Specification_B3_Add_Alt_B158_Simulator_1Feb19.pdf
PDF 12 MB Posted
- Attached to
- ADAL Simulator Bldg. Federal contract opportunity
- Solicitation number
- W9136419B8002
About this file
Simulator building Spec's
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SIM_Abstract_of_Offers.pdf | ||
| Sim_Bid_Opening_sign-in.pdf | ||
| 2.Attachment_2_-_Revised_Detail_2_-_Sheet_EY501.pdf | ||
| 2.Attachment_1_-_ADVANTOR_ACS_Panel_Detail_-_Sheet_EY501.pdf | ||
| W9136419B80020001_ADAL_Sim_Amendment_01.pdf | ||
| W91364-19-B-8002_Addendum_02_RFIs.pdf | ||
| Attmt_-_TTL_Geotech_Report_ADAL_Sim__7-26-18.pdf | ||
| W91364-19-B-8002_Addendum_01.pdf | ||
| Sim_Site_visit_2_signin.pdf | ||
| Pre-Bid_Conference_SIM-19B8002v2.pptx | PPTX presentation | |
| PreBid_SIM_signin.pdf | ||
| Drawings_B3_Add_Alt_B158_Simulator_1Feb19.pdf | ||
| W9136419B8002-ADAL_SIM.pdf | ||
| RFI_template-SIM.doc | DOC document |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Add/Alter Bldg 158 for Flight Simulator Toledo Air National Guard Base
Swanton, OH
FY 2019, PN WYTD162018
Type B-3 Final Submission February 1, 2018
Prepared For: National Guard Bureau and the Ohio Air National Guard
Contract No. W9133L-16-D-0005, Delivery Order AW01 Prepared by: Frankfurt Short Bruza Associates, P.C.
5801 Broadway Extension, Suite 500, Oklahoma City OK 73118 Telephone: 405.840.2931 Fax: 405.842.7750
RICHARD S.
JOHNSON
1616552
R E
G
IS
T
ER ED A RCH
IT
E
C T
S
T
A TE OF OHIO
Frankfurt-Short-Bruza Architects Engineers Planners document1 Page 1 of 1
5801 Broadway Extension, Suite 500, Oklahoma City, Oklahoma 73118-7436 Telephone (405) 840-2931 Facsimile (405) 842-7750 Website www.fsb-ae.com c:\users\mcb\desktop\signatures\20180570 – ngbjvoh - adal flight simulator final qc type b-3 submission\garyjames.docx Page 1 of 1
5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436
405.840.2931 | fsb-ae.com
GARY W.
JAMES
E-73760
S
TA TE OF OHIO
P R
O F
E
S S IO NA L ENG
IN
E
E R
R
EGIS T ERED
NGBJV/OH - Add/Alter Bldg 158 for Flight Simulator
PN WYTD162018
Toledo Express Airport Swanton, OH
Type B-3 Final Submission
01 FEBRUARY, 2019
Table of Contents
TOC - 1
TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 000 – GENERAL REQUIREMENTS
SECTION 01 100 – SUMMARY
SECTION 01 250 – SUBSTITUTION PROCEDURES
SECTION 01 3100 – PROJECT MANAGEMENT AND COORDINATION
SECTION 01 325 – CONSTRUCTION PHOTOGRAPHS
SECTION 01 330 – SUBMITTALS
SECTION 01 400 – QUALITY REQUIREMENTS
SECTION 01 440 – CONTRACTOR QUALITY CONTROL
SECTION 01 455 – TESTING LABORATORY SERVICES
SECTION 01 500 – TEMPORARY FACILITIES, UTILITIES, BARRIERS AND CONTROLS
SECTION 01 568 – EROSION AND SEDIMENT CONTROL
SECTION 01 572 – TEMPORARY STORM WATER POLLUTION CONTROL
SECTION 01 6000 – PRODUCT REQUIREMENTS
SECTION 01 7300 – EXECUTION REQUIREMENTS
SECTION 01 731 – CUTTING AND PATCHING
SECTION 01 7419 – CONSTRUCTION WASTE MANAGEMENT
SECTION 01 780 – CONTRACT CLOSEOUT
SECTION 01 781 – PROJECT RECORD DOCUMENTS
SECTION 01 782 – OPERATION AND MAINTENANCE MANUALS
SECTION 01 800 – ENVIRONMENTAL REQUIREMENTS AND REFERENCES
SECTION 01 811 – SUSTAINABLE DESIGN REQUIREMENTS
SECTION 01 820 – DEMONSTRATION AND TRAINING
SECTION 01 9113 – GENERAL COMMISSIONING REQUIREMENTS
DIVISION 02 - EXISTING CONDITIONS
SECTION 02 4119 - SELECTIVE DEMOLITION
DIVISION 03 - CONCRETE
SECTION 03 3000 - CAST-IN-PLACE CONCRETE
DIVISION 04 - MASONRY
SECTION 04 2000 - UNIT MASONRY
DIVISION 05 - METALS
SECTION 05 1200 - STRUCTURAL STEEL FRAMING
SECTION 05 2100 - STEEL JOIST FRAMING
SECTION 05 3100 - STEEL DECKING
SECTION 05 5000 - METAL FABRICATIONS
SECTION 05 5213 - PIPE AND TUBE RAILINGS
Toledo Express Airport Swanton, OH
Type B-3 Final Submission
01 FEBRUARY, 2019
Table of Contents
TOC - 2
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
SECTION 06 1000 - ROUGH CARPENTRY
SECTION 06 1600 - SHEATHING
SECTION 06 4116 - PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
SECTION 07 1700 - BENTONITE WATERPROOFING
SECTION 07 2100 - THERMAL INSULATION
SECTION 07 2726 - FLUID-APPLIED MEMBRANE AIR BARRIERS
SECTION 07 4213.19 - INSULATED METAL WALL PANELS
SECTION 07 5323 - ETHYLENE-PROPYLENE-DIENE-MONOMER (EPDM) ROOFING
SECTION 07 6200 - SHEET METAL FLASHING AND TRIM
SECTION 07 8413 - PENETRATION FIRESTOPPING
SECTION 07 8446 - FIRE-RESISTIVE JOINT SYSTEMS
SECTION 07 9200 - JOINT SEALANTS
DIVISION 08 - OPENINGS
SECTION 08 1113 - HOLLOW METAL DOORS AND FRAMES
SECTION 08 3113 - ACCESS DOORS AND FRAMES
SECTION 08 3473.13 - METAL SOUND CONTROL DOOR ASSEMBLIES
SECTION 08 7100 - DOOR HARDWARE
SECTION 08 9000 - LOUVERS AND VENTS
DIVISION 09 - FINISHES
SECTION 09 0690 - COLOR SCHEDULE
SECTION 09 2216 - NON-STRUCTURAL METAL FRAMING
SECTION 09 2900 - GYPSUM BOARD
SECTION 09 3000 - TILING
SECTION 09 5113 - ACOUSTICAL PANEL CEILINGS
SECTION 09 6513 - RESILIENT BASE AND ACCESSORIES
SECTION 09 6519 - RESILIENT TILE FLOORING
SECTION 09 6900 - ACCESS FLOORING
SECTION 09 9113 - EXTERIOR PAINTING
SECTION 09 9123 - INTERIOR PAINTING
SECTION 09 9600 - HIGH-PERFORMANCE COATINGS
DIVISION 10 - SPECIALTIES
SECTION 10 1100 - VISUAL DISPLAY UNITS
SECTION 10 2113 - TOILET COMPARTMENTS
SECTION 10 2600 - WALL AND DOOR PROTECTION
SECTION 10 2800 - TOILET, BATH, AND LAUNDRY ACCESSORIES
SECTION 10 4413 - FIRE PROTECTION CABINETS
SECTION 10 4416 - FIRE EXTINGUISHERS
SECTION 10 5113 - METAL CELL PHONE LOCKERS
Toledo Express Airport Swanton, OH
Type B-3 Final Submission
01 FEBRUARY, 2019
Table of Contents
TOC - 3
DIVISION 12 - FURNISHINGS
SECTION 12 3661.16 - SOLID SURFACING COUNTERTOPS
DIVISION 21 - FIRE SUPPRESSION
SECTION 21 1313 - WET-PIPE SPRINKLER SYSTEMS
DIVISION 22 - PLUMBING
SECTION 22 0519 - METERS AND GAGES FOR PLUMBING PIPING
SECTION 22 0523.12 - BALL VALVES FOR PLUMBING PIPING
SECTION 22 0523.14 - CHECK VALVES FOR PLUMBING PIPING
SECTION 22 0529 - HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT
SECTION 22 0553 - IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT
SECTION 22 0719 - PLUMBING PIPING INSULATION
SECTION 22 0800 – COMMISSIONING OF PLUMBING
SECTION 22 1116 - DOMESTIC WATER PIPING
SECTION 22 1119 - DOMESTIC WATER PIPING SPECIALTIES
SECTION 22 1316 - SANITARY WASTE AND VENT PIPING
SECTION 22 1319 - SANITARY WASTE PIPING SPECIALTIES
SECTION 22 4213.13 - COMMERCIAL WATER CLOSETS
SECTION 22 4213.16 - COMMERCIAL URINALS
SECTION 22 4216.13 - COMMERCIAL LAVATORIES
SECTION 22 4216.16 - COMMERCIAL SINKS
SECTION 22 4716 - PRESSURE WATER COOLERS
DIVISION 23 - HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)
SECTION 23 0513 - COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT
SECTION 23 0517 - SLEEVES FOR HVAC PIPING
SECTION 23 0518 - ESCUTCHEONS FOR HVAC PIPING
SECTION 23 0519 - METERS AND GAGES FOR HVAC PIPING
SECTION 23 0523.12 - BALL VALVES FOR HVAC PIPING
SECTION 23 0529 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT
SECTION 23 0548.13 - VIBRATION CONTROLS FOR HVAC
SECTION 23 0553 - IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT
SECTION 23 0593 - TESTING, ADJUSTING, AND BALANCING FOR HVAC
SECTION 23 0713 - DUCT INSULATION
SECTION 23 0719 - HVAC PIPING INSULATION
SECTION 23 0800 - COMMISSIONING OF HVAC
SECTION 23 0900 - INSTRUMENTATION AND CONTROL FOR HVAC
SECTION 23 0923.18 - LEAK-DETECTION INSTRUMENTS
SECTION 23 2113 - HYDRONIC PIPING
SECTION 23 2116 - HYDRONIC PIPING SPECIALTIES
SECTION 23 2300 - REFRIGERANT PIPING
SECTION 23 3113 - METAL DUCTS
SECTION 23 3300 - AIR DUCT ACCESSORIES
SECTION 23 3346 - FLEXIBLE DUCTS
SECTION 23 3423 - HVAC POWER VENTILATORS
SECTION 23 3600 - AIR TERMINAL UNITS
SECTION 23 3713.13 - AIR DIFFUSERS
Toledo Express Airport Swanton, OH
Type B-3 Final Submission
01 FEBRUARY, 2019
Table of Contents
TOC - 4
SECTION 23 3713.23 - AIR REGISTERS AND GRILLES
SECTION 23 7416.11 - PACKAGED, SMALL-CAPACITY, ROOFTOP AIR-CONDITIONING UNITS
SECTION 23 8123.12 - COMPUTER-ROOM AIR-CONDITIONERS FLOOR-MOUNTED UNITS
SECTION 23 8123.13 - COMPUTER-ROOM AIR-CONDITIONERS, CEILING-MOUNTED UNITS
SECTION 23 8126 - SPLIT-SYSTEM AIR-CONDITIONERS
SECTION 23 8239.16 - PROPELLER UNIT HEATERS
SECTION 23 8413 - HUMIDIFIERS
DIVISION 26 - ELECTRICAL
SECTION 26 0513 - MEDIUM-VOLTAGE CABLES
SECTION 26 0519 - LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
SECTION 26 0523 - CONTROL-VOLTAGE ELECTRICAL POWER CABLES
SECTION 26 0526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
SECTION 26 0529 - HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS
SECTION 26 0533 - RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS
SECTION 26 0544 - SLEEVES AND SLEEVE SEALS FOR ELECTRICAL RACEWAYS AND CABLING
SECTION 26 0553 - IDENTIFICATION FOR ELECTRICAL SYSTEMS
SECTION 26 0800 - COMMISSIONING OF ELECTRICAL SYSTEMS
SECTION 26 0913 - ELECTRICAL POWER MONITORING AND CONTROL
SECTION 26 0923 - LIGHTING CONTROL DEVICES
SECTION 26 1219 - PAD-MOUNTED, LIQUID-FILLED, MEDIUM-VOLTAGE TRANSFORMERS
SECTION 26 2200 - LOW-VOLTAGE TRANSFORMERS
SECTION 26 2416 - PANELBOARDS
SECTION 26 2726 - WIRING DEVICES
SECTION 26 2816 - ENCLOSED SWITCHES AND CIRCUIT BREAKERS
SECTION 26 2923 - VARIABLE-FREQUENCY MOTOR CONTROLLERS
SECTION 26 4113 - LIGHTNING PROTECTION FOR STRUCTURES
SECTION 26 4313 - SURGE PROTECTION FOR LOW-VOLTAGE ELECTRICAL POWER CIRCUITS
SECTION 26 5116 - FLUORESCENT INTERIOR LIGHTING
SECTION 26 5119 - LED INTERIOR LIGHTING
SECTION 26 5600 - EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
SECTION 27 0536 - CABLE TRAYS FOR COMMUNICATIONS SYSTEMS
SECTION 27 1100 - COMMUNICATIONS EQUIPMENT ROOM FITTINGS
SECTION 27 1513 - COMMUNICATIONS COPPER HORIZONTAL CABLING
SECTION 27 5119 – SOUND MASKING SYSTEMS
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
SECTION 28 3176 - FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 - EARTHWORK
SECTION 31 1000 – SITE CLEARING
SECTION 31 2000 – EARTH MOVING
DIVISION 33 - UTILITIES
SECTION 33 4100 – STORM UTILITY DRAINAGE PIPING
Toledo Express Airport Swanton, OH
Type B-3 Final Submission GENERAL REQUIREMENTS
01 FEBRUARY, 2019 01000-1
SECTION 01000 – GENERAL REQUIREMENTS
1. INSURANCE - MINIMUM AMOUNTS
1.1. Reference Contract Clause titled, “Insurance -Work on a Government Installation (FAR 52.228- 5). Kinds and minimum amounts are as follows:
KIND AMOUNTS (FAR 28.307-2)
Workmen’s Compensation $100,000 (see paragraph 1.2, below)
Comprehensive General Liability $500,000 per occurrence for bodily injury
Comprehensive Automobile Liability $200,000 per person and $500,000 per accident for bodily injury and $20,000 for property damage
(If applicable) $200,000 per person and $500,000 per occurrence Aircraft Public and Passenger for bodily injury, other than passenger Liability liability and $200,000 per occurrence for property damage; coverage for passenger liability bodily injury shall be at least $200,000 multiplied by the number of seats $200,000 multiplied by the number of seats or passengers, whichever is greater
1.2. Except in states with exclusive or monopolistic funds that do not permit workers’ compensation to be written by private carriers.
1.3. NOTE: Before commencing work under this contract, the Contractor shall certify to the Contracting Officer, in writing, that the required insurance has been obtained. The policies referenced in the certification (s) shall contain an endorsement to the effect that any cancellation or any material change adversely affecting the Government’s interest shall not be effective (1) for such period as the laws of the state in which this contract is to be performed prescribe or (2) until 30 days after the insurer or the Contractor gives written notice to the Contracting Officer, whichever period is longer. The Contractor shall maintain a copy of proofs of required insurance, and shall make copies available to the Contracting Officer upon request. The Contractor shall maintain a copy of all subcontractors’ proofs of required insurance, and shall make copies available to the Contracting Officer upon request.
2. ORDER OF PRECEDENCE (REFERENCE FAR 52.236-21)
Any inconsistency in this solicitation or contract will be resolved by giving precedence in the following order:
1) Representations and other instructions,
2) Contract clauses,
3) Other documents, to include special contract requirements, exhibits, and attachments,
4) The specifications
5) The drawings
3. SCHEDULING
Toledo Express Airport Swanton, OH
Type B-3 Final Submission GENERAL REQUIREMENTS
01 FEBRUARY, 2019 01000-2
3.1. Normal base work hours for the Contractor will be between the hours of 7:00 AM through 4:30 PM, excluding Saturdays, Sundays, and Federal Holidays. If the Contractor desires to work during periods other than above, he must notify the Contracting Officer’s Representative (COR) five (5) working days in advance of his intention to work during other periods to allow assignment of additional inspection forces. When the COR determines that they are reasonably available, he may authorize the Contractor to perform work during periods other than normal duty hours/days. However, if inspectors are required to perform in excess of their normal duty hours/days solely for the benefit of the Contractor, the actual cost of the inspection, at overtime rates, will be charged to the Contractor and will be deducted from the final payment of the Contract amount.
3.2. The following Federal legal Holidays are observed by this base:
New Year’s Day 1 January Martin Luther King’s Birthday Third Monday of January President’s Day Third Monday of February Memorial Day Last Monday of May Independence Day 4 July Labor Day First Monday in September Columbus Day Second Monday in October Veteran’s Day 11 November Thanksgiving Day Fourth Thursday in November Christmas Day 25 December
3.3. NOTE: Any of the above holidays falling on a Saturday will be observed the preceding Friday;
holidays falling on a Sunday will be observed on the following Monday.
3.4. Prior to commencing work on the job initially, resumption of work after prolonged interruption (7 calendar days or more), commencement of any warranty work, and upon completion of warranty work, the contractor must notify the Contracting Officer (or the Contracting Officer’s Representative). When relocating to new sites, returning to sites for follow-up work on a phased work plan, notification to the Contracting Officer’s Representative is sufficient. Notification should be by personal contact; however, advance notification may be by telephone, or in writing, and should be accomplished sufficiently in advance to allow scheduling of inspection forces. The purpose of the above precautions is to ensure construction inspection and recording of work proceedings.
3.5. The organization of the specifications into divisions, sections, and articles, and the arrangement of the drawings shall not control the Contractor in dividing the work among subcontractors or in establishing the extent of the work to be performed by any trade.
4. INVOICING AND PAYMENT
4.1. Properly prepared invoices, bearing the contract number, shall be submitted in original and (1) copy to the Contracting Office, on designated invoice forms provided at the pre-construction meeting PRIOR to uploading in Wide Area Workflow (WAWF/iRAPT) the DFAS paying system. This submission will be for review prior to submitting an electronic invoice through Wide Area Workflow (WAWF/iRAPT). Payment will be made by in accordance with FAR Clause 52.232-5 Fixed-Price Construction Contracts and FAR Clause 52.232-27, Prompt Payment for Construction Contracts, All payments will be made by electronic transfer of funds (EFT).
4.2. To meet compliance with DFARS 252.232-7003, Electronic Submission of Payment Requests, you shall submit your request for payment (invoice) through WAWF/iRAPT. For more information on
Toledo Express Airport Swanton, OH
Type B-3 Final Submission GENERAL REQUIREMENTS
01 FEBRUARY, 2019 01000-3
the WAWF/iRAPT system, including how to register, visit https://wawf.eb.mil. Payment will be made by paying office specified in the contract award in accordance with the clauses Payments under Fixed- Price Construction Contracts, FAR 52.232-5, and Prompt Payment for Construction Contracts, FAR 52.232-27.
4.3. The Government will make payment through WAWF/iRAPT upon satisfactory completion of work AND receipt of a proper certification for payment. Do not input invoice into WAWF until the pre-approval of invoice is received from the contracting officer. This will lessen the need for rejections in WAWF Payment may be withheld unless all contractual requirements including but not limited to: RECEIPT OF PROPER WEEKLY PAYROLLS IAW DAVIS BACON REQUIREMENTS, Small Business Subcontracting Reports, have been timely received.
4.4. All requests for payments through WAWF must include a Subcontractor Payment Register pursuant to FAR Clause 52.232-5 and a contractor’s certification that reads as follows:
I hereby certify, to the best of my knowledge and belief that –
The amounts requested are only for performance in accordance with the specifications, terms and conditions of the contract; All payments due to subcontractors and suppliers from previous payments received under the contract have been made, and timely payments will be made from the proceeds of the payment covered by this certification, in accordance with subcontract agreements and requirements of Chapter 39 of Title 31, United States Code; This request for progress payments does not include any amounts which the prime contractor intends to withhold or retain from subcontractor or supplier in accordance with the terms and conditions of the subcontract; and This certification is not to be construed as final acceptance of a subcontractor’s performance.
4.5. The Government will make payment upon satisfactory completion of work AND receipt of a proper certification for payment. Payment may be withheld unless all contractual requirements, including but not limited to: RECEIPT OF PROPER WEEKLY PAYROLLS IAW DAVIS BACON REQUIREMENTS, have been timely received. Payrolls shall indicate CLIN to which they are applicable.
4.6. A release of claims is required for all final payment requests and shall be submitted by the contractor with the final invoice.
5. CONTRACT ADMINISTRATION
5.1. The contracting office of the 180th FW is the office having administrative jurisdiction over this contract for all matters. A list of the names and telephone numbers of the Government team comprising the contract administrator, Contracting Officer’s Representative (COR), consultant, and point of contact at the project site will be provided at the post-award/pre-construction conference.
5.2. All correspondence shall be addressed to the Contracting Officer. A copy of all correspondence shall be furnished to the contracting officer’s representative. Enclosures attached to or transmitted with the correspondence shall also be furnished with an original and one copy. Each letter shall make reference to the contract name, contract number, project number, and project title, and shall have only one subject. For tracking purposes, a sequential numbering system should be used for all correspondence.
6. PAPERLESS CONTRACTING
Toledo Express Airport Swanton, OH
Type B-3 Final Submission GENERAL REQUIREMENTS
01 FEBRUARY, 2019 01000-4
6.1. The National Guard is fully committed to the Federal Government’s electronic commerce and paperless contracting initiatives. As such, it is anticipated that to the maximum extent possible to include but not limited to correspondence, modification distribution, etc., to include specifications and drawings, will be issued using electronic methods, i.e., electronic mail (e-mail). Contractors shall have and maintain capability to receive documents in this manner.
6.2. Additionally, it is anticipated that within the life of this contract, other electronic processes will be enacted. These include, but are not limited to, electronic bidding/offers, change order proposals, and electronic invoicing. When implemented by the Contracting Officer, contractors shall participate fully in any of these new requirements at no additional cost to the Government.
7. TELEPHONE COMMUNICATIONS SECURITY MONITORING
All communications with DOD organizations are subject to communications security (COMSEC) review. Contractor personnel must be aware that telephone communications networks are continually subject to intercept by unfriendly intelligence organizations. The DOD has authorized the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DOD organizations. Therefore, civilian contractor personnel are advised that any time they place a call to, or receive a call from, a DOD organization, they are subject to COMSEC procedures. The contractor shall assume the responsibility for ensuring wide and frequent dissemination of the above information to all employees dealing with DOD information.
8. UTILITY SERVICES
The Contracting Officer has determined that Government-operated utilities are adequate and will be furnished to the contractor without charge where existing outlets are available. The contractor is responsible for installing temporary service outlets, as necessary, at its expense in accordance with the clause entitled “Availability and Use of Utility Services” (FAR Clause 52.236-14). The following utilities will be available: Water and Electrical.
9. PREPARATION OF MATERIAL APPROVAL SUBMITTALS
The contractor shall submit all materials and articles requiring approval, as required by the Material and Workmanship Clause, FAR 52.236-5. Submittals shall be made using AF Form 3000, or approved equal.
Submittals shall be processed in accordance with the procedures in Section 01330, Submittals.
Submittals shall be given a distinct identification system by CLIN if multiple CLINS are applicable.
Individual submittal documents shall not be comprised of items for more than one CLIN. Address for delivery of submittals will be provided at the post award/pre-construction conference. The contractor is reminded that an individual within the company who has authority to make the certification must sign the certification on the AF Form 3000.
10. WORK PROGRESS AND PREPARATION OF PROGRESS SCHEDULES AND REPORTS
10.1 A bi-weekly meeting will be held with the Contractor, COR and Contracting Officer (KO), if necessary, to discuss work progress, problems and potential change orders. The Contractor shall attend these meetings at no additional cost to the Government. The Contractor shall record meeting minutes and distribute to attendees within 48 hours after the meeting. Agenda items shall include, but not limited to the following:
a) Schedule and progress with two week look ahead
Toledo Express Airport Swanton, OH
Type B-3 Final Submission GENERAL REQUIREMENTS
01 FEBRUARY, 2019 01000-5
b) Submittals
c) RFI’s
d) RFP’s/Modifications
e) QC deficiencies and activities
f) Safety
g) Planned utility interruptions
Prior to beginning work on specific work elements of a project, the contractor shall confer with the COR and agree on a sequence of procedures and means of access to premises and buildings; space for storage of materials and equipment; delivery of materials; and use of approaches, use of corridors, stairways and similar means of passage.
10.1.1. In accordance with FAR Clause 52.236-15, “Schedules for Construction Contracts”, the contractor shall within five days after work commences on the contract, or another period of time determined by the KO, prepare and submit to the KO for approval three copies of a practicable schedule showing the order in which the contractor proposes to perform the work, and the dates on which the Contractor contemplates starting and completing features of work. A composite schedule for the overall contract shall also be provided. The schedule shall be on an AF Form 3064, Contract Progress Schedule, or an approved computer generated format similar to the AF Form 3064. The work shall be scheduled so that, upon the start of construction, work progresses in a continuous and diligent manner. A schedule which does not reflect steady and reasonable progress throughout the construction period will be rejected.
Both the Contractor and the COR are required to provide monthly progress reports covering the period from notice to proceed through final inspection. Unless agreement cannot be made on the applicable percentage of progress a joint report will be submitted to the Contracting Officer. This reports shall be submitted on the NGB Contract Progress Report form (similar to an AF Form 3065), or an approved computer generated similar format. These reports shall track progress by CLIN, if contract contains multiple CLINs, multiple AF Form 3064 and NG Contract Progress Reports will also be required for payment purposes.
10.2. Additionally, for projects exceeding $1M, the contractor shall provide a project plan in a commercially available network scheduling software that meets requirements of the specification to define work tasks and track progress. At least five days prior to work initiation, the contractor shall provide the Contracting Officer a hardcopy CPM and a formatted diskette or CD copy, or e-mail file copy, of the plan that shall include definition of rescues. No work may start until the Contracting Officer approves the plan in writing.
10.3. The Contractor shall prepare a work progress schedule required for completion of each of the various divisions of work. Updated plans and Form 3064 showing work progress (hardcopy and formatted diskette or CD, or e-mail file copy), unless otherwise directed by the Contracting Officer, shall be provided Bi-weekly If there are possible deviations from the original plan, those must be noted and approved by the Contracting Officer before work changes are implemented. The schedule shall be submitted to the Contracting Officer, in the number of copies as directed. Reference Contract Clause FAR 52.236-15, “Schedules for Construction Contracts”. The reports contemplated by the clause herein titled “Schedules for Construction Contracts” shall be accomplished on and in accordance with instructions pertaining to AF Form 3064, “Contract Progress Schedule” and a National Guard Contract Progress Report”.
11. NOTICE OF COMPLETION OF CONSTRUCTION/PRE-FINAL AND FINAL INSPECTION
Toledo Express Airport Swanton, OH
Type B-3 Final Submission GENERAL REQUIREMENTS
01 FEBRUARY, 2019 01000-6
11.1. The contractor shall conduct a pre-final inspection in the presence of the Contracting Officer’s Representative (COR) prior to the date scheduled for Final Inspection. Any discrepancies noted shall be corrected prior to Final Inspection.
11.2. The contractor shall request scheduling of a final inspection in writing to the Contracting Officer at least five (5) working days prior to the desired date or as otherwise negotiated with the Contracting Officer.
11.3. Civil Engineering personnel and the Contracting Officer will perform the Final Inspection in the presence of the contractor, and any discrepancies noted shall be corrected within the time specified by the Contracting Officer.
11.4. Final Inspection shall not constitute acceptance of a project unless so stipulated by issuance of a separate acceptance notice.
11.5. The contractor is cautioned to ensure they have completed adequate Quality Control reviews prior to scheduling pre-final or final inspections. In the event the Contracting Officer finds that the project is not ready for the applicable inspection, (too many discrepancies) the contractor may be held liable for the costs of a repeat inspection. If the inspection involves A/E personnel these costs may include additional labor, travel and miscellaneous expenses.
12. DESIGNATION OF TECHNICAL REPRESENTATIVE
The Contracting Officer will appoint a qualified Contracting Officer’s Representative (COR) for the purposes of technically administering the contract; however, all matters concerning this contract or any work ordered placed against this contract must first be approved by the Contracting Officer. This in no way authorizes anyone other than the Contracting Officer to commit the Government to changes in terms of the contract.
13. CONTRACTOR STAFF AND EMPLOYEES
13.1. Prior to commencing on-site construction, the contractor shall provide the Contracting Officer with a telephone number and FAX number at which the contractor or his representative may be contacted at any time during regular working hours and an emergency number at which the contractor may be contacted in situations requiring immediate attention.
13.2. Supervision. The Government shall not exercise any supervision or control over the contractor employees performing services under this contract; such employees shall be accountable not to the Government, but solely to the contractor, who in turn is responsible to the Government.
13.3. Contractor’s Employees. All work under this contract shall be performed in a skillful and workmanlike manner. The Contracting Officer may, in writing, require the contractor to remove from the job site, any employee the Contracting Officer deems incompetent, careless or otherwise objectionable.
14. CONTRACTOR OFFICE AND STORAGE
14.1. Parking of contractor vehicles shall be restricted to the contractor’s designed on-site area or the work area. The company name shall be prominently displayed on all construction vehicles parked on the job site.
Toledo Express Airport Swanton, OH
Type B-3 Final Submission GENERAL REQUIREMENTS
01 FEBRUARY, 2019 01000-7
14.2. Security of material storage areas on the job site shall be the responsibility of the contractor.
The area shall be kept neat and orderly and free of debris.
15. RECORD DRAWINGS
During construction of a project and on the job site, the contractor shall maintain a completed record of all changes and corrections from the layout shown on the drawings, if applicable. The contractor shall enter such changes and corrections on contract or record drawings promptly, and submit the “red line” drawings to the Contracting Officer upon completion of the project. The record drawings shall indicate all changes and corrections concerning the actual locations of all sub-surface utility lines. In order for the location of these lines and appurtenances to be determined in the event the surface opening or indictors become covered or obscured, the record drawings shall show, by offset dimensions to two permanently fixed surface features, the end of the each run including each change in direction. Valves splice boxes, and similar appurtenances shall be located by dimensioning along the utility run from a reference point.
The average depth below the surface of each run shall also be recorded. The Government does not guarantee the accuracy of existing record drawings; it is the contractor’s responsibility to verify all as-built conditions.
16. VERIFICATION OF DIMENSIONS
The contractor shall be responsible for the coordination and proper relation of all aspects of the work.
He/she shall field verify all dimensions and advise the Contracting Officer of any discrepancies prior to proceeding with any phase of the work. Where exact locations are not given for the positioning of equipment and devices, they shall be positioned to permit easy access for maintenance and for removal and replacement of component parts.
17. SECURITY REQUIREMENTS
17.1. The contractor shall comply with all security regulations imposed by the base/post commander and/or agency occupying the space where work is to be performed. Any necessary security clearances shall be obtained prior to commencement of work.
17.2. It is expected that new security requirements to satisfy contractor personal identification requirements in Homeland Security Presidential Directive (HSPD-12), ''Policy for a Common Identification Standard for Federal Employees and Contractors,'' and Federal Information Processing Standards Publication (FIPS PUB) Number 201, ''Personal Identity Verification (PIV) of Federal Employees and Contractors” are incorporated in the life of this contract. Contractor shall comply with all requirements, at no additional cost to the Government.
17.3. The contractor shall ensure that all parts of the facility where work is being performed are adequately protected against vandalism and theft.
17.4. Contractors shall follow instructions provided by the Security Forces for access to the 180th
FW. If a gate pass is not granted to a contractor allowing the delivery of goods, execution of warranty support, or performance of services please contact the contracting officer. Be sure that all of your employees have the proper ID (driver’s license, state ID, immigration card, U.S. Passport, etc.). If they do not have the proper ID, they will be turned away.
17.5. The Prime Contractor and all of its subcontractors will be required to wear orange or lime colored safety vests while performing work on the installation.
Toledo Express Airport Swanton, OH
Type B-3 Final Submission GENERAL REQUIREMENTS
01 FEBRUARY, 2019 01000-8
17.6. U.S. Government will not be held liable for any delays or breach of contract caused by refusal of the Security Forces to allow entry.
17.7. All prospective contractors MUST be U.S. citizens or MUST have established and maintain legal residence in the U.S., and are authorized by the US government to work in the United States (i.e.
Green card, worker authorization, etc.). All prospective contractors MUST have at least one form of U.S.
government issued photo identification (driver’s license, U.S. passport, U.S. work visa, etc.) for entry to the installation. Security Forces will review any questionable identification documents for determination as to whether or not said identification is authorized for access to the installation.
17.8. All prospective contractors/contractor employees, once it has been established that they maintain the appropriate credential as described in one above, are subject to a Criminal History Check.
17.9. Note: For the purposes of contracting services, it is implied that, that any and all parties agree to a Criminal History Background Check once entered into any contract. Any documents that are provided and found fraudulent to include, but not limited to driver’s licenses, contracting licenses, etc., will result in an arrest and potential termination for default from the contract. All contractors are subject to search in order to obtain entry onto the installation and while working on the installation. Any refusal to submit to a search of their person or vehicle will be deemed as a violent act of aggression against the installation and will be cause for dismissal from the installation and revocation of future privileges and installation access.
17.10. AT Level I Training. This provision/contract text is for contractor employees with an area of performance within a National Guard controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access to National Guard installations, facilities and controlled access shall complete AT Level I awareness training. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the Contracting Officer’s Representative (COR).
AT Level 1 awareness training is available at the following website: https://atlevel1.dtic.mil/at
AT/OPSEC
17.11. Access and General Protection/Security Policy and Procedures. This standard language is for contractor employees with an area of performance within Government controlled installation, facility, or area. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer’s Representative (COR). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, HAF and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.
17.12. For Contractors that do not require CAC, but require access to a DoD Facility and/or Installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (AFI 31-101 and AFI 10-245), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
https://atlevel1.dtic.mil/at
Toledo Express Airport Swanton, OH
Type B-3 Final Submission GENERAL REQUIREMENTS
01 FEBRUARY, 2019 01000-9
17.13. AT Level I Training. This standard language is for contractor employees with an area of performance within a Government controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access Government Installations, Facilities and Controlled Access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable.
Certificates of completion for each affected contractor employee and subcontractor employee will be maintained by the COR or Antiterrorism Representative. AT level I Awareness Training is available at the following website: http://jko.jten.mil
18. REGULATIONS
18.1. The contractor shall comply with all applicable Federal, State, Local, DOD, National Guard Bureau, Army and Air Force regulations pertaining to safety, traffic control and fire prevention.
18.2. The contractor may use the Civil Engineering library, which contains most applicable Army and Air Force publications as well as some commercial project data information, or the Defense Procurement and Acquisition Policy website, http://www.acq.osd.mil/dpap/, which has links for several other sites with available publications, forms and project data information. These may also be acquired from the Government Printing Office website, http://www.gpoaccess.gov/index.html
19. TRANSPORTATION, HANDLING AND STORAGE
19.1. The contractor shall coordinate with suppliers and shippers to ensure that incoming materials are properly identified with the contractor’s name, contract number and project title. The contractor shall designate an authorized individual to be available to receive shipment. The Government will not provide storage other than that available at the project site.
19.2. Storage of supplies, materials and equipment on the project site shall be accomplished in such a manner so as to prevent mechanical and climatic damage and loss due to vandalism or theft. Equipment temporarily removed in the performance of work and stored on the job site shall be stored and protected in accordance with previous paragraphs, and shall be replaced in a condition compatible with its original state. Security for equipment and material removed from the job site for temporary storage until reuse shall be the responsibility of the contractor.
20. CLEANUP AND DISPOSAL OF DEBRIS AND FILL MATERIALS
20.1. At the end of each workday, the contractor shall clean up the work and storage areas and stack all materials in a manner approved by the Contracting Officer or his designated representative. Upon completion of a project, the contractor shall ensure that all dirt, trash, and debris resulting from the construction operations are removed from the work area. Unless directed otherwise in the contract or by the Contracting Officer, disposal of debris shall be made at the contractor’s expense and shall be delivered to a state approved disposal site located off base. Debris shall not be left in such a manner that wind or other weather conditions can cause the debris to be scattered outside the work area (i.e., on nearby runways, ramps or taxiways).
20.2. The hauling and disposal of excess fill material including rock, gravel, sod, broken concrete or asphalt, plaster, etc., shall be the responsibility of the contractor. Disposal shall be in accordance with applicable state and local regulations.
21. ENVIRONMENTAL IMPACT
http://jko.jten.mil/ http://www.acq.osd.mil/dpap/ http://www.gpoaccess.gov/index.html
Toledo Express Airport Swanton, OH
Type B-3 Final Submission GENERAL REQUIREMENTS
01 FEBRUARY, 2019 01000-10
All waste materials generated by any work under the contract performed on a Government installation shall at all times be handled, transported, stored, and disposed of by the contractor and by his subcontractors in accordance with all applicable Federal, state, and local laws, ordinances, regulations, court orders, and other types of rulings having the effect of the law. Should the United States Government be held liable for any neglect or improper actions by the contractor or any subcontractor regarding removal or disposal of any hazardous waste, the contractor shall reimburse the Government for all such liability.
22. HAZARDOUS MATERIALS
22.1. Any material suspected of being hazardous that is encountered during performance of a project shall immediately be brought to the attention of the Contracting Officer, at which time a determination will be made as to whether hazardous material testing shall be performed. If the Contracting Officer directs the contractor to perform tests, and/or the material is found to be of a hazardous nature requiring additional protective measures, a contract modification may be required, subject to equitable adjustment under the terms of the contract.
22.2. The contractor is advised that friable and/or non-friable asbestos-containing material may be encountered in project areas. Friable asbestos-containing material is any material that contains more than one percent asbestos by weight, and that hand pressure can crumble, pulverize or reduce to powder when dry. Non-friable asbestos-containing materials are materials in which asbestos fibers are bound by a matrix material, saturation, impregnation or coating. Non-friable asbestos-containing materials do not normally release airborne asbestos fiber during routine handling and end-use. However, excessive fiber concentrations may be produced during uncontrolled abrading, sanding, drilling, cutting, machining, removal, demolition, or other similar activities. 29 CFR 1910.1001 shall be referenced in the event asbestos-containing materials are encountered. Friable asbestos-containing materials are not authorized for use in new construction or maintenance projects.
23. POLLUTION ABATEMENT
23.1. All work shall be performed in a manner minimizing pollution of air, water and land as required.
23.2. Transporting materials to or from the site shall be accomplished in a manner preventing materials or particles from becoming airborne. Earth materials shall be wetted or otherwise protected.
Gravel, sand and concrete shall be contained within vehicles to prevent spillage. Tarpaulins must be fastened over load before entering surrounding streets. Removal of any materials dropped or blown off vehicles shall be the responsibility of the contractor.
23.3. Burning of any material is strictly prohibited.
23.4. Stream beds, lakes, drainage ways, sanitary and storm sewers, etc., shall not be polluted by fuels, oils, bitumen, acids or other harmful materials. Grading shall be accomplished to prevent surface drainage from the construction site containing harmful amounts of sediment from draining onto adjacent areas.
23.5. Flushing of concrete trucks is restricted to the location specifically designed for this purpose by the Contracting Officer’s Representative.
Toledo Express Airport Swanton, OH
Type B-3 Final Submission GENERAL REQUIREMENTS
01 FEBRUARY, 2019 01000-11
23.6. Excess mortar, plaster or drywall materials shall not be disposed of on Government property.
Water utilized for plastering or drywall equipment shall be disposed of in accordance with the instructions of the COR, and under no circumstances shall water be disposed of in areas which are planted or scheduled to be planted.
24. COORDINATION WITH GOVERNMENT ACTIVITIES
24.1. If it becomes necessary to interrupt work activities in buildings and/or areas for construction purposes, permission to do so must be requested in writing to the Contracting Officer five (5) working days prior to commencing work on the planned interruption and shall be subject to Civil Engineering approval. Written requests for street closing shall be submitted for approval of the Civil Engineer ten (10) working days prior to closing the street.
24.2. Work in connection with this contract which requires utility outages, including electrical, water, gas, steam, etc., which will close down or limit (as determined by the Contracting Officer) normal activities in the building, construction area or other affected areas, shall be performed by the contractor at a time other than the regular work period of the organization occupying the facility. Work required by the contractor on a non-standard basis or at premium pay shall be done at no additional cost to the Government. Request for utility outages shall be submitted to the Civil Engineer, in writing ten (10) working days prior to commencing work and shall be subject to his/her approval.
24.3. Any temporary construction for facilities used by the contractor for preventing interruption of normal work activity or loss of utility services shall be subject to Contracting Officer’s approval.
25. UNAUTHORIZED PERSONNEL
The contractor shall inform all personnel working under his jurisdiction (including subcontractor and visiting supplier personnel) that access to areas outside of the immediate work area; excluding direct haul and access routes, contracting and Civil Engineering offices, and points of supply and storage; is prohibited. Circulation of said personnel will be limited to official business only. Persons in violation of the above will be apprehended and appropriately disciplined.
26. PERFORMANCE EVALUATION OF CONTRACTOR
26.1. As a minimum, the contractor’s performance will be evaluated upon final inspection. Any specific requirements for contract quality control and quality assurance by the Government personnel will be defined in the specifications. The contractor will be rated as outstanding, satisfactory or unsatisfactory in the areas of contract quality control, timely performance, and effectiveness of management, compliance with labor standards, and compliance with safety standards. The contractor will be notified of any unsatisfactory rating, either in an individual element or in the overall rating, prior to completing the evaluation, and all contractor comments will be made a part of the official record. Performance evaluation reports will be available to all DoD Contracting Officers for their future use.
26.2 Past Performance evaluations will be posted via https://www.cpars.gov. It is the responsibility of the contractor to request access to this site.
27. CONTRACTOR QUALITY CONTROL
27.1. The contractor shall comply with the quality control provisions as specified herein. The Contractor shall perform all quality control inspection and/or testing required by this contract unless specifically designated to be performed by the Government. The quality control system consists of plans, https://www.cpars.gov/
Toledo Express Airport Swanton, OH
Type B-3 Final Submission GENERAL REQUIREMENTS
01 FEBRUARY, 2019 01000-12
workmanship, fabrication, construction, and operations that comply with contract requirements. The system shall cover construction operations, including fabrication both on-site and off-site, and shall be keyed to the proposed construction sequence. If the contractor fails to submit an acceptable quality control plan within the time herein prescribed, the Contracting Officer may refuse to allow construction to start if an acceptable interim plan is not furnished or may withhold funds from progress payments in accordance with the contract clause titled, “Payments under Fixed Price Construction Contracts”, until such time as the contractor submits an acceptable final plan.
27.2. Quality Control Plan
27.2.1. General. Upon receipt of the Notice of Contract Award, the contractor’s quality control plan (2 copies) shall be submitted for acceptance in accordance with specifications.
27.2.2. Acceptance. The Contracting Officer’s Representative will review the quality control plan. The contractor shall make such changes and additions as necessary for clarity and completeness as requested by the Contracting Officer’s Representative through the Contracting Officer. Acceptance of the contractor’s plan is predicated on satisfactory performance during construction. Acceptance is conditional and the Government reserves the right to require the contractor to make changes in quality control plans, personnel and operations to correct deficiencies and to assure contract compliance.
27.2.3. Changes. When the contractor proposes changes in the quality control plan or implementation during construction, the Contracting Officer shall be notified in writing. The contractor shall implement no changes prior to acceptance in writing by the Contracting Officer.
28. SAFETY ASSURANCE
28.1. Compliance with Regulations. All work including the handling of hazardous materials or the disturbance or dismantling of structures containing hazardous materials shall comply with the applicable requirements of 29 CFR 1910/1926. Work involving the disturbance or dismantling of asbestos or asbestos-containing materials; the demolition of structures containing asbestos; and/or disposal and removal of asbestos, shall also comply with the requirements of 40 CFR, Part 61, Subpart A. All work shall comply with applicable state and municipal safety and health requirements. Where there is a conflict between applicable regulations, the most stringent shall apply. The Safety Manual is available at the following web site:
http://www.usace.army.mil/SafetyandOccupationalHealth/SafetyandHealthRequirementsManual.aspx
28.2. Contractor Responsibility. The contractor shall assume full responsibility and liability for compliance with all applicable regulations pertaining to the health and safety of personnel during the execution of work. The Government shall not be held liable for any actions on the part of the contractor, his employees or subcontractors, which result in illness, injury or death.
28.2.1.Inspections, Tests and Reports. The required inspections, tests and reports made by the contractor, subcontractors, specially trained technicians, equipment manufacturers and others as required, shall be at the contractor’s expense.
28.2.2.Materials and Equipment. Special facilities, devices, equipment, clothing and similar items used by the contractor in the execution of work shall comply with applicable regulations.
28.2.3.Traffic Control Devices. The contractor shall comply with the recommendations contained in Part 6 of the U. S.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.