This is Standard Form 30 Amendment No. 0003 to solicitation W912WJ26QA171 issued by the U.S. Army Corps of Engineers, New England District (W2SD ENDIST), Concord, Massachusetts. The amendment was issued on October 9, 2026, with an effective date of October 8, 2026, and addresses industry questions regarding a snow-removal project.
The amendment provides clarifications on five key topics: (1) bid schedule item categorization for snowfall amounts, specifying that storms of exactly 12 inches fall under Bid Schedule Item #2 (6-12 inches) and storms of exactly 24 inches fall under Bid Schedule Item #3 (12-24 inches); (2) certification requirements, confirming that only certifications marked with an "x" in the solicitation survey are mandatory; (3) personnel qualification, clarifying that a single qualified employee may serve as both Quality Control representative and Level 3 Site Safety and Health Officer if meeting all requirements; (4) snow disposal scope, confirming that snow will be relocated on-site only with no off-site hauling required and that costs should be included in the fixed price; and (5) plowing response time, establishing that upon TPOC notification, the contractor must commence plowing within two hours maximum after the request if a storm reaches the 2-inch plowing threshold. The solicitation closing date remains October 13, 2026, at 2:00 PM Eastern, with all other terms and conditions unchanged. Contracting Officer Jennifer Samela issued this amendment.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment W912WJ26QA171-0002.pdf | ||
| Solicitation Survey 26QA171.pdf | ||
| Attachment 26QA171.pdf | ||
| Amendment W912WJ26QA171-0001.pdf | ||
| Solicitation W912WJ26QA171.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Solicitation/Contract Form
The following changes have been made:
Miscellaneous text in this section has been added to:
REQUEST FOR INFORMATION:
Question 13: Could you clarify which bid-schedule item applies to a storm total of exactly 12 inches and exactly 24 inches?
Response 13: A storm total of exactly 12 inches would be included in Bid Schedule Item #2, 6 inch to 12 inch snowfall. A storm of exactly 24 inches would be included in Bid Schedule Item #3, 12 inch to 24 inch snowfall.
Question 14: The Solicitation Survey lists several certifications, including fall protection, rope access, crane/rigging, and boat operator. Could you please confirm which of these are actually required for this snow-removal project?
Response 14: Only those certifications that include an "x" next to them are applicable.
Question 15: Can one qualified subcontractor employee serve as both the Quality Control representative and the Level 3 SSHO, provided they meet the requirements for both roles and are authorized to act on behalf of the prime contractor?
Response 15: Yes
Question 16: For the on-call snow removal item, is the snow expected to be relocated onsite only, or could offsite hauling/disposal also be required? If offsite hauling may be required, should that cost be included in the fixed price for that item?
W912WJ26QA1710003
Response 16: Snow will only be relocated on-site. No off-site hauling is required.
Question 17: If a storm reaches the 2-inch plowing threshold after 7:00 AM, is there a specific response time required for the contractor to begin plowing?
Response 17: Upon notification from the TPOC, it is anticipated that the Contractor will commence plowing as soon as possible, but no later than two (2) hours after the TPOC requests services.
W912WJ26QA1710003
| IDCode: J |
| Page: 1 |
| Pages: 3 |
| AmendNo: 0003 |
| EffDate: 08 OCT 2026 |
| ReqNo: |
| ProjNo: |
| IssCode: W912WJ |
| AdmCode: |
| IssuedBy: W2SD ENDIST NEW ENGLAND |
KO CONTRACTING DIVISION, 696 VIRGINIA ROAD
CONCORD, MA 01742-2751
UNITED STATES
JENNIFER SAMELA, EMAIL: JENNIFER.M.SAMELA@USACE.ARMY.MIL TELEPHONE: 978-318-8324
AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: W912WJ26QA171 |
| SolDate: 17 SEP 2026 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: Off |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: Amendment is necessary to provide responses to questions from industry. Questions/responses #13 -#17 are applicable to this amendment. |
Closing remains October 13, 2026 at 2:00 PM Eastern.
All other terms and conditions remain unchanged.
| ContNameTitle: |
| CoNameTitle: JENNIFER SAMELA |
| ContDate: |
| CODate: 09 OCT 2026 |