Attachments.pdf
PDF 589 KB Posted
- Solicitation number
- W912WJ26QA133
About this file
This is a Performance Work Statement for snow removal and sanding services at two U.S. Army Corps of Engineers facilities in Royalston, Massachusetts: Tully Lake Dam and Birch Hill Dam.
The document provides six detailed aerial maps (Figures 1-6) depicting the specific service areas at each location. The maps use color-coding to distinguish between shovel areas (yellow) and plow areas (red). For Tully Lake Dam, the maps show extensive plow areas along access roads and around administrative facilities, with smaller shovel areas for parking and building entrances. For Birch Hill Dam, the plow areas cover entrance roads and perimeter routes, while shovel areas are concentrated around administrative buildings and facility entrances. The maps serve as visual references for contractors to understand the scope and layout of snow removal and sanding operations required across both dam facilities. The Performance Work Statement establishes the geographic boundaries and service locations for contractor performance but does not include specific performance requirements, response dates, pricing information, contract award dates, or other transactional details in the provided pages.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment W912WJ26QA133-0001.pdf | ||
| Solicitation Survey 26QA133.pdf | ||
| Solicitation W912WJ26QA133.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SNOW REMOVAL AND SANDING SERVICES
U.S. ARMY CORPS OF ENGINEERS
TULLY LAKE & BIRCH HILL DAM
ROYALSTON, MA
Performance Work Statement
Figure 1
TULLY LAKE & BIRCH HILL DAM
ROYALSTON, MA
Performance Work Statement
Figure 2.
TULLY LAKE & BIRCH HILL DAM
ROYALSTON, MA
Performance Work Statement
Figure 3.
TULLY LAKE & BIRCH HILL DAM
ROYALSTON, MA
Performance Work Statement
Figure 4.
TULLY LAKE & BIRCH HILL DAM
ROYALSTON, MA
Performance Work Statement
Figure 5
TULLY LAKE & BIRCH HILL DAM
ROYALSTON, MA
Performance Work Statement
Figure 6.
File details come from the government source that posted it. Updated .