Bid Sheet W_Coefficient Asphalt Reqmts_20210223_LOCKED.xlsx
XLSX spreadsheet 41 KB Posted
- Solicitation number
- W91QF421B0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend 01_IFB Opening Date Extended_.pdf | ||
| Asphalt_21-B-0001_Solicitation_Overview Slides.pptx | PPTX presentation | |
| Question Due Date.pdf | ||
| WD-KS20210141_Highway_dtd-09APR2021.pdf | ||
| MUTCD 2003_Revision 1.pdf | ||
| SPECS-FLEXPVMTJF (20201119).pdf | ||
| Sol_W91QF4-21-B-0001 Asphalt Installation.pdf | ||
| Bid Shee W-Coefficient Asphalt Reqmts-20210223-LOCKED.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Year
| ASPHALT REPAIRS - BIDDING SCHEDULE | ||||||||
| BASE YEAR | ||||||||
| BID ITEM | DESCRIPTION | Unified Facilities Guide Specification | UNIT OF MEASURE | DPW - Cost Estimate | ESTIMATED QUANTITY | TOTAL COST | ||
| 0001 | Hot Mix Asphalt Leveling Course | 32 12 16 | Hot Mix Asphalt | TONS | $127.45 | 500 | $63,725.00 | |
| 0002 | Hot Mix Asphalt (2" )(< 100 TONS) | 32 12 16 | Hot Mix Asphalt | TONS | $127.45 | 500 | $63,725.00 | |
| 0003 | Hot Mix Asphalt (2")(≥ 100 TONS) | 32 12 16 | Hot Mix Asphalt | TONS | $127.45 | 2000 | $254,900.00 | |
| 0004 | Hot Mix Asphalt (6")(< 100 TONS) | 32 12 16 | Hot Mix Asphalt | TONS | $115.93 | 100 | $11,593.00 | |
| 0005 | Hot Mix Asphalt (6")(100-1000 TONS) | 32 12 16 | Hot Mix Asphalt | TONS | $115.93 | 500 | $57,965.00 | |
| 0006 | Hot Mix Asphalt (6")(≥ 1000 TONS) | 32 12 16 | Hot Mix Asphalt | TONS | $115.93 | 4600 | $533,278.00 | |
| 0007 | Hot Mix Asphalt (8")(< 100 TONS) | 32 12 16 | Hot Mix Asphalt | TONS | $115.93 | 100 | $11,593.00 | |
| 0008 | Hot Mix Asphalt (8")(≥ 100 TONS) | 32 12 16 | Hot Mix Asphalt | TONS | $115.93 | 1000 | $115,930.00 | |
| 0009 | Emulsified Asphalt (SS-1HP) | 32 12 13 | Tack | SQYD | $0.31 | 500000 | $155,000.00 | |
| 0010 | Milling (2")(< 10 TONS)(Maintenance Patches) | 32 01 16.71 | Cold Milling Asphalt Paving | TONS | $11.41 | 500 | $5,705.00 | |
| 0011 | Milling (2")(≥ 10 TONS) | 32 01 16.71 | Cold Milling Asphalt Paving | TONS | $9.89 | 2000 | $19,780.00 | |
| 0012 | Milling (4") | 32 01 16.71 | Cold Milling Asphalt Paving | TONS | $10.42 | 50 | $521.00 | |
| 0013 | Asphalt Base Patching (in conjunction with Mill and Overlay) | 32 12 16 | Hot Mix Asphalt | TONS | $200.00 | 100 | $20,000.00 | |
| 0014 | Full Depth Asphalt Patching | 32 12 16 | Hot Mix Asphalt | TONS | $300.00 | 100 | $30,000.00 | |
| 0015 | Ultrathin Bonded Asphalt Surface (UBAS), Thoroughfare (5/8") | 32 12 36.26 23 | Ultrathin Bonded Asphalt Surface | SQYD | $3.86 | 5000 | $19,300.00 | |
| 0016 | Ultrathin Bonded Asphalt Surface (UBAS), Residential (5/8") | 32 12 36.26 23 | Ultrathin Bonded Asphalt Surface | SQYD | $4.02 | 1000 | $4,020.00 | |
| 0017 | Milling (5/8") | 32 01 16.71 | Cold Milling Asphalt Paving | TONS | $9.89 | 6000 | $59,340.00 | |
| 0018 | Asphalt Rejuvenator - Liquid | 32 01 13.64 | Bituminous Pavement Liquid Rejunvenating | GAL | $13.98 | 2000 | $27,960.00 | |
| 0019 | Asphalt Rejuvenator - Treated Pavement | 32 01 13.64 | Bituminous Pavement Liquid Rejunvenating | SQYD | $0.19 | 20000 | $3,800.00 | |
| 0020 | Asphalt Price Adjustment | N/A | NO BID | TON | $0.00 | $0.00 | ||
| 0021 | Emulsified Asphalt Price Adjustment | N/A | NO BID | TON | $0.00 | $0.00 | ||
| 0022 | Replace Curb and Gutter | 32 16 19 | Concrete Curbs Gutters and Sidewalks | LNFT | $59.50 | 300 | $17,850.00 | |
| 0023 | New Curb and Gutter | 32 16 19 | Concrete Curbs Gutters and Sidewalks | LNFT | $35.22 | 200 | $7,044.00 | |
| 0024 | Replace Sidewalk | 32 16 19 | Concrete Curbs Gutters and Sidewalks | SQYD | $80.15 | 100 | $8,015.00 | |
| 0025 | Replace Sidewalk Ramps | 32 16 19 | Concrete Curbs Gutters and Sidewalks | SQYD | $165.74 | 15 | $2,486.10 | |
| 0026 | Replace Sidewalk Ramps (Detectable Warning) | 32 16 19 | Concrete Curbs Gutters and Sidewalks | SQYD | $189.25 | 15 | $2,838.75 | |
| 0027 | Asphalt Crack Sealing (>1/8" and ≤1/2")(Route and Seal with Asphalt) | 32 01 17.61 | Sealing Cracks in Asphalt Paving | LNFT | $6.25 | 1500 | $9,375.00 | |
| 0028 | Asphalt Crack Sealing (>1/2" and <1")(Seal with Fiber-Reinforced Asphalt) | 32 01 17.61 | Sealing Cracks in Asphalt Paving | LNFT | $9.85 | 400 | $3,940.00 | |
| 0029 | Asphalt Crack Sealing (≥1" and <2")(Seal with Fiber-Reinforced Asphalt) | 32 01 17.61 | Sealing Cracks in Asphalt Paving | LNFT | $11.95 | 200 | $2,390.00 | |
| 0030 | Construct Aggregate Sub-base (< 5 CUYD) | 32 11 23 | Aggregate Base Courses and Aggregate Shoulders | CUYD | $125.81 | 100 | $12,581.00 | |
| 0031 | Construct Aggregate Sub-base (5 CUYD to 50 CUYD) | 32 11 23 | Aggregate Base Courses and Aggregate Shoulders | CUYD | $112.20 | 300 | $33,660.00 | |
| 0032 | Construct Aggregate Sub-base (> 50 CUYD) | 32 11 23 | Aggregate Base Courses and Aggregate Shoulders | CUYD | $99.98 | 1000 | $99,980.00 | |
| 0033 | Aggregate for Shoulders (AS-1) | 32 11 23 | Aggregate Base Courses and Aggregate Shoulders | TONS | $139.21 | 100 | $13,921.00 | |
| 0034 | Fine Grading for New Road Work | 31 00 00 | Earthwork | SQYD | $35.00 | 1000 | $35,000.00 | |
| 0035 | Excavation and Fill for construction | 31 00 00 | Earthwork | CUYD | $25.00 | 1000 | $25,000.00 | |
| 0036 | Dirt spoils or fill for repair or new road work remove from or bring on post | Hauling | CUYD | $21.00 | 1000 | $21,000.00 | ||
| 0037 | Manipulation | 32 11 13.13 | Lime Treated Subgrade | SQYD | $24.45 | 2000 | $48,900.00 | |
| 0038 | Quicklime | 32 11 13.13 | Lime Treated Subgrade | TONS | $330.46 | 30 | $9,913.80 | |
| 0039 | Pavement Marking Paint Type III | 4" Yellow line (Without Glass Bead) | 32 17 23 | Pavement Markings | LNFT | $0.76 | 3000 | $2,280.00 |
| 0040 | 4" White Line (Without Glass Bead) | 32 17 23 | Pavement Markings | LNFT | $0.76 | 5000 | $3,800.00 | |
| 0041 | 4" Yellow line | 32 17 23 | Pavement Markings | LNFT | $0.81 | 10000 | $8,100.00 | |
| 0042 | 4" White Line | 32 17 23 | Pavement Markings | LNFT | $0.81 | 2000 | $1,620.00 | |
| 0043 | 18" white Line | 32 17 23 | Pavement Markings | LNFT | $4.25 | 500 | $2,125.00 | |
| 0044 | 24" white Line | 32 17 23 | Pavement Markings | LNFT | $5.09 | 500 | $2,545.00 | |
| 0045 | Symbol: Thru Arrow | 32 17 23 | Pavement Markings | EACH | $60.59 | 10 | $605.90 | |
| 0046 | Symbol: Turn Arrow | 32 17 23 | Pavement Markings | EACH | $55.82 | 20 | $1,116.40 | |
| 0047 | Symbol: Turn and Thru Arrow | 32 17 23 | Pavement Markings | EACH | $65.99 | 5 | $329.95 | |
| 0048 | Symbol: Sharrow | 32 17 23 | Pavement Markings | EACH | $150.13 | 15 | $2,251.95 | |
| 0049 | Symbol: Handicap | 32 17 23 | Pavement Markings | EACH | $52.41 | 30 | $1,572.30 | |
| 0050 | Symbol: RR Crossing | 32 17 23 | Pavement Markings | EACH | $300.71 | 2 | $601.42 | |
| 0051 | Word "ONLY" | 32 17 23 | Pavement Markings | EACH | $97.00 | 5 | $485.00 | |
| 0052 | Pavement Marking Methacrylate | Yellow (Airfield Markings) | 32 17 23 | Pavement Markings | SQFT | $6.79 | 2500 | $16,975.00 |
| 0053 | White (Airfield Markings) | 32 17 23 | Pavement Markings | SQFT | $6.79 | 2000 | $13,580.00 | |
| 0054 | Black (Airfield Markings) | 32 17 23 | Pavement Markings | SQFT | $6.79 | 1000 | $6,790.00 | |
| 0055 | 4" Yellow line | 32 17 23 | Pavement Markings | LNFT | $1.79 | 10000 | $17,900.00 | |
| 0056 | 4" White Line | 32 17 23 | Pavement Markings | LNFT | $1.79 | 2000 | $3,580.00 | |
| 0057 | 18" white Line | 32 17 23 | Pavement Markings | LNFT | $7.22 | 500 | $3,610.00 | |
| 0058 | 24" white Line | 32 17 23 | Pavement Markings | LNFT | $9.23 | 500 | $4,615.00 | |
| 0059 | Symbol: Thru Arrow | 32 17 23 | Pavement Markings | EACH | $250.45 | 10 | $2,504.50 | |
| 0060 | Symbol: Turn Arrow | 32 17 23 | Pavement Markings | EACH | $250.45 | 20 | $5,009.00 | |
| 0061 | Symbol: Turn and Thru Arrow | 32 17 23 | Pavement Markings | EACH | $275.68 | 5 | $1,378.40 | |
| 0062 | Symbol: Sharrow | 32 17 23 | Pavement Markings | EACH | $307.26 | 10 | $3,072.60 | |
| 0063 | Symbol: RR Crossing | 32 17 23 | Pavement Markings | EACH | $387.92 | 2 | $775.84 | |
| 0064 | Word "ONLY" | 32 17 23 | Pavement Markings | EACH | $192.73 | 5 | $963.65 | |
| 0065 | Grinding for Pavement Markings | 32 17 23 | Pavement Markings | SQFT | $8.02 | 1000 | $8,020.00 | |
| 0066 | Pavement Marking Removal | 32 17 23 | Pavement Markings | SQFT | $5.85 | 1000 | $5,850.00 | |
| 0067 | Paint Removal, Airfields | 32 01 11.51 | Rubber and Paint Removal for Airfield Pavements | SQFT | $7.21 | 2,000 | $14,420.00 | |
| 0068 | Rubber Removal from Airfields | 32 01 11.51 | Rubber and Paint Removal for Airfield Pavements | SQFT | $9.11 | 1,000 | $9,110.00 | |
| 0069 | Survey to Correct Road Profile | STA | $2,250.00 | 5 | $11,250.00 | |||
| 0070 | Install Manhole Adjustment Rings | 33 40 00 | Storm Drainage Utilities | EACH | $1,250.50 | 8 | $10,004.00 | |
| 0071 | Adjust Inlet Height | 33 40 00 | Storm Drainage Utilities | LNFT | $74.89 | 800 | $59,912.00 | |
| 0072 | Seed, Tall Fescue and Fertilizer | 32 92 19 | Seeding | SQYD | $50.53 | 200 | $10,106.00 |
SUBTOTAL $9,153.12 $2,048,888.56
Contractor Co-Efficient 0.00
Asphalt Line Items Sub-Total (Pre-Bond) $ - 0
| 073 | Payment & Performance Bond - On Task Order at or over $30,000.00 | % | 3% | $ - 0 | $ - 0 |
| 074 | Payment & Performance Bond - On Task Order at or over $150,000.00 | % | 3% | $ - 0 | $ - 0 |
TOTAL $ - 0
Option Year #1
| ASPHALT REPAIRS - BIDDING SCHEDULE | ||||||||
| OPTION YEAR #1 | ||||||||
| BID ITEM | DESCRIPTION | Unified Facilities Guide Specification | UNIT OF MEASURE | DPW - Cost Estimate | ESTIMATED QUANTITY | TOTAL COST | ||
| 0001 | Hot Mix Asphalt Leveling Course | 32 12 16 | Hot Mix Asphalt | TONS | $133.82 | 500 | $66,911.25 | |
| 0002 | Hot Mix Asphalt (2" )(< 100 TONS) | 32 12 16 | Hot Mix Asphalt | TONS | $133.82 | 500 | $66,911.25 | |
| 0003 | Hot Mix Asphalt (2")(≥ 100 TONS) | 32 12 16 | Hot Mix Asphalt | TONS | $133.82 | 2000 | $267,645.00 | |
| 0004 | Hot Mix Asphalt (6")(< 100 TONS) | 32 12 16 | Hot Mix Asphalt | TONS | $121.73 | 100 | $12,172.65 | |
| 0005 | Hot Mix Asphalt (6")(100-1000 TONS) | 32 12 16 | Hot Mix Asphalt | TONS | $121.73 | 500 | $60,863.25 | |
| 0006 | Hot Mix Asphalt (6")(≥ 1000 TONS) | 32 12 16 | Hot Mix Asphalt | TONS | $121.73 | 4600 | $559,941.90 | |
| 0007 | Hot Mix Asphalt (8")(< 100 TONS) | 32 12 16 | Hot Mix Asphalt | TONS | $121.73 | 100 | $12,172.65 | |
| 0008 | Hot Mix Asphalt (8")(≥ 100 TONS) | 32 12 16 | Hot Mix Asphalt | TONS | $121.73 | 1000 | $121,726.50 | |
| 0009 | Emulsified Asphalt (SS-1HP) | 32 12 13 | Tack | SQYD | $0.33 | 500000 | $162,750.00 | |
| 0010 | Milling (2")(< 10 TONS)(Maintenance Patches) | 32 01 16.71 | Cold Milling Asphalt Paving | TONS | $11.98 | 500 | $5,990.25 | |
| 0011 | Milling (2")(≥ 10 TONS) | 32 01 16.71 | Cold Milling Asphalt Paving | TONS | $10.38 | 2000 | $20,769.00 | |
| 0012 | Milling (4") | 32 01 16.71 | Cold Milling Asphalt Paving | TONS | $10.94 | 50 | $547.05 | |
| 0013 | Asphalt Base Patching (in conjunction with Mill and Overlay) | 32 12 16 | Hot Mix Asphalt | TONS | $210.00 | 100 | $21,000.00 | |
| 0014 | Full Depth Asphalt Patching | 32 12 16 | Hot Mix Asphalt | TONS | $315.00 | 100 | $31,500.00 | |
| 0015 | Ultrathin Bonded Asphalt Surface (UBAS), Thoroughfare (5/8") | 32 12 36.26 23 | Ultrathin Bonded Asphalt Surface | SQYD | $4.05 | 5000 | $20,265.00 | |
| 0016 | Ultrathin Bonded Asphalt Surface (UBAS), Residential (5/8") | 32 12 36.26 23 | Ultrathin Bonded Asphalt Surface | SQYD | $4.22 | 1000 | $4,221.00 | |
| 0017 | Milling (5/8") | 32 01 16.71 | Cold Milling Asphalt Paving | TONS | $10.38 | 6000 | $62,307.00 | |
| 0018 | Asphalt Rejuvenator - Liquid | 32 01 13.64 | Bituminous Pavement Liquid Rejunvenating | GAL | $14.68 | 2000 | $29,358.00 | |
| 0019 | Asphalt Rejuvenator - Treated Pavement | 32 01 13.64 | Bituminous Pavement Liquid Rejunvenating | SQYD | $0.20 | 20000 | $3,990.00 | |
| 0020 | Asphalt Price Adjustment | N/A | NO BID | TON | $0.00 | $0.00 | ||
| 0021 | Emulsified Asphalt Price Adjustment | N/A | NO BID | TON | $0.00 | $0.00 | ||
| 0022 | Replace Curb and Gutter | 32 16 19 | Concrete Curbs Gutters and Sidewalks | LNFT | $62.48 | 300 | $18,742.50 | |
| 0023 | New Curb and Gutter | 32 16 19 | Concrete Curbs Gutters and Sidewalks | LNFT | $36.98 | 200 | $7,396.20 | |
| 0024 | Replace Sidewalk | 32 16 19 | Concrete Curbs Gutters and Sidewalks | SQYD | $84.16 | 100 | $8,415.75 | |
| 0025 | Replace Sidewalk Ramps | 32 16 19 | Concrete Curbs Gutters and Sidewalks | SQYD | $174.03 | 15 | $2,610.41 | |
| 0026 | Replace Sidewalk Ramps (Detectable Warning) | 32 16 19 | Concrete Curbs Gutters and Sidewalks | SQYD | $198.71 | 15 | $2,980.69 | |
| 0027 | Asphalt Crack Sealing (>1/8" and ≤1/2")(Route and Seal with Asphalt) | 32 01 17.61 | Sealing Cracks in Asphalt Paving | LNFT | $6.56 | 1500 | $9,843.75 | |
| 0028 | Asphalt Crack Sealing (>1/2" and <1")(Seal with Fiber-Reinforced Asphalt) | 32 01 17.61 | Sealing Cracks in Asphalt Paving | LNFT | $10.34 | 400 | $4,137.00 | |
| 0029 | Asphalt Crack Sealing (≥1" and <2")(Seal with Fiber-Reinforced Asphalt) | 32 01 17.61 | Sealing Cracks in Asphalt Paving | LNFT | $12.55 | 200 | $2,509.50 | |
| 0030 | Construct Aggregate Sub-base (< 5 CUYD) | 32 11 23 | Aggregate Base Courses and Aggregate Shoulders | CUYD | $132.10 | 100 | $13,210.05 | |
| 0031 | Construct Aggregate Sub-base (5 CUYD to 50 CUYD) | 32 11 23 | Aggregate Base Courses and Aggregate Shoulders | CUYD | $117.81 | 300 | $35,343.00 | |
| 0032 | Construct Aggregate Sub-base (> 50 CUYD) | 32 11 23 | Aggregate Base Courses and Aggregate Shoulders | CUYD | $104.98 | 1000 | $104,979.00 | |
| 0033 | Aggregate for Shoulders (AS-1) | 32 11 23 | Aggregate Base Courses and Aggregate Shoulders | TONS | $146.17 | 100 | $14,617.05 | |
| 0034 | Fine Grading for New Road Work | 31 00 00 | Earthwork | SQYD | $36.75 | 1000 | $36,750.00 | |
| 0035 | Excavation and Fill for construction | 31 00 00 | Earthwork | CUYD | $26.25 | 1000 | $26,250.00 | |
| 0036 | Dirt spoils or fill for repair or new road work remove from or bring on post | Hauling | CUYD | $22.05 | 1000 | $22,050.00 | ||
| 0037 | Manipulation | 32 11 13.13 | Lime Treated Subgrade | SQYD | $25.67 | 2000 | $51,345.00 | |
| 0038 | Quicklime | 32 11 13.13 | Lime Treated Subgrade | TONS | $346.98 | 30 | $10,409.49 | |
| 0039 | Pavement Marking Paint Type III | 4" Yellow line (Without Glass Bead) | 32 17 23 | Pavement Markings | LNFT | $0.80 | 3000 | $2,394.00 |
| 0040 | 4" White Line (Without Glass Bead) | 32 17 23 | Pavement Markings | LNFT | $0.80 | 5000 | $3,990.00 | |
| 0041 | 4" Yellow line | 32 17 23 | Pavement Markings | LNFT | $0.85 | 10000 | $8,505.00 | |
| 0042 | 4" White Line | 32 17 23 | Pavement Markings | LNFT | $0.85 | 2000 | $1,701.00 | |
| 0043 | 18" white Line | 32 17 23 | Pavement Markings | LNFT | $4.46 | 500 | $2,231.25 | |
| 0044 | 24" white Line | 32 17 23 | Pavement Markings | LNFT | $5.34 | 500 | $2,672.25 | |
| 0045 | Symbol: Thru Arrow | 32 17 23 | Pavement Markings | EACH | $63.62 | 10 | $636.20 | |
| 0046 | Symbol: Turn Arrow | 32 17 23 | Pavement Markings | EACH | $58.61 | 20 | $1,172.22 | |
| 0047 | Symbol: Turn and Thru Arrow | 32 17 23 | Pavement Markings | EACH | $69.29 | 5 | $346.45 | |
| 0048 | Symbol: Sharrow | 32 17 23 | Pavement Markings | EACH | $157.64 | 15 | $2,364.55 | |
| 0049 | Symbol: Handicap | 32 17 23 | Pavement Markings | EACH | $55.03 | 30 | $1,650.92 | |
| 0050 | Symbol: RR Crossing | 32 17 23 | Pavement Markings | EACH | $315.75 | 2 | $631.49 | |
| 0051 | Word "ONLY" | 32 17 23 | Pavement Markings | EACH | $101.85 | 5 | $509.25 | |
| 0052 | Pavement Marking Methacrylate | Yellow (Airfield Markings) | 32 17 23 | Pavement Markings | SQFT | $7.13 | 2500 | $17,823.75 |
| 0053 | White (Airfield Markings) | 32 17 23 | Pavement Markings | SQFT | $7.13 | 2000 | $14,259.00 | |
| 0054 | Black (Airfield Markings) | 32 17 23 | Pavement Markings | SQFT | $7.13 | 1000 | $7,129.50 | |
| 0055 | 4" Yellow line | 32 17 23 | Pavement Markings | LNFT | $1.88 | 10000 | $18,795.00 | |
| 0056 | 4" White Line | 32 17 23 | Pavement Markings | LNFT | $1.88 | 2000 | $3,759.00 | |
| 0057 | 18" white Line | 32 17 23 | Pavement Markings | LNFT | $7.58 | 500 | $3,790.50 | |
| 0058 | 24" white Line | 32 17 23 | Pavement Markings | LNFT | $9.69 | 500 | $4,845.75 | |
| 0059 | Symbol: Thru Arrow | 32 17 23 | Pavement Markings | EACH | $262.97 | 10 | $2,629.73 | |
| 0060 | Symbol: Turn Arrow | 32 17 23 | Pavement Markings | EACH | $262.97 | 20 | $5,259.45 | |
| 0061 | Symbol: Turn and Thru Arrow | 32 17 23 | Pavement Markings | EACH | $289.46 | 5 | $1,447.32 | |
| 0062 | Symbol: Sharrow | 32 17 23 | Pavement Markings | EACH | $322.62 | 10 | $3,226.23 | |
| 0063 | Symbol: RR Crossing | 32 17 23 | Pavement Markings | EACH | $407.32 | 2 | $814.63 | |
| 0064 | Word "ONLY" | 32 17 23 | Pavement Markings | EACH | $202.37 | 5 | $1,011.83 | |
| 0065 | Grinding for Pavement Markings | 32 17 23 | Pavement Markings | SQFT | $8.42 | 1000 | $8,421.00 | |
| 0066 | Pavement Marking Removal | 32 17 23 | Pavement Markings | SQFT | $6.14 | 1000 | $6,142.50 | |
| 0067 | Paint Removal, Airfields | 32 01 11.51 | Rubber and Paint Removal for Airfield Pavements | SQFT | $7.57 | 2,000 | $15,141.00 | |
| 0068 | Rubber Removal from Airfields | 32 01 11.51 | Rubber and Paint Removal for Airfield Pavements | SQFT | $9.57 | 1,000 | $9,565.50 | |
| 0069 | Survey to Correct Road Profile | STA | $2,362.50 | 5 | $11,812.50 | |||
| 0070 | Install Manhole Adjustment Rings | 33 40 00 | Storm Drainage Utilities | EACH | $1,313.03 | 8 | $10,504.20 | |
| 0071 | Adjust Inlet Height | 33 40 00 | Storm Drainage Utilities | LNFT | $78.63 | 800 | $62,907.60 | |
| 0072 | Seed, Tall Fescue and Fertilizer | 32 92 19 | Seeding | SQYD | $53.06 | 200 | $10,611.30 |
SUBTOTAL $9,610.78 $2,151,332.99
Contractor Co-Efficient 0.00
Asphalt Line Items Sub-Total (Pre-Bond) $ - 0
| 073 | Payment & Performance Bond - On Task Order at or over $30,000.00 | % | 3% | $ - 0 | $ - 0 |
| 074 | Payment & Performance Bond - On Task Order at or over $150,000.00 | % | 3% | $ - 0 | $ - 0 |
TOTAL $ - 0
Option Year #2
| ASPHALT REPAIRS - BIDDING SCHEDULE | ||||||||
| OPTION YEAR #2 | ||||||||
| BID ITEM | DESCRIPTION | Unified Facilities Guide Specification | UNIT OF MEASURE | DPW - Cost Estimate | ESTIMATED QUANTITY | TOTAL COST | ||
| 0001 | Hot Mix Asphalt Leveling Course | 32 12 16 | Hot Mix Asphalt | TONS | $140.20 | 500 | $70,097.50 | |
| 0002 | Hot Mix Asphalt (2" )(< 100 TONS) | 32 12 16 | Hot Mix Asphalt | TONS | $140.20 | 500 | $70,097.50 | |
| 0003 | Hot Mix Asphalt (2")(≥ 100 TONS) | 32 12 16 | Hot Mix Asphalt | TONS | $140.20 | 2000 | $280,390.00 | |
| 0004 | Hot Mix Asphalt (6")(< 100 TONS) | 32 12 16 | Hot Mix Asphalt | TONS | $127.52 | 100 | $12,752.30 | |
| 0005 | Hot Mix Asphalt (6")(100-1000 TONS) | 32 12 16 | Hot Mix Asphalt | TONS | $127.52 | 500 | $63,761.50 | |
| 0006 | Hot Mix Asphalt (6")(≥ 1000 TONS) | 32 12 16 | Hot Mix Asphalt | TONS | $127.52 | 4600 | $586,605.80 | |
| 0007 | Hot Mix Asphalt (8")(< 100 TONS) | 32 12 16 | Hot Mix Asphalt | TONS | $127.52 | 100 | $12,752.30 | |
| 0008 | Hot Mix Asphalt (8")(≥ 100 TONS) | 32 12 16 | Hot Mix Asphalt | TONS | $127.52 | 1000 | $127,523.00 | |
| 0009 | Emulsified Asphalt (SS-1HP) | 32 12 13 | Tack | SQYD | $0.34 | 500000 | $170,500.00 | |
| 0010 | Milling (2")(< 10 TONS)(Maintenance Patches) | 32 01 16.71 | Cold Milling Asphalt Paving | TONS | $12.55 | 500 | $6,275.50 | |
| 0011 | Milling (2")(≥ 10 TONS) | 32 01 16.71 | Cold Milling Asphalt Paving | TONS | $10.88 | 2000 | $21,758.00 | |
| 0012 | Milling (4") | 32 01 16.71 | Cold Milling Asphalt Paving | TONS | $11.46 | 50 | $573.10 | |
| 0013 | Asphalt Base Patching (in conjunction with Mill and Overlay) | 32 12 16 | Hot Mix Asphalt | TONS | $220.00 | 100 | $22,000.00 | |
| 0014 | Full Depth Asphalt Patching | 32 12 16 | Hot Mix Asphalt | TONS | $330.00 | 100 | $33,000.00 | |
| 0015 | Ultrathin Bonded Asphalt Surface (UBAS), Thoroughfare (5/8") | 32 12 36.26 23 | Ultrathin Bonded Asphalt Surface | SQYD | $4.25 | 5000 | $21,230.00 | |
| 0016 | Ultrathin Bonded Asphalt Surface (UBAS), Residential (5/8") | 32 12 36.26 23 | Ultrathin Bonded Asphalt Surface | SQYD | $4.42 | 1000 | $4,422.00 | |
| 0017 | Milling (5/8") | 32 01 16.71 | Cold Milling Asphalt Paving | TONS | $10.88 | 6000 | $65,274.00 | |
| 0018 | Asphalt Rejuvenator - Liquid | 32 01 13.64 | Bituminous Pavement Liquid Rejunvenating | GAL | $15.38 | 2000 | $30,756.00 | |
| 0019 | Asphalt Rejuvenator - Treated Pavement | 32 01 13.64 | Bituminous Pavement Liquid Rejunvenating | SQYD | $0.21 | 20000 | $4,180.00 | |
| 0020 | Asphalt Price Adjustment | N/A | NO BID | TON | $0.00 | $0.00 | ||
| 0021 | Emulsified Asphalt Price Adjustment | N/A | NO BID | TON | $0.00 | $0.00 | ||
| 0022 | Replace Curb and Gutter | 32 16 19 | Concrete Curbs Gutters and Sidewalks | LNFT | $65.45 | 300 | $19,635.00 | |
| 0023 | New Curb and Gutter | 32 16 19 | Concrete Curbs Gutters and Sidewalks | LNFT | $38.74 | 200 | $7,748.40 | |
| 0024 | Replace Sidewalk | 32 16 19 | Concrete Curbs Gutters and Sidewalks | SQYD | $88.17 | 100 | $8,816.50 | |
| 0025 | Replace Sidewalk Ramps | 32 16 19 | Concrete Curbs Gutters and Sidewalks | SQYD | $182.31 | 15 | $2,734.71 | |
| 0026 | Replace Sidewalk Ramps (Detectable Warning) | 32 16 19 | Concrete Curbs Gutters and Sidewalks | SQYD | $208.18 | 15 | $3,122.63 | |
| 0027 | Asphalt Crack Sealing (>1/8" and ≤1/2")(Route and Seal with Asphalt) | 32 01 17.61 | Sealing Cracks in Asphalt Paving | LNFT | $6.88 | 1500 | $10,312.50 | |
| 0028 | Asphalt Crack Sealing (>1/2" and <1")(Seal with Fiber-Reinforced Asphalt) | 32 01 17.61 | Sealing Cracks in Asphalt Paving | LNFT | $10.84 | 400 | $4,334.00 | |
| 0029 | Asphalt Crack Sealing (≥1" and <2")(Seal with Fiber-Reinforced Asphalt) | 32 01 17.61 | Sealing Cracks in Asphalt Paving | LNFT | $13.15 | 200 | $2,629.00 | |
| 0030 | Construct Aggregate Sub-base (< 5 CUYD) | 32 11 23 | Aggregate Base Courses and Aggregate Shoulders | CUYD | $138.39 | 100 | $13,839.10 | |
| 0031 | Construct Aggregate Sub-base (5 CUYD to 50 CUYD) | 32 11 23 | Aggregate Base Courses and Aggregate Shoulders | CUYD | $123.42 | 300 | $37,026.00 | |
| 0032 | Construct Aggregate Sub-base (> 50 CUYD) | 32 11 23 | Aggregate Base Courses and Aggregate Shoulders | CUYD | $109.98 | 1000 | $109,978.00 | |
| 0033 | Aggregate for Shoulders (AS-1) | 32 11 23 | Aggregate Base Courses and Aggregate Shoulders | TONS | $153.13 | 100 | $15,313.10 | |
| 0034 | Fine Grading for New Road Work | 31 00 00 | Earthwork | SQYD | $38.50 | 1000 | $38,500.00 | |
| 0035 | Excavation and Fill for construction | 31 00 00 | Earthwork | CUYD | $27.50 | 1000 | $27,500.00 | |
| 0036 | Dirt spoils or fill for repair or new road work remove from or bring on post | Hauling | CUYD | $23.10 | 1000 | $23,100.00 | ||
| 0037 | Manipulation | 32 11 13.13 | Lime Treated Subgrade | SQYD | $26.90 | 2000 | $53,790.00 | |
| 0038 | Quicklime | 32 11 13.13 | Lime Treated Subgrade | TONS | $363.51 | 30 | $10,905.18 | |
| 0039 | Pavement Marking Paint Type III | 4" Yellow line (Without Glass Bead) | 32 17 23 | Pavement Markings | LNFT | $0.84 | 3000 | $2,508.00 |
| 0040 | 4" White Line (Without Glass Bead) | 32 17 23 | Pavement Markings | LNFT | $0.84 | 5000 | $4,180.00 | |
| 0041 | 4" Yellow line | 32 17 23 | Pavement Markings | LNFT | $0.89 | 10000 | $8,910.00 | |
| 0042 | 4" White Line | 32 17 23 | Pavement Markings | LNFT | $0.89 | 2000 | $1,782.00 | |
| 0043 | 18" white Line | 32 17 23 | Pavement Markings | LNFT | $4.68 | 500 | $2,337.50 | |
| 0044 | 24" white Line | 32 17 23 | Pavement Markings | LNFT | $5.60 | 500 | $2,799.50 | |
| 0045 | Symbol: Thru Arrow | 32 17 23 | Pavement Markings | EACH | $66.65 | 10 | $666.49 | |
| 0046 | Symbol: Turn Arrow | 32 17 23 | Pavement Markings | EACH | $61.40 | 20 | $1,228.04 | |
| 0047 | Symbol: Turn and Thru Arrow | 32 17 23 | Pavement Markings | EACH | $72.59 | 5 | $362.95 | |
| 0048 | Symbol: Sharrow | 32 17 23 | Pavement Markings | EACH | $165.14 | 15 | $2,477.15 | |
| 0049 | Symbol: Handicap | 32 17 23 | Pavement Markings | EACH | $57.65 | 30 | $1,729.53 | |
| 0050 | Symbol: RR Crossing | 32 17 23 | Pavement Markings | EACH | $330.78 | 2 | $661.56 | |
| 0051 | Word "ONLY" | 32 17 23 | Pavement Markings | EACH | $106.70 | 5 | $533.50 | |
| 0052 | Pavement Marking Methacrylate | Yellow (Airfield Markings) | 32 17 23 | Pavement Markings | SQFT | $7.47 | 2500 | $18,672.50 |
| 0053 | White (Airfield Markings) | 32 17 23 | Pavement Markings | SQFT | $7.47 | 2000 | $14,938.00 | |
| 0054 | Black (Airfield Markings) | 32 17 23 | Pavement Markings | SQFT | $7.47 | 1000 | $7,469.00 | |
| 0055 | 4" Yellow line | 32 17 23 | Pavement Markings | LNFT | $1.97 | 10000 | $19,690.00 | |
| 0056 | 4" White Line | 32 17 23 | Pavement Markings | LNFT | $1.97 | 2000 | $3,938.00 | |
| 0057 | 18" white Line | 32 17 23 | Pavement Markings | LNFT | $7.94 | 500 | $3,971.00 | |
| 0058 | 24" white Line | 32 17 23 | Pavement Markings | LNFT | $10.15 | 500 | $5,076.50 | |
| 0059 | Symbol: Thru Arrow | 32 17 23 | Pavement Markings | EACH | $275.50 | 10 | $2,754.95 | |
| 0060 | Symbol: Turn Arrow | 32 17 23 | Pavement Markings | EACH | $275.50 | 20 | $5,509.90 | |
| 0061 | Symbol: Turn and Thru Arrow | 32 17 23 | Pavement Markings | EACH | $303.25 | 5 | $1,516.24 | |
| 0062 | Symbol: Sharrow | 32 17 23 | Pavement Markings | EACH | $337.99 | 10 | $3,379.86 | |
| 0063 | Symbol: RR Crossing | 32 17 23 | Pavement Markings | EACH | $426.71 | 2 | $853.42 | |
| 0064 | Word "ONLY" | 32 17 23 | Pavement Markings | EACH | $212.00 | 5 | $1,060.02 | |
| 0065 | Grinding for Pavement Markings | 32 17 23 | Pavement Markings | SQFT | $8.82 | 1000 | $8,822.00 | |
| 0066 | Pavement Marking Removal | 32 17 23 | Pavement Markings | SQFT | $6.44 | 1000 | $6,435.00 | |
| 0067 | Paint Removal, Airfields | 32 01 11.51 | Rubber and Paint Removal for Airfield Pavements | SQFT | $7.93 | 2,000 | $15,862.00 | |
| 0068 | Rubber Removal from Airfields | 32 01 11.51 | Rubber and Paint Removal for Airfield Pavements | SQFT | $10.02 | 1,000 | $10,021.00 | |
| 0069 | Survey to Correct Road Profile | STA | $2,475.00 | 5 | $12,375.00 | |||
| 0070 | Install Manhole Adjustment Rings | 33 40 00 | Storm Drainage Utilities | EACH | $1,375.55 | 8 | $11,004.40 | |
| 0071 | Adjust Inlet Height | 33 40 00 | Storm Drainage Utilities | LNFT | $82.38 | 800 | $65,903.20 | |
| 0072 | Seed, Tall Fescue and Fertilizer | 32 92 19 | Seeding | SQYD | $55.58 | 200 | $11,116.60 |
SUBTOTAL $10,068.43 $2,253,777.42
Contractor Co-Efficient 0.00
Asphalt Line Items Sub-Total (Pre-Bond) $ - 0
| 073 | Payment & Performance Bond - On Task Order at or over $30,000.00 | % | 3% | $ - 0 | $ - 0 |
| 074 | Payment & Performance Bond - On Task Order at or over $150,000.00 | % | 3% | $ - 0 | $ - 0 |
TOTAL $ - 0
Totals
| TOTALS FOR BASE AND OPTION YEARS | ||
| Coefficient | Totals | |
| Base Year | 0.00 | $0.00 |
| Option Year 1 | 0.00 | $0.00 |
| Option Year 2 | 0.00 | $0.00 |
| TOTAL | $0.00 |