B08.03 Clean Room Q&A 2.docx
DOCX document 15 KB Posted
- Attached to
- Clean Room Equipment
- Solicitation number
- W9132T20R0003
About this file
This document contains questions and answers regarding a federal contract opportunity for a clean room project. The U.S. Army Engineer Research and Development Center is seeking a contractor to provide materials, equipment, and installation services to create a modular cleanroom at its Construction Engineering Research Laboratory facility in Champaign, Illinois. The cleanroom must meet ISO 5 standards for particle counts and have HEPA filtration, temperature and humidity control, and specialized sealed lighting fixtures. Required equipment includes chemical storage cabinets, benches with hoods, and eyewash/safety systems. Interested offerors must attend an optional site visit and submit responses by March 16, 2020. The acquisition is set aside for small businesses.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ(R).pdf | ||
| B08.03 Clean Room Q&A.DOCX | DOCX document | |
| A02.12 Cleanroom layout v5.pptx | PPTX presentation | |
| RFQ.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions & Answers
Q: Can we use Al. wall panels with ESD compatible coating instead of Fiber Reinforced Plastic as described in tender?
A: No, Fiber Reinforced Plastic is a firm requirement
Q: Are there building drawings that can be provided? Specifically interested in 1) Plan View of area, 2) Cross View showing heights from building slab to overhead steel or obstructions above?
A: There is a layout document posted with the solicitation already. This is the only site related document that can be shared publically.
Q: Will you please share RFI Answers to questions that have been submitted on the project?
A: That information was posted in the prior Q&A
Q: Should we plan for the Cleanroom HVAC to be separate and stand-alone from the Building, or is there Chilled Water and Plant Steam to tie into?
A: No, the clean room will not be a stand-alone building. Yes, there is Chilled Water and a Plant Steam to tie into
Q: Classification Requirements (FS209E, EU, ISO, Other):
A: ISO 5
Q: Is the Shell or Host Building Existing or New Construction?
A: It is an existing building
Q: Is any Demolition Required, if so what and by whom?
A: No
Q: Describe the Shell or Host Building (Stories, Warehouse, etc.):
A: Warehouse in design
Q: What is the construction of the Shell or Host Building Walls?
A: Concrete block
Q: What is the construction of the Shell or Host Building Floors?
A: Concrete
Q: What is the location of the Cleanroom Area within the Shell or Host Building?
A: Centrally Located
Q: Are any of the Cleanroom Walls adjacent to exterior building walls-exposed to outdoors (if so provide sketch)?
A: No
Q: Can the Cleanroom Ceiling be supported from the existing Building Steelwork?
A: No
Q: Is the Cleanroom Project located in a Seismic Zone (if so please indicate)?
A: No
Q: Do any of the existing Building Columns interfere with the cleanroom layout (if so please provide sketch)?
A: No
Q: Does an Equipment Mezzanine exist (if not, is one required)?
A: No
Q: Is a new Independent Self Supported Steel Structure required for the cleanroom (if so, by whom)?
A: No
Q: What is the intended design location of the Cleanroom HVAC Equipment?
A: HVAC unit exterior to the building. Chilled water is available and preferred
Q: What is the Source and year-round Conditions of the Make-Up Air (MUA) (Outside or Inside)?
A: MUA will be supplied from inside air maintained at 68 F and ~50% humidity.
Q: What is the year-round Ambient Temperature and Humidity Conditions adjacent to and above the cleanroom?
A: 68 F and ~50% humidity; this is the requirement for the interior of the clean room
Q: Are any of the cleanroom areas classified as Bio-Hazardous (if so, please describe)?
A: No
Q: What is the HVAC Cooling Method (Chilled Water, Water Cooled DX, Air Cooled DX)?
A: Chilled Water is available
Q: Will the Cleanroom HVAC Controls be connected to a building management system (BMS) (if so, describe and by whom)?
A: The clean room must have its own HVAC.
Q: Will the Cleanroom Area require a Sprinkler System?
A: No
Q: Does a Sprinkler Main exist (if not, then it will be provided by whom)?
A: Yes – one is located above where the cleanroom will be installed
Q: Will the area above the Cleanroom Ceiling require sprinklers?
A: Currently sprinklers are already available.
Q: Will Smoke and Fire Alarms be required (if so, by whom)?
A: Yes
Q: What is the required Cleanroom HEPA/ULPA Filter ratings?
A: Filter system that can maintain ISO 5
Q: Describe the required Cleanroom Lights (Tear Drop, Flow-Thru Troffers, Lay-In, Top-Access, etc.):
A: Cleanroom lighting must consist of sealed fixtures, with the standard 70 foot candles of illumination. These specialized fixtures are designed for wash-down procedures and to prevent the exfiltration of air. The lighting in the photolithography room must be yellow-tinted to prevent unwanted exposure of photoresist to light of shorter wavelengths.
Q: What Light Ballasts are required?
A: Please see above answer
Q: Are any special type of light fixture required?
A: Please see above answer
Q: Is other than 1P-120V required for the Cleanroom Lighting?
A: No Q: Is other than 60HZ require?
A: No
Q: If not white light, describe the color and wave length:
A: Yellow-tinted light to prevent unwanted exposure of photoresist.
Q: Are colored lamps or lamp shields preferred?
A: Yes
Q: Light levels will be measured at 30" AFF unless otherwise specified.
A: 70 foot candles of illumination
Q: Are any 3P Outlets required in the cleanroom (if so, by whom)?
A: Need one 208 V receptacle
Q: What type of Door Interlocks will be used for the Cleanroom Doors (Traffic Lights, Magnetics, Shoot Bolts), please provide Interlocking sequence?
A: Cleanroom doors must have good performance at outside face, flat, high structural strength, corrosion resistance, no dust, easy to clean.
Q: What type of Cleanroom Telephones and/or Intercoms are required (provide type, location and quantity)?
A: Government-issued phone will be installed and used.
Q: What is the Type and Quantity of Process Exhaust (Acid, Solvent, General)?
A: Acid/Base, Solvents (acetone, methanol, photoresist, isopropanol)
Q: What chemicals and/or gasses are used within the cleanroom (Type, Concentration, Amount, Container)?
A: Developers from the bottles for SU-8 and AZ photoresist, SUMA from the bottle cleaning solution, solvents, Nitrogen, Argon, and Oxygen.
Q: Please indicate the required level of Certification:
A: ISO 5
Q: Particle Counts:
A: >100,000 particles (0.1um) per sq meter
Q: HEPA Filter Integrity Test:
A: Yes
Q: Temperature:
A: 68 F +- 2 F
Q: Humidity:
A: 50% +- 10% relative humidity
Q: Light:
A: Cleanroom lighting must consist of sealed fixtures, with the standard 70 foot candles of illumination. These specialized fixtures are designed for wash-down procedures and to prevent the exfiltration of air. The lighting in the photolithography room must be yellow-tinted to prevent unwanted exposure of photoresist to light of shorter wavelengths.
Q: Is Third Party Testing Required (if so by whom and for which tests)?
A: No
Q: Who is providing and Validation Services (what services and by whom)?
A: Vendor
Q: Are the Cleanroom Installers to be Union members?
A: Davis Bacon Act terms and conditions are not included in this award as it is not considered construction
Q: Are there any Bonding requirements?
A: Davis Bacon Act terms and conditions are not included in this award as it is not considered construction
Q: Are any Permits or Fees required (if so, by whom)?
A: See prior Q&A regarding permitting questions
Q: Is any Ancillary Cleanroom Equipment to be included (if so, what and by whom)?
A: Solvent bench hood with bench, Acid/base bench with hood, stainless steel benches, one stainless steel bench with wheels, eye wash/safety shower systems, corrosive chemical storage cabinet, storage cabinet, storage shelving.
Q: Is there an Architect Firm already involved with this cleanroom project (if so, who is the contact)?
A: No
Q: Is there an Engineering Firm already involved with this cleanroom project (if so, who is the contact)?
A: No
Q: Is there a Cleanroom Consulting Firm already involved with this cleanroom project (if so, who is the contact)?
A: No
Q: Is there a Validation Consulting Firm already involved with this cleanroom project (if so, who is the contact)?
A: No
Q: Is there a General Contracting Firm already involved with this cleanroom project (if so, who is the contact)?
A: No
Q: Is there a Mechanical Contracting Firm already involved with this cleanroom project (if so, who is the contact)?
A: No
Q: Is there an Electrical Contracting Firm already involved with this cleanroom project (if so, who is the contact)?
A: No
Q: Is there a High Purity Process Contracting Firm already involved with this cleanroom project (if so, who is the contact)?
A: No