Amendment W912WJ26QA134-0005.pdf
PDF 1 MB Posted
- Attached to
- Tree Removal, Barre Falls Dam, Barre, MA
- Solicitation number
- W912WJ26QA134
About this file
This is a Standard Form 30 amendment to solicitation W912WJ26QA134, issued by the U.S. Army Corps of Engineers (USACE) New England District on July 29, 2026. The amendment provides responses to industry questions (Questions 14-18 noted as applicable) regarding a tree removal and maintenance project. The solicitation closing date remains August 7, 2026 at 2:00 PM Eastern, with all other terms and conditions unchanged.
The amendment addresses 18 questions and responses covering operational and compliance requirements for the approximately 403-tree removal project near power lines and gaging stations. Key requirements include: contractors must prevent damage to surrounding trees and may be required to remove damaged trees entirely if unsound; skid roads and landscape alteration are prohibited; on-site burning of debris is not permitted, with all debris requiring off-site disposal per State and local laws; contractors may not alter access points and snow removal is limited to parking lot gates; no bonding is required, though State regulations may mandate liability and workers' compensation insurance; teaming arrangements with subcontractors require written confirmation of willingness to perform work but no specific form is mandated; wood chips may be broadcast into adjacent wooded areas within specified pile limits (one foot height, 75-foot diameter maximum) or removed off-site; low-hanging branches along identified equipment access points only may be pruned; spillway bridge weight ratings on Coldbrook Road are 17 tons (3-type), 25 tons (3S2 type), and 30 tons (3-3 type); and all applicable Federal, State, County, and Municipal laws regarding disease-infected or parasitic trees must be followed at the contractor's responsibility.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
J 1 6
0005 29 JUL 2026
W912WJ
W2SD ENDIST NEW ENGLAND
KO CONTRACTING DIVISION, 696 VIRGINIA ROAD
CONCORD, MA 01742-2751
UNITED STATES
JENNIFER SAMELA, EMAIL: JENNIFER.M.SAMELA@USACE.ARMY.MIL TELEPHONE:
978-318-8324
SCD: PAS:
W912WJ26QA134
17 JUL 2026
SEE CONTINUATION
Amendment is necessary to provide responses to questions from industry. Questions/responses #14-#18 are applicable to this amendment.
Closing remains August 7, 2026 at 2:00 PM Eastern.
All other terms and conditions remain unchanged.
JENNIFER SAMELA
29 JUL 2026
SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Solicitation/Contract Form Continuation
The following changes have been made:
Miscellaneous text in this section has been modified to:
REQUEST FOR INFORMATION:
Question 1: The solicitation requires experience that is "similar in nature, size, and complexity" to the scope of felling approximately 403 trees near power lines and gaging stations. Will prime past performance that includes landscaping services, window cleaning, and septic pumping, performed for the federal government, be considered relevant past performance?
Response 1: No, past performance of landscape services, window cleaning, and septic pumping would not be considered relevant as these services are unrelated to the requirements for large scale, potentially hazardous tree removal. As included in the question, relevant past performance is work that of a similar scope, complexity, technical difficulty, and dollar value.
Question 2: If a vendor provides a formal teaming arrangement with a subcontractor who possesses specific large-scale tree removal experience, will that subcontractor's past performance be considered to satisfy the technical "similarity and complexity" requirements as outlined in Evaluation Step 4 (iii)?
Response 2: If a vendor provides a sufficient teaming arrangement as indicated in the solicitation and solicitation survey, past performance of a subcontractor can be considered. The solicitation survey affords vendors the ability to indicate if the past performance included is their own, or that of a subcontractor. The Government reserves the right to review and verify teaming arrangements and past performance references.
Question 3: Can the debris that is no larger than the local acceptable burn limit be burned on site if all local and state regulations are followed and the Contractor maintains responsibility for this and obtains all pertinent permits?
Response 3: Burning on site is not permitted. Any debris such as cut logs, slash, or any other vegetative debris the Contractor is unable to, or prefers not to chip shall be removed from the site and disposed of in accordance with State and local laws.
W912WJ26QA1340005
Question 4: What responsibility does the Contractor have if removing trees may require damage to surrounding trees?
Response 4: The Contractor shall prevent damage to the surrounding trees to the maximum extent practicable. Methods of tree removal shall be outlined in the Tree Maintenance and Removal Plan and discussed at the pre-work conference. Disposition of trees that are not marked for removal, but are damaged shall be discussed with the Technical Point of Contact. At a minimum any debris shall be removed, however, the Contractor may be required to remove the damaged trees in their entirety if they are no longer sound.
Question 5: Can the Contractor create roads and alter the landscape to provide access? Can skid roads be made to access these areas?
Response 5: No, the Contractor may not create skid roads or alter the landscape to provide access.
Question 6: Will the access point identified in the maps be plowed?
Response 6: Access points will not be plowed. Snow will be removed up to the gates in the parking lot where the access point to each section begins.
Question 7: Can you confirm whether any bid, performance, or payment bond is required, and whether there is a minimum commercial general liability or worker's compensation level needed for award or performance.
Response 7: No bonding, bid, payment, or performance is required. No minimum commercial general liability or worker's compensation levels are required by the solicitation; however, State regulations may require the Contractor to carry liability and worker's compensation insurance.
Question 8: Survey items 8 and 9 require a named subcontractor and teaming arrangement be submitted with the quote, but the solicitation does not specify a format. Would a signed teaming arrangement between the prime and named subcontractor, signed by both parties at the time of submission, satisfy this requirement, or does the Government require a specific form or particular content?
Response 8: There is no required form or content for a teaming arrangement. The teaming arrangement shall adhere to the requirements of the solicitation survey and shall include a confirmation from the subcontractor that they are willing to complete the work required by the solicitation in conjunction with the prime. A teaming arrangement, signed by both parties citing agreement to perform the work contemplated by this solicitation is acceptable.
Question 9: Can trees that are not tagged for removal be removed to allow better access to the larger trees being removed?
Response 9: The Contractor shall outline proposed removal of unmarked trees for access to larger marked trees in the Tree Maintenance and Removal Plan. Proposed removal of unmarked trees shall be reviewed and approval is at the discretion of the Technical Point of Contact. The removal of unmarked trees shall be kept to a minimum, shall only be considered when access to marked trees is beneficial, and shall be approved in advance by the Technical Point of Contact.
Question 10: Can trees be felled into the water located at the downstream area if removed once felled?
Response 10: Yes, trees can be felled into the water located at the downstream area. All debris shall be removed once felled. Methods of tree removal shall be outlined in the Tree Maintenance and Removal Plan and discussed at the pre-work conference.
Question 11: Is it possible to have the power line that is running to the small concrete building in the woods taken down for the project?
Response 11: No, the power line shall not be taken down for the project.
Question 12: Are all of the approximately 403 trees currently marked and countable in the field? Will any be marking be completed after award?
Response 12: All trees that are to be removed are currently marked. No trees will be marked after award.
Question 13: The Performance Work Statement requires non-chippable material to be removed off site. Is there a designated on-site staging area or chip broadcast area we should plan around, and are there any local disposal or tipping constraints the Government is already aware of?
Response 13: Wood chips may be broadcast into the adjacent wooded areas where possible or brought off site. All debris removed from the site must be disposed of in accordance with State and local laws. Staging areas shall be designated by the Technical Point of
Contact. Determination of local disposal or tipping constraints is the responsibility of the vendor /awarded Contractor.
Question 14: Are there any additional requirements or regulations on removing trees that could be infected with disease or parasites?
Response 14: The Contractor shall comply with any applicable Federal, State, County, and Municipal laws, codes, and regulations in connection with the performance of the work specified under this contract. It is the Contractor's responsibility to determine the requirements or regulations that must be adhered to if trees are infected with disease or parasites.
Question 15: Are there any septic systems near the access points? Are there weight ratings on the roads?
Response 15: No, there are no septic systems near the equipment access points. There are no weight limits on the equipment access roads. The weight rating for the spillway bridge on Coldbrook Road is 17 tons for 3type, 25 tons for 3S2 type, and 30 tons for 3-3 type.
Question 16: Do bumper trees on skid roads need to be removed?
Response 16: The Contractor shall prevent damage to the surrounding trees to the maximum extent practicable. The Contractor may be required to remove the damaged trees in their entirety if they are no longer sound.
Question 17: Can wood chips be utilized to create roads or fill in holes in roads for safer access?
Response 17: Wood chips may be used as long as piles do not exceed one foot in height or seventy-five feet in diameter.
Question 18: Can low hanging branches on trees along access points be pruned to allow for equipment access?
Response 18: Yes, low hanging branches only along equipment access points identified in the maps can be pruned.
File details come from the government source that posted it. Updated .