20190320_Exhibit_A_Listing_of_Facilities_and_Equipment.pdf
PDF 86 KB Posted
- Solicitation number
- W91QF419Q0019
About this file
Listing of Facilities and Equipment
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1 W91QF4‐19‐Q‐0019 (currently treated by CE Water)
BLDG
Closed Loops Cooling Towers
Boilers Chillers Geothermal Glycol Count Cooling Tower
Usage Approximate gallons in tower COUNT Water Boilers Steam Boilers Steam Boiler Usage Count Tonnage 61 4 230,000 BTU Aluminum 2
73 2 422,000 BTU
85 3 150,000 BTU
119 2 310,000 BTU Aluminum 1 YES Glycol 120 3 500,000 BTU 1 1 ‐ 500 YES 1 Summer 2500 BAC 126* 7 2,000,000 BTU 1 435 Heat Pumps 1 Year Round 3000 Tower Tech 136 6 150,000 BTU 2 1‐ 300 1 Year Round 2500 Tower Tech
391 3 150,000 BTU 1
427 N/A N/A 50 Heat Pumps YES
465 2 800,000 BTU 2
466 2 600,000 BTU 3
467 2 500,000 BTU 3
1056 2 285,000 BTU 1
1147 1 500,000 BTU Aluminum 160 Heat Pumps Yes
NOTES: Italicized Equipment is located at the Military Corrections Complex. *Existing stock of chemical will be consolidated in and used for Bldg 126 until current stock is exhausted.
File details come from the government source that posted it.