Construction of OHARNG RTI Federal contract opportunity
Solicitation number
W91364-09-B-0004
Issued by
Department of the Army Ohio Army National Guard

About this file

Specifications Divisions 1 and 2

View the file

Other files for this federal contract opportunity

Other files attached to Construction of OHARNG RTI, newest first.
File Type Posted
Bid Abstract 09-B-0004.pdf PDF
SF 30.pdf PDF
Amendment 3.doc DOC document
W91364-09-B-0004 Amendment 2.pdf PDF
Bid Package.doc DOC document
RTI Geotech Report Vol 2.pdf PDF
Administrative or Contract Questions and Answers.doc DOC document
RTI Geotech Report Vol 1.pdf PDF
Technical Questions and Answers.doc DOC document
W01364-B-0004 Mod 1.pdf PDF
Pre-Bid Site Visit Sign In Roster 30 Apr 09.pdf PDF
ARCH 7 of 7.pdf PDF
ELEC-DWGS 6 of 6.pdf PDF
ARCH 3 of 7.pdf PDF
CivilDwgs 6 of 7.pdf PDF
STR —
PLUMB-DWGS 1 of 2.pdf PDF
CivilDwgs 3 of 7.pdf PDF
ARCH 1 of 7.pdf PDF
SpecsDiv 3-12 14.pdf PDF
CivilDwgs 2 of 7.pdf PDF
ARCH 6 of 7.pdf PDF
STR —
FIRE_PROTECT-DWGS 1 of 1.pdf PDF
PLUMB-DWGS 2 of 2.pdf PDF
W91364-09-B-0004.doc DOC document
CivilDwgs 4 of 7.pdf PDF
CivilDwgs 7 of 7.pdf PDF
ARCH 2 of 7.pdf PDF
Bid Package.doc DOC document
CivilDwgs 1 of 7.pdf PDF
Div2 ODOT Specs.pdf PDF
MECH-DWGS 2 of 3.pdf PDF
SpecsDiv13and16.pdf PDF
SpecsDiv15.pdf PDF
ELEC-DWGS 1 of 6.pdf PDF
ARCH 4 of 7.pdf PDF
MECH-DWGS 3 of 3.pdf PDF
SF 24.pdf PDF
ARCH 5 of 7.pdf PDF
ELEC-DWGS 5 of 6.pdf PDF
ELEC-DWGS 3 of 6.pdf PDF
Appendix A B Specs.pdf PDF
ELEC-DWGS 2 of 6.pdf PDF
ELEC-DWGS 4 of 6.pdf PDF
MECH-DWGS 1 of 3.pdf PDF
CivilDwgs 5 of 7.pdf PDF
Show all 47

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ohio Army National Guard Regional Training Institute 6 April 2009 Defense Supply Center Columbus (DSCC) – Columbus, Ohio Issued For Construction Solicitation Number: W91364-09-B-0004

TABLE OF CONTENTS

DIVISION 1 - GENERAL REQUIREMENTS

01000 GENERAL REQUIREMENTS

01001 AFFIRMATIVE PROCUREMENT

01100 SUMMARY

01310 PROJECT MANAGEMENT AND COORDINATION

01320 CONSTRUCTION PROGRESS DOCUMENTATION

01322 PHOTOGRAPHIC DOCUMENTATION

01330 SUBMITTAL PROCEDURES

01400 QUALITY REQUIREMENTS

01420 REFERENCES

01451 CONTRACTOR QUALITY CONTROL

01500 TEMPORARY FACILITIES AND CONTROLS

01600 PRODUCT REQUIREMENTS

01635 SUBSTITUTION PROCEDURES

01700 EXECUTION REQUIREMENTS

01710 SEQUENCE OF FINISH INSTALLATION

01740 CONSTRUCTION WASTE MANAGEMENT

01751 INDOOR AIR QUALITY (IAQ) MANAGEMENT PLAN

01770 CLOSEOUT PROCEDURES

01781 PROJECT RECORD DOCUMENTS

01782 OPERATION AND MAINTENANCE DATA

01811 SUSTAINABLE DESIGN REQUIREMENTS

01820 DEMONSTRATION AND TRAINING

DIVISION 2 - SITE CONSTRUCTION

02080 PIPED UTILITIES – BASIC MATERIALS AND METHODS

02230 SITE CLEARING

02240 DEWATERING

02300 EARTHWORK

02510 WATER DISTRIBUTION

02530 SANITARY SEWERAGE

02553 NATURAL GAS DISTRIBUTION

02630 STORM DRAINAGE

02741 HOT-MIX ASPHALT PAVING

02751 CEMENT CONCRETE PAVEMENT

02764 PAVEMENT JOINT SEALANTS

02780 UNIT PAVERS

02821 CHAIN-LINK FENCES AND GATES

02920 LAWNS AND GRASSES

02930 EXTERIOR PLANTS

DIVISION 3 - CONCRETE

03200 CONCRETE REINFORCEMENT

03300 CAST-IN-PLACE CONCRETE

03365 POLISHED CONCRETE FLOORS

DIVISION 4 - MASONRY

04810 UNIT MASONRY ASSEMBLIES

TABLE OF CONTENTS TOC - 1

Solicitation Number: W91364-09-B-0004

DIVISION 5 - METALS

05120 STRUCTURAL STEEL

05211 LONGSPAN STEEL JOISTS, LH SERIES

05300 DOVETAIL ROOF DECK

05310 STEEL DECK

05400 COLD-FORMED METAL FRAMING

05500 METAL FABRICATIONS

05511 METAL STAIRS

05521 PIPE AND TUBE RAILINGS

05721 ORNAMENTAL RAILINGS

05811 ARCHITECTURAL JOINT SYSTEMS

DIVISION 6 - WOOD AND PLASTICS

06105 MISCELLANEOUS CARPENTRY

06160 SHEATHING

06402 INTERIOR ARCHITECTURAL WOODWORK

DIVISION 7 - THERMAL AND MOISTURE PROTECTION

07131 SELF-ADHERING SHEET WATERPROOFING

07210 BUILDING INSULATION

07272 FLUID-APPLIED MEMBRANE AIR BARRIERS

07411 METAL ROOF PANELS

07620 SHEET METAL FLASHING AND TRIM

07720 ROOF ACCESSORIES

07811 SPRAYED FIRE-RESISTIVE MATERIALS

07841 THROUGH-PENETRATION FIRESTOP SYSTEMS

07842 FIRE-RESISTIVE JOINT SYSTEMS

07920 JOINT SEALANTS

DIVISION 8 - DOORS AND WINDOWS

08110 STEEL DOORS AND FRAMES

08211 FLUSH WOOD DOORS

08120 FEDERAL SPECIFICATION DOOR, VAULT, SECURITY

08212 STILE AND RAIL WOOD DOORS

08311 ACCESS DOORS AND FRAMES

08331 OVERHEAD COILING DOORS

08380 TRAFFIC DOORS

08411 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS

08520 ALUMINUM WINDOWS

08710 DOOR HARDWARE

08800 GLAZING

08911 GLAZED ALUMINUM CURTAIN WALLS

DIVISION 9 - FINISHES

09111 NON-LOAD-BEARING STEEL FRAMING

09220 PORTLAND CEMENT PLASTER

09250 GYPSUM BOARD

09310 CERAMIC TILE

09511 ACOUSTICAL PANEL CEILINGS

09640 WOOD FLOORING

TABLE OF CONTENTS TOC - 2

Solicitation Number: W91364-09-B-0004

09651 RESILIENT FLOOR TILE

09653 RESILIENT WALL BASE AND ACCESSORIES

09681 CARPET TILE

09841 ACOUSTICAL WALL PANELS

09911 EXTERIOR PAINTING

09912 INTERIOR PAINTING

09960 HIGH-PERFORMANCE COATINGS

DIVISION 10 - SPECIALTIES

10101 VISUAL DISPLAY SURFACES

10155 TOILET COMPARTMENTS

10200 LOUVERS AND VENTS

10265 IMPACT-RESISTANT WALL PROTECTION

10350 FLAGPOLES

10431 SIGNAGE

10505 LOCKERS

10520 FIRE-PROTECTION SPECIALTIES

10550 POSTAL SPECIALTIES

10600 AUDIO VISUAL EQUIPMENT (FOR INFORMATION AND COORDINATION ONLY)

10651 OPERABLE PANEL PARTITIONS

10655 ACCORDION FOLDING PARTITIONS

10801 TOILET AND BATH ACCESSORIES

DIVISION 11 - EQUIPMENT

11400 FOOD SERVICE EQUIPMENT

DIVISION 12 - FURNISHINGS

12484 FLOOR MATS AND FRAMES

12491 HORIZONTAL LOUVER BLINDS

12497 DRAPERIES AND TRACKS

DIVISION 13 - SPECIAL CONSTRUCTION

13100 LIGHTNING PROTECTION

13845 LIGHTING CONTROLS

13854 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

13915 FIRE-SUPPRESSION PIPING

DIVISION 14 - CONVEYING SYSTEMS

14210 ELECTRIC TRACTION ELEVATORS

DIVISION 15 - MECHANICAL

15051 COMMON WORK RESULTS FOR FIRE SUPPRESSION

15052 COMMON WORK RESULTS FOR PLUMBING

15053 COMMON WORK RESULTS FOR HVAC

15056 COMMON MOTOR REQUIREMENTS FOR FIRE SUPPRESSION EQUIPMENT

15057 COMMON MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENT

15058 COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT

15061 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

15062 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

TABLE OF CONTENTS TOC - 3

Solicitation Number: W91364-09-B-0004

15072 VIBRATION AND SEISMIC CONTROLS FOR FIRE SUPPRESSION PIPING AND

EQUIPMENT

15073 VIBRATION AND SEISMIC CONTROLS FOR PLUMBING PIPING AND EQUIPMENT

15074 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND EQUIPMENT

15076 IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT

15077 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

15082 PLUMBING INSULATION

15083 HVAC INSULATION

15111 GENERAL-DUTY VALVES FOR PLUMBING PIPING

15112 GENERAL-DUTY VALVES FOR HVAC PIPING

15123 EXPANSION FITTINGS AND LOOPS FOR PLUMBING PIPING

15124 EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING

15126 METERS AND GAGES FOR PLUMBING PIPING

15126A ADVANCED WATER METERS

15126B ADVANCED NATURAL GAS METERS

15127 METERS AND GAGES FOR HVAC PIPIING

15140 DOMESTIC WATER PIPING

15145 DOMESTIC WATER PIPING SPECIALTIES

15150 SANITARY WASTE AND VENT PIPING

15155 SANITARY WASTE PIPING SPECIALTIES

15181 HYDRONIC PIPING

15185 HYDRONIC PUMPS

15189 HVAC WATER TREATMENT

15195 FACILITY NATURAL-GAS PIPING

15410 PLUMBING FIXTURES

15411 MEDICAL PLUMBING FIXTURES

15415 DRINKING FOUNTAINS AND WATER COOLERS

15441 DOMESTIC WATER PUMPS

15486 FUEL-FIRED WATER HEATERS

15515 WATER-TUBE BOILERS

15550 BREECHINGS, CHIMNEYS, AND STACKS

15625 CENTRIFUGAL WATER CHILLERS

15635 REFRIGERANT DETECTION AND ALARM

15640 COOLING TOWERS

15725 MODULAR INDOOR CENTRAL-STATION AIR HANDLING UNITS

15745 WATER-SOURCE HEAT PUMPS

15815 METAL DUCTS

15820 DUCT ACCESSORIES

15840 AIR TERMINAL UNITS

15855 DIFFUSERS, REGISTERS, AND GRILLES

15900 HVAC INSTRUMENTATION AND CONTROLS

15940 SEQUENCE OF OPERATION

15950 TESTING, ADJUSTING, AND BALANCING

DIVISION 16 - ELECTRICAL

16051 COMMON WORK RESULTS FOR ELECTRICAL

16052 COMMON WORK RESULTS FOR COMMUNICATIONS

16060 GROUNDING AND BONDING

16073 HANGARS AND SUPPORTS FOR ELECTRICAL SYSTEMS

16074 VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS

16075 ELECTRICAL IDENTIFICATION

16120 CONDUCTORS AND CABLES

16124 MEDIUM-VOLTAGE CABLES

16130 RACEWAYS AND BOXES

TABLE OF CONTENTS TOC - 4

Solicitation Number: W91364-09-B-0004

16140 WIRING DEVICES

16146 NETWORK LIGHTING CONTROL

16231 PACKAGED ENGINE GENERATORS

16269 VARIABLE FREQUENCY CONTROLLERS

16271 MEDIUM-VOLTAGE TRANSFORMERS

16342 MEDIUM-VOLTAGE PAD-MOUNTED SWITCHES

16410 ENCLOSED SWITCHES AND CIRCUIT BREAKERS

16415 TRANSFER SWITCHES

16420 ENCLOSED CONTROLLERS

16441 SWITCHBOARDS

16442 PANELBOARDS

16461 LOW-VOLTAGE TRANSFORMERS

16511 INTERIOR LIGHTING

16521 EXTERIOR LIGHTING

16572 MODULAR DIMMING CONTROLS

16714 COMMUNICATIONS EQUIPMENT ROOM FITTINGS

16716 COMMUNICATIONS BACKBONE CABLING

16717 COMMUNICATIONS HORIZONTAL CABLING

16785 TELEVISION SYSTEM

APPENDIX

APPENDIX “A” – GALAXY CONTROL SYSTEMS (FOR COORDINATION AND INFORMATION ONLY)

APPENDIX “B” – INSTALLATION DESIGN PACKAGE FOR ELECTRONIC SECURITY SYSTEMS (FOR

COORDINATION AND INFORMATION ONLY)

TABLE OF CONTENTS TOC - 5

Section 01000 - Page 1

SECTION 01000 - GENERAL REQUIREMENTS

WHERE THE FOLLOWING REQUIREMENTS DIFFER FROM REQUIREMENTS ESTABLISHED BY A SPECIFIC

TASK ORDER, THE TASK ORDER REQUIREMENTS SHALL GOVERN.

1.01 SCOPE

a. The Contractor will be held responsible for all requirements described in the contract documents and task order documents and all work including that of his Sub-contractor, if any, shall be done in accordance with the contract documents and/or task order documents. Failure to familiarize himself with their requirements will not relieve the Contractor of his responsibility to comply.

c. The organization of the specifications into divisions, sections, and articles, and the arrangement of the drawings shall not control the Contractor in dividing the work among Sub-contractors or in establishing the extent of the work to be performed by any trade.

1.02 WORK SCHEDULING

a. Normal base work hours for the Contractor will be between the hours of 7:00 AM, through 5:00 PM excluding Saturdays, Sundays, and Federal Holidays. If the Contractor desires to work during periods other than above, he must notify the Contracting Officer three (3) working days in advance of his intention to work during other periods to allow assignment of additional inspection forces and for notification of fire, security and safety. When the Contracting Officer determines that they are reasonably available, he may authorize the Contractor to perform work during periods other than normal duty hours/days. However, if inspectors are required to perform in excess of their normal duty hours/days solely for the benefit of the Contractor, the actual cost of the inspection, at overtime rates, will be charged to the Contractor and will be deducted from the final payment of the Contract amount. (Note: If applicable, at time of award this paragraph will be modified to the negotiated schedule for this project).

b. The following Federal legal Holidays are observed by this Base:

New Year's Day 1 January Martin Luther's King's Birthday Third Monday of January President's Day Third Monday of February Memorial Day Last Monday of May Independence Day 4 July Labor Day First Monday in September Columbus Day Second Monday in October Veteran's Day 11 November Thanksgiving Day Fourth Thursday in November Christmas Day 25 December

c. NOTE: Any of the above holidays falling on a Saturday will be observed the preceding Friday, holidays falling on a Sunday will be observed on the following Monday.

d. Prior to commencing work on the job initially, resumption of work after prolonged interruption (7 calendar days or more) commencement of any warranty work, and upon completion of warranty work, the Contractor must notify the Contracting Officer (or his/her Contracting Officer Representative). When relocating to new sites, returning to sites for follow-up work on a phased work plan, notification to the Contracting Officer’s Representative is sufficient.

Notification should be by personal contact; however, advance notification may be by telephone, or in writing, and should be accomplished sufficiently in advance to allow scheduling of inspection forces. The above precautions are to ensure construction inspection and recording of work proceedings.

e. The organization of the specifications into divisions, sections, and articles, and the arrangement of the drawings shall not control the Contractor in dividing the work among Sub-contractors or in establishing the extent of the work to be performed by any trade.

1.03 ENTRY TO BASE/ACCESS TO SITE

a. Locations to be serviced by the resulting contracts include pots and bases that are “closed” to the public, Ohio Army National Guard Regional Training Institute Defense Supply Center Columbus (DSCC) - Columbus, Ohio Contract Number: W91364-09B-0004

6 April 2009 Issued for Construction

23359 Typewritten Text

23359 Typewritten Text

Section 01000 - Page 2 pursuant to Sec 21, Internal Security Act of 1950, 50 U.S.C. 797 and, as such, only those persons granted permission may enter. It is, therefore, required that control be exercised over Contractor personnel while working on the Base. To maintain this control, a listing of all Contractor personnel who will be working under the contract, must be submitted to the Contracting Officer prior to the start of work under the contract. The preferred method of providing this list is via email, to the contract administrator, unless notified otherwise. The listing shall include, but not limited to: contract number, project number, employee name, and the estimated starting and ending date of each employee. Subsequent listings of all additions or deletions will be submitted as employees are hired or released.

b. During construction, the Contractor shall permit base personnel access to the facilities within the work area. The Contractor shall provide protection to persons and property throughout the progress of the work.

In the event of a declared National Emergency the Contracting Officer may be required to stop work on this contract for security reasons. Contractor shall ensure the Contracting Officer has a current “Off Duty” contact name and telephone number at all times to facilitate notification.

The Contractor shall be responsible for compliance with all regulations and orders of the Commanding Officer of the Military Installation, respecting identification of employees, movements on installation, parking, truck entry, and all other military regulations, which may affect the work. Special requirements will be identified in the statement of work for an individual task order.

The work under this Contract may be performed at an operating Military Installation with consequent restrictions on entry and movement of nonmilitary personnel and equipment.

The Military Installation may have specific requirements, which will be identified by the Individual Task Orders.

The contractor shall inform all personnel working under its jurisdiction (including subcontractor and visiting supplier personnel) that access to areas outside of the immediate work area, excluding direct haul and access routes, contracting and COR and point of supply and storage is prohibited. Circulation of said personnel will be limited to official business only. Persons in violation of the above may be apprehended and turned over to the appropriate authorities.

1.04 UNAUTHORIZED PERSONNEL

The Contractor shall inform all personnel working under his jurisdiction (including sub-contractor and visiting supplier personnel) that access to areas outside of the immediate work area excluding, direct haul and access routes, contracting and Civil Engineering offices and point of supply and storage is prohibited. Circulation of said personnel will be limited to official business only. Persons in violation of the above will be apprehended and appropriately disciplined.

1.05 INSPECTION OF SITE

a. The Contractor shall be responsible for the complete coordination and proper relation of the work of all trades. Reference Contract Clauses FAR 52.236-3, “Site Investigation and Conditions Affecting the Work” and FAR 52.236-8, “Other Contracts”.

b. No allowances or extra construction on behalf of any Contractor will be permitted subsequently by reason of error or oversight on the part of the sub-contractor, or on account of interferences by the activities of the owner or others. Reference Contract Clause FAR 52.236-3, “Site Investigation and Conditions Affecting the Work”.

c. All dimensions shown on the drawings are based on “as-built” record drawings and, to the extent possible, accurately represent existing conditions; however, there may be some variance between existing conditions and contract drawings. The Contractor is responsible for verifying all dimensions and for reporting to the Contracting Officer any discrepancies that may affect performance of the work represented by contract drawings and specifications. Reference Contract Clause DFARS 252.236-7001 “Contract Drawings, Maps, and Specifications”.

1.06 CORRELATION OF DRAWINGS, SPECIFICATIONS AND CONTRACTS

The specifications, Contract and the accompanying Drawings are intended to describe and provide for a complete, new and usable facility. They are intended to be cooperative and what is called for by one shall be as binding as if called for by all. The Contractor will understand that the work herein described shall be complete in

Ohio Army National Guard Regional Training Institute Defense Supply Center Columbus (DSCC) - Columbus, Ohio Contract Number: W91364-09B-0004

6 April 2009 Issued for Construction

Section 01000 - Page 3 every detail, not withstanding every item necessarily involved is not particularly mentioned, and the Contractor shall be held to provide all labor and material for the entire completion of the work intended to be described and shall not avail himself of any manifestly unintentional error or omission, should any exist. Should any error or inconsistency appear in the Drawings or Specifications, the Contractor, before proceeding with the work, shall make mention of same to the Contracting Officer for proper adjustment, and in no case shall he proceed with the work in uncertainty.

Reference Contract Clause DFARS 252.236-7001, “Contract Drawings, Maps and Specifications”.

1.07 REPORT OF ERROR AND DISCREPANCIES

a. The Contractor shall be responsible for any and all discrepancies in work due to failure to obtain dimensions and investigate conditions at the building before fabrication and installation.

b. The Contractor shall bear all costs in replacing all materials and labor due to not observing the above paragraph and such replaced materials shall meet the approval of the Contracting Officer.

c. The Contractor shall promptly notify the Contracting Officer in writing of any discrepancies.

d. Reference Contract Clauses FAR 52.236-21, “Specifications and Drawings for Construction”. FAR 52.246-12 “Inspection of Construction”, and DFARS 252.236-7001, “Contract Drawings, Maps and Specifications”.

e. Any proposed changes to the specifications by the Contractor must be submitted in writing to the Contracting Officer for approval prior to implementation.

1.08 DIVISION OF WORK

a. The various divisions of the Specifications shall not be considered as negotiations of the material and labor involved. The arrangement and order of these divisions have been made for convenience only, and it is not the intent, nor shall it be so construed, a particular trade or sub-contractor must perform that work included in any one division.

b. Any item mentioned under any division heading must be supplied even though it is not specified under the heading for the respective work, but is shown on the Drawings. No claims for extras arising out of real or alleged error in such arrangement or order of the various divisions will be given consideration

c. The organization of the specifications into divisions, sections, and articles, and the arrangement of the drawings shall not control the Contractor in dividing the work among Sub-contractors or in establishing the extent of the work to be performed by any trade.

d. Reference Contract Clause FAR 52.236-21, “Specifications and Drawings for Construction”.

1.09 METHOD OF CARRYING ON THE WORK

a. All work under the Contract shall be arranged and carried on in such a manner as to complete work in the least possible time. The Contractor shall consult with the Contracting Officer as to methods or sequence of carrying on the work. A definite program of work shall be arranged before starting. Reference Contract Clause FAR 52.236- 15, “Schedules for Construction Contracts”.

b. Activities in the vicinity of this project may be kept in full or partial operation during construction. The Contractor shall coordinate with the Contracting Officer and schedule construction activities. Reference Contract Clause FAR 52.236-8, “Other Contracts”.

1.10 STANDARDS OF MANUFACTURE

a. All recognized regulatory/code standards shall be the latest published edition prior to the date of release for bid/proposal of the contract documents.

b. For purpose of establishing the standard of construction and the requirements to be met in the work of all divisions, the drawings and these specifications are based on the use of products hereinafter specified, adapted to the installation as required to meet the condition.

Ohio Army National Guard Regional Training Institute Defense Supply Center Columbus (DSCC) - Columbus, Ohio Contract Number: W91364-09B-0004

Section 01000 - Page 4

c. Where brand names are shown, these names are intended to describe a quality of product, and in no way are intended to limit products of equal quality. Therefore, products of other manufacturers may be employed for this work provided they are equivalent materials and construction and equally adaptable to the conditions as approved by the Contracting Officer. Reference Contract Clause FAR 52.236-5, “Materials and Workmanship.”

1.11 MEANING OF APPROVED, DIRECTED, ETC.

“Approved,” “Directed,” “Required,” “Applicable,” or words of like or similar effect, when used in the specifications shall be interpreted to mean “Approved By,” “Directed By,” etc., the Contracting Officer unless otherwise specifically stipulated.

1.12 MISPLACED MATERIALS

Any material that is deposited elsewhere than areas designated as approved by the Contracting Officer shall be re-handled and deposited where directed. No payment will be made for re-handling such material. The Contracting Officer will notify Contractor of any noncompliance with the foregoing provisions.

1.13 COMPLIANCE WITH CODES AND REGULATIONS

a. All work shall be done in accordance with the applicable codes and/or ordinances in force at the time of construction. It is the Contractor’s responsibility to insure that where EPA or other such regulations control the removal, handling, installation or disposal of materials, they shall be strictly adhered to whether or not specifically referenced in the construction documents.

b. Contractor shall have data sheets available at the site on any materials used to comply with Massachusetts OSHA and EPA. Reference Contract Clause FAR 52.223-3, “Hazardous Material Identification and Material Safety Data”.

1.14 MATERIAL TESTING BY NATIONAL LABORATORIES

a. Electrical materials and equipment shall be new and bear the UL label or be listed in UL Electrical Construction Materials Directory or Electrical Appliance and Utilization Equipment Directory, wherever standards have been established by the agency.

b. The Contractor shall submit proof that the material or equipment, which he proposes to furnish under this specification, conforms to the standards of Underwriters’ Laboratories. The label of Underwriters Laboratories (UL) shall be accepted as conforming to this requirement.

c. In lieu of the label, the Contractor may submit a written certification from any recognized testing agency, adequately equipped and competent to perform such services, that the material or equipment has been tested and conforms to the standards, including the methods of testing used.

1.15 KEYS

The Contractor shall be responsible for any Government-owned keys that have been issued to him for access to facilities or areas pertinent to this contract.

Upon completion of the work in an area, or upon request of the Contracting Officer, the key or keys relevant to the area shall be returned immediately. Keys shall be returned prior to final task order payments.

Should the Contractor Lose a Key: The Contractor shall notify the Contracting Officer, immediately and in writing, but not later than one (1) working day after he is aware of the loss. Should the key not be found before final acceptance, the final contract payment shall be reduced by the replacement cost for each key not returned and, if required by the Contracting Officer, any re-keying costs and cost of any other damages suffered by the Government.

1.16 CONSTRUCTION SCHEDULING, WORK PROGRESS AND PREPARATION OF PROGRESS SCHEDULES

AND REPORTS

1.16.1 The instructions for preparation and submittal of the Contractor-prepared Network Analysis System or Construction Progress Charts and Status Reports will be included with individual Task Orders.

Ohio Army National Guard Regional Training Institute Defense Supply Center Columbus (DSCC) - Columbus, Ohio Contract Number: W91364-09B-0004

Section 01000 - Page 5

1.16.2 A weekly meeting may be held between the Contractor, COR and Contracting Officer, if necessary, to discuss work progress, problems and potential change orders. Contractors shall attend these meetings at no additional cost to the Government. Prior to specific work elements of a project, the contractor shall confer with the COR and agree on a sequence of procedures and means of access to premise and buildings; space for storage of materials and equipment; delivery of materials and use of approaches, use of corridors, stairways and similar means of passage.

1.16.3 Furniture and portable office equipment in the immediate area will be moved by the contractor to a location designed by the COR and replaced to its original position, or an alternate location as determined by the COR, upon completion of the work. Schedules for movement of furniture and equipment and delivery of materials shall be incorporated in the progress schedule and shall be made with a minimum of interference to Government operations and personnel. So far as practicable, the work shall be completed by section and confined to limited areas.

Coordination with the COR and the user activity shall be accomplished at least three days in advance.

1.16.4 For task order with performance period of 60 calendar days or more, or at the direction of the Contracting Officer, and in accordance with FAR Clause “Schedules for Construction Contracts” (April 1984), the contractor shall, within five days after work commence on the contract or another period of time determined by the Contracting Officer, prepare and submit to the Contracting Officer for approval three copies of practicable schedule shown the order in which the Contractor proposes to perform the work, and the dates on which the Contractor contemplates starting and completing the several salient features of work. The schedule shall be on an AF Form 3064, Contract Progress Schedule or acceptable substitute. The work shall be scheduled so that, upon the start of construction, work progresses in a continuous and diligent manner. A schedule that does not reflect steady and reasonable progress throughout the construction period will be rejected. In accordance with FAR 36.515; “Schedules for Construction Contracts” (April 1984), weekly progress reports, submitted on AF Form 3065, or acceptable substitute, Contractor Progress Report, are required for both the contractor and the Contracting Officer’s Representative (COR) covering the period from notice to proceed through final inspection.

1.16.5 Additionally, the Contractor is to provide a project plan in any approved CPM format to define work tasks and track progress for task orders in excess of $1,000,000.00, and/or when otherwise directed by the Contracting Officer at any dollar value. At least five days prior to work initiation, the contractor is to provide the Contracting Officer hardcopy Gantt charts and a formatted diskette copy, or e-mail file copy, of the plan (CPM) usable with Microsoft Windows that is to include definition of rescues. Additionally, the (CPM) is to have a cost per task field for each task – this is commonly called line item cost. No work is to start until there is written approval from the Contracting Officer that the plan is approved. Form 3064, Contract Progress Schedule, can be delivered in hardcopy or Excel format.

1.16.6 For task order with a performance period of less than 60 calendar days, no progress schedule or contractor progress reports will be required unless directed by the Contracting Officer. A weekly progress report in a format acceptable to the Contracting Officer shall be provided to the COR until final inspection.

1.16.7 The Contractor shall prepare a work progress schedule required for completion of each of the various divisions of work, unless the exception in paragraph e above applies. Updated CPM plans and Form 3064 (hardcopy and formatted diskette, or e-mail file copy) shall be provided by the contractor on a (to be indicated per project) basis, unless otherwise directed by the Contracting Officer, showing work progress, at the beginning of the workweek. If there are possible deviations from the original plan, those are to be noted and approved by the Contracting Officer before work changes are implemented. The schedule shall be submitted to the Contracting Officer, in the number of copies as directed prior to start of construction. Reference Contract Clause FAR 52.236-15, “Schedules for Construction Contracts”. The reports contemplated by the clause herein titled "Schedules for Construction Contracts" shall be accomplished on and in accordance with instructions pertaining to AF Form 3064, "Contract Progress Schedule" and AF Form 3065, "Contract Progress Report."

1.17 SAFETY ASSURANCE

a. Compliance with Regulations. All work including the handling of hazardous materials or the disturbance or dismantling of structures containing hazardous materials shall comply with the applicable requirements of 29 CFR 1910/1926. Work involving the disturbance or dismantling of asbestos or asbestos-containing materials; the demolition of structures containing asbestos; and/or disposal and removal of asbestos, shall also comply with the requirement of 40 CFR, Part 61, Subparts A and B. ETL 1110-1-118 and DA Circular 40-83-4. All work shall comply with applicable state and municipal safety and health requirements. Where there is a conflict between applicable

Ohio Army National Guard Regional Training Institute Defense Supply Center Columbus (DSCC) - Columbus, Ohio Contract Number: W91364-09B-0004

Section 01000 - Page 6 regulations, the most stringent shall apply.

b. Contractor Responsibility. The Contractor shall assume full responsibility and liability for compliance with all applicable regulations pertaining to the health and safety of personnel during the execution of work. The Government shall not be held liable for any action on the part of the Contractor, his employees or Sub-contractor, which result in illness, injury or death.

c. Crawl spaces and attics are to be treated as confined space entry. Contractor must follow 29CFR

1910.146 and use Air Force Form 1024 when making an entry. NOTE: A confined space does not include areas above suspended acoustical tile ceiling.

d. Where an employee can fall more than 6 feet, a fall protection system must be used; 29 CFR 1926.500 stipulates where this occurs and the different types of fall arrest systems.

e. When the Contractor is working in buildings that are occupied by Government personnel, the Contractor must provide Material Safety Data Sheets (MSDS) to the Contracting Officer before they begin the work.

f. All references to protection of the site and adjacent buildings when trenching, shall include protection of all employees also.

g. Inspections, Tests and Reports. The required inspections, tests and reports made by the Contractor, Sub-contractor, specially trained technicians, equipment manufacturers and other as required, shall be at the Contractor’s expense.

h. Materials and Equipment. Special facilities, devices, equipment, clothing and similar items used by the Contractor in the execution of work shall comply with applicable regulations.

i. Traffic Control Devices. The Contractor shall comply with the recommendations contained in Part 6 of the U. S. Department of Transportation, Federal Highway Administrations “Manual on Uniform Traffic Control Devices (D6. -1978) to ensure proper warnings to motorists and adequate traffic control. The Contractor shall provide all warning lights, barricades and other traffic control devices and signs.

1.18 INSPECTIONS AND TESTS

Inspections and tests are for the sole benefit of the Government and shall not relieve the Contractor of the responsibility of providing quality control measures to ensure that the work strictly complies with the contract requirements. No inspection or test by the Government shall be construed as constituting or implying acceptance.

Reference Contract Clause FAR 52.246-12, “Inspection of Construction”.

1.19 QUALITY CONTROL/TESTS Also See Section 01451

a. Where work is specified to be in conformity with Standard Specifications of the American Society for Testing Materials (ATSM), or with Federal specifications or with specifications of well known recognized technical and trade organizations, but no tests are specifically stipulated in connection herewith, the Contractor shall furnish and pay for any tests or certifications required by the Contracting Officer to show that the proposed materials meet with the applicable requirements.

b. The Contractor shall submit a written certification from any recognized testing agency, adequately equipped and competent to perform such services, that the material or equipment has been tested and conforms to the standards, including the methods of testing used.

c. Wherever testing or analysis of material is required, such testing unless otherwise noted will be made at the Contractor’s expense.

d. Subsequent testing of those materials that fail to meet specifications will be accomplished by the Contractor at no cost to the Government.

e. Contractor Quality Control (CQC) Program: The Contractor shall provide and maintain an effective quality control program in accordance with the contract. Within ten (10) days of the award of the task order, the Contractor shall provide three (3) copies of the task order CQC plan to the Contracting Officer This document, as a

Ohio Army National Guard Regional Training Institute Defense Supply Center Columbus (DSCC) - Columbus, Ohio Contract Number: W91364-09B-0004

Section 01000 - Page 7 minimum, shall include name and address of the independent testing agency and the responsible principal with the firm; a summary of QC tests required by the specification and to be provided by the testing agency; and typical daily reports forms to be used for this project. The plan shall also indicate organizational procedures to immediately notify the Contracting Officer or his/her representative of test results in noncompliance with the specification and recommendations on correction. The testing agency must be an independent company and not owned or partially owned by the Contractor or any relation or employee of the Contractor.

f. Samples used for testing shall be selected as specified for the various tests elsewhere in the specifications but in every case the method of selecting samples and the location for selection shall be as approved by the Contracting Officer.

g. Tests shall be made in accordance with the specified testing procedures and/or methods and otherwise as required to provide compliance with all contract requirements. Tests shall be made by independent, commercial testing laboratories approved in writing by the Contracting Officer.

h. Results of all tests shall be recorded on certified test reports of the commercial testing laboratories.

Reports shall include a statement that the materials tested do or do not meet the requirements of the Contract specifications. Six copies of all reports shall be forwarded directly to the Contracting Officer for approval within five

(5) days of the actual performance of the test. The testing agency shall immediately notify (verbally) the Contracting Officer of any tests that indicate failure to meet the contract requirements.

i. Any item, for which test reports show failure to meet all Contract requirements shall be retested as often as required to show full compliance with Contract requirements, at the Contractor’s expense.

j. Contractor will provide an emergencies plan, with Contractors to accomplish the repairs in the event of utility and/or communications emergencies.

1.20 WARRANTY

a. In addition to the specific guarantees required by the specifications for certain portions of the work to be performed under this Contract, the Contractor shall furnish a written warranty for all of the work to be performed under this Contract, against defects in materials or workmanship for a period of one (1) year from the date of final acceptance of the completed work by the Government.

b. All work including workmanship, material, and equipment (other than Government furnished equipment) shall be warranted for the full period of standard manufacturer’s warranty, but in no case shall be warranted for a period of less than one (1) year upon notice from the Contracting Officer of any failure during this warranty period, the part or parts shall be replaced promptly with new parts by and at the expense of the Contractor. Whenever the manufacturer of a piece of equipment supplied by the Contractor customarily provides a warranty covering the equipment, the Contractor shall promptly turn over such to the Contracting Officer.

c. Upon completion, the Contractor shall provide the Contracting Officer with five (5) bound sets containing maintenance, repair and operating instructions and parts lists for each piece of installed equipment.

d. Reference Contract Clause FAR 52.246-12, “Inspection of Construction” and FAR 52.246-21, “Warranty of Construction”.

1.21 CUTTING AND REPAIRING

a. Unless otherwise specified hereinafter, the Contractor shall do all necessary cutting, drilling, fitting and patching of work and corresponding work that may be required to make several parts come together and fit it to receive, or be received, by work of other trades shown upon, or reasonably implied, by the Drawings and Specifications for the completed project. Reference Contract Clause FAR 52.246-12, “Inspection of Construction”.

b. The Contractor shall be held responsible for all cutting, replacement, and repairing of work that is due to faulty workmanship and which is not specifically covered by specifications for trades which are affected. He will also be held responsible for providing, without extra cost to the Government, any small incidental items which are not specifically mentioned in trade specifications, but which are necessary to complete the work in accordance with the drawings, and under the general understanding that the work when completed shall be a finished and workmanlike job. Reference Contract Clause FAR 52.236-5, “Material and Workmanship” and FAR 52.246-12, “Inspection of

Ohio Army National Guard Regional Training Institute Defense Supply Center Columbus (DSCC) - Columbus, Ohio Contract Number: W91364-09B-0004

Section 01000 - Page 8

Construction.”

1.22 SITE CLEAN UP

a. The Contractor shall maintain the construction site in as clean and orderly condition as possible. All refuse and/or salvage material shall be gathered and disposed of periodically to maintain the site in this condition. All roadways, taxiways and ramp areas within the work area, or used by the Contractor, shall be swept and vacuumed daily to assure safe operation of aircraft. The cleaning operation shall be accomplished with self-propelled sweepers equipped with pick-up devices. The method of cleaning and equipment employed shall be subject to the approval of the Contracting Officer. Reference Contract Clause FAR 52.235-12, “Cleaning Up”.

b. During and after periods of rain, this construction site may have a very high water table and/or areas of standing surface water. Dewatering techniques are a Contractor’s option; however, the Contracting Officer shall approve the method prior to start of work.

c. Following completion of the work, the Contractor shall clean the entire area from any debris and/or excess of misplaced material due to his operation and obtain Contracting Officer’s approval of this finished work.

(Reference Contract Clause FAR 52.246-12, entitled “Inspection of Construction” and FAR 52.236-12, “Cleaning Up”.)

1.23 LAYOUT AND GRADES

a. All lines and grade work not presently established at the site shall be laid out by the Contractor in accordance with the drawings and specifications. The Contractor shall maintain all established boundaries and benchmarks and replace as directed any which are destroyed or disturbed. Reference Contract Clause FAR 52.236- 17, “Layout of Work”.

b. The Contractor shall engage a Professional Engineer or Registered Land Surveyor, licensed to practice in the State of Massachusetts to properly establish all locations, grades, elevations, dimensions, joints, etc., necessary to the proper location of all items of work included in this Contract. All such items shall be established in relation to the benchmark and control points noted on the drawings.

c. Prior to acceptance of the facility and at such times as directed by the Contracting Officer, the Contractor shall thoroughly clean all exposed surfaces of the building where work under this contract was completed.

d. All protective coatings, except lacquers, shall be removed from finish surfaces and the finish surfaces shall be washed and cleaned. Contractor shall be held responsible for all damaged materials, and at completion, shall replace, at his own expense, all such damaged materials.

e. Reference Contract Clause FAR 52.236-21, “Cleaning Up”, and FAR 52.246-12, “Inspection of Construction”.

1.24 REFUSE AND SALVAGE MATERIALS:

a All refuse, debris, and construction waste shall be legally disposed of off base at the Contractor’s expense. (Reference FAR 52.236-12 “Cleaning Up.”). Accumulations of refuse on the site will not be permitted.

b. All salvage property removed and not reinstalled under this contract shall be returned to the Government at a place on Base designated by the Contracting Officer, or properly disposed of when directed by the Government.

c. Non-Hazardous Solid Waste should be diverted to recycling, through appropriate means available to the Contractor, if such diversion is less than or equal to the equivalent cost of land-filling or incineration.

d. The Contractor shall maintain adequate property control records for all materials or equipment specified to be salvaged. These records may be in accordance with the Contractor's system of property control, if approved by the property administrator. The Contractor shall be responsible for the adequate storage and protection of all salvaged materials and equipment, and shall replace, at no cost to the Government, all salvage materials and equipment which are broken or damaged during salvage operations as the result of its negligence, or while in its care.

Point of contact concerning Government salvaged items will be identified under the individual task order.

Contract Number: W91364-09B-0004

Section 01000 - Page 9

1.25 STORAGE

a. No secure storage space will be provided by the Government. The Government will not be responsible for property belonging to, or under the present control of the Contractor. The Contractor is to protect his materials.

An unsecured, open area will be designated by the Contracting Officer for storage of construction equipment and materials during the period covered by this contract. Reference Contract Clause FAR 52.236-10, “Operations and Storage Areas”.

b. Contractor shall construct such temporary sheds as he may require for the use of his workmen and as required for tool cribs and storage of all work under this Contract. Temporary sheds shall be confined to the space assigned by the Contracting Officer. Sheds shall be of approved construction and wood floors, lighting and heat shall be provided in all parts used by workmen. Exterior of sheds shall be painted, all parts maintained in good condition throughout the life of the Contract, and at completion, all parts shall be removed and the premises cleaned up.

Reference Contract Clauses FAR 52.236-10, “Operations and Storage Areas” and FAR 52.236-12, “Cleaning Up”.

1.26 TEMPORARY FIELD OFFICES

a. As soon as practicable after award of Task Order, and until final completion of the work, Contractor shall provide, maintain and later remove a suitable temporary office(s) for his own use. All field offices shall be painted on the exterior, maintained in good repair, provided with adequate heating, lighting and maintained in a clean and sanitary condition at all times. Reference Contract Clause FAR 52.236-10, “Operations and Storage Areas”.

b. When required by the solicitation/task order documents the Contractor shall provide temporary office space for exclusive use of the Government inspectors, to include Contracted inspectors. This office shall include, as a minimum, as desk, a suitable chair, and access to a phone line at no additional cost to the Government.

c. The Contractor is reminded that smoking in buildings on a Government facility is prohibited. Contractors must provide a smoking area for employees away from the main entrance of a building.

1.27 TEMPORARY TOILET FACILITIES

Contractor to provide, at his expense, all temporary toilet facilities. All temporary toilet facilities shall meet the requirements of health authorities having jurisdiction and shall be kept clean and in a sanitary condition at all times.

1.28 TELEPHONE AND COMMUNICATIONS SECURITY MONITORING

a. Contractor shall provide telephone services at his field office for his own use and for the use of Sub-contractor and the Contracting Officer. He shall make all arrangements with the telephone company and shall pay all charges for installation, services and removal.

b. All communications with DOD organizations are subject to communications security (COMSEC) review.

Contractor personnel will be aware telephone communications networks are continually subject to intercept by unfriendly intelligence organizations. The DOD has authorized the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DOD organizations. Therefore, civilian Contractor personnel are advised any time they place a call to, or receive a call from, an USAF organization, they are subject to COMSEC procedures. The Contractor will assume the responsibility for ensuring wide and frequent dissemination of the above information to all employees dealing with DOD information

1.29 UTILITIES

a. The Contracting Officer has determined that Government-operated utilities (to be specified in individual task orders) are/are not adequate and will/will not be furnished to the Contractor without charge where existing outlets are available. The Contractor may use reasonable amounts of specified utilities for this construction operation without charge. The Contractor is responsible for installing temporary service outlets, as necessary, and charges will be made in accordance with the clause entitled “Availability and Use of Utility Services, FAR Clause 52.236-14. Any expense incurred to gain access to these utilities (temporary tap-ins, etc.,) shall be the responsibility of the Contractor and all utilities shall be returned to their original configurations at the end of the contracts. No alterations to existing utilities shall be accomplished without the written permission of the Contracting Office. The following utility/utilities will

Ohio Army National Guard Regional Training Institute Defense Supply Center Columbus (DSCC) - Columbus, Ohio Contract Number: W91364-09B-0004

Section 01000 - Page 10 be made available: will be specified in each individual task order.

b. Contractor shall be responsible for gas charges once gas service is established until accepted by the Government.

1.30 UTILITY INTERRUPTIONS

a. All utility shutdowns require the prior approval of the Contracting Officer. Request for utility shutdown shall be made in writing at least four (4) weeks prior to the expected date of implementation., or as indicated in Task order documents. As soon as actual shutdown date is known, the Contractor shall notify the Contracting Officer in writing requesting approval at least eight (8) work days prior to requested shutdown.

b. The Contractor’s progress schedule shall include preliminary listing of all proposed shutdown dates.

Every effort shall be made to make all shutdowns as brief as possible, and as limited in extent as possible.

1.31 EXCAVATING PERMIT

Contractor is required to secure an excavating permit from Base Civil Engineering, or other applicable agency as designated by the Contracting Officer before proceeding with any exterior on-site excavating or digging.

The Base Civil Engineer must have three (3) to four (4) working days notice from the Contractor prior to permit being secured.

1.32 COMPRESSED AIR

Contractor shall provide all compressed air used for work under this contract including temporary lines and connections. Remove all temporary lines, etc., at the completion of the work.

1.33 WEATHER PROTECTION AND TEMPORARY HEATING

a. The Contractor shall provide and maintain weather protection as may be required to properly protect all parts of the structure from damage during construction.

b. The Contractor shall be responsible for repairs and maintenance to the heating system or units during the period during progress of building construction and shall deliver same to the Government, at termination of such use, in perfect condition, cleaning out all air ducts and replacing all filters. Any temporary heating shall be at the expense of the Contractor.

1.34 BLOCKING OFF BASE STREETS

At least two (2) hours prior to the blocking of any street, or as designated by the task order documents, the Contractor shall advise the COR, appropriate Fire Department and Security Police of his intentions, identifying the location and the estimated time of closure. No more than two streets shall be closed at any time, and the two shall be no closer than five blocks from each other. However, there shall be no closures of any street without at least eight (8) days of prior notification to both the COR, appropriate Fire Department, Security Officer and the Contracting Officer.

1.35 ARCHEOLOGICAL, PALEONTOLOGICAL AND ENDANGERED SPECIES FINDS.

Any archeological finds (evidence of human occupation) or paleontological finds (evidence of prehistoric plant or animal life) are to be reported to the Contracting Officer immediately and continue work in other areas without interruption. Protect native endangered flora and fauna and notify Contracting Officer of any construction activities that might threaten endangered species or their habitats.

1.36 EQUIPMENT REPORT

a. The Contractor shall furnish, unless directed otherwise, upon completion of the project, “Real Property Installed Cost”, form in triplicate, of all equipment installed in the facility, and the installed cost of each item.

Furthermore, the listing shall include the location of each item and nameplate date.

b. Typically, the listing shall include: air conditioners, air handling units, condensers, fans, pumps, air compressors, transformers, unit heaters, regulators, direct current power…

This is the start of the file's text. The full file is on GovTribe.