Amendment W912WJ27QA006-0002.pdf
PDF 4 MB Posted
- Solicitation number
- W912WJ27QA006
About this file
This is Amendment 0002 to Solicitation W912WJ27QA006 for snow plowing and shoveling services at Westville Lake, a U.S. Army Corps of Engineers project in Southbridge, Massachusetts, issued by the W2SD ENDIST New England KO Contracting Division on November 9, 2026. The amendment provides responses to 23 industry questions and clarifications regarding the Performance Work Statement, personnel requirements, subcontracting arrangements, payment procedures, insurance, cybersecurity requirements, and wage determinations.
The solicitation is a total small business set-aside and remains open until November 16, 2026, at 2:00 PM Eastern. Key service requirements include snow plowing and shoveling at multiple locations (Westville Dam/Storage Building/Marjorie Lane totaling 61,000 square feet, and Grand Trunk Trail Parking Lot totaling 10,315 square feet) with services triggered by two inches or more of snow accumulation. Pricing is tiered by snowfall totals: less than to 6 inches, over 6 to 12 inches, over 12 to 24 inches, and greater than 24 inches. The contract period runs from award through April 30, 2027, with monthly invoicing and net 30 payment terms per FAR 52.212-4. The amendment clarifies that vendors may submit as prime contractors with qualified local snow removal subcontractors; personnel designated as Project Manager, Quality Control person, and Level 3 Site Safety and Health Officer must meet qualification requirements and have authority to act on behalf of the contractor. Critical amendments include removal of DFARS cybersecurity clauses 252.204-7012 and 252.240-7997 (no CMMC or cybersecurity assessments required), addition of Wage Determination No. 2015-4101 Revision 35 dated August 13, 2026, for Sturbridge work, and clarification that the 6-inch storm category encompasses up to and including 6 inches. No bonding, insurance, or WAWF payment provisions are required.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment W912WJ27QA006-0003.pdf | ||
| Amendment W912WJ27QA006-0001.pdf | ||
| Solicitation Survey 27QA006.pdf | ||
| Attachments 27QA006.pdf | ||
| Solicitation W912WJ27QA006.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Amendment is necessary to provide Block 14 (Description of Amendment/Modification):
responses to questions from industry. Questions/responses #18-#23 are applicable to this amendment. The Performance Work Statement will be revised.
Amendment will also add Wage Determination No.: 2015-4101 Revision 35, Dated 08/13/2026 to Section H and remove DFARS Clauses 252.204-7012 and 252.240-7997.
Closing remains November 16, 2026 at 2:00 PM Eastern.
All other terms and conditions remain unchanged.
Solicitation/Contract Form
The following changes have been made:
Miscellaneous text in this section has been added to:
REQUEST FOR INFORMATION:
Question 1: Key personnel at the Pre-Work Conference. We will perform with a local snow removal subcontractor under a teaming arrangement. May the Project Manager and Quality Control person who attend the Pre-Work Conference in person be employees of our subcontractor, provided they are named in our quote and the teaming arrangement?
Response 1: Personnel designated as the Project Manager and Quality Control person shall meet the qualification requirements of these positions and have the authority to act on behalf of the Contractor.
Question 2: Site visit. We understand site visits are arranged through the technical point of contact, Keith Beecher. Is there a date by which a visit must be completed?
Response 2: No.
Question 3: Is a vendor permitted to submit a proposal as the prime contractor while partnering with an established local snow-removal company as its subcontractor for the actual snow-removal operations?
Response 3: Yes.
W912WJ27QA0060002
Question 4: Would the subcontractor be permitted to provide the necessary snow-removal equipment, trucks, operators, labor, materials, salting, and storm-response services?
Response 4: Yes.
Question 5: Would the prime be permitted to retain responsibility for contract administration, government communications, scheduling, quality assurance, reporting, invoicing, and overall contract management?
Response 5: The prime contractor is required to retain responsibility for contract administration, government communications, scheduling, quality assurance, reporting, invoicing, and overall contract management. The Government's contractual relationship is with the awarded Contractor, not with the awarded Contractor's subcontractor.
Question 6: Are there any limitations under the current solicitation concerning the percentage of work that may be subcontracted, particularly under the applicable Small Business Set-Aside requirements and FAR 52.219-14?
Response 6: Clause 52.219-14 is not included in the solicitation, therefore, it is not applicable.
Question 7: Does the current solicitation contain any specific provisions or restrictions regarding this type of teaming or subcontracting arrangement?
Response 7: The vendor submitting a quote is responsible for reviewing the solicitation to determine if any provisions or restrictions are included.
Question 8: Please clarify the applicable workshare requirements and whether the proposed performer may provide the required on-site safety personnel and experience references.
Response 8: The solicitation does not include any workshare requirements. The "proposed performer" or subcontractor may provide the required on-site safety personnel if they meet the requirements and have the authority to act on behalf of the awarded Contractor only. Experience references shall be of the vendor submitting the quote unless otherwise indicated on the Solicitation Survey.
Question 9: Please also confirm any bid, performance or payment bonds, CMMC status or cybersecurity assessments required of the prime or subcontractor, and whether the proposed performer may attend a site visit on the prime's behalf.
Response 9: No bonding provisions or clauses are included in the solicitation. No CMMC status or . cybersecurity assessment provisions or clauses are included in the solicitation DFARS 252.204-
7012 and 252.240-7997 have been removed. No CMMC or cybersecurity assessments are A subcontractor may attend a site visit.applicable.
Question 10: The notice and FAR 52.219-6 describe a total small-business set-aside, but the solicitation's cover text also refers to WOSB. Is this open to all qualifying small businesses?
Response 10: Block 10 of the solicitation indicates that the requirement is set aside for small business. Women-Owned Small Business is not checked in block 10, therefore, this is not a WOSB set aside.
Question 11: Is the arranged site visit recommended or mandatory for quote eligibility? We understand the solicitation survey must be returned with the quote.
Response 11: A site visit is not mandatory, however, interested vendors should review the Performance Work Statement, A. General, 3. Site Visit.
Question 12: The PWS requires a Level 3 SSHO and requires the prime's project manager and quality-control personnel to attend the pre-work conference on site. May qualified personnel supplied through a locally based subcontractor serve in those positions under the prime's direct oversight, or must these be prime employees?
Response 12: Refer to the response to question 1. The response is applicable to a SSHO as well as the project manager and quality control personnel.
Question 13: Is any bid bond or offer guarantee required with the quotation?
Response 13: Reference response to question 9.
Question 14: Can a prime contractor propose a qualified local snow removal subcontractor to perform the on-site services, provided all applicable subcontracting requirements are met?
Response 14: Refer to the responses above.
Question 15: May the subcontractor's relevant experience, personnel, and equipment capabilities be included in our technical submission, clearly identified as belonging to the subcontractor, while separately reporting the prime's own experience as required by the solicitation survey?
Response 15: Yes.
Question 16: The SAM.gov notice identifies this as a total small-business set-aside, while part of the solicitation appears to reference WOSB. Could you confirm the applicable set-aside designation?
Response 16: Refer to the response to question 10.
Question 17: Are there any additional requirements for subcontractor personnel regarding safety certifications, site access, or government facility experience that we should consider?
Response 17: Personnel performing work shall meet the requirements as stated in the Performance Work Statement.
Question 18: Payment timing: Is payment due within 30 days after receipt of a proper invoice and acceptance of services? Please identify the applicable payment clause and any conditions affecting the due date.
Response 18: Invoices shall be submitted monthly for services completed. Payment is net 30 from receipt of a proper invoice. Refer to clause 52.212-4.
Question 19: Invoice submission: The PWS describes monthly invoices mailed to the project office, while the solicitation also includes WAWF payment instructions. Must invoices be submitted through WAWF, mailed to the project office, or submitted through both methods? Please confirm the required WAWF document type, if applicable.
Response 19: WAWF is not applicable, as is indicated by the NOT APPLICABLE text entries in 252.232-7006
Question 20: Insurance: What insurance coverage types, minimum limits, and documentation are required for this contract? Please identify when proof must be provided and any requirements applicable to subcontractors.
Response 20: There are no insurance coverages required. Information would need to be identified in the solicitation if applicable.
Question 21: Snowfall pricing tiers: Please confirm which pricing tier applies to storms totaling exactly 6, 12, or 24 inches, as the PWS descriptions appear to overlap at certain boundaries.
Response 21: The Bid Schedule and Performance Work Statement contain clear information for storm totals, other than for a 6 inch storm. The Performance Work Statement will be revised to clarify the 6 inch storm category only. All other categories are clearly stated.
Question 22: Amendment 0001, response 9, says no cybersecurity assessment provisions or clauses are included, but the original solicitation lists DFARS 252.240-7997 on page 25 and 252.204-7012 on page 24. Please confirm which requirements apply and whether the prime or proposed snow-removal subcontractor needs an assessment before award.
Response 22: Refer to the revised response for Question 9.
Question 23: PWS B.7 places the Grand Trunk Trail lot in Sturbridge, but the linked wage determination 2015-4103, revision 36, lists Southbridge and does not list Sturbridge. Which wage determination applies to the Sturbridge work?
Response 23: WD 2015-4101, revision 35, dated 8/13/2026 has been added to section H and is applicable to Sturbridge.
Description/Specifications/Statement of Work
Miscellaneous text in this section has been added to:
SNOW PLOWING & SHOVELING SERVICES
U.S. ARMY CORPS OF ENGINEERS
WESTVILLE LAKE
SOUTHBRIDGE, MASSACHUSETTS
PERFORMANCE WORK STATEMENT
REVISED
A. GENERAL
1. Scope
Provide all equipment, materials, labor, and transportation necessary to perform snow plowing and shoveling services at the Westville Lake project areas.
*Note: This work requires the following submittals prior to the commencement of work (Refer to Section B.2. Submittals for a full list of submittals):
ENG Form 6293 (Accident Prevention Plan Worksheet)
ENG Form 6206 (Activity Hazard Analysis)
ENG Form 6282 (Site Safety and Health Officer Designation Letter)
First Aid and CPR Certificates
2. Locations
Westville Dam is located at 200 Marjorie Lane, in Southbridge, Massachusetts.
3. Site Visit
Contact the Technical Point of Contact (TPOC), Keith Beecher at 978-318-8405 or keith.w.
beecher@usace.army.mil to arrange a site visit.
Interested vendors should conduct a site visit to confirm understanding of the scope, inspect existing conditions, and familiarize themselves with the site(s) prior to submitting a quote. No extra payment will be allowed for perceived additional work caused by unfamiliarity with site conditions and requirements.
4. Schedule
The contract period of performance shall be from contract award to 30 April 2027.
All pre-work submittals shall be submitted within fourteen (14) days of contract award. The Government reserves up to seven (7) days for review and acceptance on each submittal /resubmittal from the date of receipt. If revisions are necessary to the submittals, the Contractor shall make such revisions and shall be resubmitted to the Government in an acceptable form within seven (7) days of the response, unless additional time is granted by the Government in writing.
No field work may proceed prior to the acceptance of pre-work submittals.
5. Safety Requirements
a. General:
All work shall be conducted in accordance with the USACE Safety and Occupational Health Requirements (EM 385-1-1, most recent edition), and all applicable Occupational Safety and Health Administration (OSHA), federal, state, and local safety and health requirements. A copy of EM 385-1-1 can be accessed electronically at the following link:
https://www.publications.usace.army.mil/Portals/76/EM%20385-1-1%20_EFFECTIVE% 2015March2024.pdf
Project staff reserve the right to cease work at any time should the safety of employees, Contractors, and/or the public become jeopardized.
b. Accident Prevention Plan (APP):
The Contractor shall prepare a site-specific Accident Prevention Plan. The APP must be written by a Competent Person (CP) and document the specific work processes, equipment, materials to be used, hazards and applicable control measures.
The mandatory ENG Form 6293 (Accident Prevention Plan Worksheet) must be submitted and accepted prior to beginning on site work:
https://www.publications.usace.army.mil/Portals/76/Eng_Form_6293_Aug%202024%20-% 20FINAL.pdf
A preparatory meeting shall be conducted by the Prime Contractor to discuss the APP contents with all effected onsite employees. The Prime Contractor is responsible for informing the subcontractors of the safety provisions under the terms of the contract, the penalties for noncompliance, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out.
Daily safety meetings shall be held and documented. Records shall be available to the TPOC upon request.
c. Activity Hazard Analysis (AHA):
An AHA shall be submitted and accepted for each definable feature of work (DFOW) in accordance with EM 385-1-1, Chapter 2-6. A DFOW is defined as any task, which is separate and distinct from other tasks, has separate control requirements, or is identified as different trades or disciplines. The AHA shall be continuously reviewed and revised to address changing site conditions as appropriate.
For a non-mandatory formatted outline of an AHA, see ENG Form 6206 (Activity Hazard Analysis) https://www.publications.usace.army.mil/Portals/76/Eng_Form_6206_Sep%202024%20-% 20FINAL.pdf
d. Site Safety and Health Officer (SSHO) Requirements:
The Contractor shall employ a minimum of one person to function as a Level 3, SSHO. A Level 3 SSHO is a designated Qualified Person (QP) or Competent Person (CP) with Safety and Occupational Health (SOH) responsibility that meets the requirements of EM 385-1-1, Chapter 2-3.
b and 2-4.b.
Level 3 SSHOs must have training, knowledge, and/or experience identifying hazards and implementing controls for the work being performed.
The SSHO shall be present at the project site and be responsible for overseeing the implementation of the Prime Contractor's SOH program. Contractor shall designate all SSHOs on a mandatory ENG Form 6282 (Site Safety and Health Officer Designation Letter): SITE SAFETY & HEALTH OFFICER (SSHO) DESIGNATION LETTER (army.mil)
e. First-Aid and CPR Personnel Requirements:
For shifts with multiple employees, provide at least two employees that are certified to administer First Aid and CPR. When employees work alone, they must be certified in First Aid and be provided an effective means of communication to call for assistance in the event of an emergency.
Minimum First Aid and CPR qualifications are outlined in EM 385-1-1, Chapter 3-3.
f. Additional Personnel Requirements:
Other Competent Person (CP) or Qualified Persons (QP) may be required per EM 385-1-1 and/or other sections of this Scope of Work, based on the definable features of work for this project.
g. Accident Reporting:
All accidents and near misses shall be investigated by the Contractor and reported to the TPOC in accordance with EM 385-1-1, Table 2-1.
The mandatory ENG Form 3394 shall be completed and submitted to the TPOC within seven (7) days of an incident: https://www.publications.usace.army.mil/Portals/76/Publications /EngineerForms/Eng_Form_3394_2021Aug.pdf
h. Employee Exposure Data:
The Contractor shall electronically report total employee work hours (including subcontractors) to the TPOC by close of business on the 10th calendar day of the following month.
6. Pre-Work Conference
Prior to the start of any work, the TPOC will schedule and conduct a "Pre-Work Conference." The Contractor's Project Manager and Quality Control Personnel shall be physically present at this meeting. The Contractor shall directly oversee all work on the project and the Project Manager and Quality Control Personnel shall have the authority to act on behalf of the Contractor. This conference will be held at the time and location agreeable to the Government and Contractor. No work may be performed under this contract prior to this conference. The purpose of the conference is to enable the TPOC to outline the procedures that will be followed by the Government in its administration of the contract, and to discuss the performance that will be expected from the Contractor. This conference will allow the Contractor an opportunity to ask questions about the Government's administration and inspection of contract work or obtain other pertinent information that might be required. At the Pre-Work Conference the Contractor shall provide the name of the project superintendent with a telephone number for project coordination.
The following is a general list of items for discussion during this pre-work conference:
i. Authority of the TPOC
ii. Contractor's Safety Program
iii. Abbreviated Accident Prevention Plan
iv. Activity Hazard Analysis
v. Requirements for Safety Meetings (Documented on NED Form 251)
vi. Accident Reporting (ENG Form 3394)
vii. Accident Exposure Hours - Reporting requirements
viii. Safety Data Sheet (SDS) requirements
ix. Contractor's Quality Control Plan
x. Communications and Correspondence Procedure
xi. Administrative Procedures
xii. Invoice and payment
7. Permits
The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses, permits, and letters of certification. The Contractor shall comply with any applicable federal, state, county, and municipal laws, codes, and regulations in connection with the performance of the work specified under this contract.
8. Security
The Contractor will comply with all established security policies at Westville Lake. Due to periods of heightened security that may affect access to the areas covered under this contract, areas may be subject to periodic closures, which in turn may reduce or inhibit the Contractor's ability to access certain areas. During periods of heightened security, the Government reserves the right, at any time, to close any property or portion of property and reschedule and/or cancel any subsequent service in an area. The Contractor shall be given at least 24-hour notice of any such closure.
9. Contractor Conduct
Alcohol and firearms are prohibited on project grounds. The Contractor and employees must comply with CFR 36 Rules and Regulations.
10. Payment
The Contractor shall furnish the TPOC with one invoice per month. The invoice shall include the invoice date, contract number, dates of service, description of work, quantities, labor hours, and total amount due per line item. The invoice must also include the company letterhead, and this must match the data that is registered in the System for Award Management (SAM) registry.
Payment shall be made monthly for the actual services performed at the applicable contract unit price.
NOTE: Final Payment may be held until the Contractor has returned any and all issued keys to the TPOC at the completion of work. All keys are required to be physically handed to the TPOC, or if mailed, the Contractor assumes all responsibility for loss (which may include the cost of rekeying the applicable project).
All invoices shall be mailed to:
U.S. Army corps of Engineers
East Brimfield Lake
24 Riverview Avenue
Fiskdale, MA 01518
Or emailed to keith.w.beecher@usace.army.mil
B. TECHNICAL REQUIRMENTS
1. General
Provide all equipment, materials, labor, and transportation necessary to provide snow plowing and shoveling services. Services shall be performed at the Westville Dam project as shown on attached maps. The services shall include storms that are "less than 6-inches", "Over 6-inches to 12-inches", "Over 12-inches to 24-inches" and "greater than 24-inches". Contractor's work and responsibility shall include, but not be limited to, all job planning, programming, scheduling, administration, inspection, personnel, equipment, vehicles, fuel, materials, supplies, supervision, and quality control necessary to perform the various services required herein.
2. Submittals
Although the Government reviews submissions required by this Performance Work Statement, it is emphasized that the Contractor's work must be completed using proper internal controls and review procedures. The Government reserves up to seven (7) days for review and acceptance on each submittal/resubmittal from the date of receipt. If revisions are necessary to the submittals, the Contractor shall make such revisions and shall resubmit to the Government in acceptable form within seven (7) days of the Government's response, unless additional time is granted by the Government in writing.
The documents identified below must be prepared in accordance with the applicable standards, submitted to the TPOC for review and accepted by the Government.
a. Pre-work Submittals: Submitted within 14 days of contract award. Submittals must be accepted prior to the commencement of any field work.
i. ENG Form 6293 (Accident Prevention Plan Worksheet)
ii. Activity Hazard Analysis (AHA)
iii. ENG Form 6282 (Site Safety and Health Officer Designation Letter)
iv. First Aid/CPR Certifications
3. Equipment
The Contractor is required to have sufficient equipment to plow snow and open frozen locks. The equipment should be able to handle heavy snow loads from falling snow, ice, and rain, to drifted snow. The equipment should be able to broadcast the snow to avoid encroaching snowbanks.
4. Site Access
The Contractor will be provided a key for access to the Westville Dam Project gates. If the Contractor is required to unlock and open a gate to plow, then the Contractor will be required to secure the gate when the plowing is completed unless project personnel are present. The Contractor may have to use a warming device to thaw frozen locks to gain access to areas in this contract. Upon the completion of this contract, the Contractor will return the key to TPOC or his designee before final payment is made.
5. Property Damage
In the event that property becomes damaged, it is the Contractor's responsibility to immediately notify the TPOC to report the damage. It will be the responsibility of the Contractor to coordinate with the TPOC an appropriate way to repair damaged property at no cost to the Government.
6. Service Description
a. Snow Plowing: The following services shall be performed as part of the snow plowing:
i. Snow plowing will be required after accumulation of two (2) inches or more of snow, or upon notification by TPOC or his designee during normal business hours.
ii. Snow will be pushed and stored in such a manner that parking areas and gates are not blocked.
iii. The Contractor will make sure to safely push back all banks along roadways, parking lots and entry points to maintain access. All access roads shall be at a minimum of sixteen (16) feet in width.
iv. Contractor may back blade snow from in front of the Westville Dam Gatehouse.
v. Snow can be broadcast via plow over both sides of Westville Dam.
vi. Westville Dam, Storage Building, and Marjorie Lane must be accessible by 07:00 AM daily.
vii. In addition to morning plowing, plowing will also be performed on weekends, holidays, and after normal working hours during the week to maintain access during storm events.
b. Snow Shoveling: The following services shall be performed as part of snow shoveling:
i. Snow shoveling will be required after accumulation of two (2) inches or more of snow, or upon notification by TPOC or his designee during normal business hours.
ii. Shoveled snow will be removed in such a manner that garage doors, building doors, stairways and hydrants are free of any accumulated snow.
iii. Road gates shall have the ability to move without any hindrance from snow at swing post, entire length of gate, or at the locking open posts.
iv. Shoveled snow shall not be deposited in a way that blocks roads, driveways, or other access to buildings.
c. Snowfall Accumulation Thresholds: The scope of services includes the following snowfall accumulation thresholds:
i. - Storm events Less than 6 inches Up to and including 6 inches that total less than up to and six (6) inches.including
ii. Over 6 inches to 12 inches - Storm events that total at least six (6) inches and up to (and including) twelve (12) inches.
iii. Over 12 inches to 24 inches - Storm events that total at least twelve (12) inches and up to (and including) twenty-four (24) inches.
iv. 24 inches and greater - Storm event totals in excess of twenty-four (24) inches.
v. Snowfall Totals: Storm totals will be calculated based upon daily measurements taken at the East Brimfield Lake project office. In the event of a large storm, the Contractor may need to plow several times during the storm event to keep service areas open and accessible. Compensation is restricted strictly to a single event unit price based on the final cumulative snowfall totals.
7. Service Locations
a. Westville Dam, Storage Building, and Marjorie Lane Plowing Area are located at the end of Marjorie Lane in Southbridge, MA off South Street. The Grand Trunk Trail Parking Lot is located in Sturbridge, MA on Breakneck Road.
i. Plowing:
1) Westville Dam, Storage Building, and Marjorie Lane Plowing Area: 61,000 square feet.
2) Grand Trunk Trail Parking Lot (outside of Westville Lake Rec Area): 10,315 square feet.
ii. Shoveling:
1) Westville Office: front door and garage door.
2) Westville Dam Storage Building: two (2) entry doors as well as in front of four (4) garage bays.
3) Westville Dam Gatehouse: bridge to and including front access door.
8. Estimated Quantities: The following table is the estimate for the required service including the location, service and storm event.
Special Contract Requirements
Miscellaneous text in this section has been added to:
The Wage Determination for this project can be found at:
https://sam.gov/wage-determination/2015-4101/35 [STURBRIDGE]
Wage Determination No.: 2015-4101
Modification No.: 35
Date: 13 August 2026
Contract Clauses
Additional Information/Notes
W912WJ27QA0060002
https://sam.gov/wage-determination/2015-4101/35
The following clauses were deleted:
DFARS Clauses Incorporated by Reference
Number Title Effective Date Alternate/ Deviation
Variation Effective Date
252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting
(DEVIATION 2026-O0025)
May 2024 Deviation 2026-O0025 Jun 2026
252.240-7997 NIST SP 800-171 DoD Assessment Requirements.
(DEVIATION 2026-O0025)
Feb 2026 Deviation 2026-O0025 Feb 2026
| IDCode: J |
| Page: 1 |
| Pages: 15 |
| AmendNo: 0002 |
| EffDate: 09 NOV 2026 |
| ReqNo: |
| ProjNo: |
| IssCode: W912WJ |
| AdmCode: |
| IssuedBy: W2SD ENDIST NEW ENGLAND |
KO CONTRACTING DIVISION, 696 VIRGINIA ROAD
CONCORD, MA 01742-2751
UNITED STATES
JENNIFER SAMELA, EMAIL: JENNIFER.M.SAMELA@USACE.ARMY.MIL TELEPHONE: 978-318-8324
AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: W912WJ27QA006 |
| SolDate: 29 OCT 2026 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: Off |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: See Schedule |
| ContNameTitle: |
| CoNameTitle: JENNIFER SAMELA |
| ContDate: |
| CODate: 09 NOV 2026 |