JOC QA.Final.docx
DOCX document 20 KB Posted
- Solicitation number
- W91364-20-Q-0057
View the file
Other files
| File | Type | Posted |
|---|---|---|
| JOC Rev.PWS.docx | DOCX document | |
| W91364-20-Q-0057-0002.pdf | ||
| JOC Floor Plans.pdf | ||
| W91364-20-Q-0057-0001 JOC Install Amendment 001.pdf | ||
| Sol W91364-20-Q-0057.pdf | ||
| JOC PHASE 1 (2020) PWS.DOCX | DOCX document | |
| JOC Display SOW - PD.XLSX | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sol# W91364-20-Q-0057 OHARNG JOC A/V Display Replacement Q&A
1. The project docs refer to “composite video” over fiber Tx / Rx ... is that supposed to be “HD Video” or do they still want to maintain composite?
Answer: HD Video is preferred, but may not be compatible with current computer feeds
2. Is the customer absolutely 100% certain the source code on hand is the latest version and includes all software modules/components?
Answer: No, however whatever code is used, would be preferred to remain with us
3. If the source code is not the latest version or if there are missing components, the additional time to resolve disparities would have to be T&M – or is the vendor able to rewrite the code.
Answer: Vendor will be unable to rewrite codes
4. Will technicians have the ability to work after hours (beyond 7am-5pm) within the 48 hour time window?
Answer: Yes, The JOC has coverage 24/7.
5. Are there 3 total existing LCD Video Walls? (1) 2X2 55" Wall, (2 additional) 2X2 55" Walls?
Answer: Yes, the current display is (3) 2x2 55” video wall
6. Will the final product include 2 total video walls? (1) 2X2 55" Video Wall, (1) 2X3 55" Video Wall?
Answer: No, the Final product will be (1) 98” LCD TV Replacing the center (1) 2x2 55’ video wall the (2) Flanking 2x2 55” video walls will be replaced with (2) 2x3 55” video walls
7. What are the content layout requirements for 2X2 video walls?
Answer: Display external feed from Ohio Emergency management agency OHEMA, Security camera feed, cable TV and a few computer workstations. Feeds will be mainly computer or cable/sat feeds
8. What are the content layout requirements for the 2X3 video wall?
Answer: The same as the current 2x2 video wall
9. How much space is between each monitor currently?
Answer: 114 inches between Center and flanking video walls
10. In the PWS - "Vendor will need to install all fiber transmitters with DisplayPort compatible items. Are HDMI transmitters existing?
Answer: No existing transmitters are DVI. Existing fiber in certain areas will need to be replaced; no HDMI transmitters are currently available
11. What are the existing switchers and IO cards?
Answer: Voyager fiber switch and cards
12. What is the "existing VTC system" in JPG Room?
Answer: Voyager/ Video Tele Conf. NIPR and SIPR
13. What are the "existing major AV system components" mentioned in the JOC Control Refresh section?
Answer: Video switch, AV Switch, cable TV tuners
14. Will photographs of the room be provided?
Answer: No photography is not permitted in the JOC
15. Will floor plan drawings with measurements be provided?
Answer: Please see the attached 140I-11-64059 OHIO NG (AS-BUILT 02-03-11) from the original project
16. In regards to the fiber cables, how should we quote the job? Should we quote as if we need to replace ALL of the cables, a portion of the cables assuming a good portion are reusable, or leave this cost off? In the last scenario we would test the cables and reuse the ones that we are able to and issue a change order for the cable that does need to be replaced?
Answer: Fiber should be require to replace in the JPG room and Command Conference room up to 1000’
17. What is the composition of the wall behind the 2, 80” TV’s currently mounted in the room?
Answer: Due to SIPR requirements for the 80” TV’s will remain in the Command conference room and (1) of the 98” LCD TV’s will be removed from the Product Work Statement
18. Do you want to have the capability to show both NIPER and SIPER on one screen with split screen capabilities or toggle or switch screens between the two networks?
Answer: No
20. In the command conference room do you need the capability to plug in an external device to display on the screens within the room?
Answer: No
21. Does the ceiling mount projector need to be upgraded or removed?
Answer: No
22. What is the current cabling running to the ceiling projector- type?
Answer: N/A Projectors will remain stand alone and not part of contract
23. Is all existing cable is Cat 5?
Answer: Yes
24. Do you want to be able to switch video sources between the commander’s rooms, JPG meeting room, etc.
Answer: No, They are separate functioning work spaces
25. Is VTC participation required for the JOC main room?
Answer: No
26. If we have to replace any of the fiber or copper homeruns, do they need to hang in J hooks attached to the supports for the raised floor or should they just follow the current path on the ground or in cable tray?
Answer: Cable tray
27 What is the total number of fiber cables that have potential of needing to be replaced?
Answer: Plan on replacing 1000’ of least serviceable cable
28. What type of fiber do you prefer (50m OM3 is preferred)?
Answer: Match existing fiber
29. What type of fiber connecters will be used at the rack side for patch panel? (SC/ST/LC)
Answer: Match existing fiber
30. Will tile suction cups need to be provided for the raised floor?
Answer: No we have a couple on site
31. Do fiber and copper home runs need to be certified or just tested to see if they pass the test?
Answer: Certified
32. Do you need a printout of the report of all cables that were tested?
Answer: Yes
33. What type of power plug do we need to have (datacenter rack power or typical outlet plug) (110v or 220v plug?)
Answer: 110V
34. What make and model of speakers are preferred?
Answer: There is no specific name brand preferred as long as the products meet the specifications described in the SOW and Performance Work Statements.
35. Which is any floor speakers will be changed? How many?
Answer: No
36. Is there a preferred type of mixer preferred?
Answer: There is no specific name brand preferred as long as the products meet the specifications described in the SOW and Performance Work Statements.
37. Do we need to provide a separate UPS to supply power to new devices?
Answer: No
38. For how long does the requirement for contractor being held responsible for equipment? Does this include the warranty? Defer to contracting
39. Do you require a trim piece to be around all TVs or just the grouping of TVs? (for example on the current JOC floor all three sets of TVs have a metal 3 inch trim around that hides cables and other loose objects, do you require that around single TVs as well?
Answer: Only on the (3) Displays on the JOC Floor
40. Will you be adding an additional 98” tv in the CG conference room for Simultaneous NIPR/SIPR Viewing or using an (NON-Preferred) domain AV switch that allows for cross domain use?
Answer: NO the (2) 80” TVs will remain in the Command Conference room and the 98” display for this area will be removed from the solicitation.
41. When we are in the configuration stage, if any changes or troubleshooting need to be done, what computer device can we use in order to make necessary changes to devices?
Answer: Laptops from manufactures who are not on the disapproved list, and WIFI disabled
42. Will we be provided a NIPR laptop to make changes on devices, if any code or changes are required?
Answer: Laptops from manufactures who are not on the disapproved list, and WIFI disabled
43. Do you want to have the capability to show both NIPER and SIPER on one screen with split screen capabilities or toggle or switch screens between the two networks?
Answer: NO
44. Do you want to be able to switch video sources between the commander’s rooms, JPG meeting room, etc.
Answer: No
45. Is VTC participation required for the JOC main room?
Answer: No
JOC
Existing AV Matrix Fiber Switch make and model number?
Answer: VOYAGER VG-MATRIX Total# of DVI over Fiber inputs will be required?
Answer: UNK Existing Audio system current make and model number?
Answer: UNK Existing Ceiling Speaker current make and model number?
Answer: SOUNDTUBE CM62-EZs
TAG CR
Existing VTC make and model number?
Answer: CISCO TelePresence SX-20 Existing AV Matrix Fiber Switch make and model number?
Answer: CISCO TTC7-21 (SVTC); CISCO TANDBERG TTC6-11 (NIPR VTC) Total # of DVI over Fiber inputs will be required?
Answer: UNK Existing Audio system current make and model number?
Answer: UNK Existing Ceiling Speaker current make and model number?
Answer: SOUNDTUBE CM62-EZs
JOINT PLANNING GROUP
Existing VTC make and model number?
Answer: CISCO TTC7-21 (SVTC); CISCO TANDBERG TTC6-11 (NIPR VTC)
Existing AV Matrix Fiber Switch make and model number?
Answer: UNK Total # of DVI over Fiber inputs will be required?
Answer: UNK Existing Ceiling Speaker current make and model number?
Answer: SOUNDTUBE CM62-EZs