PM SPE ENGINEERING CHANGE REQUEST (ECR)

(Vendors – Complete Blocks 2 – 19 and Submit to PM SPE)

1. PM SPE CONTROL NUMBER

2. ORIGINATOR 3. ECR TYPE

a. TYPED NAME (First, Middle Initial, Last)

b. ADDRESS (Street, City, State, Zip Code)

□ ECP □ RFD

□ RFW

4. CLASSIFICATION

□ Critical □ Minor

□ Major

5. TITLE OF ECR

6. ITEM DESIGNATION 7. PROCUREMENT ACTIVITY

8. BASELINE AFFECTED

a. MCN / NSN b. MODEL / DESIGN CODE □ Functional □ Product

□ Allocated

9. END ITEM NOMENCLATURE 10. CONTRACT NUMBER AND LINE ITEM

11. LOTS / MATERIAL AFFECTED

12. REOCCURING DEVIATION (if Yes, Provide CAR# in Block 12 & Status in Block 18)

13. EFFECT ON COST / PRICE

14. EFFECT ON DELIVERY SCHEDULE

15. OTHER SYSTEMS / CONFIGURATION ITEMS / INTERFACES AFFECTED

16. DESCRIPTION OF ECR

17. NEED FOR ECR

18. CORRECTIVE ACTION TAKEN

19. SUBMITTING ACTIVITY

a. TYPED NAME (FIRST, MIDDLE INITIAL, LAST)

c. SIGNATURE

b. TITLE / ORGANIZATION

d. DATE (YYYYMMDD)

PM SPE FORM 1 (ECR), JULY 15 Page 1

PM SPE CONTROL NUMBER

TITLE OF ECR

20. PM SPE JUSTIFICATION

21. ATTACHMENTS

22. COR (APPROVAL AUTHORITY FOR MINOR ECRS) / PM SPE TECHNICAL STAFF APPROVAL / DISAPPROVAL FOR MAJOR OR CRITICAL ECRS)

a. APPROVAL

□ Approved

□ Disapproved

b. SIGNATURE

c. DATE SIGNED

(YYYYMMDD)

23. APM APPROVAL / DISAPPROVAL (APPROVAL AUTHORITY FOR MAJOR ECRs)

□ Approved

24. PM SPE APPROVAL / DISAPPROVAL (APPROVAL AUTHORITY FOR CRITICAL ECRs)

□ Approved

PM SPE FORM 1 (ECR), JULY 15 Page 2

PM SPE CONTROL NUMBER

TITLE OF ECR

PM SPE FORM 1 (ECR), JULY 15 Page 3

ORIGINATOR NAME:
ORIGINATOR ADDRESS:
ECP Checkbox: Off
RFD Checkbox: Off
RFW Checkbox: Off
Critical Checkbox: Off
Major Checkbox: Off
Minor Checkbox: Off
MCN NSN:
MODEL DESIGN CODE:
PROCUREMENT ACTIVITY:
Functional Checkbox: Off
Allocated Checkbox: Off
Product Checkbox: Off
END ITEM NOMENCLATURE:
CONTRACT NUMBER AND LINE ITEM:
LOTS MATERIAL AFFECTED:
REOCCURING DEVIATION:
EFFECT ON COST PRICE:
EFFECT ON DELIVERY SCHEDULE:
OTHER SYSTEMS CONFUGRATION ITEMS INTERFACES AFFECTED:
DESCRIPTION OF ECR:
NEED FOR ECR:
CORRECTIVE ACTION TAKEN:
SUBMITTING ACTIVITY NAME:
SUBMITTING ACTIVITY TITLE:
SUBMISSION DATE:
PM SPE Control Number:
TITLE:
PM SPE JUSTIFICATION:
ATTACHMENTS:
COR APPROVAL: Off
COR DISAPPROVAL: Off
APM APPROVAL: Off
APM DISAPPROVAL: Off
PM APPROVAL: Off
PM DISAPPROVAL: Off
COR DATE:
APM DATE:
PM DATE:
ADDITIONAL INFO: