This is Amendment 0003 to Solicitation W912WJ27QA006, issued by the W2SD ENDIST New England KO Contracting Division on 10 November 2026. The amendment provides industry questions and responses (Questions/Responses #24-#35) clarifying requirements for a snow removal and plowing contract at the East Brimfield Lake project in Massachusetts. The solicitation closing date remains 16 November 2026 at 2:00 PM Eastern, with all other terms and conditions unchanged.
Key clarifications include: salting, sanding, and ice treatment are not required under this contract; a single storm event is defined by local forecast duration with no minimum hours specified between events; estimated quantities (8/5/3/1 on the bid schedule) are estimates only with payment for actual services performed and no minimum guarantee; response time is four hours after the 2-inch accumulation threshold or TPOC notification; the Grand Trunk Trail Parking Lot has no 7:00 AM opening requirement but uses the same 2-inch threshold; off-site snow hauling is not required, only on-site pushing and broadcasting; no anticipated award date will be provided and no work commences until all submittals are approved; attendance at the pre-work conference is mandatory in person; no historical data on previous years' event billing will be provided; and Wage Determination 2015-4103 applies to Southbridge while Wage Determination 2015-4101 applies to Sturbridge. The Contracting Officer is Jennifer Samela, reachable at jennifer.m.samela@usace.army.mil or 978-318-8324.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment W912WJ27QA006-0002.pdf | ||
| Amendment W912WJ27QA006-0001.pdf | ||
| Solicitation Survey 27QA006.pdf | ||
| Attachments 27QA006.pdf | ||
| Solicitation W912WJ27QA006.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Solicitation/Contract Form
The following changes have been made:
Miscellaneous text in this section has been added to:
REQUEST FOR INFORMATION:
Question 24: Salting/Sanding: The PSC is S218 (Snow Removal/Salt), but the PWS only describes plowing and shoveling. Is salting, sanding, or ice treatment of roads, lots, walkways, or stairs required? If so, is material furnished by the Contractor and included in the per-event price?
Response 24: The Product Service Code (PSC) is a category of work, it does not dictate the work required in a solicitation. Salting, sanding, or ice treatment is not included in this requirement.
Question 25: Event Definition: How does the Government define a single storm event when snowfall stops and restarts over multiple days? Is there a minimum number of hours without snowfall that separates one event from the next?
Response 25: A single storm event is based on the local forecast for storm duration. No minimum hours without snowfall will be specified.
Question 26: TPOC Call-outs Below 2 Inches: PWS B.6.a.i states service is required at 2 inches of accumulation or upon notification by the TPOC during normal business hours. If the TPOC requests service for an accumulation of less than 2 inches, or for an ice/freezing rain event, will that call-out be paid at the Task 1 unit price?
Response 26: Yes, as the storm total is at or below 6 inches, the work will be paid at the unit price for Task 1.
W912WJ27QA0060003
Question 27: Estimated Quantities: Are the quantities on the Bid Schedule (8/5/3/1) estimates only, with payment made solely for actual events performed? Is there a guaranteed minimum number of events?
Response 27: The quantities are estimates only and shall not be exceeded. Payment is only made for services actually performed. There is no minimum guarantee of events.
Question 28: Response Time: Other than the 7:00 AM daily access requirement, is there a required response time after the 2-inch threshold is reached or after TPOC notification during a storm?
Response 28: Response time shall be four (4) hours.
Question 29: Grand Trunk Trail Parking Lot: Does the 7:00 AM accessibility requirement also apply to the Grand Trunk Trail Parking Lot, and is it serviced at the same 2-inch threshold?
Response 29: The Grand Trunk Trail Parking Lot shall be plowed as soon as possible, however, there is no requirement to have the parking lot opened by 7:00 am. This location shall be serviced at the same 2-inch threshold or upon notification from the Technical Point of Contact for less than 2-inch accumulation.
Question 30: Snowfall Measurement: Will the Government provide the Contractor with the official storm total measured at the East Brimfield Lake project office after each event, for invoicing purposes?
Response 30: The Contractor may contact the Technical Point of Contact to confirm official storm totals for invoicing purposes if required.
Question 31: Snow Hauling: Is any off-site hauling or relocation of snow required, or will on-site pushing and broadcasting satisfy all requirements for every tier?
Response 31: Off-site hauling or relocation of snow is not required, only on-site pushing and broadcasting of snow.
Question 32: Anticipated Award Date: What is the anticipated award date? If storms occur before pre-work submittals are accepted, how will those events be handled?
Response 32: An anticipated award date will not be provided. No work shall be performed by the awarded Contractor prior to the acceptance and approval of all submittals. The Government has other means of accomplishing work if the Contractor has not been approved to commence field work.
Question 33: Per Responses 1 and 12, may the subcontractor's foreman serve as PM/QC/SSHO under a written delegation of authority from the prime, and may the prime attend the pre-work conference by phone if those personnel attend on site?
Response 33: As required by the Performance Work Statement, attendance at the pre-work conference shall be in person only.
Question 34: Approximately how many storm events, by task, were billed in each of the 2023-24, 2024-25 and 2025-26 seasons?
Response 34: As stated in the solicitation, no additional information on previous awards will be provided, this includes the number of services, by task, billed for previous years.
Question 35: The base solicitation references Wage Determination 2015-4103, and Amendment 0002 references Wage Determination 2015-4101. Could you confirm which wage determination applies to this contract?
Response 35: Wage Determination 2015-4103 applies to the work performed in the town of Southbridge, wage determination 2015-4101 applies to the work performed int he town of Sturbridge.
| IDCode: J |
| Page: 1 |
| Pages: 4 |
| AmendNo: 0003 |
| EffDate: 10 NOV 2026 |
| ReqNo: |
| ProjNo: |
| IssCode: W912WJ |
| AdmCode: |
| IssuedBy: W2SD ENDIST NEW ENGLAND |
KO CONTRACTING DIVISION, 696 VIRGINIA ROAD
CONCORD, MA 01742-2751
UNITED STATES
JENNIFER SAMELA, EMAIL: JENNIFER.M.SAMELA@USACE.ARMY.MIL TELEPHONE: 978-318-8324
AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: W912WJ27QA006 |
| SolDate: 29 OCT 2026 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: Off |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: Amendment is necessary to provide responses to questions from industry. Questions/responses #24-#35 are applicable to this amendment. |
Closing remains November 16, 2026 at 2:00 PM Eastern.
All other terms and conditions remain unchanged.