Amendment W912WJ26QA133-0001.pdf
PDF 1 MB Posted
- Solicitation number
- W912WJ26QA133
About this file
This is a Standard Form 30 Amendment of Solicitation for snow removal services at two U.S. Army Corps of Engineers (USACE) project sites in Royalston, Massachusetts: Tully Lake and Birch Hill Dam. The amendment, issued July 21, 2026, with Solicitation Number W912WJ26QA133, provides responses to industry questions and revises the Performance Work Statement. The closing date remains July 31, 2026 at 2:00 PM Eastern.
The revised Performance Work Statement requires contractors to provide all equipment, materials, labor, and transportation for snow removal and sanding services. Services include snow plowing (approximately 203,522.62 square feet total), shoveling (approximately 3,051.18 square feet total), and sand/salt application across designated roadways and walkways at both locations. Snow removal services must commence automatically after two inches of snow accumulation. Service tiers are defined by storm totals: 2-6 inches equals up to 1 service; 7-12 inches equals up to 2 services; 13-24 inches equals up to 3 services; and 24+ inches equals up to 4 services. Contractors are compensated only for services actually performed, not the maximum tier amount. All services must be completed within 8 hours of storm completion, with priority given to vehicle access by 7:00 AM daily. The contractor must notify the Technical Point of Contact within 24 hours of service completion. The contract period runs September 1, 2026 through August 31, 2027, with one optional year extending through April 30, 2028. Minimum equipment requirements include a 3/4-ton four-wheel-drive truck with 8-foot plow, powered spreader with one-yard minimum capacity, and snow shovel or snowblower. The contractor must submit pre-work submittals including Accident Prevention Plans, Site Safety and Health Officer designation, Activity Hazard Analysis, and CPR/First Aid certifications within 14 days of award. OSHA certifications are not required but all work must comply with OSHA requirements. Site visits can be scheduled by contacting Natural Resource Specialist Dylan Dickson at 978-318-8477 or Dylan.M.Dickson@usace.army.mil.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachments.pdf | ||
| Solicitation Survey 26QA133.pdf | ||
| Solicitation W912WJ26QA133.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
J 1 17
0001 21 JUL 2026
W912WJ
W2SD ENDIST NEW ENGLAND
KO CONTRACTING DIVISION, 696 VIRGINIA ROAD
CONCORD, MA 01742-2751
UNITED STATES
JENNIFER SAMELA, EMAIL: JENNIFER.M.SAMELA@USACE.ARMY.MIL TELEPHONE:
978-318-8324
SCD: PAS:
W912WJ26QA133
17 JUL 2026
SEE CONTINUATION
Amendment is necessary to provide responses to questions from industry and revise the Performance Work Statement. The revised Performance Work Statement will also include an updated contact for scheduling site visits.
Closing remains July 31, 2026 at 2:00 PM Eastern.
All other terms and conditions remain unchanged.
JENNIFER SAMELA
21 JUL 2026
SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Solicitation/Contract Form Continuation
The following changes have been made:
Miscellaneous text in this section has been added to:
REQUEST FOR INFORMATION:
Question 1: Please confirm whether the contractor is expected to mobilize automatically once on-site snowfall exceeds two inches or only after notification or authorization from the Technical Point of Contact. Please also confirm the required or recommended service-start and completion timeframes for each location.
Response 1: The Contractor is required to commence snow removal services as indicated in the Performance Work Statement after accumulation of two (2) inches of snow. Refer to the revised Performance Work Statement for start and completion timeframes.
Question 2: During a single storm, must the Technical Point of Contact authorize each intermediate plowing service before it is performed, or is the contractor expected to perform additional services automatically as accumulation reaches the stated tiers? If prior authorization is not required, may each completed service be invoiced based on the final documented storm total within the applicable maximum tier? Please also confirm whether shoveling performed with each intermediate plowing service is separately billable and subject to the same storm-tier limits.
Response 2: IV Service Requirements, 1.b. indicates the maximum number of services that the Government will compensate the Contractor for based on the storm total. The Contractor shall not automatically invoice for the maximum number of services. As required by the Performance Work Statement, the Contractor is required to notify the Technical Point of Contact within 24 hours of completion of on-site services. The Contractor shall only be compensated for the total number of services actually performed, for instance, if only one service was completed for a storm that totaled 7", the Contractor would only be compensated for one service, not two. Please refer to the revised Performance Work Statement for additional information. Shoveling is required with each plow service. Shoveling will be compensated as specified for plowing in this response.
Question 3: Are OSHA Certifications required?
W912WJ26QA1330001
Response 3: OSHA certifications are not required, however, all work shall be completed in accordance with OSHA requirements.
Continuation of Description
Miscellaneous text in this section has been modified to:
INTERESTED VENDORS SHALL REVIEW THE "ADDENDUM TO 52.212-1" AND "ADDENDUM
TO EVALUATION" FOR INSTRUCTIONS AND EVALUATION CRITERIA. VENDORS ARE
RESPONSIBLE FOR ENSURING THEIR QUOTE SUBMISSION MEETS ALL REQUIREMENTS.
FAILURE TO DO SO MAY RESULT IN QUOTES BEING DEEMED NON-RESPONSIVE AND
REMOVED FROM CONSIDERATION.
THE MANDATORY SOLICITATION SURVEY SHALL BE COMPLETED IN ITS ENTIRETY AND
RETURNED WITH QUOTES. FAILURE TO DO SO MAY RESULT IN QUOTES BEING DEEMED
NON-RESPONSIVE AND REMOVED FROM CONSIDERATION.
SNOW REMOVAL SERVICES
U.S. ARMY CORPS OF ENGINEERS
TULLY LAKE & BIRCH HILL DAM
ROYALSTON, MA
PERFORMANCE WORK STATEMENT
REVISED
I. GENERAL:
1. Scope
Provide all equipment, materials, labor, and transportation necessary to perform snow removal and sanding services at Tully Lake and Birch Hill Dam project areas.
2. Locations
Tully Lake is located at 2 Athol-Richmond Road, Royalston, Massachusetts. Birch Hill Dam is located at 68 Birch Hill Dam Road, Royalston, Massachusetts.
3. Technical Point of Contact
The Technical Point of Contact for this contract will be Natural Resource Specialist Cole LaRose.
Cole LaRose can be reached at: 978-302-5057 or cole.g.larose@usace.army.mil.
4. Site Visit
Interested contractors should conduct a site visit to confirm understanding of the scope, inspect existing conditions, and familiarize themselves with the sites) prior to submitting a quote. No extra payment will be allowed for perceived additional work caused by unfamiliarity with the site conditions and requirements. An appointment can be made by contacting the Technical Point of
Contact, Park Ranger Cole LaRose Natural Resource Specialist Dylan Dickson at Dylan.M.
. Site visits are generally scheduled between 8:00am Dickson@usace.army.mil or 978-318-8477 and 4:00pm Monday through Friday.
5. Schedule
The period of performance is from 01 September 2026 through 31 August 2027. In addition, the Government may exercise one optional year with the same scope of services. Option Year 1 will have a period of performance from 01 September 2027 through 30 April 2028.
All pre-work submittals shall be submitted within 14 days of contract award. The Government reserves up to 7 days for review and acceptance on each submittal/resubmittal from the date of receipt. If revisions are necessary to the submittals, the Contractor shall make such revisions and shall be resubmitted to the Government in an acceptable form within 7 days of the Government's response, unless additional time is granted by the Government in writing. No field work may proceed prior to the acceptance of pre-work submittals.
6. SAFETY REQUIREMENTS
a. General:
All work shall be conducted in accordance with the U.S. Army Corps of Engineers (USACE) Safety and Occupational Health Requirements (EM 385-1-1, most recent edition), and all applicable Occupational Safety and Health Administration (OSHA), federal, state, and local safety and health requirements. A copy of EM 385-1-1 can be accessed electronically at the following link:
https://www.publications.usace.army.mil/Portals/76/EM%20385-1-1%20_EFFECTIVE% 2015March2024.pdf
Project staff reserve the right to cease work at any time should the safety of employees, Contractors, and/or the public become jeopardized.
b. Accident Prevention Plan (APP):
The Contractor shall prepare a site-specific Accident Prevention Plan. The APP must be written by a Competent Person (CP) and document the specific work processes, equipment, materials to be used, hazards and applicable control measures.
The mandatory ENG Form 6293 (Accident Prevention Plan Worksheet) must be submitted and accepted prior to beginning on site work:
https://www.publications.usace.army.mil/Portals/76/Eng_Form_6293_Aug%202024%20-% 20FINAL.pdf
A preparatory meeting shall be conducted by the Prime Contractor to discuss the APP contents with all effected onsite employees. The Prime Contractor is responsible for informing the subcontractors of the safety provisions under the terms of the contract, the penalties for noncompliance, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out.
Daily safety meetings shall be held and documented. Records shall be available to the Technical Point of Contact upon request.
c. Activity Hazard Analysis (AHA):
An AHA shall be submitted and accepted for each definable feature of work (DFOW) in accordance with EM 385-1-1, Chapter 2-6. A DFOW is defined as any task, which is separate and distinct from other tasks, has separate control requirements, or is identified as different trades or disciplines. The AHA shall be continuously reviewed and revised to address changing site conditions as appropriate.
For a non-mandatory formatted outline of an AHA, see ENG Form 6206 (Activity Hazard Analysis) https://www.publications.usace.army.mil/Portals/76/Eng_Form_6206_Sep%202024%20-% 20FINAL.pdf
d. Site Safety and Health Officer (SSHO) Requirements:
The Contractor shall employ a minimum of one person to function as a Level 3, SSHO. A Level 3 SSHO is a designated Qualified Person (QP) or Competent Person (CP) with Safety and Occupational Health (SOH) responsibility that meets the requirements of EM 385-1-1, Chapter 2-3.
b and 2-4.b.
Level 3 SSHOs must have training, knowledge, and/or experience identifying hazards and implementing controls for the work being performed.
The SSHO shall be present at the project site and be responsible for overseeing the implementation of the Prime Contractor's SOH program. Contractor shall designate all SSHOs on a mandatory ENG Form 6282 (Site Safety and Health Officer Designation Letter):
https://www.publications.usace.army.mil/Portals/76/Eng_Form_6282_Site%20Safety%20&% 20Health%20Officer%20(SSHO)%20Designation%20Letter_2024%20Aug%20-%20FINAL.pdf
e. First-Aid and CPR Personnel Requirements:
For shifts with multiple employees, provide at least two employees that are certified to administer First Aid and CPR. When employees work alone, they must be certified in First Aid and be provided an effective means of communication to call for assistance in the event of an emergency.
Minimum First Aid and CPR qualifications are outlined in EM 385-1-1, Chapter 3-3.
f. Additional Personnel Requirements:
Other Competent Person (CP) or Qualified Persons (QP) may be required per EM 385-1-1 and/or other sections of this Scope of Work, based on the definable features of work for this project.
g. Accident Reporting:
All accidents and near misses shall be investigated by the Contractor and reported to the Technical Point of Contact in accordance with EM 385-1-1, Table 2-1.
The mandatory ENG Form 3394 shall be completed and submitted to the Technical Point of Contact within seven (7) days of an incident: https://www.publications.usace.army.mil/Portals/76 /Publications/EngineerForms/Eng_Form_3394_2021Aug.pdf
h. Employee Exposure Data:
The Contractor shall electronically report total employee work hours (including subcontractors) to the Technical Point of Contact by close of business on the 10th calendar day of the following month.
7. Pre-Work Conference
Prior to the start of any work, the Technical Point of Contact will schedule and conduct an in-person "Pre-Work Conference". The Contractor's Project Manager and Quality Control Personnel shall be physically present to attend this meeting. The Contractor shall directly oversee all work on the project and the Project Manager and Quality Control Personnel shall have the authority to act on behalf of the Contractor. This conference will be held at the time agreeable to the Government and Contractor. Pre-Work Conference shall take place at the Tully Lake Dam Project Office. No work may be performed under this contract prior to this conference. The purpose of the conference is to enable the Technical Point of Contact to outline the procedures that will be followed by the Government in its administration of the contract, and to discuss the performance that will be expected from the Contractor. This conference will allow the Contractor an opportunity to ask questions about the Government's administration and inspection of contract work or obtain other pertinent information that might be required. At the Pre-Work Conference the Contractor shall provide the name of the Project Superintendent along with a telephone number for project coordination.
The following is a general list of items for discussion during this Pre-Work Conference:
a. Authority of the Technical Point of Contact and Quality Assurance Inspectors.
b. Contractor's Safety Program (including sub-contractors).
c. Accident Prevention Plan, ENG Form 6293 (Submitted & accepted prior to start of work on site)
d. Activity Hazard Analysis (Submitted & accepted prior to start of work on site)
e. SSHO Designation Form, ENG Form 6282 (Submitted & accepted prior to start of work on site)
f. Safety Meetings (Documented on NED Form 251)
g. Accident Reporting (ENG Form 3394)
h. Safety Data Sheet (SDS) requirements
i. Contractor's Equipment
j. Correspondence, Communication, Security and Administrative Procedures.
k. Invoice and payment.
8. Permits
The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses, permits, and letters of certification. The Contractor shall comply with any applicable Federal, State, County, and Municipal laws, codes, and regulations in connection with the performance of the work specified under this contract.
9. Security
The Contractor will comply with all established security policies at Barre Falls Dam. Due to periods of heightened security that may affect access to areas covered under this contract, areas may be subject to periodic closures which in turn may reduce or inhibit the Contractor's ability to access certain areas. During periods of heightened security, the Government reserves the right, at any time, to close any property or portion of property and reschedule and/or cancel any subsequent service in an area. The Contractor shall be given at least 24 hours' notice of any such closure.
10. Contractor's Personnel
a. Minimum Personnel Requirements - The Contractor shall provide an adequate number of fully qualified personnel to perform the specified service properly and efficiently within the time limits specified. The Contractor shall provide a list of the names and contact phone numbers for all employees prior to them working on Government Property.
Note:
At least one (1) of the Contractor employees on site shall be able to communicate effectively and efficiently with project staff.
b. Employee Conduct - The Contractor shall be responsible for seeing that the Contractor's employees strictly comply with all Federal, State, and Municipal laws. Any personnel activity, which, in the opinion of the Government, is deemed detrimental to the performance of the contract may result in the removal of Contractor employee/employees.
Examples of unbecoming actions or conduct include but are not limited to the following:
i. Cursing, harassment, or discrimination of and/or unwarranted physical contact with visitors, USACE personnel, or other contractors
ii. Recurring written and/or verbal complaints from visitors, USACE personnel, or other contractors.
iii. Unsafe operation of vehicles while on USACE property.
c. Removal of Contractor's Employees - The Technical Point of Contact may require the Contractor to immediately remove from the work site any employee of the Contractor or subcontractor, who, in the opinion of the Technical Point of Contact, who endangers persons or property, or whose physical or mental condition is such that it would impair the employee's ability to satisfactorily perform assigned work. Notification to the Contractor shall be promptly made in writing if time and circumstances permit. Otherwise, notification shall be verbal or by telephone and shall be confirmed in writing as soon as possible. No such removal, however, will reduce the Contractor's obligation to perform all work required under this contract, and immediate replacement will be made as required. This requirement shall not be made the basis of any claim for compensation or damages against the United States or any of its officers or agents.
11. Payment
The Contractor shall furnish the Technical Point of Contact with one invoice per month. The invoice shall include the invoice date, contract number, dates of service, description of work, quantities, and total amount due per line item. The invoice must also include the company letterhead, and this must match the data that is registered in the System for Award Management (SAM) registry. Payment shall be made monthly for the actual services performed at the applicable contract unit price.
All invoices may be mailed to:
Tully Lake Park Office
2 Athol-Richmond Road
Royalston, MA 01368
Or emailed to cole.g.larose@usace.army.mil
II. TECHNICAL REQUIREMENTS:
Part 1 General:
1. Summary
Provide all equipment, materials, labor, and transportation necessary to provide snow removal, and sand/salt mix application on designated roadways and walkways. The services include two different site locations: Birch Hill and Tully Lake Dams. The services shall be performed according to the locations on the attached Figures. Contractor's work and responsibility shall include, but not be limited to, all job planning, programming, scheduling, administration, inspection, personnel, equipment, vehicles, fuel, materials, supplies, supervision, and quality control necessary to perform the various services required herein.
2. Submittals
Although the Government reviews submissions required by this Performance Work Statement, it is emphasized that the Contractor's work must be completed using proper internal controls and review procedures. The Government reserves up to 7 days for review and acceptance on each submittal/resubmittal from the date of receipt. If revisions are necessary to the submittals, the Contractor shall make such revisions and shall resubmit to the Government in an acceptable form within 7 days of the Government's response, unless additional time is granted by the Government in writing.
a. Pre-work Submittals
Submitted within 14 days of Contract Award. Submittals must be accepted before the commencement of any field work.
i. Accident Prevention Plan on mandatory ENG Form 6293
ii. Site Safety and Health Officer Level 3 Designation letter on mandatory ENG Form 6282
iii. Activity Hazard Analysis (AHA)
iv. CPR and First Aid Certification.
3. Other Contracts
The Government may undertake or award other contracts for additional work not related to this contract, and the Contractor shall fully cooperate with other contractors and Government employees. The Contractor shall not commit or permit any act which will interfere with the performance of work by another contractor or by Government employees.
4. Environmental Protection
Water, air and land resources shall not be adversely impacted during the course of the work. The Contractor will take necessary steps to ensure all Federal, State, and Local environmental regulatory requirements are met at no additional cost to the Government. Assurance of compliance with this section by subcontractors shall be the responsibility of the Contractor.
5. Personal Protective Equipment
It is the Contractor's responsibility to furnish and supply personnel with the proper personal protective equipment necessary for performing the work.
6. Damage to Government and Private Property
The Contractor shall be responsible for restoring all Government facilities or structures damaged as a result of the Contractor's operation. The Contractor shall also be responsible for any damage to private property or injury to any person as a result of the Contractor's operation. The Contractor shall notify the Technical Point of Contact immediately of damage to Government and private property and injury to any person resulting from the Contractor's operation. Also, the Contractor shall notify the Technical Point of Contact of damage to Government facilities due to vandalism or other causes on the day such damage is first noticed. Trucks and/or trailers will be driven on existing roads only and not across or through park areas to facilities. The Contractor shall also restore landscape features (shrubs, flowers, grasses, etc.), which are damaged or destroyed by the Contractor's operation. Damaged or destroyed grass areas shall be re-planted as directed by the Technical Point of Contact, and shrubs and flowers which are damaged or destroyed shall be replaced from nursery stock of like size and kind.
7. Quality Assurance
The Contractor is responsible for the quality control of the contract work. The Contractor shall establish and maintain a quality control system to assure compliance with the contract requirements. The Government has the right to inspect and test all items called for by the contract, to the extent practicable always and at all places during the term of the contract.
8. Inspections
a. Contractor Quality Control - The Contractor is responsible for establishing and maintaining an adequate quality control system to satisfactorily inspect and ensure that all work performed by the Contractor's organization in each separate service is in full compliance with this contract and the instructions, provisions, specifications, drawings, and maps herein.
b. General Inspection - Upon the completion of each service requirement, the Contractor will perform an inspection of all areas under this contract to ensure compliance with the Performance Work Statement. The Contractor or their representative must be able to commit personnel, equipment, and resources to correct deficiencies. The Services Inspection Form (form to be provided to the Contractor at the pre-work conference) will be submitted to the Technical Point of Contact to allow verification of results for payment. A Government representative may accompany the Contractor on an inspection of completed work and will identify any contract deficiencies. Any deficiencies noted will be corrected within original contract time frames or appropriate deductions in payment will be made.
c. Equipment/Supplies Inspections - The Contractor is required to have equipment capable of plowing snow, sanding roadways, removing snow from and sanding walkways. The equipment shall be able to handle winter weather and any snow conditions. These conditions shall include light to heavy rates of falling and accumulating snowfall, freezing rain and drifting snow. The equipment should be able to broadcast the snow to avoid encroaching snowbanks. The Technical Point of Contact may inspect required equipment and, supplies at any time when in use on Government property. Any equipment found deficient shall be removed from service immediately until faulty conditions have been corrected and passed by the Technical Point of Contact. No such removal will reduce the Contractor's obligation to perform all work required within the time scheduled under this contract. This requirement shall not be made the basis of any claim for compensation or damages against the United States or any of its officers or agents.
i. Minimum equipment requirements shall include:
1) A 3/4 ton four-wheel drive truck with 8-foot-wide angle-controlled plow.
2) A powered spreader with a minimum one-yard capacity. Hand sanding is not acceptable, except on the Tully Lake Gate House stairway and administrative building entryways, by all entrance doors, and on the entrance ramp to the Tully Lake Recreation Area restrooms.
3) A snow shovel or snowblower.
d. Government Inspections -
The Government will monitor the Contractor's service performance and make deductions accordingly for work not corrected with the time permitted.
9. Omissions
This contract may not cover all specified activities, steps, and procedures required to provide the contracted service. In case of omission, the normal industry, state, or federal standards, practices, specifications, and/or guides shall prevail. In no instance shall an omission be reason to produce less than an acceptable service result.
10. Figures
Figure 1 Tully Lake Snow Removal Map Overview
Figure 2 Tully Lake Administration Area
Figure 3 Tully Lake Recreation Area
Figure 4 Birch Hill Dam Snow Removal Map Overview
Figure 5 Birch Hill Dam Administration Area
Figure 6 Birch Hill Dam Entrance Road Area
III. MATERIALS & SUPPLIES:
1. The following materials shall be provided by Contractor:
a. Sand/Salt mix (for plowed areas).
b. Walkway salt
c. Warming device to thaw frozen locks.
Note: The Contractor shall submit one copy of the manufacturer's Safety Data Sheet for each chemical proposed for use.
IV. SERVICE REQUIREMENTS:
1. Service Requirements - Definition
a. One service is defined as a single completion of all requirements for each task described in section 4, Service Tasks below.
b. Snowstorms over 2" in total may require the number of services as indicated below. Snowfall is measured by project staff on site and is documented daily. The general guidelines are as follows:
i. 2" to 6" storm = up to 1 service
ii. 7" to 12" storm = up to 2 services
iii. 13" to 24" storm = up to 3 services
iv. 24" and greater storms = up to 4 services
c. The table above lists the maximum number of services the Government will pay for based on the storm total. Additional snow removal services performed by the Contractor at their own discretion will not be reimbursed by the Government.
d. Storm totals will be determined by measurement at the Project Office, with the amounts rounded to the nearest whole inch.
e. If the Government Technical Point of Contact requests additional plowing, that work shall be considered a separate service and invoiced as such.
f. All on-site services must be reported to Technical Point of Contact via email or text within 24 hours of the service having taken place.
g. The Contractor shall only be paid for work fully completed. If a partial service is rendered, payment will be adjusted according to percent of area completed. Partial service is defined as completing anything other than all designated locations as identified in Service Locations. The information in b. above indicates the maximum number of services the Government will pay for based on storm total; the Contractor is only authorized to request payment for the actual number of services performed each storm, up to the maximum number of services identified above. The Government will not accept any invoices that list the maximum number of services if the Contractor did not perform the maximum number of services to accomplish work.
2. Site Access
a. The Contractor will be provided a key for access to both Birch Hill Dam and Tully Lake dam road gates.
b. If the Contractor is required to unlock and open a gate to plow, then the Contractor will be required to secure the gate when the plowing is completed unless project personnel are present and state otherwise.
c. The Contractor may have to use a warming device to thaw frozen locks to gain access to areas in this contract.
d. Upon the completion of this contract, the Contractor will return the key to project staff before final payment is made.
3. Property Damage
a. In the event that property does become damaged, it is the Contractor's responsibility to immediately notify the Technical Point of Contact to report the damage.
b. Parking lots shall be plowed to within one to two feet of wooden fences and/or rock borders as necessary so that no damage to fence or rocks is incurred.
c. It will be the responsibility of the Contractor to coordinate with the Technical Point of Contact to agree upon an appropriate way to repair damaged property at no cost to the Government.
4. Service Tasks
a. Task 1: Snow Plowing (approximately 203,522.62 square feet total)
i. The Contractor shall plow snow from all paved surfaces shown in Figures 1-6.
ii. Snow shall be pushed beyond the edge of pavement
iii. Upon completion of plowing all pavement shall be neatly scraped clean, leaving no measurable snow.
iv. Snow shall not be pushed against garage doors, entrance doors, fenced gates, dumpsters, or culverts.
v. DO NOT BACK BLADE THE SLOPED DRIVEWAY NEXT TO BASIN OFFICE. This makes it difficult to shovel down to pavement and creates an icy surface.
Service Schedule:
Generally, all services shall be completed within 8 hours after completion of a snowstorm, unless otherwise directed. The service priority shall be to plow and shovel snow to provide vehicle access to offices and garage bays by 0700 daily.
The Contractor shall coordinate timing of each service with the TPOC.
b. Task 2: Shoveling (approximately 3,051.18 square feet total)
i. Snow shoveling is required with each plowing service.
ii. The Contractor shall shovel snow at all building entry and garage doors, walkways, stairs, oil and propane fill pipes, culverts, and dumpsters as shown in Figures 1 - 6.
1) Entrance and garage doors shall be cleared of snow beyond swing of door and beyond each side of door frame. METAL ROOFS OVER THE GARAGE
DOORS MAY RELEASE SNOW AT ANYTIME. THESE DOORS
SHOULD BE SHOVELED LAST.
2) Walkways and stairs shall be cleared of snow their full length and width; THIS INCLUDES THE
SLOPED DRIVEWAY NEXT TO THE BASIN OFFICE.
3) Culverts shall be cleared of snow beyond the full diameter of the culvert.
4) The dumpster at Tully shall be shoveled along the front and sides a width of 2 feet.
5) Kiosks shall be cleared to provide access to the brochure racks.
6) The entrance gate at Birch Hill Dam shall be cleared approximately 3 feet in circumference around both lock posts.
iii. Areas to be shoveled shall be clear to the existing pavement or concrete. If the areas are icy upon completion of shoveling, walkway salt/sand mix shall be spread to melt existing ice and prevent additional icing or hazardous conditions.
iv. Snow may not be placed against any building or be piled in front of garage bays, doorways, gates, or other access points.
c. Task 3: Sanding and Salting. The contractor shall sand plowed surfaces and shoveled areas as needed or as directed by the Technical Point of Contact. Sanding is not required for each snow plowing service unless unsafe icy conditions exist. When needed, sand shall be spread adequately to provide traction for driving and walking. The Technical Point of Contact may request additional sanding and salting as conditions require.
2. Service Locations
a. Tully Lake consists of the Administrative Area and Recreation Area (Figures 1-3). The area descriptions are presented below:
Plowing:
i. Park Office & Basin Office (Figure 2)
ii. Gate House (Figure 2)
iii. Recreation Area (Figure 3)
Shoveling:
i. Building Entrances & Garage Doors (Figure 2)
ii. Walkways & Stairs (Figure 2 & 3)
iii. Culverts (Figure 2)
iv. Dumpster- adjacent to building (Figure 2)
v. Oil and Propane Fill Pipes (Figure 2)
Sanding:
i. Administrative Area (Figure 2)
1) Plowed areas
2) Entry doors, walkways, and stairs
ii. Gate House (Figure 2)
1) Plowed areas
2) Inlet channel walkway & stairs
iii. Recreation Area (Figure 3)
1) Plowed areas
2) Romtec walkway
b. Birch Hill Dam consists of the Administration Area and Entrance Road Area (Figures 4-6). The area descriptions are presented below:
Plowing:
i. Administrative Area (Figure 5)
ii. Entrance Road (Figures 4 & 6) - Approximately 1.3 miles
iii. Parking Areas (Figure 4)
Shoveling:
i. Building Entrances, Garage Doors, Dumpster & Rain Gauge (Figure 5)
ii. Walkways & Kiosks (Figure 5 & 6)
iii. Entrance Road Gate (Figure 6)
iv. Dumpster- adjacent to building (Figure 5)
v. Oil Fill Pipes (Figure 5)
vi. Gatehouse (Figure 5)
Sanding:
i. Administrative Area including plowed areas and entry doors (Figure 5)
ii. Entrance Road (Figures 4 & 6) - Approximately 1.3 miles
iii. Parking Areas (Figure 4)
5. Quantities - The actual quantity required will be determined by the number and nature of snowstorms. The following table identifies the maximum number of services that could be required at each Service Location.
Task Qty
Plowing 20
Shoveling 20
Sanding 20