Base Year

ASPHALT REPAIRS - BIDDING SCHEDULE
BASE YEAR
BID ITEMDESCRIPTIONUnified Facilities Guide SpecificationUNIT OF MEASUREDPW - Cost EstimateESTIMATED QUANTITYTOTAL COST
0001Hot Mix Asphalt Leveling Course32 12 16Hot Mix AsphaltTONS$127.45500$63,725.00
0002Hot Mix Asphalt (2" )(< 100 TONS)32 12 16Hot Mix AsphaltTONS$127.45500$63,725.00
0003Hot Mix Asphalt (2")(≥ 100 TONS)32 12 16Hot Mix AsphaltTONS$127.452000$254,900.00
0004Hot Mix Asphalt (6")(< 100 TONS)32 12 16Hot Mix AsphaltTONS$115.93100$11,593.00
0005Hot Mix Asphalt (6")(100-1000 TONS)32 12 16Hot Mix AsphaltTONS$115.93500$57,965.00
0006Hot Mix Asphalt (6")(≥ 1000 TONS)32 12 16Hot Mix AsphaltTONS$115.934600$533,278.00
0007Hot Mix Asphalt (8")(< 100 TONS)32 12 16Hot Mix AsphaltTONS$115.93100$11,593.00
0008Hot Mix Asphalt (8")(≥ 100 TONS)32 12 16Hot Mix AsphaltTONS$115.931000$115,930.00
0009Emulsified Asphalt (SS-1HP)32 12 13TackSQYD$0.31500000$155,000.00
0010Milling (2")(< 10 TONS)(Maintenance Patches)32 01 16.71Cold Milling Asphalt PavingTONS$11.41500$5,705.00
0011Milling (2")(≥ 10 TONS)32 01 16.71Cold Milling Asphalt PavingTONS$9.892000$19,780.00
0012Milling (4")32 01 16.71Cold Milling Asphalt PavingTONS$10.4250$521.00
0013Asphalt Base Patching (in conjunction with Mill and Overlay)32 12 16Hot Mix AsphaltTONS$200.00100$20,000.00
0014Full Depth Asphalt Patching32 12 16Hot Mix AsphaltTONS$300.00100$30,000.00
0015Ultrathin Bonded Asphalt Surface (UBAS), Thoroughfare (5/8")32 12 36.26 23Ultrathin Bonded Asphalt SurfaceSQYD$3.865000$19,300.00
0016Ultrathin Bonded Asphalt Surface (UBAS), Residential (5/8")32 12 36.26 23Ultrathin Bonded Asphalt SurfaceSQYD$4.021000$4,020.00
0017Milling (5/8")32 01 16.71Cold Milling Asphalt PavingTONS$9.896000$59,340.00
0018Asphalt Rejuvenator - Liquid32 01 13.64Bituminous Pavement Liquid RejunvenatingGAL$13.982000$27,960.00
0019Asphalt Rejuvenator - Treated Pavement32 01 13.64Bituminous Pavement Liquid RejunvenatingSQYD$0.1920000$3,800.00
0020Asphalt Price AdjustmentN/ANO BIDTON$0.00$0.00
0021Emulsified Asphalt Price AdjustmentN/ANO BIDTON$0.00$0.00
0022Replace Curb and Gutter32 16 19Concrete Curbs Gutters and SidewalksLNFT$59.50300$17,850.00
0023New Curb and Gutter32 16 19Concrete Curbs Gutters and SidewalksLNFT$35.22200$7,044.00
0024Replace Sidewalk32 16 19Concrete Curbs Gutters and SidewalksSQYD$80.15100$8,015.00
0025Replace Sidewalk Ramps32 16 19Concrete Curbs Gutters and SidewalksSQYD$165.7415$2,486.10
0026Replace Sidewalk Ramps (Detectable Warning)32 16 19Concrete Curbs Gutters and SidewalksSQYD$189.2515$2,838.75
0027Asphalt Crack Sealing (>1/8" and ≤1/2")(Route and Seal with Asphalt)32 01 17.61Sealing Cracks in Asphalt PavingLNFT$6.251500$9,375.00
0028Asphalt Crack Sealing (>1/2" and <1")(Seal with Fiber-Reinforced Asphalt)32 01 17.61Sealing Cracks in Asphalt PavingLNFT$9.85400$3,940.00
0029Asphalt Crack Sealing (≥1" and <2")(Seal with Fiber-Reinforced Asphalt)32 01 17.61Sealing Cracks in Asphalt PavingLNFT$11.95200$2,390.00
0030Construct Aggregate Sub-base (< 5 CUYD)32 11 23Aggregate Base Courses and Aggregate ShouldersCUYD$125.81100$12,581.00
0031Construct Aggregate Sub-base (5 CUYD to 50 CUYD)32 11 23Aggregate Base Courses and Aggregate ShouldersCUYD$112.20300$33,660.00
0032Construct Aggregate Sub-base (> 50 CUYD)32 11 23Aggregate Base Courses and Aggregate ShouldersCUYD$99.981000$99,980.00
0033Aggregate for Shoulders (AS-1)32 11 23Aggregate Base Courses and Aggregate ShouldersTONS$139.21100$13,921.00
0034Fine Grading for New Road Work31 00 00EarthworkSQYD$35.001000$35,000.00
0035Excavation and Fill for construction31 00 00EarthworkCUYD$25.001000$25,000.00
0036Dirt spoils or fill for repair or new road work remove from or bring on postHaulingCUYD$21.001000$21,000.00
0037Manipulation32 11 13.13Lime Treated SubgradeSQYD$24.452000$48,900.00
0038Quicklime32 11 13.13Lime Treated SubgradeTONS$330.4630$9,913.80
0039Pavement Marking Paint Type III4" Yellow line (Without Glass Bead)32 17 23Pavement MarkingsLNFT$0.763000$2,280.00
00404" White Line (Without Glass Bead)32 17 23Pavement MarkingsLNFT$0.765000$3,800.00
00414" Yellow line32 17 23Pavement MarkingsLNFT$0.8110000$8,100.00
00424" White Line32 17 23Pavement MarkingsLNFT$0.812000$1,620.00
004318" white Line32 17 23Pavement MarkingsLNFT$4.25500$2,125.00
004424" white Line32 17 23Pavement MarkingsLNFT$5.09500$2,545.00
0045Symbol: Thru Arrow32 17 23Pavement MarkingsEACH$60.5910$605.90
0046Symbol: Turn Arrow32 17 23Pavement MarkingsEACH$55.8220$1,116.40
0047Symbol: Turn and Thru Arrow32 17 23Pavement MarkingsEACH$65.995$329.95
0048Symbol: Sharrow32 17 23Pavement MarkingsEACH$150.1315$2,251.95
0049Symbol: Handicap32 17 23Pavement MarkingsEACH$52.4130$1,572.30
0050Symbol: RR Crossing32 17 23Pavement MarkingsEACH$300.712$601.42
0051Word "ONLY"32 17 23Pavement MarkingsEACH$97.005$485.00
0052Pavement Marking MethacrylateYellow (Airfield Markings)32 17 23Pavement MarkingsSQFT$6.792500$16,975.00
0053White (Airfield Markings)32 17 23Pavement MarkingsSQFT$6.792000$13,580.00
0054Black (Airfield Markings)32 17 23Pavement MarkingsSQFT$6.791000$6,790.00
00554" Yellow line32 17 23Pavement MarkingsLNFT$1.7910000$17,900.00
00564" White Line32 17 23Pavement MarkingsLNFT$1.792000$3,580.00
005718" white Line32 17 23Pavement MarkingsLNFT$7.22500$3,610.00
005824" white Line32 17 23Pavement MarkingsLNFT$9.23500$4,615.00
0059Symbol: Thru Arrow32 17 23Pavement MarkingsEACH$250.4510$2,504.50
0060Symbol: Turn Arrow32 17 23Pavement MarkingsEACH$250.4520$5,009.00
0061Symbol: Turn and Thru Arrow32 17 23Pavement MarkingsEACH$275.685$1,378.40
0062Symbol: Sharrow32 17 23Pavement MarkingsEACH$307.2610$3,072.60
0063Symbol: RR Crossing32 17 23Pavement MarkingsEACH$387.922$775.84
0064Word "ONLY"32 17 23Pavement MarkingsEACH$192.735$963.65
0065Grinding for Pavement Markings32 17 23Pavement MarkingsSQFT$8.021000$8,020.00
0066Pavement Marking Removal32 17 23Pavement MarkingsSQFT$5.851000$5,850.00
0067Paint Removal, Airfields32 01 11.51Rubber and Paint Removal for Airfield PavementsSQFT$7.212,000$14,420.00
0068Rubber Removal from Airfields32 01 11.51Rubber and Paint Removal for Airfield PavementsSQFT$9.111,000$9,110.00
0069Survey to Correct Road ProfileSTA$2,250.005$11,250.00
0070Install Manhole Adjustment Rings33 40 00Storm Drainage UtilitiesEACH$1,250.508$10,004.00
0071Adjust Inlet Height33 40 00Storm Drainage UtilitiesLNFT$74.89800$59,912.00
0072Seed, Tall Fescue and Fertilizer32 92 19SeedingSQYD$50.53200$10,106.00

SUBTOTAL $9,153.12 $2,048,888.56

Contractor Co-Efficient 0.00

Asphalt Line Items Sub-Total (Pre-Bond) $ - 0

073Payment & Performance Bond - On Task Order at or over $30,000.00%3%$ - 0$ - 0
074Payment & Performance Bond - On Task Order at or over $150,000.00%3%$ - 0$ - 0

TOTAL $ - 0

Option Year #1

ASPHALT REPAIRS - BIDDING SCHEDULE
OPTION YEAR #1
BID ITEMDESCRIPTIONUnified Facilities Guide SpecificationUNIT OF MEASUREDPW - Cost EstimateESTIMATED QUANTITYTOTAL COST
0001Hot Mix Asphalt Leveling Course32 12 16Hot Mix AsphaltTONS$133.82500$66,911.25
0002Hot Mix Asphalt (2" )(< 100 TONS)32 12 16Hot Mix AsphaltTONS$133.82500$66,911.25
0003Hot Mix Asphalt (2")(≥ 100 TONS)32 12 16Hot Mix AsphaltTONS$133.822000$267,645.00
0004Hot Mix Asphalt (6")(< 100 TONS)32 12 16Hot Mix AsphaltTONS$121.73100$12,172.65
0005Hot Mix Asphalt (6")(100-1000 TONS)32 12 16Hot Mix AsphaltTONS$121.73500$60,863.25
0006Hot Mix Asphalt (6")(≥ 1000 TONS)32 12 16Hot Mix AsphaltTONS$121.734600$559,941.90
0007Hot Mix Asphalt (8")(< 100 TONS)32 12 16Hot Mix AsphaltTONS$121.73100$12,172.65
0008Hot Mix Asphalt (8")(≥ 100 TONS)32 12 16Hot Mix AsphaltTONS$121.731000$121,726.50
0009Emulsified Asphalt (SS-1HP)32 12 13TackSQYD$0.33500000$162,750.00
0010Milling (2")(< 10 TONS)(Maintenance Patches)32 01 16.71Cold Milling Asphalt PavingTONS$11.98500$5,990.25
0011Milling (2")(≥ 10 TONS)32 01 16.71Cold Milling Asphalt PavingTONS$10.382000$20,769.00
0012Milling (4")32 01 16.71Cold Milling Asphalt PavingTONS$10.9450$547.05
0013Asphalt Base Patching (in conjunction with Mill and Overlay)32 12 16Hot Mix AsphaltTONS$210.00100$21,000.00
0014Full Depth Asphalt Patching32 12 16Hot Mix AsphaltTONS$315.00100$31,500.00
0015Ultrathin Bonded Asphalt Surface (UBAS), Thoroughfare (5/8")32 12 36.26 23Ultrathin Bonded Asphalt SurfaceSQYD$4.055000$20,265.00
0016Ultrathin Bonded Asphalt Surface (UBAS), Residential (5/8")32 12 36.26 23Ultrathin Bonded Asphalt SurfaceSQYD$4.221000$4,221.00
0017Milling (5/8")32 01 16.71Cold Milling Asphalt PavingTONS$10.386000$62,307.00
0018Asphalt Rejuvenator - Liquid32 01 13.64Bituminous Pavement Liquid RejunvenatingGAL$14.682000$29,358.00
0019Asphalt Rejuvenator - Treated Pavement32 01 13.64Bituminous Pavement Liquid RejunvenatingSQYD$0.2020000$3,990.00
0020Asphalt Price AdjustmentN/ANO BIDTON$0.00$0.00
0021Emulsified Asphalt Price AdjustmentN/ANO BIDTON$0.00$0.00
0022Replace Curb and Gutter32 16 19Concrete Curbs Gutters and SidewalksLNFT$62.48300$18,742.50
0023New Curb and Gutter32 16 19Concrete Curbs Gutters and SidewalksLNFT$36.98200$7,396.20
0024Replace Sidewalk32 16 19Concrete Curbs Gutters and SidewalksSQYD$84.16100$8,415.75
0025Replace Sidewalk Ramps32 16 19Concrete Curbs Gutters and SidewalksSQYD$174.0315$2,610.41
0026Replace Sidewalk Ramps (Detectable Warning)32 16 19Concrete Curbs Gutters and SidewalksSQYD$198.7115$2,980.69
0027Asphalt Crack Sealing (>1/8" and ≤1/2")(Route and Seal with Asphalt)32 01 17.61Sealing Cracks in Asphalt PavingLNFT$6.561500$9,843.75
0028Asphalt Crack Sealing (>1/2" and <1")(Seal with Fiber-Reinforced Asphalt)32 01 17.61Sealing Cracks in Asphalt PavingLNFT$10.34400$4,137.00
0029Asphalt Crack Sealing (≥1" and <2")(Seal with Fiber-Reinforced Asphalt)32 01 17.61Sealing Cracks in Asphalt PavingLNFT$12.55200$2,509.50
0030Construct Aggregate Sub-base (< 5 CUYD)32 11 23Aggregate Base Courses and Aggregate ShouldersCUYD$132.10100$13,210.05
0031Construct Aggregate Sub-base (5 CUYD to 50 CUYD)32 11 23Aggregate Base Courses and Aggregate ShouldersCUYD$117.81300$35,343.00
0032Construct Aggregate Sub-base (> 50 CUYD)32 11 23Aggregate Base Courses and Aggregate ShouldersCUYD$104.981000$104,979.00
0033Aggregate for Shoulders (AS-1)32 11 23Aggregate Base Courses and Aggregate ShouldersTONS$146.17100$14,617.05
0034Fine Grading for New Road Work31 00 00EarthworkSQYD$36.751000$36,750.00
0035Excavation and Fill for construction31 00 00EarthworkCUYD$26.251000$26,250.00
0036Dirt spoils or fill for repair or new road work remove from or bring on postHaulingCUYD$22.051000$22,050.00
0037Manipulation32 11 13.13Lime Treated SubgradeSQYD$25.672000$51,345.00
0038Quicklime32 11 13.13Lime Treated SubgradeTONS$346.9830$10,409.49
0039Pavement Marking Paint Type III4" Yellow line (Without Glass Bead)32 17 23Pavement MarkingsLNFT$0.803000$2,394.00
00404" White Line (Without Glass Bead)32 17 23Pavement MarkingsLNFT$0.805000$3,990.00
00414" Yellow line32 17 23Pavement MarkingsLNFT$0.8510000$8,505.00
00424" White Line32 17 23Pavement MarkingsLNFT$0.852000$1,701.00
004318" white Line32 17 23Pavement MarkingsLNFT$4.46500$2,231.25
004424" white Line32 17 23Pavement MarkingsLNFT$5.34500$2,672.25
0045Symbol: Thru Arrow32 17 23Pavement MarkingsEACH$63.6210$636.20
0046Symbol: Turn Arrow32 17 23Pavement MarkingsEACH$58.6120$1,172.22
0047Symbol: Turn and Thru Arrow32 17 23Pavement MarkingsEACH$69.295$346.45
0048Symbol: Sharrow32 17 23Pavement MarkingsEACH$157.6415$2,364.55
0049Symbol: Handicap32 17 23Pavement MarkingsEACH$55.0330$1,650.92
0050Symbol: RR Crossing32 17 23Pavement MarkingsEACH$315.752$631.49
0051Word "ONLY"32 17 23Pavement MarkingsEACH$101.855$509.25
0052Pavement Marking MethacrylateYellow (Airfield Markings)32 17 23Pavement MarkingsSQFT$7.132500$17,823.75
0053White (Airfield Markings)32 17 23Pavement MarkingsSQFT$7.132000$14,259.00
0054Black (Airfield Markings)32 17 23Pavement MarkingsSQFT$7.131000$7,129.50
00554" Yellow line32 17 23Pavement MarkingsLNFT$1.8810000$18,795.00
00564" White Line32 17 23Pavement MarkingsLNFT$1.882000$3,759.00
005718" white Line32 17 23Pavement MarkingsLNFT$7.58500$3,790.50
005824" white Line32 17 23Pavement MarkingsLNFT$9.69500$4,845.75
0059Symbol: Thru Arrow32 17 23Pavement MarkingsEACH$262.9710$2,629.73
0060Symbol: Turn Arrow32 17 23Pavement MarkingsEACH$262.9720$5,259.45
0061Symbol: Turn and Thru Arrow32 17 23Pavement MarkingsEACH$289.465$1,447.32
0062Symbol: Sharrow32 17 23Pavement MarkingsEACH$322.6210$3,226.23
0063Symbol: RR Crossing32 17 23Pavement MarkingsEACH$407.322$814.63
0064Word "ONLY"32 17 23Pavement MarkingsEACH$202.375$1,011.83
0065Grinding for Pavement Markings32 17 23Pavement MarkingsSQFT$8.421000$8,421.00
0066Pavement Marking Removal32 17 23Pavement MarkingsSQFT$6.141000$6,142.50
0067Paint Removal, Airfields32 01 11.51Rubber and Paint Removal for Airfield PavementsSQFT$7.572,000$15,141.00
0068Rubber Removal from Airfields32 01 11.51Rubber and Paint Removal for Airfield PavementsSQFT$9.571,000$9,565.50
0069Survey to Correct Road ProfileSTA$2,362.505$11,812.50
0070Install Manhole Adjustment Rings33 40 00Storm Drainage UtilitiesEACH$1,313.038$10,504.20
0071Adjust Inlet Height33 40 00Storm Drainage UtilitiesLNFT$78.63800$62,907.60
0072Seed, Tall Fescue and Fertilizer32 92 19SeedingSQYD$53.06200$10,611.30

SUBTOTAL $9,610.78 $2,151,332.99

Contractor Co-Efficient 0.00

Asphalt Line Items Sub-Total (Pre-Bond) $ - 0

073Payment & Performance Bond - On Task Order at or over $30,000.00%3%$ - 0$ - 0
074Payment & Performance Bond - On Task Order at or over $150,000.00%3%$ - 0$ - 0

TOTAL $ - 0

Option Year #2

ASPHALT REPAIRS - BIDDING SCHEDULE
OPTION YEAR #2
BID ITEMDESCRIPTIONUnified Facilities Guide SpecificationUNIT OF MEASUREDPW - Cost EstimateESTIMATED QUANTITYTOTAL COST
0001Hot Mix Asphalt Leveling Course32 12 16Hot Mix AsphaltTONS$140.20500$70,097.50
0002Hot Mix Asphalt (2" )(< 100 TONS)32 12 16Hot Mix AsphaltTONS$140.20500$70,097.50
0003Hot Mix Asphalt (2")(≥ 100 TONS)32 12 16Hot Mix AsphaltTONS$140.202000$280,390.00
0004Hot Mix Asphalt (6")(< 100 TONS)32 12 16Hot Mix AsphaltTONS$127.52100$12,752.30
0005Hot Mix Asphalt (6")(100-1000 TONS)32 12 16Hot Mix AsphaltTONS$127.52500$63,761.50
0006Hot Mix Asphalt (6")(≥ 1000 TONS)32 12 16Hot Mix AsphaltTONS$127.524600$586,605.80
0007Hot Mix Asphalt (8")(< 100 TONS)32 12 16Hot Mix AsphaltTONS$127.52100$12,752.30
0008Hot Mix Asphalt (8")(≥ 100 TONS)32 12 16Hot Mix AsphaltTONS$127.521000$127,523.00
0009Emulsified Asphalt (SS-1HP)32 12 13TackSQYD$0.34500000$170,500.00
0010Milling (2")(< 10 TONS)(Maintenance Patches)32 01 16.71Cold Milling Asphalt PavingTONS$12.55500$6,275.50
0011Milling (2")(≥ 10 TONS)32 01 16.71Cold Milling Asphalt PavingTONS$10.882000$21,758.00
0012Milling (4")32 01 16.71Cold Milling Asphalt PavingTONS$11.4650$573.10
0013Asphalt Base Patching (in conjunction with Mill and Overlay)32 12 16Hot Mix AsphaltTONS$220.00100$22,000.00
0014Full Depth Asphalt Patching32 12 16Hot Mix AsphaltTONS$330.00100$33,000.00
0015Ultrathin Bonded Asphalt Surface (UBAS), Thoroughfare (5/8")32 12 36.26 23Ultrathin Bonded Asphalt SurfaceSQYD$4.255000$21,230.00
0016Ultrathin Bonded Asphalt Surface (UBAS), Residential (5/8")32 12 36.26 23Ultrathin Bonded Asphalt SurfaceSQYD$4.421000$4,422.00
0017Milling (5/8")32 01 16.71Cold Milling Asphalt PavingTONS$10.886000$65,274.00
0018Asphalt Rejuvenator - Liquid32 01 13.64Bituminous Pavement Liquid RejunvenatingGAL$15.382000$30,756.00
0019Asphalt Rejuvenator - Treated Pavement32 01 13.64Bituminous Pavement Liquid RejunvenatingSQYD$0.2120000$4,180.00
0020Asphalt Price AdjustmentN/ANO BIDTON$0.00$0.00
0021Emulsified Asphalt Price AdjustmentN/ANO BIDTON$0.00$0.00
0022Replace Curb and Gutter32 16 19Concrete Curbs Gutters and SidewalksLNFT$65.45300$19,635.00
0023New Curb and Gutter32 16 19Concrete Curbs Gutters and SidewalksLNFT$38.74200$7,748.40
0024Replace Sidewalk32 16 19Concrete Curbs Gutters and SidewalksSQYD$88.17100$8,816.50
0025Replace Sidewalk Ramps32 16 19Concrete Curbs Gutters and SidewalksSQYD$182.3115$2,734.71
0026Replace Sidewalk Ramps (Detectable Warning)32 16 19Concrete Curbs Gutters and SidewalksSQYD$208.1815$3,122.63
0027Asphalt Crack Sealing (>1/8" and ≤1/2")(Route and Seal with Asphalt)32 01 17.61Sealing Cracks in Asphalt PavingLNFT$6.881500$10,312.50
0028Asphalt Crack Sealing (>1/2" and <1")(Seal with Fiber-Reinforced Asphalt)32 01 17.61Sealing Cracks in Asphalt PavingLNFT$10.84400$4,334.00
0029Asphalt Crack Sealing (≥1" and <2")(Seal with Fiber-Reinforced Asphalt)32 01 17.61Sealing Cracks in Asphalt PavingLNFT$13.15200$2,629.00
0030Construct Aggregate Sub-base (< 5 CUYD)32 11 23Aggregate Base Courses and Aggregate ShouldersCUYD$138.39100$13,839.10
0031Construct Aggregate Sub-base (5 CUYD to 50 CUYD)32 11 23Aggregate Base Courses and Aggregate ShouldersCUYD$123.42300$37,026.00
0032Construct Aggregate Sub-base (> 50 CUYD)32 11 23Aggregate Base Courses and Aggregate ShouldersCUYD$109.981000$109,978.00
0033Aggregate for Shoulders (AS-1)32 11 23Aggregate Base Courses and Aggregate ShouldersTONS$153.13100$15,313.10
0034Fine Grading for New Road Work31 00 00EarthworkSQYD$38.501000$38,500.00
0035Excavation and Fill for construction31 00 00EarthworkCUYD$27.501000$27,500.00
0036Dirt spoils or fill for repair or new road work remove from or bring on postHaulingCUYD$23.101000$23,100.00
0037Manipulation32 11 13.13Lime Treated SubgradeSQYD$26.902000$53,790.00
0038Quicklime32 11 13.13Lime Treated SubgradeTONS$363.5130$10,905.18
0039Pavement Marking Paint Type III4" Yellow line (Without Glass Bead)32 17 23Pavement MarkingsLNFT$0.843000$2,508.00
00404" White Line (Without Glass Bead)32 17 23Pavement MarkingsLNFT$0.845000$4,180.00
00414" Yellow line32 17 23Pavement MarkingsLNFT$0.8910000$8,910.00
00424" White Line32 17 23Pavement MarkingsLNFT$0.892000$1,782.00
004318" white Line32 17 23Pavement MarkingsLNFT$4.68500$2,337.50
004424" white Line32 17 23Pavement MarkingsLNFT$5.60500$2,799.50
0045Symbol: Thru Arrow32 17 23Pavement MarkingsEACH$66.6510$666.49
0046Symbol: Turn Arrow32 17 23Pavement MarkingsEACH$61.4020$1,228.04
0047Symbol: Turn and Thru Arrow32 17 23Pavement MarkingsEACH$72.595$362.95
0048Symbol: Sharrow32 17 23Pavement MarkingsEACH$165.1415$2,477.15
0049Symbol: Handicap32 17 23Pavement MarkingsEACH$57.6530$1,729.53
0050Symbol: RR Crossing32 17 23Pavement MarkingsEACH$330.782$661.56
0051Word "ONLY"32 17 23Pavement MarkingsEACH$106.705$533.50
0052Pavement Marking MethacrylateYellow (Airfield Markings)32 17 23Pavement MarkingsSQFT$7.472500$18,672.50
0053White (Airfield Markings)32 17 23Pavement MarkingsSQFT$7.472000$14,938.00
0054Black (Airfield Markings)32 17 23Pavement MarkingsSQFT$7.471000$7,469.00
00554" Yellow line32 17 23Pavement MarkingsLNFT$1.9710000$19,690.00
00564" White Line32 17 23Pavement MarkingsLNFT$1.972000$3,938.00
005718" white Line32 17 23Pavement MarkingsLNFT$7.94500$3,971.00
005824" white Line32 17 23Pavement MarkingsLNFT$10.15500$5,076.50
0059Symbol: Thru Arrow32 17 23Pavement MarkingsEACH$275.5010$2,754.95
0060Symbol: Turn Arrow32 17 23Pavement MarkingsEACH$275.5020$5,509.90
0061Symbol: Turn and Thru Arrow32 17 23Pavement MarkingsEACH$303.255$1,516.24
0062Symbol: Sharrow32 17 23Pavement MarkingsEACH$337.9910$3,379.86
0063Symbol: RR Crossing32 17 23Pavement MarkingsEACH$426.712$853.42
0064Word "ONLY"32 17 23Pavement MarkingsEACH$212.005$1,060.02
0065Grinding for Pavement Markings32 17 23Pavement MarkingsSQFT$8.821000$8,822.00
0066Pavement Marking Removal32 17 23Pavement MarkingsSQFT$6.441000$6,435.00
0067Paint Removal, Airfields32 01 11.51Rubber and Paint Removal for Airfield PavementsSQFT$7.932,000$15,862.00
0068Rubber Removal from Airfields32 01 11.51Rubber and Paint Removal for Airfield PavementsSQFT$10.021,000$10,021.00
0069Survey to Correct Road ProfileSTA$2,475.005$12,375.00
0070Install Manhole Adjustment Rings33 40 00Storm Drainage UtilitiesEACH$1,375.558$11,004.40
0071Adjust Inlet Height33 40 00Storm Drainage UtilitiesLNFT$82.38800$65,903.20
0072Seed, Tall Fescue and Fertilizer32 92 19SeedingSQYD$55.58200$11,116.60

SUBTOTAL $10,068.43 $2,253,777.42

Contractor Co-Efficient 0.00

Asphalt Line Items Sub-Total (Pre-Bond) $ - 0

073Payment & Performance Bond - On Task Order at or over $30,000.00%3%$ - 0$ - 0
074Payment & Performance Bond - On Task Order at or over $150,000.00%3%$ - 0$ - 0

TOTAL $ - 0

Totals

TOTALS FOR BASE AND OPTION YEARS
CoefficientTotals
Base Year0.00$0.00
Option Year 10.00$0.00
Option Year 20.00$0.00
TOTAL$0.00