listed under NSF. The dry anionic polymer must also be certified for ISO 9002 quality standards and from the specific plant or site holding this certification. A copy of the valid certificate must be included with the submitted bid. The Government will not accept certification to ANSI / NSF Standard 60 as having the producers / suppliers quality system registered to ISO 9001 or ISO 9002 standards. A separate and distinct certificate must be submitted for both. The dry anionic must be easily applied via chemical metering pump after “wetting”, mixing, and aging in the feed system on site. The dry anionic polymer must have the capability to act under wide variations in water characteristics, be non-reactive to chlorine, be effective over a wide temperature and pH range, and not create high head loss or “blind” mixed media filters when applied at recommended dosage. Dry anionic polymer must conform to these additional specifications:
o *Maximum Dosage (as per registration) – 1 mg/L o *Solubility – Complete o *Residual Acrylamide, % - <0.05 o *% Anionic Charge – 40 o *Bulk Density (lb. /ft3) – 40 o *Manufacturer Location – Suffolk, VA o *Analytical procedures for determining these values must be methods found in Standard Methods for the Examination of Water and Wastewater.
Only high molecular weight, dry anionic coagulants are acceptable. APPROVED equivalent must meet the mentioned specifications.
2.7.2.10 De-Watering Polymer
This product will be used in a centrifuge unit to de-water sediment sludge. Contractor is to provide a product that is commonly used by other water treatment plants for this process. The contractor shall provide, at no cost to the Government, a one-time onsite jar test at the award of the contract for the product to determine appropriate chemical feed rates. A Certificate of Analysis of the lot from which the shipment was made shall be supplied with each shipment.
2.7.2.11 Carbon Dioxide (Gas)
The carbon dioxide supplied under this contract shall be in accordance with AWWA Standard B-510 (latest revision) and shall meet the purity requirements of ANSI/ NSF 60 (latest revision). The chlorine shall be a minimum of 99.9% pure by volume as obtained from vaporized liquid carbon dioxide and shall be suitable for water treatment.
2.7.3 Specific Delivery Instructions
The contractor shall deliver chemicals to the location on the water treatment plant complex as indicated below. All site access and deliveries will be verified with the plant operator on duty.
2.7.3.1 Poly Aluminum Chloride
The delivery of Poly-Aluminum Chloride will be performed at the north side of Building 1162. The contractor will make an external hose connection (2” quick connect fitting) to deliver product. Permanent spill containment is on site. The connection is approximately 2 feet off the ground, in a vertical orientation over the spill containment. Before disconnection of fill hose, sufficient air is to be delivered through fill hose to completely clear hose and line of excess product. Bulk tank capacity is 6,000 gallons, and there is a tank level gage visible at point of connection. Contractor must utilize PPE that is specific to this product during all transfer / delivery procedures. The Contractor shall provide, at no cost to the Government, a single onsite jar testing of product to determine feed rate and training as specified by the Water Treatment Plant operators.
2.7.3.2 Powdered Activated Carbon
The delivery of Powder Activated Carbon will be performed at the west side of Building 1162. The Contractor will place product containers in an area where it is accessible to the loading hoist on site. The Contractor will be responsible for the cleanup of any spilled product that occurs before connection to the on-site hoist. Contractor must utilize PPE that is specific to this product during all transfer / delivery procedures.
2.7.3.3 Liquefied Chlorine Gas
The delivery of Chlorine gas in cylinders will be performed at the west side of Building 1162. The Contractor will place the cylinders in an area where it is accessible to the loading hoist on site. Contractor personnel shall be knowledgeable and prepared for any release of product that could occur during transfer of cylinders, to include emergency response procedures. Contractor must utilize PPE that is specific to this product during all transfer / delivery procedures. Any full defective cylinders received shall be exchanged by the Contractor, upon notification, as soon as possible at no cost to the Government. The cylinders shall be reconditioned and maintained by the Contractor. The Contractor shall provide two new lead washers for each cylinder.
2.7.3.4 Potassium Permanganate
The delivery of Potassium Permanganate will be performed at the west side of Building 1162. The Contractor will place the product containers on the ground in an area convenient for ease of pick up and transport by Water Treatment Plant personnel into the building. The Contractor will be responsible for the cleanup of any spilled product that occurs during the unloading and placement on the ground. Contractor must utilize PPE that is specific to this product during all delivery / transfer procedures.
2.7.3.5 Aluminum Sulfate
The delivery of Aluminum Sulfate (liquid alum) will be performed at the north side of Building 1162. The Contractor will make an external hose connection (2” quick connect fitting) to deliver product. Permanent spill containment is on site. The connection is approximately 2 feet off the ground, in a vertical orientation over the spill containment. Before disconnection of fill hose, sufficient air is to be delivered through fill hose to completely clear hose and line of excess product. Bulk tank capacity is 6,000 gallons, and there is a tank level gage visible at point of connection. Contractor must utilize PPE that is specific to this product during all transfer / delivery procedures.
2.7.3.6 Zinc Ortho-Phosphate
The delivery of Zinc Ortho-Phosphate will be performed at the west side of Building 1162. The Contractor will place the product containers on the ground in an area convenient for ease of pick up and transport by Water Treatment Plant personnel into the building.. The Contractor will be responsible for the cleanup of any spilled product that occurs during the unloading and placement on the ground. Contractor must utilize PPE that is specific to this product during all delivery / transfer procedures.
2.7.3.7 De-Watering Polymer
The delivery of De-Watering Polymer will be performed at the west side of Building 1162. The Contractor will place product containers on the ground in an area convenient for ease of pick up and transport by Water Treatment Plant personnel into the building. The Contractor will be responsible for the cleanup of any spilled product that occurs during the unloading and placement on the ground. Contractor must utilize PPE that is specific to this product during all delivery / transfer procedures.
2.7.3.8 Anionic Coagulant Aid Polymer
The delivery of Coagulant Aid Polymer will be performed at the west side of Building 1162. The Contractor will place product containers on the ground in an area convenient for ease of pick up and transport by Water Treatment Plant personnel to the storage area. The Contractor will be responsible for the cleanup of any spilled product that occurs during the unloading and placement on the ground. Contractor must utilize PPE that is specific to this product during all delivery / transfer procedures.
2.7.3.9 Caustic Soda
The delivery of Caustic Soda will be performed at the north side of Building 1162. The Contractor will make an external hose connection (2” quick connect fitting) to deliver product. Permanent spill containment is on site.
The connection is approximately 2 feet off the ground, in a vertical orientation over the spill containment.
Before disconnection of fill hose, sufficient air is to be delivered through fill hose to completely clear hose and line of excess product. Bulk tank capacity is 6,000 gallons, and there is a tank level gage visible at point of connection. Contractor must utilize PPE that is specific to this product during all transfer / delivery procedures.
2.7.3.10 Hydro-Fluorosilicic Acid
The delivery of Hydro-Fluorosilicic Acid will be performed at north side of Building 1140. The Contractor will make an external hose connection (2” quick connect fitting) and place a portable spill containment under said connection to deliver product. The connection is approximately 2.5 feet off the ground, in a horizontal orientation, so the contractor will provide any bracing of the fill hose as to not damage the fill connector. Before disconnection of fill hose, sufficient air is to be delivered through fill hose to completely clear hose and line of excess product. Bulk tank capacity is 3,000 gallons. Tank level gage is not visible at point of connection. It must be monitored from entrance doorway of the building. Contractor must utilize PPE that is specific to this product during all transfer / delivery procedures.
2.7.3.11 Carbon Dioxide Gas
The delivery of Carbon Dioxide gas will be performed at the west side of Building 1162. The Contractor will connect to one of two external standard nozzle receivers. Receivers are enclosed in a locked cage. Contractor personnel shall be knowledgeable and prepared for any release of product that could occur during transfer of product, to include emergency response procedures. Contractor must utilize PPE that is specific to this product during all transfer / delivery procedures.
2.8 Building 693 Cooling Tower/Boiler Chemicals
The contractor shall furnish the following chemical supplies in a timely manner in order to support the operations of the Cooling Tower and Boilers in building 693
2.8.1 Delivery Requirements
- Contractor shall deliver chemicals to 9250 Amber Meadows Drive, Fort Detrick, MD 21702
- Contractor must provide all labor, supervision, transportation and tools for transferring and handling
- Must Provide Material Safety Data Sheets (MSDS) for chemicals delivered.
2.8.2 Chemical Requirements
Contractor shall deliver the following chemicals. Delivery quantities and total annual quantities are located in Table TE1-8 in Technical Exhibit 1.
- Non Oxidizing Biocide: 5-chloro-2-methyl-4-isothiazolin-3-one (26172-55-4) 1.11 wt.%; 2-methyl-4-isothiazolin-3-one (2682-20-4) 0.39 wt.%.
- Oxidizing Biocide 1: 2-phosphono-1,2,4-butanetricarboxylic acid, sodium salt (40372-66-5) 3-7 wt. %;
Potassium hydroxide (1310-58-3) 3-7 wt. %; Tolytriazole, sodium salt (64665-57-2) 0.5-1.5 wt. %.
- Oxidizing Biocide 2 : Sodium chlorosulfamate (17172-27-9) 5-10 wt. %, Sodium bromosulfamate (134509-56-1) 7-13 wt. %, Sodium hydroxide (1310-73-2) 5-10 wt. %.
3. SPECIFIC TASKS
Provide chemicals as detailed in 2. Scope.
4. UNSATISFACTORY PERFORMANCE
All items listed in 2. Scope must be provided. Failure to perform to this scope would mean possible termination for default of the contract by the contractor.
5. HOURS OF OPERATION
The contractor is responsible for conducting business, between the hours of 7:30 a.m. and 3:30 p.m., Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.
6. PERIOD OF PERFORMANCE
The period of performance shall be one (1) Base Year of 12 months and four (4) 12-month option years.
7. PLACE OF PERFORMANCE
The following locations are the places where this contract will be performed. All locations are on Fort Detrick, MD, with specific street address provided. Refer to section 2 for additional details.
Boiler Plant, Building 190, 190 Miller Drive.
Incinerator Plant, Building 393, 393 Beasley Drive Power Plant, Building 1673, 1673 Nelson St.
Water Treatment Plant, 1930 North Market St.
Indoor Pool, Building 1507, 1507 Porter St.
Outdoor Pool, Building 841, 841 Sultan Drive Steam Sterilization Plant, Building 375, 375 Beasley Drive O&M Facility, Building 9250, 9250 Amber Meadows Drive
8. Type of Contract Firm Fixed Price Supply Contract
9. Recognized-Holidays The contractor is not required to perform services on Federal holidays (as listed below).
New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Independence Day Christmas Day
10. Security
10.1 Information Security: IAW AR 380-5, contractor personnel will execute the NDA through their company and not through the sponsoring DA command. Non-U.S. Government personnel, who have been hired under Civil Service procedures as consultants to the Department of the Army, and granted a DA security clearance or access authorization, in accordance with AR 380-67, will follow the same procedure, for execution of the SF 312, as civilian personnel. Classified information will be protected at all times, either by storage in an approved security container, or having it under the personal observation and physical control of an authorized individual.
10.2 Physical Security: The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.
10.3 Gate Access Requirements: IAW Army Directive 2014-05 all personnel desiring unescorted access to Fort Detrick will enter the installation through an authorized Access Control Point (ACP) and be vetted using the National Crime Information Center (NCIC) interstate Identification Index (III). The Installation Commander will, in the absence of a waiver deny uncleared contractor, subcontractor and visitors unescorted access to the installation based on the results of the NCIC-III check that contains credible derogatory information. Such derogatory information includes, but is not limited to the following:
The NCIC III contains criminal arrest information about the individual that causes the installation Commander to determine that individual present a potential threat to the good order, discipline, or health and safety on the installation.
The Installation is unable to verify the individual’s claimed identity in the attempt to gain access.
The individual has a current arrest warrant in NCIC, regardless of the offense or violation.
The individual is currently barred from entry or access to a federal installation or facility.
The individual has been convicted of crimes encompassing sexual assault, armed robbery, rape, child molestation, production or possession of child pornography trafficking in humans, drug possession with the intent to sell or drug distribution.
The individual has a US conviction for espionage, sabotage, treason, terrorism or murder.
The individual is a registered sex offender.
The individual has a felony conviction within the past 10 years, regardless of the offense or violation.
The individual has been convicted of a felony firearms or explosives violation.
The individual has engaged in acts or activities designed to overthrow the U.S. Government by force.
The individual is identified in the Terrorist Screening Database (TSDB) as known to be or suspected of being a terrorist or belonging to an organization with known links to terrorism or support of terrorist activity.
Individual is barred from Fort Detrick.
10.4 Access Denial Waiver Process: In case where unclear contractor, subcontractor is denied access based on derogatory information obtained from an NCIC or NCIC III check, the Installation Commander shall offer an Access Denial Wavier Application packet only if the individual request a waiver.
10.5 Access to Secure Facilities: Special requirements are required to gain access to a secure facility including but not limited to being a US Citizen or documented legal resident alien. Access to secure facilities on Fort Detrick requires coordination with the Contracting Officer’s Representative. Requests for access must be filed 15 days in advance in order to obtain necessary clearances. The Contractor shall provide all required personal data on personnel requiring access with the application. Upon completion of work the contractor shall surrender all issued security passes. Final contract payment will be withheld until all passes have been returned. The contractor is required to work with the Contracting Officer's Representative to meet the individual security requirements for that facility in order to gain access. The normal processing time for access is approximately 14 calendar days from the receipt of a complete vetting form (FD 190-13). Vetting forms must be legible. Incomplete or illegible forms will be returned to the contractor for resubmission and will delay access to the installation.
COR can obtain the FD190-13 from the Physical Security Office or Installation Badge Office
10.6 Key Control: N/A Contractor shall not be provided keys to government facilities.
10.7 Lock Combinations: N/A The Contractor shall not be provided lock combinations.
10.8 Anti-terrorism Security Requirements: The contractor and all associated subcontractors’ employees shall comply with applicable installation, facility, and area commander installation and facility access and local security policies and procedures (provided by the Government COR). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the installation Provost Marshal Office, Director of Emergency Services, or Security Office. The contractor workforce must comply with all personal identity verification requirements as directed by DoD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
10.8.1 Anti-Terrorism Level (1) One Training. All contractor employees, including subcontractor employees, requiring access to Army installations, facilities, or controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever applies. All contractor employees must complete annual AT Level 1 awareness training.
Annual training is to be conducted in the anniversary month it was initially completed. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee to the COR (or to the contracting officer, if a COR is not assigned) within 15 calendar days after completion of training by all employees and subcontractor personnel. AT Level I training is now conducted on the Joint Knowledge Online (JKO) site. For those that have a CAC, AT Level I can be accessed via https://jkodirect.jten.mil For those personnel that do not have a CAC they can utilize the below instructions to complete, i.e. contractors etc.
1. Google JKO and begin the process from there. http://jko.jten.mil Clicks:
2. No DOD CAC.
3. I am a US mil, government civil servant or contract employee.
4. I've been directed to take required training on JKO.
5. Courses.
6. I do not have a .MIL, .GOV, or .NDU.EDU address or I am a Multi-National Student.
7. Fill out the contact sheet and email to sponsor (In my opinion this is the COR)
8. Sponsor will email to the JKO help desk. (Again in my opinion this is the COR) Approval
1) Help desk sends non-CAC user an email with User ID.
2) Help desk will send a separate email with an electronic token to register a new password (token is good for 24 hours).
3) New User follows the instructions in the email and enters a new password.
4) User will need to enroll in Course # JS-US007-14 (User has up to 1 year to complete the course) (Contractors need to follow the requirements outlined in the AT/OPSEC cover sheet and complete it in 30 days).
If training is required in a non-English language, please contact Fort Detrick ATO at usarmy.detrick.usag.mbx.dptms-antiterrorism@mail.mil.
10.8.2 iWatch Awareness Training. The contractor and all associated subcontractors shall brief all employees on the local iWATCH program (training standards provided in this PWS by the Fort Detrick ATO). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report on suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees’ commencing performance, with the results reported to the COR no later than 5 calendar days after completion. All training materials can be found at http://www.detrick.army.mil/ready/iwatch.cfm.
10.9 Operational Security (OPSEC) Requirements. Personal information or information considered…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .