Repost_Questions and Answers for GRL Fast-Scanning Mirror_1-16-25.docx
DOCX document 18 KB Posted
- Attached to
- GRL Fast-Scanning Mirror
- Solicitation number
- W9132V25S1207
About this file
This is a Questions and Answers document dated January 16, 2025, for solicitation W9132V25S1207 regarding a GRL Fast-Scanning Mirror procurement by the Army Corps of Engineers Engineer Research and Development Center.
The Q&A addresses four questions regarding travel requirements (none required), precision specifications (not applicable), motion profile and dynamic requirements (not applicable), and mechanical interface mounting. For the mounting question, it was clarified that a separate company will handle the integration into a pre-designed fast scanning mirror assembly, and the product should be delivered as a stand-alone unit. The agency indicated they can provide input on preferred mechanical mounting during contract execution if needed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 29 January 2025_Questions and Answers for GRL Fast-Scanning Mirror_.pdf | ||
| Questions and Answers for GRL Fast-Scanning Mirror_1-16-25.pdf | ||
| Revised DOR_Mirror_1-16-25.docx | DOCX document | |
| A02.12_DOR_Mirror.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
January 16, 2025
W9132V25S1207 – GRL Fast-Scanning Mirror Questions and Answers
1. How much travel is required?
Answer: None
2. What precision is needed?
Answer: Minimum Incremental Motion – Not Applicable Repeatability over full travel range – Not Applicable
3. What is the motion profile, and dynamic requirements?
Answer: Not Applicable
4. Can you also confirm that the Mechanical Interface for mounting will be provided after award?
Answer: The mounting will be done by a separate company as part of integrating into a pre-designed fast scanning mirror assembly. Thus, we expect the product to be provided stand-alone for delivery to them. If input is needed on what mechanical mounting is preferred, we can engage with the awardee during the contract execution.