ABS_GA_SD-3_02_99.pdf
PDF 6 MB Posted
- Solicitation number
- W91364-22-R-0002
About this file
This document contains a solicitation for a firm fixed price contract and related project documents. The Ohio Army National Guard requires abatement and demolition services for Building U-0014 Cold Storage and seven additional buildings at Camp James A. Garfield under a set-aside for Service-Disabled Veteran-Owned Small Businesses. Services include asbestos abatement as well as demolition of the specified structures in accordance with site standards. A site visit will be held on August 19th and all questions must be submitted in writing by August 23rd. Sealed bids are due on September 8th and will be publicly opened at 1100 hours under a solar canopy. Bidders must use the required bid format or their bids may not be accepted. Accompanying documents provide building summaries, risk assessments, and sample analysis forms related to asbestos abatement for the project sites.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ir ■r o o
RAVINNA, AIM* AMUJNTTICN PLANT
Building Sunmary Sheet
Farm A
Building ID:
Building Type (Use):
Number of People/
Percentage of Time:
Area:
Inspection Team (Names):
Drawing Numbers:
Year of Construction:
Total Square
Footage Buildirsg:
Floors:
Basements/Crawl Spaces:
Fan/Boiler Rooms:
Samples Taken:
Q.A. Samples Taken:
Survey Date:
oil)
Sumnary Data
L
Type of Construction:
(Check Applicable)
Wood Frame
Masonry
Transite Siding
Steel Frame
Reinforced Concrete
Comments:
Portion of Building Not Inspected (square feet):
Reason:
b
R A V E N N A A R M Y i M M G N T E E C N
E L f t N T
B U I L D I N G S L M M A R Y S H E E T
F O R M B
B u i l d i n g
S h e e t
N o o f
S a m p l e oA
D r a w i n g
53).
jS
R e v i s i o n O c c u p i e d F l o o r
R o o m
A r e a
M a t e r i a l
T y p e
C c x r P
O o F
D e s c r i p t i o n
L o c a t i o n
E n c a p s u l a t e d o r
E n c l o s e d
F r i a b l e C o n d i t i o n
B e s t
W o r s t
Q u a n t i t y
A m o u n t
U n i t P i p e
D i a
C o m m e n t s
RAVENNA ARMY AMOCETXCN PIANT
RISK ASSESSMENT
POEM C
Building No:
Drawing No:
Date:
SP-3 Floor No:
Room No:
Evaluator: Af
FACTOR FOR ASSESSING POTENTIAL FIBER RELEASE
Current Condition of ACBM A/
Present Absent
Potential far Riture Disturbance
Damage or Erosion of ACEM
Low
Occt^ancy
Occupied
Evidence of deterioration of delamination from underlying surface
Evidence of Physical Damage
Evidence of Water Damage
• w/ft
High
Proximity of Air Plenum or
Direct Air Stream
Visibility, Accessibility (to building occupants and maintenance personnel), and degree of activity
(air movements, vibration, movement of building occupants)
Change in Building Use v v / V
Unoccupied
Current Occupancy
Building No:
Drawing No:
Date:
RAVENNA ARM¥ AftMQNTXICN PLANT
RISK ASSESSMENT SHEET
PCRM C
Floor No: fit Room No: -*-
Evaluator:
FACTOR FOR ASSESSING POTENTIAL FIBER RELEASE
Current Condition of ACBM
Present Absent
Potential far Future Disturbance
Damage or Erosion of ACEM
Low
Occupancy
Occupied
Evidence of deterioration of delamination from underlying surface
Evidence of Physical Damage
Evidence of Water Damage
M<A
High
Proximity of Air Plenum or
Direct Air Stream
Visibility, Accessibility (to building occupants and maintenance personnel), and degree of activity (air movements, vibration, movement of building occupants)
Change in Building Use
Unoccupied
Current Occupancy
ESVENNA AEM¥ AIMDNITICN PLANT
ASBESTOS BGLK SAMPLE OmiN-OF-COSTCOY RECCRD
FCKM E
laboratory Name: P=>)
Date Samples Collected: _1 I
Sampler's Name:
Sampler's Signature:
Control Number: ^ZOOio
Date Received in Tab:
Name:
Signature:
Sample Field
Identification No:
Sample Laboratory
Identification No:
Disposition: Samples Disposed of
Delivered to Owner or Agent
Received: t>\\m
ESVENNA AKM¥ AJM2OTICN ELANT
EOLK SAMPLE ANALYSIS
FCEM D
Laboratory Name:
ID Number:
Lab Number:
ID Technique:
Gross Sample Description:.
Materials Present: Cofr/poS) TiOlO
*Estimated Percent in Sample:
Asbestos: (
Chrysotile
Amosite
Crocidolite
Anthophlyllite
Iremolite/Actinolite
Non-Asbestos Fibers: /0
Glass Fibers
Mineral Wool
Cellulose
Synthetic Fibers
Other
Non-Fibrous Component
*Percentage is Visually Estimated
Analysts Comments
Date:
| BOX64_9 ABS.GA.SD-3 02.99 A |
| BOX64_9 ABS.GA.SD-3 02.99 .pdf |
File details come from the government source that posted it. Updated .