ARCH 1 of 7.pdf

PDF 13 MB Posted

Attached to
Construction of OHARNG RTI Federal contract opportunity
Solicitation number
W91364-09-B-0004
Issued by
Department of the Army Ohio Army National Guard

About this file

Architectural Drawings 1 of 7 files

View the file

Other files for this federal contract opportunity

Other files attached to Construction of OHARNG RTI, newest first.
File Type Posted
Bid Abstract 09-B-0004.pdf PDF
Amendment 3.doc DOC document
SF 30.pdf PDF
W91364-09-B-0004 Amendment 2.pdf PDF
Bid Package.doc DOC document
Administrative or Contract Questions and Answers.doc DOC document
RTI Geotech Report Vol 1.pdf PDF
Technical Questions and Answers.doc DOC document
RTI Geotech Report Vol 2.pdf PDF
W01364-B-0004 Mod 1.pdf PDF
Pre-Bid Site Visit Sign In Roster 30 Apr 09.pdf PDF
SpecsDiv1-2.pdf PDF
ELEC-DWGS 5 of 6.pdf PDF
ELEC-DWGS 3 of 6.pdf PDF
Appendix A B Specs.pdf PDF
ELEC-DWGS 2 of 6.pdf PDF
ELEC-DWGS 4 of 6.pdf PDF
MECH-DWGS 1 of 3.pdf PDF
CivilDwgs 5 of 7.pdf PDF
ARCH 7 of 7.pdf PDF
ELEC-DWGS 6 of 6.pdf PDF
ARCH 3 of 7.pdf PDF
CivilDwgs 6 of 7.pdf PDF
STR —
PLUMB-DWGS 1 of 2.pdf PDF
CivilDwgs 3 of 7.pdf PDF
Div2 ODOT Specs.pdf PDF
MECH-DWGS 2 of 3.pdf PDF
SpecsDiv13and16.pdf PDF
SpecsDiv15.pdf PDF
ELEC-DWGS 1 of 6.pdf PDF
ARCH 4 of 7.pdf PDF
MECH-DWGS 3 of 3.pdf PDF
SF 24.pdf PDF
ARCH 5 of 7.pdf PDF
SpecsDiv 3-12 14.pdf PDF
CivilDwgs 2 of 7.pdf PDF
ARCH 6 of 7.pdf PDF
STR —
FIRE_PROTECT-DWGS 1 of 1.pdf PDF
PLUMB-DWGS 2 of 2.pdf PDF
W91364-09-B-0004.doc DOC document
CivilDwgs 4 of 7.pdf PDF
CivilDwgs 7 of 7.pdf PDF
ARCH 2 of 7.pdf PDF
Bid Package.doc DOC document
CivilDwgs 1 of 7.pdf PDF
Show all 47

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL ARCHITECTURE (CONT.) STRUCTURAL (CONT.) PLUMBING (CONT.)

G-000 COVER SHEET A-251 ENLARGED ELEVATION DETAILS S-116 ENLARGED PARTIAL SECOND FLOOR FRAMING PLAN

G-001 DRAWING INDEX A-252 ENLARGED ELEVATION DETAILS S-117 ENLARGED PARTIAL SECOND FLOOR FRAMING PLAN P-607 KITCHEN SANITARY WASTE, VENT AND DOMESTIC WATER & GAS RISERS

G-002 ABBREVIATIONS, SYMBOLS, GENERAL NOTES, LOCATION MAP & EQUIPMENT ITEMS 1, 2, & 3 A-253 ENLARGED ELEVATION DETAILS S-118 ENLARGED PARTIAL SECOND FLOOR FRAMING PLAN P-608 PLUMBING SCHEDULES

G-003 CODE ANALYSIS A-254 ENLARGED ENTRY ELEVATIONS AND SECTIONS S-119 ENLARGED PARTIAL SECOND FLOOR FRAMING PLAN P-609 PLUMBING SCHEDULES

G004 ADA NOTES AND DETAILS A-255 ENLARGED ENTRY ELEVATIONS AND SECTIONS S-120 ENLARGED PARTIAL SECOND FLOOR FRAMING PLAN

G-110 FIRST FLOOR LIFE SAFETY PLAN A-300 BUILDING SECTIONS S-121 ENLARGED MEZZANINE FLOOR FRAMING PLAN

G-111 SECOND FLOOR LIFE SAFETY PLAN A-301 BUILDING SECTIONS S-122 ENLARGED PARTIAL THIRD FLOOR FRAMING PLAN

G-112 THIRD FLOOR LIFE SAFETY PLAN A-302 BUILDING SECTIONS S-123 ENLARGED ROOF FRAMING PLAN ELECTRICAL A-303 BUILDING SECTIONS S-124 ENLARGED PARTIAL THIRD FLOOR FRAMING PLAN E-001 LEGEND, ABBREVIATIONS, & GENERAL NOTES

A-304 BUILDING SECTIONS S-125 ENLARGED PARTIAL ROOF FRAMING PLAN E-101 ELECTRICAL SITE PLAN

CIVIL A-310 WALL SECTIONS S-126 ENLARGED PARTIAL ROOF FRAMING PLAN E-102 ELECTRICAL SITE PLAN

C-001 PROJECT OVERVIEW PLAN A-311 WALL SECTIONS S-127 ENLARGED PARTIAL HIGH ROOF FRAMING PLAN E-103 FIRST FLOOR LIGHTING PLAN - SECTOR 1

C-002 HORIZONTAL AND VERTICAL CONTROL PLAN A-312 WALL SECTIONS S-128 ENLARGED PARTIAL HIGH ROOF FRAMING PLAN E-104 FIRST FLOOR LIGHTING PLAN - SECTOR 2

C-003 GENERAL NOTES, ABBREVIATIONS & LEGENDS A-313 WALL SECTIONS S-129 ENLARGED PARTIAL HIGH ROOF FRAMING PLAN E-105 FIRST FLOOR LIGHTING PLAN - SECTOR 3

C-004 SOIL BORING LOCATION PLAN A-314 WALL SECTIONS S-201 ELEVATOR-STAIR SECTION E-106 FIRST FLOOR LIGHTING PLAN - SECTOR 4

C-005 SOIL BORING LOGS A-400 OVERALL FIRST FLOOR REFLECTED CEILING PLAN S-202 DETAILS E-107 FIRST FLOOR LIGHTING PLAN - SECTOR 5

C-006 SOIL BORING LOGS A-401 OVERALL SECOND FLOOR REFLECTED CEILING PLAN S-501 SCHEDULES E-108 SECOND FLOOR LIGHTING PLAN - SECTOR 1

C-007 SOIL BORING LOGS A-402 OVERALL THIRD FLOOR REFLECTED CEILING PLAN S-601 FOUNDATION DETAILS E-109 SECOND FLOOR LIGHTING PLAN - SECTOR 2

C-008 SOIL BORING LOGS A-410 ENLARGED FIRST FLOOR REFLECTED CEILING PLAN S-602 FOUNDATION DETAILS E-110 SECOND FLOOR LIGHTING PLAN - SECTOR 3

C-009 SOIL BORING LOGS A-411 ENLARGED FIRST FLOOR REFLECTED CEILING PLAN S-603 DETAILS E-111 SECOND FLOOR LIGHTING PLAN - SECTOR 4

C-010 EXISTING CONDITIONS PLAN A-412 ENLARGED FIRST FLOOR REFLECTED CEILING PLAN S-701 TYPICAL CMU DETAILS E-112 SECOND FLOOR LIGHTING PLAN - SECTOR 5

C-011 PHASING SCHEDULE A-413 ENLARGED FIRST FLOOR REFLECTED CEILING PLAN S-801 FLOOR AND ROOF FRAMING DETAILS E-113 THIRD FLOOR LIGHTING PLAN - SECTOR 1

C-101 DEMOLITION PLAN A-414 ENLARGED FIRST FLOOR REFLECTED CEILING PLAN S-802 FLOOR AND ROOF FRAMING DETAILS E-114 THIRD FLOOR LIGHTING PLAN - SECTOR 3

C-102 GEOMETRY PLAN A-415 ENLARGED FIRST FLOOR REFLECTED CEILING PLAN S-803 FLOOR AND ROOF FRAMING DETAILS E-115 MECH/ELEC & MULTI-PURPOSE THIRD FLOOR LIGHTING PLAN

C-103 COMPOSITE UTILITY PLAN A-416 ENLARGED SECOND FLOOR REFLECTED CEILING PLAN S-901 LIGHT GAUGE WALL AND TRUSS DETAILS E-116 FIRST FLOOR POWER PLAN (RECEPTACLE) SECTOR 1

C-104 GRADING AND DRAINAGE PLAN A-417 ENLARGED SECOND FLOOR REFLECTED CEILING PLAN E-117 FIRST FLOOR POWER PLAN RECEPTACLES SECTOR 2

C-105 SANITARY SEWER UTILITY PLAN A-418 ENLARGED SECOND FLOOR REFLECTED CEILING PLAN E-118 FIRST FLOOR POWER PLAN (RECEPTACLE) SECTOR 3

C-106 WATER UTILITY PLAN A-419 ENLARGED SECOND FLOOR REFLECTED CEILING PLAN FIRE PROTECTION E-119 FIRST FLOOR POWER PLAN (RECEPTACLE) SECTOR 4

C-107 ELECTRIC / TELECOMMUNICATIONS DUCT PLAN A-420 ENLARGED SECOND FLOOR REFLECTED CEILING PLAN F-001 FIRE PROTECTION LEGEND, ABBREVIATIONS, AND GENERAL NOTES E-120 FIRST FLOOR POWER PLAN (RECEPTACLE) SECTOR 5

C-108 GAS UTILITY PLAN A-421 ENLARGED SECOND FLOOR REFLECTED CEILING PLAN F-101 FIRE PROTECTION FIRST FLOOR ZONING PLAN E-121 SECOND FLOOR POWER PLAN (RECEPTACLE) SECTOR 1

C-109 PAVEMENT PLAN A-422 ENLARGED THIRD FLOOR REFLECTED CEILING PLAN F-102 FIRE PROTECTION SECOND FLOOR ZONING PLAN E-122 SECOND FLOOR POWER PLAN (RECEPTACLE) SECTOR 2

C-110 SIGNAGE, MARKING, AND FENCING PLAN A-423 ENLARGED THIRD FLOOR REFLECTED CEILING PLAN F-103 FIRE PROTECTION THIRD FLOOR ZONING PLAN E-123 SECOND FLOOR POWER PLAN (RECEPTACLE) SECTOR 3

C-111 EROSION AND SEDIMENT CONTROL PLAN A-424 ENLARGED THIRD FLOOR REFLECTED CEILING PLAN F-104 FIRE PROTECTION FIRST FLOOR SPRINKLER PLAN, SECTORS 1 AND 3 E-124 SECOND FLOOR POWER PLAN (RECEPTACLE) SECTOR 4

C-112 EROSION AND SEDIMENT CONTROL DETAILS A-430 ENLARGED REFLECTED CEILING PLAN AND CEILING DETAILS F-105 FIRE PROTECTION FIRST FLOOR SPRINKLER PLAN, SECTOR 2 E-125 SECOND FLOOR POWER PLAN (RECEPTACLE) SECTOR 5

C-201 DETENTION BASIN PROFILES A-431 CEILING DETAILS AND STUCCO DETAILS F-106 FIRE PROTECTION FIRST FLOOR SPRINKLER PLAN, SECTOR 4 E-126 THIRD FLOOR POWER PLAN (RECEPTACLE) SECTOR 1

C-202 PAVEMENT PROFILES A-500 WALL TYPES F-107 FIRE PROTECTION FIRST FLOOR SPRINKLER PLAN, SECTOR 5 E-127 THIRD FLOOR POWER PLAN (RECEPTACLE) SECTOR 3

C-203 STORM PROFILES A-503 ROOF DETAILS F-108 FIRE PROTECTION SECOND FLOOR SPRINKLER PLAN, SECTORS 1 AND 3 E-128 MECH / ELEC & MULTI-PURPOSE THIRD FLOOR POWER PLAN (RECEPTACLE)

C-204 STORM PROFILES A-504 ROOF DETAILS F-109 FIRE PROTECTION SECOND FLOOR SPRINKLER PLAN, SECTOR 2 E-129 FIRST FLOOR POWER PLAN (HVAC) SECTOR 1

C-205 STORM PROFILES A-505 ROOF DETAILS F-110 FIRE PROTECTION SECOND FLOOR SPRINKLER PLAN, SECTORS 4 AND 5 E-130 FIRST FLOOR POWER PLAN (HVAC) SECTOR 2

C-206 SANITARY SEWER PROFILES A-506 ROOF DETAILS AND FLAG POLE DETAILS F-111 FIRE PROTECTION THIRD FLOOR SPRINKLER PLAN, SECTORS 1 AND 3 E-131 FIRST FLOOR POWER PLAN (HVAC) SECTOR 3

C-207 SANITARY SEWER PROFILES A-510 PLAN DETAILS F-112 FIRE PROTECTION THIRD FLOOR SPRINKLER PLAN, PARTIAL SECTORS 4 & 5 E-132 FIRST FLOOR POWER PLAN (HVAC) SECTOR 4

C-208 SANITARY SEWER PROFILES A-511 PLAN DETAILS F-501 FIRE PROTECTION DETAILS E-133 FIRST FLOOR POWER PLAN (HVAC) SECTOR 5

C-209 WATER LINE PROFILES A-512 PLAN DETAILS E-134 SECOND FLOOR POWER PLAN (HVAC) SECTOR 1

C-210 WATER LINE PROFILES A-513 PLAN DETAILS E-135 SECOND FLOOR POWER PLAN (HVAC) SECTOR 2

C-211 DUCT PROFILES A-514 PLAN DETAILS MECHANICAL E-136 SECOND FLOOR POWER PLAN (HVAC) SECTOR 3

C-212 DUCT PROFILES A-520 DOOR HEAD, JAMB, AND SILL DETAILS M-001 MECHANICAL LEGEND AND ABBREVIATIONS E-137 SECOND FLOOR POWER PLAN (HVAC) SECTOR 4

C-213 GAS LINE PROFILES A-521 DOOR HEAD, JAMB, AND SILL DETAILS M-002 MECHANICAL GENERAL NOTES E-138 SECOND FLOOR POWER PLAN (HVAC) SECTOR 5

C-301 TYPICAL SECTIONS A-522 DOOR HEAD, JAMB, AND SILL DETAILS M-101 OVERALL FIRST FLOOR MECHANICAL PLAN E-139 THIRD FLOOR POWER PLAN (HVAC) SECTOR 1

C-302 TYPICAL SECTIONS A-523 DOOR HEAD, JAMB, AND SILL DETAILS M-102 OVERALL SECOND FLOOR MECHANICAL PLAN E-140 THIRD FLOOR POWER PLAN (HVAC) SECTOR 3

C-303 CROSS SECTIONS A-524 WINDOW HEAD, JAMB, AND SILL DETAILS M-103 OVERALL THIRD FLOOR MECHANICAL PLAN E-141 MECH / ELEC & MULTIPURPOSE THIRD FLOOR POWER PLAN (HVAC)

C-304 CROSS SECTIONS A-525 WINDOW HEAD, JAMB, AND SILL DETAILS M-104 FIRST FLOOR MECHANICAL PLAN - SECTOR 1 E-142 FIRST FLOOR TELECOMMUNICATION PLAN SECTOR 1

C-305 CROSS SECTIONS A-526 WINDOW HEAD, JAMB, AND SILL DETAILS M-105 FIRST FLOOR HVAC PLAN - SECTOR 2 E-143 FIRST FLOOR TELECOMMUNICATION PLAN SECTOR 2

C-306 CROSS SECTIONS A-527 MOVEABLE PARTITION DETAILS M-106 FIRST FLOOR PIPING PLAN - SECTOR 2 E-144 FIRST FLOOR TELECOMMUNICATION PLAN SECTOR 3

C-307 CROSS SECTIONS A-528 EXPANSION JOINT DETAILS M-107 FIRST FLOOR MECHANICAL PLAN - SECTOR 3 E-145 FIRST FLOOR TELECOMMUNICATION PLAN SECTOR 4

C-401 ENLARGED DETENTION BASIN PLAN A-540 ENLARGED LOBBY STAIR SECTIONS M-108 FIRST FLOOR HVAC PLAN - SECTOR 4 E-146 FIRST FLOOR TELECOMMUNICATION PLAN SECTOR 5

C-402 ENLARGED PAVEMENT PLAN A-541 GUARD RAIL DETAILS M-109 FIRST FLOOR PIPING PLAN - SECTOR 4 E-147 SECOND FLOOR TELECOMMUNICATION PLAN SECTOR 1

C-403 ENLARGED PAVEMENT PLAN A-542 STAIR DETAILS M-110 FIRST FLOOR HVAC PLAN - SECTOR 5 E-148 SECOND FLOOR TELECOMMUNICATION PLAN SECTOR 2

C-404 ENLARGED PAVEMENT PLAN A-543 RAMP DETAILS M-111 FIRST FLOOR PIPING PLAN - SECTOR 5 E-149 SECOND FLOOR TELECOMMUNICATION PLAN SECTOR 3

C-405 ENLARGED PAVEMENT PLAN A-600 DOOR AND WINDOW SCHEDULE, REMARKS, AND ABBREVIATIONS LEGEND M-112 SECOND FLOOR MECHANICAL PLAN - SECTOR 1 E-150 SECOND FLOOR TELECOMMUNICATION PLAN SECTOR 4

C-406 ENLARGED PAVEMENT PLAN A-601 DOOR FRAME TYPES AND GLAZING OPENING TYPES M-113 SECOND FLOOR HVAC PLAN - SECTOR 2 E-151 SECOND FLOOR TELECOMMUNICATION PLAN SECTOR 5

C-501 SIDEWALK AND JOINT DETAILS A-650 INTERIOR FINISH SCHEDULE M-114 SECOND FLOOR PIPING PLAN - SECTOR 2 E-152 THIRD FLOOR TELECOMMUNICATION PLAN SECTOR 1

C-502 SIDEWALK AND JOINT DETAILS A-651 ENLARGED FLOOR PATTERN PLAN M-115 SECOND FLOOR MECHANICAL PLAN - SECTOR 3 E-153 THIRD FLOOR TELECOMMUNICATION PLAN SECTOR 3

C-503 PAVEMENT DETAILS A-652 ENLARGED FLOOR PATTERN PLAN M-116 SECOND FLOOR MECHANICAL PLAN - SECTOR 4 E-154 MECH / ELEC THIRD FLOOR TELECOMMUNICATION PLAN

C-504 PAVEMENT DETAILS A-653 ENLARGED FLOOR PATTERN PLAN M-117 SECOND FLOOR MECHANICAL PLAN - SECTOR 5 E-155 FIRST FLOOR FIRE ALARM PLAN SECTOR 1

C-505 JOINT DETAILS A-654 ENLARGED FLOOR PATTERN PLAN M-118 THIRD FLOOR MECHANICAL PLAN - SECTOR 1 E-156 FIRST FLOOR FIRE ALARM PLAN SECTOR 2

C-506 STORM INLET DETAILS A-655 ENLARGED FLOOR PATTERN PLAN M-119 THIRD FLOOR MECHANICAL PLAN - SECTOR 3 E-157 FIRST FLOOR FIRE ALARM PLAN SECTOR 3

C-507 STORM MANHOLE DETAILS A-656 ENLARGED FLOOR PATTERN PLAN M-120 THIRD FLOOR HVAC PLAN - PARTIAL SECTORS 4 & 5 E-158 FIRST FLOOR FIRE ALARM PLAN SECTOR 4

C-508 STORM HEADWALL DETAILS A-657 ENLARGED FLOOR PATTERN PLAN M-301 MECHANICAL MEZZANINE SECTION E-159 FIRST FLOOR FIRE ALARM PLAN SECTOR 5

C-509 SANITARY SEWER DETAILS A-658 ENLARGED FLOOR PATTERN PLAN M-401 MECHANICAL ROOM 176 PART PLAN E-160 SECOND FLOOR FIRE ALARM PLAN SECTOR 1

C-510 WATER LINE DETAILS A-659 ENLARGED FLOOR PATTERN PLAN M-402 MECHANICAL MEZZANINE 344 HVAC PART PLAN E-161 SECOND FLOOR FIRE ALARM PLAN SECTOR 2

C-511 WATER LINE DETAILS A-700 INTERIOR ELEVATIONS M-403 MECHANICAL MEZZANINE 344 PIPING PART PLAN E-162 SECOND FLOOR FIRE ALARM PLAN SECTOR 3

C-512 GREASE INTERCEPTOR DETAILS A-701 INTERIOR ELEVATIONS M-404 MECHANICAL PARTIAL PLANS E-163 SECOND FLOOR FIRE ALARM PLAN SECTOR 4

C-513 GASLINE DETAILS A-702 INTERIOR ELEVATIONS M-405 OFFICER/E7 BILLET MECHANICAL PARTIAL PLANS E-164 SECOND FLOOR FIRE ALARM PLAN SECTOR 5

C-514 FENCE DETAILS A-703 INTERIOR ELEVATIONS M-501 MECHANICAL DETAILS E-165 THIRD FLOOR FIRE ALARM PLAN SECTOR 1

C-515 FENCE AND GUARDRAIL DETAILS A-704 INTERIOR ELEVATIONS M-502 MECHANICAL DETAILS E-166 THIRD FLOOR FIRE ALARM PLAN SECTOR 3

C-516 DUMPSTER ENCLOSURE DETAILS A-705 INTERIOR ELEVATIONS M-503 MECHANICAL DETAILS E-167 MECH / ELEC & MULTI-PURPOSE THIRD FLOOR FIRE ALARM PLAN

C-517 MARKING DETAILS A-706 INTERIOR ELEVATIONS M-601 MECHANICAL SCHEDULES E-168 LIGHTNING PROTECTION PLAN

C-518 SIGN DETAILS A-751 PLATFORM PLAN, ELEVATIONS AND DETAILS M-602 MECHANICAL SCHEDULES E-169 FIRST FLOOR SECURITY PLAN SECTOR 1

C-519 MISCELLANEOUS DETAILS A-800 RECEPTION DESK ENLARGED PLAN AND ELEVATIONS M-603 MECHANICAL SCHEDULES E-170 FIRST FLOOR SECURITY PLAN SECTOR 2

C-520 MISCELLANEOUS DETAILS A-801 RECEPTION DESK ENLARGED PLAN AND ELEVATIONS M-604 MECHANICAL SCHEDULES E-171 FIRST FLOOR SECURITY PLAN SECTOR 3

A-802 RECEPTION DESK DETAILS M-605 MECHANICAL SCHEDULES E-172 FIRST FLOOR SECURITY PLAN SECTOR 4

A-803 RECEPTION DESK ENLARGED PLAN AND ELEVATIONS M-606 MECHANICAL SCHEDULES E-173 FIRST FLOOR SECURITY PLAN SECTOR 5

A-804 DISPLAY CASE DETAILS M-607 MECHANICAL FLOW SCHEMATIC E-174 SECOND FLOOR SECURITY PLAN SECTOR 1

LANDSCAPE A-805 DISPLAY CASE DETAILS M-608 MECHANICAL FLOW SCHEMATIC E-175 SECOND FLOOR SECURITY PLAN SECTOR 2

L-100 LANDSCAPE PLAN A-806 DISPLAY CASE DETAILS M-609 MECHANICAL FLOW SCHEMATIC E-176 SECOND FLOOR SECURITY PLAN SECTOR 3

L-500 PLANTING / HARDSCAPE DETAILS A-850 SIGNAGE DETAILS AND SIGNAGE GENERAL NOTES M-701 MECHANICAL CONTROLS LEGEND E-177 SECOND FLOOR SECURITY PLAN SECTOR 4

A-900 FIRST FLOOR FURNITURE PLAN M-702 MECHANICAL CONTROLS SCHEMATICS E-401 FIRST FLOOR POWER KITCHEN EQUIPMENT PLAN SECTOR 4

A-901 SECOND FLOOR FURNITURE PLAN M-703 MECHANICAL CONTROLS SCHEMATICS E-402 FIRST FLOOR ENLARGED TELECOMMUNICATION PLANS

A-902 THIRD FLOOR FURNITURE PLAN M-704 MECHANICAL CONTROLS SCHEMATICS E-403 SECOND FLOOR ENLARGED TELECOMMUNICATION PLANS

ARCHITECTURE A-950 ENLARGED KITCHEN PLAN AND KITCHEN EQUIPMENT SCHEDULE E-404 MECHANICAL ROOM 176 PART PLAN-ELECTRICAL

A-100 OVERALL FIRST FLOOR PLAN A-951 KITCHEN EQUIPMENT LOAD SCHEDULE E-405 FIRST FLOOR ENLARGED ELECTRICAL ROOM PLANS

A-101 OVERALL SECOND FLOOR PLAN A-952 KITCHEN ELECTRICAL ROUGH-IN PLAN PLUMBING E-406 SECOND AND THIRD FLOOR ENLARGED ELECTRICAL ROOM PLANS

A-102 OVERALL THIRD FLOOR PLAN A-953 KITCHEN PLUMBING ROUGH-IN PLAN P-001 PLUMBING LEGEND, ABBREVIATIONS, AND GENERAL NOTES E-501 DETAILS

A-103 OVERALL ROOF PLAN A-954 KITCHEN BUILDING CONDITION PLAN P-101 OVERALL FIRST FLOOR PLUMBING PLAN-SANITARY E-502 LIGHTNING FIXTURE DETAILS

A-110 ENLARGED FIRST FLOOR PLAN A-955 KITCHEN FABRICATION DETAILS P-102 OVERALL FIRST FLOOR PLUMBING PLAN - DOMESTIC E-503 LIGHTNING FIXTURE DETAILS

A-111 ENLARGED FIRST FLOOR PLAN A-955-1 KITCHEN FABRICATION DETAILS P-103 OVERALL SECOND FLOOR PLUMBING PLAN E-504 LIGHTNING FIXTURE DETAILS

A-112 ENLARGED FIRST FLOOR PLAN A-955-2 KITCHEN FABRICATION DETAILS P-104 OVERALL THIRD FLOOR PLUMBING PLAN E-505 LIGHTNING FIXTURE DETAILS

A-113 ENLARGED FIRST FLOOR PLAN A-955-3 KITCHEN FABRICATION DETAILS P-401 TOILET PLUMBING PART PLANS E-506 DETAILS

A-114 ENLARGED FIRST FLOOR PLAN A-956 KITCHEN HOOD FOR MAIN COOK-LINE & FIRE SUPPRESSION SYSTEM PLAN P-402 GANG SHOWER PLUMBING PART PLANS - SANITARY E-507 LIGHTNING PROTECTION DETAILS

A-115 ENLARGED FIRST FLOOR PLAN A-957 KITCHEN HOOD FOR MAIN COOK-LINE & FIRE SUPPRESSION SYSTEM PLAN P-403 GANG SHOWER PLUMBING PART PLANS - DOMESTIC E-508 SECURITY SYSTEM DETAILS

A-116 ENLARGED SECOND FLOOR PLAN A-958 KITCHEN HOOD FOR GRIDDLE AND FIRE SUPPRESSION SYSTEM PLAN P-404 E5 BILLET PLUMBING PART PLANS - FIRST FLOOR E-601 ONE LINE DIAGRAM

A-117 ENLARGED SECOND FLOOR PLAN A-959 KITCHEN HOOD FOR GRIDDLE AND FIRE SUPPRESSION SYSTEM PLAN P-405 E5 BILLET PLUMBING PART PLANS - SECOND FLOOR E-602 RISER DIAGRAM CABLE TELEVISION

A-118 ENLARGED SECOND FLOOR PLAN A-960 KITCHEN HOODS VARIABLE VOLUME FAN CONTROL PLAN P-406 E5 BILLET PLUMBING PART PLANS - THIRD FLOOR E-603 FIRE ALARM & MASS NOTIFICATION RISER DIAGRAM

A-119 ENLARGED SECOND FLOOR PLAN A-961 KITCHEN HOODS VARIABLE VOLUME FAN CONTROL PLAN P-407 LAUNDRY PLUMBING PART PLANS E-604 FIRE ALARM SYSTEM MATRIX

A-120 ENLARGED SECOND FLOOR PLAN A-962 KITCHEN HOODS EXHAUST AND SUPPLY FANS P-408 E5 EAST BILLET MEDICAL AID PLUMBING PART PLANS - FIRST FLOOR E-605 CONTROL PANEL RISER DIAGRAMS,SCHEDULES & LIGHTING FIXTURE SCHEDULE

A-121 ENLARGED THIRD FLOOR PLAN A-963 KITCHEN HOODS EXHAUST AND SUPPLY FANS P-409 E5 EAST BILLET PLUMBING PART PLANS - SECOND FLOOR E-606 PANELBOARD SCHEDULES

A-122 ENLARGED THIRD FLOOR PLAN P-410 E5 EAST BILLET PLUMBING PART PLANS - THIRD FLOOR E-607 PANELBOARD SCHEDULES

A-123 ENLARGED THIRD FLOOR PLAN P-411 E7 BILLET PLUMBING PART PLANS - FIRST FLOOR E-608 PANELBOARD SCHEDULES

A-124 ENLARGED E5, E7 AND OFFICER BILLET & LAUNDRY ROOM PLAN TYPICALS STRUCTURAL P-412 E7 BILLET PLUMBING PART PLANS - SECOND FLOOR E-609 PANELBOARD SCHEDULES

A-125 ENLARGED VAULT AREA PLAN AND MAILROOM PLAN S-001 GENERAL NOTES P-413 OFFICER/E7 BILLET PLUMBING PART PLANS - THIRD FLOOR E-610 PANELBOARD SCHEDULES

A-126 ENLARGED STAIR AND ELEVATOR PLANS S-002 GENERAL NOTES P-414 OFFICER/E7 BILLET PLUMBING PART PLANS - THIRD FLOOR E-611 PANELBOARD SCHEDULES

A-127 ENLARGED STAIR AND ELEVATOR SECTION S-003 BRACING LOCATION PLAN P-415 KITCHEN PLUMBING PART PLAN - SANITARY E-612 PANELBOARD SCHEDULES

A-128 ENLARGED STAIR PLANS S-004 WIND LOAD PRESSURES ROOF WIND LOAD DIAGRAM P-416 KITCHEN PLUMBING PART PLAN - DOMESTIC E-613 PANELBOARD SCHEDULES

A-129 ENLARGED STAIR SECTIONS AND STAIR PLAN S-100 OVERALL FOUNDATION PLAN FIRST FLOOR PLAN P-417 MECHANICAL ROOM 176 PLUMBING PART PLANS E-614 PANELBOARD SCHEDULES

A-130 ENLARGED STAIR PLANS AND SECTION S-101 OVERALL SECOND FLOOR FRAMING PLAN P-418 MECHANICAL MEZZANINE 344 PLUMBING PART PLAN E-615 PANELBOARD SCHEDULES

A-131 ENLARGED TOILET PLAN AND ACCESSORY SCHEDULE S-102 OVERALL MEZZANINE FLOOR FRAMING PLAN P-501 PLUMBING DETAILS E-616 PANELBOARD SCHEDULES

A-132 ENLARGED TOILET FLOOR PLANS S-103 OVERALL THIRD FLOOR FRAMING PLAN P-502 PLUMBING DETAILS E-617 PANELBOARD SCHEDULES

A-133 ENLARGED TOILET PLANS S-104 OVERALL HIGH ROOF FRAMING PLAN P-503 PLUMBING DETAILS E-618 PANELBOARD SCHEDULES

A-134 ENLARGED FIRST AND SECOND FLOOR MAIN LOBBY PLANS S-110 ENLARGED PARTIAL FOUNDATION PLAN P-601 BILLET E-5 SANITARY WASTE, VENT AND DOMESTIC WATER RISERS E-619 VOICE/DATA RISER DIAGRAM

A-135 ENLARGED KITCHED DIMENSION PLAN S-111 ENLARGED PARTIAL FOUNDATION PLAN P-602 1ST FL TOILET SANITARY WASTE, VENT & DOMESTIC WATER RISERS E-620 VOICE/DATA RISER DIAGRAM

A-200 EXTERIOR BUILDING ELEVATIONS S-112 ENLARGED PARTIAL FOUNDATION PLAN P-603 BILLET E-5 SANITARY WASTE, VENT & DOMESTIC WATER RISERS E-621 VOICE/DATA RISER DIAGRAM

A-201 EXTERIOR BUILDING ELEVATIONS S-113 ENLARGED PARTIAL FOUNDATION PLAN P-604 E-7/OFFICER BILLET SANITARY WASTE, VENT & DOMESTIC WATER RISERS E-622 VOICE/DATA RISER DIAGRAM

A-202 EXTERIOR BUILDING ELEVATIONS S-114 ENLARGED PARTIAL FOUNDATION PLAN P-605 TOILETS SANITARY WASTE, VENT AND DOMESTIC WATER RISERS E-623 VOICE/DATA RISER DIAGRAM

A-250 ENLARGED ELEVATION DETAILS S-115 ENLARGED PARTIAL FOUNDATION PLAN P-606 LAUNDRY SANITARY WASTE, VENT & DOMESTIC WATER RISERS E-624 SECURITY SYSTEMS DIAGRAMS

SHEET

NUMBER

SHEET DESCRIPTION

DRAWING INDEX

SHEET

NUMBER

SHEET DESCRIPTIONSHEET

NUMBER

SHEET DESCRIPTIONSHEET DESCRIPTION SHEET

NUMBER

PROJECT NAME AND ADDRESS: OWNER'S NAME AND ADDRESS:

Regional Training Institute Ohio Army National Guard (OHARNG) Columbus, Ohio

ESTIMATED CONSTRUCTION DATE:

APPLICABLE CODES: JURISDICTION:

Building: IBC 2006 City of Columbus, Ohio, Franklin County Fire & Life Safety NFPA 101 State Fire Marshal's Office Handicapped ADAAG, ANSI ANSI 117.1 - 2003 Edition Seismic IBC 2006 Other

ZONING ORDINANCE: MISCELLANEOUS ITEMS:

District: N.A. Waivers By Agencies:

Setbacks:Front: N.A. Sides: N. A. Back: N.A. Federal Govt. Exempt from local zoning Height Limitation: N.A.

Maximum No. of Floors: N.A.

Permitted Use: N.A.

Parking Requirements: Provided

300 POV parking spaces required, plus: American Disabilities Act (1991 Edit) 8 handicapped spaces 10 motorcycle spaces 7 large military vehicles

USE AND CONSTRUCTION:

Code: Section:

Occupancy:

Groups: A-2 & A-3 (Dining & Assembly) IBC 2006 303 Group: B (Training & Administration) IBC 2006 304 Group: R-2 (Residential - Dormitories) IBC 2006 310

Construction:

Type Type II-B, Unprotected 602.2 / T- 601 Protected or Unprotected Unprotected Maximum Height 55'-0" T-503 With / Without Sprinklers 55'-0"/55'-0" T-503 Maximum No. of Floors A-2: 2 T-503

A-3: 2 T-503 B: 4 T-503

R-2: 4 T-503 Allowable Area per Floor (Aa) A-2: 9,500 T-503

A-3: 9,500 T-503 B: 23,000 T-503

R-2: 16,000 T-503

Allowable Area Increases:

Percentage Increase See Area Analysis below

AREA ANALYSIS - Separated Occupancies: T-503, 506, 508.3.3.2

AREA OCCUPANCY TYPE FIRST FLOOR 2ND 3RD

A-3 AUDITORIUM 2,577 FLOOR FLOOR

MULTI-PURPOSE ROOM 5,232

SUBTOTAL A-3: 7,809

A-2 DINING 3,933

KITCHEN, ETC 1,472

SUBTOTAL A-2: 5,405

TOTAL A-3 & A-2: 13,214

R-2 DORMITORIES, EAST: 7,945 7,967 7,967

DORMITORIES, WEST: 7,945 7,967 7,967

OPEN BAY 6,183

SUBTOTAL R-2 / FL: 22,073 15,934 15,934

TOTAL R-2: 38007

B EDUCATION & ADMIN.: 21,282 24,439 2,621

TOTAL B: 45,721

TOTAL PER FLOOR: 56,569 40,373 18,555

TOTAL ALL FLOORS 18,555

Allowable Area (Aa) Increases: At = Allowable Tabular Area, If = Frontage area increase factor Is = 2 = area increase factor for sprinkler

FULLY SPRINKLERED BUILDING Aa = {At + (At x If) + Aa = Is} 100% OPEN PERIMETER > 60' At for A-2 & A-3: 9,500 Aa = 30,875 TYPE II-B CONSTRUCTION At for B: 23,000 Aa = 74,750

At for R-2: 16,000 Aa = 56,000

FOR MIXED USE, ALLOWABLE AREA / FLOOR =

A actual / A allow. + B actual / B allow. + R-2 actual / R-2 allow. = 1.10685 < 1 OK, BUT WILL STILL NEED SEPARATE BUILDINGS WITH FIRE WALLS TO ALLOW FOR EXPANSION

Occupancy Separation (Sprinklered):

R From B 1 Hours IBC 2006 T-508.3.3 A From B 1 Hours IBC 2006 T-508.3.3 R From A 1 Hours IBC 2006 T-508.3.3

Incidental Use Areas (Sprinklered):

1 Boiler Room 0 Hours T-508.2 2 Storage Room > 100 sf 0 Hours T-508.2 3 Laundry Room > 100 sf 0 Hours T-508.2

FIREPROOFING:

Sec:

Fire Walls Not Required T-705.4 NA - Refer to Interior Bearing Walls 0 Hours Non-Combustible T - 601 706.3.8 for separated Interior Nonbearing Walls 0 Hours Non-Combustible 704.1.2 705.2occupancy fire Columns 0 Hours Non-Combustible T - 601 barriers required Beams, Girders & Trusses 0 Hours Non-Combustible T - 601 Floor Construction 0 Hours Non-Combustible T - 601 Roof Construction 0 Hours Non-Combustible T - 601 Exterior Bearing Walls: 0 Hours Non-Combustible T - 601 (protected openings permitted)

0' to 5' 1 Hour No Openings T - 602 5' to 10' 1 Hour 10% of Wall T - 602 10' to 20' Non-Combustible 20% of Wall T - 602 20' to 30' Non-Combustible 40% of Wall T - 602 over 30' Non-Combustible No Limits T - 602

Exterior Nonbearing Walls:

(protected openings permitted)

0' to 5' 1 Hour No Openings T - 602 5' to 10' 1 Hour 10% of Wall T - 602 10' to 20' Non-Combustible 20% of Wall T - 602 20' to 30' Non-Combustible 40% of Wall T - 602 over 30' Non-Combustible No Limits T - 602

Corridors Non-Combustible T-1017.1 Smoke-proof/ NFPA Exit Stairs (3 stories or less) & vertical shafts 1 Hour 1020 IBC 2006 707.4

LIFE SAFETY:

Code: Section: Code: Section:

Sprinkler Requirements: Required IBC 2006 903

General 903 Special

Standpipe Required 905 NFPA 72 Fire Alarm Required 907 Emergency Lighting Required 1006 NFPA 101 Emergency Generator Required Fire Extinguishers: General 906

Special 904 Class of Finishes:

Exits Class "B" T-803.5 NFPA 101, Class A Exit Access Class "C" T-803.5 NFPA 101, Class B or C Other Spaces Class "C" T-803.5 NFPA 101, Class B o

Roof Covering Classification Class "C" T-1505.1 Fireblocking Required 717 Draftstopping - Attics Required 717.4

MEANS OF EGRESS:

Code: Section: Occupa Occupant Load: sq. ft. / person: IBC 2006 1004

1. Assembly w/o Fix Seating chairs only-Multi-Purpose 7 net T-1004.1.1

2. Assembly Seating - tables & chairs 15 net T-1004.1.1

3. Assembly with fixed seats -Auditorium 1 occup. / seat 1004.7

4. Classroom Areas 20 net T-1004.1.1

5. Offices - Administration 100 gross T-1004.1.1

6. Library Reading Room 50 net T-1004.1.1

7. Dormitories - Open Bay 50 gross T-1004.1.1

8. Accessory Storage, Mechanical Rooms 300 gross T-1004.1.1

9. Exercise Rooms 50 gross T-1004.1.1

10. Kitchens, commercial 200 gross T-1004.1.1 Exit Access Travel Distance: 1016 IBC 2006 Unsprinklered Groups A, R: 200' T-1016.1 NFPA101 10-2.6

Group B: 200' Sprinklered Groups A, R: 250' T-1016.1 NFPA101 10-2.6

Group B: 300' Maximum Dead End Corridor Groups A, R: 20' 1017.3 NFPA 10-2.6

Group B: 50' 1017.3 Egress width per person (Sprinkled): 1005 Stairs 0.2" T-1005.1 Other Egress Components 0.15" T-1005.1 333" Required - (10) 3 Egress width per person (Unsprinkled): 1005 Stairs 0.3" T-1005.1 Other Egress Components 0.2" T-1005.1 Minimum Corridor/Aisle Width 44" 1017.2 Minimum Clear Door Width 32" 1008 Minimum Requirements for one exit:

Min. No. of persons 49 Smoke Proof Enclosure not required 1020.1.7 Stair Construction:

Max. Rise per Flight 12'-0" 1009.6 Max. Riser 7" 1009.3 A4.9.2 Min. Tread 11" 1009.3 A4.9.2 Handrail Projection 4 1/2" 1012.7 Handrail / Guardrail Height 34"-38" 1012.3 Handrail Extensions Required - see Section 1012.5 1012.5 Minimum Stair Width 44" 1009 Min. Landing Width 44" 1009

HANDICAPPED:

Toilet Requirements: Seating Requirements:

Stall Dimensions : 60" x 60" Percentage of Total Seating : 5% Stall Door : 32" Minimum Number of Seats :

Clearance in front of stall : 42" Cafeteria 51-300 people: Min Number of 4 Turnaround : 60" w/in Toilet Room Parking:

Maximum Counter Height : 34" Percentage of Total Parking : 2% Min. Clearance under Counter : 27" Ramps:

Max. Difference in Elevation : 30" Max. Slope : 1:12 Handrails: Required : over 6"

Height : 34" to 38"

PLUMBING FIXTURES:

Fixture Count: Code: Section:

Number Fixtures Provided

Male Female IPC Male Female Occupancy: Mixed Use, Max. Total Building Occupancy = 350 Total: 350 Percentage 100% 100% Number 175 175 Fixtures:

Required: W.C. at 1 / 50, Lavs at 1 / 80 Water Closets 4 4 IPC Table 403.1 49 55 Urinals 2 N/A IPC Table 403.1 7 - Proportion of WC:U 50:50 N/A IPC Table 403.1 Lavatories 3 3 IPC Table 403.1 49 49 Showers Table 403.1 51 48 Drinking Fountains 3 1:100 Table 403.1 12

SPECIAL REQUIREMENTS:

Code: Section: Code: Section:

Alarms ADA A4.28

Acoustical:

Sound Transmission Coefficient (STC) Ratings:

G-000Cover.pdf
G-001.pdf
G-002.pdf
G-003.pdf
G-004.pdf
G-110.pdf
G-112.pdf
A-100.pdf
A-101.pdf
A-102.pdf
A-103.pdf
A-110.pdf
A-111.pdf
A-112.pdf
A-113.pdf
A-114.pdf
A-115.pdf
A-116.pdf
A-117.pdf
A-118.pdf
A-119.pdf
A-120.pdf

File details come from the government source that posted it. Updated .