B08_Section J Attachment 0011 (Questions and Answers date 22 June 2021)_Solicitation Amendment 0002_W91CRB-21-R-0033 P00002.xlsx
XLSX spreadsheet 15 KB Posted
- Attached to
- Solicitation for Pathfinder S and Modular Scalable Vest-B-100 (MSV-B-100) Shoot Pack Amendment 0003
- Solicitation number
- W91CRB21R0033
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 Shoot Packs W91CRB-21-R-0033
| AMENDMENT 0001 QUESTIONS | ||
| QUESTION | ANSWER | |
| 1 | For MSV, can the ballistic top marking be done in ink? | Yes. Follow instructions in the Drawings & PD including PD TABLE VI. END ITEM DEFECTS such as Markings & Labels. They should not be handwritten. |
2 For MSV, can the ripstop strike face and top marking be done in ink? Yes. Follow instructions in the Drawings & PD including PD TABLE VI. END ITEM DEFECTS such as Markings & Labels. They should not be handwritten.
3 For MSV, can the strike face marking on the shoot pack be silk screened? Yes. Follow instructions in the Drawings & PD including PD TABLE VI. END ITEM DEFECTS such as Markings & Labels. They should not be handwritten.
4 For MSV, are there any other requirements for the label other than "indelible under normal environmental conditions"? Yes. Follow instructions in the Drawings & PD including PD TABLE VI. END ITEM DEFECTS such as Markings & Labels. They should not be handwritten.
5 For Pathfinder S, does this need a "top" marking as well? No
6 For Pathfinder S, it states that "the ballistic cover shall be a lightweight, nylon ripstop that does not exceed 70 denier 1.9 oz" - this does not specify a finish like it does for the MSV in the AR/PD. So, for the 70 denier ripstop, we need to know the finish. The finish you use must be sufficient to meet all the requirements for test. In particular the operating Environment Requirements for Pathfinder-S detailed in Appendix B (Table B-II & Section B2).
7 On page 7, section 2.1 of the SOW it states:
The following documentation will be provided in Section J of the contract.
• Purchase Description (PD) Shoot Pack, Ballistic Testing AR/PD 11-01, (hereafter referred to as the “PD”);
• Pathfinder S Technical Design Package (TDP).
• MSV B100 TDP
a. We have been unable to locate the Pathfinder S Technical Design Package (TDP) or MSV B100 TDP.
b. These documents are needed to complete the PDMs.
The vendor needs to submit a request for Access to Limited Distribution Materials to the Contract Specialist in accordance with the terms of the RFP.
8 On page 56 under Section L (ii) VOLUME II – PRICE (Factor 2), there is a reference to the “Pricing evaluation matrix”.
a. We were unable to locate the pricing evaluation matrix in the documentation provided.
b. Should we create our own spreadsheet for pricing evaluation?
Pricing matrix should be generated by the vendor to clearly lay out the price for each shoot pack.
9 On page 60 under the instructions for VOLUME III – PAST PERFORMANCE (Factor 3), there is a requirement for Past Performance Questionnaires.
a. We were unable to locate the questionnaire in the documentation provided.
b. Will a questionnaire be provided or should we prepare our own?
A questionnaire has been provided with the Amendment.
AMENDMENT 0002 QUESTIONS
10 What is the correct stitches per square for both the Pathfinder-S and the MSV-B-100 Shootpacks? Shoot pack carrier stitching shall meet the requirements in the PD para. 3.2.3. and shall conform to ASTM D-6193, 8-15 stitches per inch (stitch type 301).
Pathfinder Ballistic stiching shall meet the requirements on the Pathfinder Drawing if Aramid Thread is used which shall conform to 5-10 STITCHES PER INCH.
MSV-B-100 Ballistic stitching shall meet the requirements on the MSV-B-100 Drawing. ALL TACKS OR STITCHING 3 PASS TACK ONLY. SEWING SHALL CONFORM TO 3±1 STITCHES PER INCH.
Pathfinder Drawings will be updated to remove stitching requirements for carrier.
| The PD states: |
| “3.2.3 Stitching. Stitching shall conform to ASTM D-6193, 8-15 stitches per inch. End of seams and stitches (stitch type 301) that are not caught in other seams or stitching shall be secured through backtacking or backstitching. The Contractor shall secure thread breaks or bobbin run-outs occurring during sewing by stitching back of the break a minimum of ½ inch. Thread shall maintain tension so that there shall be no loose stitching resulting in loose bobbin or top thread, or excessively high stitching resulting in puckering of the materials sewn. The Contractor shall trim thread ends to a length of not more than ¼ inch. Stitching through the composite laminate material, low profile hook, or Laminated Circular Engagement (LCE) shall conform to ASTM D-6193,6-10 stitches per inch (stitch type 301), and shall avoid needle cutting by sewing multiple stitches along the same stitch line of the material.” |
| The Pathfinder Drawing states: |
| “STITCHING SHALL CONFORM TO ASTM D-6193 AT 9-10 STITCHES PER INCH (EXCEPT FOR ARAMID THREAD SEWING WHICH SHALL BE5-10 STITCHES PER INCH) BALLISTIC INSERT SHALL BE CONSTRUCTED OF A BALLISTIC PANEL COVER THAT ENCLOSES THE BALLISTICS. THE BALLISTIC PANEL COVER SHALL BE A 70 DENIER RIPSTOP AND SHALL HAVE A COLOR OF DESERT SAND 500. THE BALLISTIC PANEL COVER SHALL BE SEWN ON THREE SIDES TO CREATE A POCKET WITH A MINIMUM SEAM EDGE OF ¼ INCH. THE BALLISTICS SHALL BE INSERTED INTO THE POCKET AND THE FOURTH SIDE SHALL BE SEWN TO FULLY ENCLOSE THE BALLISTICS. STITCHING SHALL CONFORM TO ASTM D-6193 (STITCH TYPE 301) AT 9-10 STITCHES PER INCH.” |
| The MSV-B-100 Drawing states: |
| “STITCH BALLISTIC LAYERS TOGETHER AT LOCATIONS INDICATED BY THE DASHED LINES AT 4 STITCH LOCATIONS. ALL TACKS OR STITCHING 3 PASS TACK ONLY. SEWING SHALL CONFORM TO 3±1 STITCHES PER INCH. SHOOT PACK CARRIER STITCHING SHALL CONFORM TO ASTM D-6193 AT 9-10 STITCHES PER INCH.” |
11 The solicitation document states that proposals are due 6/18/21. The SAM.gov website lists the due date as 6/25/21. Which of these dates is correct? All proposals are due 25 JUN 21. The solicitation has been updated to reflect this.
12 What is the correct color of the thread for the MSV-B-100 Shootpacks? Carrier sewing shall meet the thread requirements of PD para. 3.1.5.
Ballistic sewing shall meet the thread requirements of the MSV-B-100 Drawing.
| The PD states: |
| “3.1.5 Thread, non-ballistic. The non-ballistic thread shall be nylon, bonded, Size E (Tex 70-76) or Size F (Tex 90-112), A-A-59826, Type II or compatible equivalent,Tan 499, conforming to the physical requirements listed in Table IIC. The non-ballistic thread shall meet these requirements when tested as specified in 4.1.5.” |
| The MSV-B-100 Drawing states: |
| “FIND NUMBER: 7 – NOMENCLATURE: WHITE NYLON TEX-70 THREAD” |
13 What is the correct stitches per square inch for the ballistics? The Patherfinder-S is 5-10 and the MSV-B-100 is 2-4. see question 10.
| The MSV-B-100 Drawing states: |
| “STITCH BALLISTIC LAYERS TOGETHER AT LOCATIONS INDICATED BY THE DASHED LINES 8. AT 4 STITCH LOCATIONS. ALL TACKS OR STITCHING 3 PASS TACK ONLY. SEWING SHALL CONFORM TO3±1 STITCHES PER INCH.” |
14 May we have a 30 day extension to the solicitation from the close date? The submission deadline for proposals has been pushed back to 2:00 pm EST on 7 July 2021.
15 Does the Army have a PPQ form for this effort? If no, is NAVFAC/USACE Form PPQ-0 acceptable? A PPQ has been provided.
16 Does the KO intend to post the Q&A responses to beta.SAM? Yes
17 Based on the above and timing of Q&A responses is there an intention to postpone the submission deadline? Yes, the submission deadline for proposals has been pushed back to 2:00 pm EST on 7 July 2021.
18 What is the correct color of the labels for the Pathfinder-S? All labels shall be TAN 499. The PD will be updated.
19 Can we have a two week extension to the proposal due date? The submission deadline for proposals has been pushed back to 2:00 pm EST on 7 July 2021.
20 As a follow up to Question #7 from the Q&A released today: Are the Pathfinder S Technical Design Package (TDP) & MSV B100 TDP separate documents as stated in the PD? We were granted access to the Limited Distribution Materials, but still do not see these attachments. The TDP is the drawing for each design.
| 21 | Please clarify the Hook & Loop requirements: | |
| a. Width: Section 3.1.4 of the PD states that the Hook & Loop shall be ½” +/- 1/16”. According to A-A-55126, Type II Class 1 is not available in this width. Available widths are 4”, 2” ,1 ½”, 1”, ¾”, & 5/8”. Standard for this product has always been 5/8”. | For FAT 1/2 inch or 5/8 inch hook and loop will be accpeted. | |
| b. High or Low Profile: Section 3.1.4 of the PD is asking for High profile Type II Class 1, but the description includes properties for low profile warp knit loop and molded hook. | High profile hook and loop fasteners located throughout the system shall conform to A-A-55126 Type II Class 1. | |
| c. Table IIIB in the PD below does not match 5/8” Type II Class 1 shear requirement which is 4.7 and also the Peel and Shear is after 3 launderings per A-A-55126C spec. | The application for shoot packs does not require laundering and therefore the test will be conducted without the laundering as required by the spec. The hook should meet the requirements in TABLE IIB. HOOK AND LOOP FASTENER REQUIREMENTS without laundering. |