Snow Removal and Sanding Services, Birch Hill Dam and Tully Lake, Royalston, MA
Solicitation number
W912WJ26QA133
Issued by

About this file

This is a Request for Quotations (RFQ) for snow removal and sanding services at two U.S. Army Corps of Engineers facilities in Royalston, Massachusetts: Tully Lake and Birch Hill Dam. The solicitation number is W912WJ26QA133, issued on 17 July 2026 with a closing date of 31 July 2026 at 2:00 PM. The contract is set aside as a Women-Owned Small Business (WOSB) acquisition with a total estimated value of $9,500,000 USD. This is a Request for Quotations under FAR Part 12 for commercial services, using the Standard Form 1449. The contracting activity is the U.S. Army Corps of Engineers, New England District, located in Concord, Massachusetts, with Jennifer M. Samela serving as the Contract Specialist (978-318-8324; Jennifer.M.Samela@usace.army.mil).

The Performance Work Statement outlines three primary service tasks: Task 1 (Snow Plowing) covering approximately 203,522.62 square feet across both sites, Task 2 (Shoveling) for approximately 3,051.18 square feet at building entries, walkways, stairs, and designated areas, and Task 3 (Sanding/Salting) to provide traction on plowed and shoveled surfaces as conditions require. The contract period runs from 1 September 2026 through 31 August 2027, with one optional year from 1 September 2027 through 30 April 2028. The bid schedule requires unit pricing for up to 20 services each for plowing, shoveling, and sanding at both locations. Contractors must provide all equipment, materials, labor, and transportation; maintain compliance with USACE safety requirements including preparation of an Accident Prevention Plan and designation of a Level 3 Site Safety and Health Officer; conduct a pre-work site visit; and submit pre-work submittals within 14 days of award. Payment is monthly based on actual services performed at applicable contract unit prices. The wage determination for this project is identified as 2015-4061, Modification 37.

View the file

Other files

File Type Posted
Amendment W912WJ26QA133-0001.pdf PDF
Attachments.pdf PDF
Solicitation Survey 26QA133.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WOMEN-OWNED SMALL

BUSINESS (WOSB)

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

1. REQUISITION NUMBER PAGE 1 OF

2. CONTRACT NUMBER 3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE

DATE

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME b. TELEPHONE NUMBER (No collect 8. OFFER DUE DATE/

LOCAL TIME

9. ISSUED BY

13b. RATING

14. METHOD OF SOLICITATION

CODE

15. DELIVER TO 16. ADMINISTERED BY CODE

18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/

OFFEROR

CODE

FACILITY

CODE

CODE

TELEPHONE NUMBER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

REQUEST

FOR QUOTE

(RFQ)

INVITATION

FOR BID

(IFB)

REQUEST

FOR

PROPOSAL

(RFP)

SEE ADDENDUM

19.

ITEM NUMBER

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH

AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND

ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS

SPECIFIED

29. AWARD OF CONTRACT: REFERENCE OFFER

DATED . . YOUR OFFER ON SOLICITATION

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 11/2021)

Prescribed by GSA - FAR (48 CFR) 53.212

10. THIS ACQUISITION IS UNRESTRICTED OR

NORTH AMERICAN

INDUSTRY CLASSIFICATION

STANDARD (NAICS):

SIZE STANDARD:

13a. THIS CONTRACT IS A

RATED ORDER UNDER

THE DEFENSE PRIORITIES

AND ALLOCATIONS

SYSTEM - DPAS (15 CFR 700)

SET ASIDE: % FOR:

11. DELIVERY FOR FREE ON

BOARD (FOB) DESTINATION

UNLESS BLOCK IS MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

ARE ARE NOT ATTACHED

ARE ARE NOT ATTACHED

27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3

AND 52.212-5 ARE ATTACHED. ADDENDA

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

8(A)

ECONOMICALLY

DISADVANTAGED

WOMEN-OWNED SMALL

BUSINESS (EDWOSB)

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

(SDVOSB)

HUBZONE SMALL

BUSINESS

SMALL BUSINESS

NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30.

calls)

SEE CONTINUATION

SEE CONTINUATION

SEE CONTINUATION

W912WJ26QA133 17 JUL 2026

JENNIFER SAMELA

978-318-8324

31 JUL 2026

02:00 PM

W912WJ 100

W2SD ENDIST NEW ENGLAND

KO CONTRACTING DIVISION, 696 VIRGINIA ROAD

CONCORD, MA 01742-2751

UNITED STATES

JENNIFER SAMELA, EMAIL: JENNIFER.M.SAMELA@USACE.ARMY.MIL

TELEPHONE: 978-318-8324

561730

USD 9,500,000.00

SEE SCHEDULE

Solicitation/Contract Form Continuation

Snow Removal and Sanding Services, Birch Hill Dam and Tully Lake, Instrument Name:

Royalston, MA

Product Service Code : S218

W912WJ26QA133

Continuation of Supplies or Services and Prices/Costs

Additional Information/Notes

BID SCHEDULE:

SNOW REMOVAL AND SANDING SERVICES

U.S. ARMY CORPS OF ENGINEERS

TULLY LAKE & BIRCH HILL DAM

ROYALSTON, MA

PERFORMANCE WORK STATEMENT

Bid Schedule

Base Year- Tully Lake

TASK / ITEM NUMBER

UNIT QTY UNIT

PRICE

TOTAL

Task 1 - Plowing EA 20

Task 2 - Shoveling EA 20

Task 3 - Sanding EA 20

Base Year- Birch Hill Dam

TASK / ITEM NUMBER

UNIT QTY UNIT

PRICE

TOTAL

Task 1 - Plowing EA 20

Task 2 - Shoveling EA 20

Task 3 - Sanding EA 20

Option Year 1- Tully Lake

TASK / ITEM NUMBER

UNIT QTY UNIT

PRICE

TOTAL

Task 1 - Plowing EA 20

Task 2 - Shoveling EA 20

Task 3 - Sanding EA 20

Option Year 1- Birch Hill Dam

TASK / ITEM NUMBER

UNIT QTY UNIT

PRICE

TOTAL

Task 1 - Plowing EA 20

Task 2 - Shoveling EA 20

Task 3 - Sanding EA 20

*** END OF NARRATIVE ***

Continuation of Description

INTERESTED VENDORS SHALL REVIEW THE "ADDENDUM TO 52.212-1" AND "ADDENDUM

TO EVALUATION" FOR INSTRUCTIONS AND EVALUATION CRITERIA. VENDORS ARE

RESPONSIBLE FOR ENSURING THEIR QUOTE SUBMISSION MEETS ALL REQUIREMENTS.

FAILURE TO DO SO MAY RESULT IN QUOTES BEING DEEMED NON-RESPONSIVE AND

REMOVED FROM CONSIDERATION.

THE MANDATORY SOLICITATION SURVEY SHALL BE COMPLETED IN ITS ENTIRETY AND

RETURNED WITH QUOTES. FAILURE TO DO SO MAY RESULT IN QUOTES BEING DEEMED

NON-RESPONSIVE AND REMOVED FROM CONSIDERATION.

SNOW REMOVAL SERVICES

U.S. ARMY CORPS OF ENGINEERS

TULLY LAKE & BIRCH HILL DAM

ROYALSTON, MA

PERFORMANCE WORK STATEMENT

I. GENERAL:

1. Scope

Provide all equipment, materials, labor, and transportation necessary to perform snow removal and sanding services at Tully Lake and Birch Hill Dam project areas.

2. Locations

Tully Lake is located at 2 Athol-Richmond Road, Royalston, Massachusetts. Birch Hill Dam is located at 68 Birch Hill Dam Road, Royalston, Massachusetts.

3. Technical Point of Contact

The Technical Point of Contact for this contract will be Natural Resource Specialist Cole LaRose.

Cole LaRose can be reached at: 978-302-5057 or cole.g.larose@usace.army.mil.

4. Site Visit

Interested contractors should conduct a site visit to confirm understanding of the scope, inspect existing conditions, and familiarize themselves with the sites) prior to submitting a quote. No extra payment will be allowed for perceived additional work caused by unfamiliarity with the site conditions and requirements. An appointment can be made by contacting the Technical Point of Contact, Park Ranger Cole LaRose. Site visits are generally scheduled between 8:00am and 4:

00pm Monday through Friday.

5. Schedule

The period of performance is from 01 September 2026 through 31 August 2027. In addition, the Government may exercise one optional year with the same scope of services. Option Year 1 will have a period of performance from 01 September 2027 through 30 April 2028.

All pre-work submittals shall be submitted within 14 days of contract award. The Government reserves up to 7 days for review and acceptance on each submittal/resubmittal from the date of receipt. If revisions are necessary to the submittals, the Contractor shall make such revisions and shall be resubmitted to the Government in an acceptable form within 7 days of the Government's response, unless additional time is granted by the Government in writing. No field work may proceed prior to the acceptance of pre-work submittals.

6. SAFETY REQUIREMENTS

a. General:

All work shall be conducted in accordance with the U.S. Army Corps of Engineers (USACE) Safety and Occupational Health Requirements (EM 385-1-1, most recent edition), and all applicable Occupational Safety and Health Administration (OSHA), federal, state, and local safety and health requirements. A copy of EM 385-1-1 can be accessed electronically at the following link:

https://www.publications.usace.army.mil/Portals/76/EM%20385-1-1%20_EFFECTIVE% 2015March2024.pdf

Project staff reserve the right to cease work at any time should the safety of employees, Contractors, and/or the public become jeopardized.

b. Accident Prevention Plan (APP):

The Contractor shall prepare a site-specific Accident Prevention Plan. The APP must be written by a Competent Person (CP) and document the specific work processes, equipment, materials to be used, hazards and applicable control measures.

The mandatory ENG Form 6293 (Accident Prevention Plan Worksheet) must be submitted and accepted prior to beginning on site work:

https://www.publications.usace.army.mil/Portals/76/Eng_Form_6293_Aug%202024%20-% 20FINAL.pdf

A preparatory meeting shall be conducted by the Prime Contractor to discuss the APP contents with all effected onsite employees. The Prime Contractor is responsible for informing the subcontractors of the safety provisions under the terms of the contract, the penalties for noncompliance, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out.

Daily safety meetings shall be held and documented. Records shall be available to the Technical Point of Contact upon request.

c. Activity Hazard Analysis (AHA):

An AHA shall be submitted and accepted for each definable feature of work (DFOW) in accordance with EM 385-1-1, Chapter 2-6. A DFOW is defined as any task, which is separate and distinct from other tasks, has separate control requirements, or is identified as different trades or disciplines. The AHA shall be continuously reviewed and revised to address changing site conditions as appropriate.

For a non-mandatory formatted outline of an AHA, see ENG Form 6206 (Activity Hazard Analysis) https://www.publications.usace.army.mil/Portals/76/Eng_Form_6206_Sep%202024%20-% 20FINAL.pdf

d. Site Safety and Health Officer (SSHO) Requirements:

The Contractor shall employ a minimum of one person to function as a Level 3, SSHO. A Level 3 SSHO is a designated Qualified Person (QP) or Competent Person (CP) with Safety and Occupational Health (SOH) responsibility that meets the requirements of EM 385-1-1, Chapter 2-3.

b and 2-4.b.

Level 3 SSHOs must have training, knowledge, and/or experience identifying hazards and implementing controls for the work being performed.

The SSHO shall be present at the project site and be responsible for overseeing the implementation of the Prime Contractor's SOH program. Contractor shall designate all SSHOs on a mandatory ENG Form 6282 (Site Safety and Health Officer Designation Letter):

https://www.publications.usace.army.mil/Portals/76/Eng_Form_6282_Site%20Safety%20&% 20Health%20Officer%20(SSHO)%20Designation%20Letter_2024%20Aug%20-%20FINAL.pdf

e. First-Aid and CPR Personnel Requirements:

For shifts with multiple employees, provide at least two employees that are certified to administer First Aid and CPR. When employees work alone, they must be certified in First Aid and be provided an effective means of communication to call for assistance in the event of an emergency.

Minimum First Aid and CPR qualifications are outlined in EM 385-1-1, Chapter 3-3.

f. Additional Personnel Requirements:

Other Competent Person (CP) or Qualified Persons (QP) may be required per EM 385-1-1 and/or other sections of this Scope of Work, based on the definable features of work for this project.

g. Accident Reporting:

All accidents and near misses shall be investigated by the Contractor and reported to the Technical Point of Contact in accordance with EM 385-1-1, Table 2-1.

The mandatory ENG Form 3394 shall be completed and submitted to the Technical Point of Contact within seven (7) days of an incident: https://www.publications.usace.army.mil/Portals/76 /Publications/EngineerForms/Eng_Form_3394_2021Aug.pdf

h. Employee Exposure Data:

The Contractor shall electronically report total employee work hours (including subcontractors) to the Technical Point of Contact by close of business on the 10th calendar day of the following month.

7. Pre-Work Conference

Prior to the start of any work, the Technical Point of Contact will schedule and conduct an in-person "Pre-Work Conference". The Contractor's Project Manager and Quality Control Personnel shall be physically present to attend this meeting. The Contractor shall directly oversee all work on the project and the Project Manager and Quality Control Personnel shall have the authority to act on behalf of the Contractor. This conference will be held at the time agreeable to the Government and Contractor. Pre-Work Conference shall take place at the Tully Lake Dam Project Office. No work may be performed under this contract prior to this conference. The purpose of the conference is to enable the Technical Point of Contact to outline the procedures that will be followed by the Government in its administration of the contract, and to discuss the performance that will be expected from the Contractor. This conference will allow the Contractor an opportunity to ask questions about the Government's administration and inspection of contract work or obtain other pertinent information that might be required. At the Pre-Work Conference the Contractor shall provide the name of the Project Superintendent along with a telephone number for project coordination.

The following is a general list of items for discussion during this Pre-Work Conference:

a. Authority of the Technical Point of Contact and Quality Assurance Inspectors.

b. Contractor's Safety Program (including sub-contractors).

c. Accident Prevention Plan, ENG Form 6293 (Submitted & accepted prior to start of work on site)

d. Activity Hazard Analysis (Submitted & accepted prior to start of work on site)

e. SSHO Designation Form, ENG Form 6282 (Submitted & accepted prior to start of work on site)

f. Safety Meetings (Documented on NED Form 251)

g. Accident Reporting (ENG Form 3394)

h. Safety Data Sheet (SDS) requirements

i. Contractor's Equipment

j. Correspondence, Communication, Security and Administrative Procedures.

k. Invoice and payment.

8. Permits

The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses, permits, and letters of certification. The Contractor shall comply with any applicable Federal, State, County, and Municipal laws, codes, and regulations in connection with the performance of the work specified under this contract.

9. Security

The Contractor will comply with all established security policies at Barre Falls Dam. Due to periods of heightened security that may affect access to areas covered under this contract, areas may be subject to periodic closures which in turn may reduce or inhibit the Contractor's ability to access certain areas. During periods of heightened security, the Government reserves the right, at any time, to close any property or portion of property and reschedule and/or cancel any subsequent service in an area. The Contractor shall be given at least 24 hours' notice of any such closure.

10. Contractor's Personnel

a. Minimum Personnel Requirements - The Contractor shall provide an adequate number of fully qualified personnel to perform the specified service properly and efficiently within the time limits specified. The Contractor shall provide a list of the names and contact phone numbers for all employees prior to them working on Government Property.

Note:

At least one (1) of the Contractor employees on site shall be able to communicate effectively and efficiently with project staff.

b. Employee Conduct - The Contractor shall be responsible for seeing that the Contractor's employees strictly comply with all Federal, State, and Municipal laws. Any personnel activity, which, in the opinion of the Government, is deemed detrimental to the performance of the contract may result in the removal of Contractor employee/employees.

Examples of unbecoming actions or conduct include but are not limited to the following:

i. Cursing, harassment, or discrimination of and/or unwarranted physical contact with visitors, USACE personnel, or other contractors

ii. Recurring written and/or verbal complaints from visitors, USACE personnel, or other contractors.

iii. Unsafe operation of vehicles while on USACE property.

c. Removal of Contractor's Employees - The Technical Point of Contact may require the Contractor to immediately remove from the work site any employee of the Contractor or subcontractor, who, in the opinion of the Technical Point of Contact, who endangers persons or property, or whose physical or mental condition is such that it would impair the employee's ability to satisfactorily perform assigned work. Notification to the Contractor shall be promptly made in writing if time and circumstances permit. Otherwise, notification shall be verbal or by telephone and shall be confirmed in writing as soon as possible. No such removal, however, will reduce the Contractor's obligation to perform all work required under this contract, and immediate replacement will be made as required. This requirement shall not be made the basis of any claim for compensation or damages against the United States or any of its officers or agents.

11. Payment

The Contractor shall furnish the Technical Point of Contact with one invoice per month. The invoice shall include the invoice date, contract number, dates of service, description of work, quantities, and total amount due per line item. The invoice must also include the company letterhead, and this must match the data that is registered in the System for Award Management (SAM) registry. Payment shall be made monthly for the actual services performed at the applicable contract unit price.

All invoices may be mailed to:

Tully Lake Park Office

2 Athol-Richmond Road

Royalston, MA 01368

Or emailed to cole.g.larose@usace.army.mil

II. TECHNICAL REQUIREMENTS:

Part 1 General:

1. Summary

Provide all equipment, materials, labor, and transportation necessary to provide snow removal, and sand/salt mix application on designated roadways and walkways. The services include two different site locations: Birch Hill and Tully Lake Dams. The services shall be performed according to the locations on the attached Figures. Contractor's work and responsibility shall include, but not be limited to, all job planning, programming, scheduling, administration, inspection, personnel, equipment, vehicles, fuel, materials, supplies, supervision, and quality control necessary to perform the various services required herein.

2. Submittals

Although the Government reviews submissions required by this Performance Work Statement, it is emphasized that the Contractor's work must be completed using proper internal controls and review procedures. The Government reserves up to 7 days for review and acceptance on each submittal/resubmittal from the date of receipt. If revisions are necessary to the submittals, the Contractor shall make such revisions and shall resubmit to the Government in an acceptable form within 7 days of the Government's response, unless additional time is granted by the Government in writing.

a. Pre-work Submittals

Submitted within 14 days of Contract Award. Submittals must be accepted before the commencement of any field work.

i. Accident Prevention Plan on mandatory ENG Form 6293

ii. Site Safety and Health Officer Level 3 Designation letter on mandatory ENG Form 6282

iii. Activity Hazard Analysis (AHA)

iv. CPR and First Aid Certification.

3. Other Contracts

The Government may undertake or award other contracts for additional work not related to this contract, and the Contractor shall fully cooperate with other contractors and Government employees. The Contractor shall not commit or permit any act which will interfere with the performance of work by another contractor or by Government employees.

4. Environmental Protection

Water, air and land resources shall not be adversely impacted during the course of the work. The Contractor will take necessary steps to ensure all Federal, State, and Local environmental regulatory requirements are met at no additional cost to the Government. Assurance of compliance with this section by subcontractors shall be the responsibility of the Contractor.

5. Personal Protective Equipment

It is the Contractor's responsibility to furnish and supply personnel with the proper personal protective equipment necessary for performing the work.

6. Damage to Government and Private Property

The Contractor shall be responsible for restoring all Government facilities or structures damaged as a result of the Contractor's operation. The Contractor shall also be responsible for any damage to private property or injury to any person as a result of the Contractor's operation. The Contractor shall notify the Technical Point of Contact immediately of damage to Government and private property and injury to any person resulting from the Contractor's operation. Also, the Contractor shall notify the Technical Point of Contact of damage to Government facilities due to vandalism or other causes on the day such damage is first noticed. Trucks and/or trailers will be driven on existing roads only and not across or through park areas to facilities. The Contractor shall also restore landscape features (shrubs, flowers, grasses, etc.), which are damaged or destroyed by the Contractor's operation. Damaged or destroyed grass areas shall be re-planted as directed by the Technical Point of Contact, and shrubs and flowers which are damaged or destroyed shall be replaced from nursery stock of like size and kind.

7. Quality Assurance

The Contractor is responsible for the quality control of the contract work. The Contractor shall establish and maintain a quality control system to assure compliance with the contract requirements. The Government has the right to inspect and test all items called for by the contract, to the extent practicable always and at all places during the term of the contract.

8. Inspections

a. Contractor Quality Control - The Contractor is responsible for establishing and maintaining an adequate quality control system to satisfactorily inspect and ensure that all work performed by the Contractor's organization in each separate service is in full compliance with this contract and the instructions, provisions, specifications, drawings, and maps herein.

b. General Inspection - Upon the completion of each service requirement, the Contractor will perform an inspection of all areas under this contract to ensure compliance with the Performance Work Statement. The Contractor or their representative must be able to commit personnel, equipment, and resources to correct deficiencies. The Services Inspection Form (form to be provided to the Contractor at the pre-work conference) will be submitted to the Technical Point of Contact to allow verification of results for payment. A Government representative may accompany the Contractor on an inspection of completed work and will identify any contract deficiencies. Any deficiencies noted will be corrected within original contract time frames or appropriate deductions in payment will be made.

c. Equipment/Supplies Inspections - The Contractor is required to have equipment capable of plowing snow, sanding roadways, removing snow from and sanding walkways. The equipment shall be able to handle winter weather and any snow conditions. These conditions shall include light to heavy rates of falling and accumulating snowfall, freezing rain and drifting snow. The equipment should be able to broadcast the snow to avoid encroaching snowbanks. The Technical Point of Contact may inspect required equipment and, supplies at any time when in use on Government property. Any equipment found deficient shall be removed from service immediately until faulty conditions have been corrected and passed by the Technical Point of Contact. No such removal will reduce the Contractor's obligation to perform all work required within the time scheduled under this contract. This requirement shall not be made the basis of any claim for compensation or damages against the United States or any of its officers or agents.

i. Minimum equipment requirements shall include:

1) A 3/4 ton four-wheel drive truck with 8-foot-wide angle-controlled plow.

2) A powered spreader with a minimum one-yard capacity. Hand sanding is not acceptable, except on the Tully Lake Gate House stairway and administrative building entryways, by all entrance doors, and on the entrance ramp to the Tully Lake Recreation Area restrooms.

3) A snow shovel or snowblower.

d. Government Inspections -

The Government will monitor the Contractor's service performance and make deductions accordingly for work not corrected with the time permitted.

9. Omissions

This contract may not cover all specified activities, steps, and procedures required to provide the contracted service. In case of omission, the normal industry, state, or federal standards, practices, specifications, and/or guides shall prevail. In no instance shall an omission be reason to produce less than an acceptable service result.

10. Figures

Figure 1 Tully Lake Snow Removal Map Overview

Figure 2 Tully Lake Administration Area

Figure 3 Tully Lake Recreation Area

Figure 4 Birch Hill Dam Snow Removal Map Overview

Figure 5 Birch Hill Dam Administration Area

Figure 6 Birch Hill Dam Entrance Road Area

III. MATERIALS & SUPPLIES:

1. The following materials shall be provided by Contractor:

a. Sand/Salt mix (for plowed areas).

b. Walkway salt

c. Warming device to thaw frozen locks.

Note: The Contractor shall submit one copy of the manufacturer's Safety Data Sheet for each chemical proposed for use.

IV. SERVICE REQUIREMENTS:

1. Service Requirements - Definition

a. One service is defined as a single completion of all requirements for each task described in section 4, Service Tasks below.

b. Snowstorms over 2" in total may require the number of services as indicated below. Snowfall is measured by project staff on site and is documented daily. The general guidelines are as follows:

i. 2" to 6" storm = up to 1 service

ii. 7" to 12" storm = up to 2 services

iii. 13" to 24" storm = up to 3 services

iv. 24" and greater storms = up to 4 services

c. The table above lists the maximum number of services the Government will pay for based on the storm total. Additional snow removal services performed by the Contractor at their own discretion will not be reimbursed by the Government.

d. Storm totals will be determined by measurement at the Project Office, with the amounts rounded to the nearest whole inch.

e. If the Government Technical Point of Contact requests additional plowing, that work shall be considered a separate service and invoiced as such.

f. All on-site services must be reported to Technical Point of Contact via email or text within 24 hours of the service having taken place.

2. Site Access

a. The Contractor will be provided a key for access to both Birch Hill Dam and Tully Lake dam road gates.

b. If the Contractor is required to unlock and open a gate to plow, then the Contractor will be required to secure the gate when the plowing is completed unless project personnel are present and state otherwise.

c. The Contractor may have to use a warming device to thaw frozen locks to gain access to areas in this contract.

d. Upon the completion of this contract, the Contractor will return the key to project staff before final payment is made.

3. Property Damage

a. In the event that property does become damaged, it is the Contractor's responsibility to immediately notify the Technical Point of Contact to report the damage.

b. Parking lots shall be plowed to within one to two feet of wooden fences and/or rock borders as necessary so that no damage to fence or rocks is incurred.

c. It will be the responsibility of the Contractor to coordinate with the Technical Point of Contact to agree upon an appropriate way to repair damaged property at no cost to the Government.

4. Service Tasks

a. Task 1: Snow Plowing (approximately 203,522.62 square feet total)

i. The Contractor shall plow snow from all paved surfaces shown in Figures 1-6.

ii. Snow shall be pushed beyond the edge of pavement

iii. Upon completion of plowing all pavement shall be neatly scraped clean, leaving no measurable snow.

iv. Snow shall not be pushed against garage doors, entrance doors, fenced gates, dumpsters, or culverts.

v. DO NOT BACK BLADE THE SLOPED DRIVEWAY NEXT TO BASIN OFFICE. This makes it difficult to shovel down to pavement and creates an icy surface.

b. Task 2: Shoveling (approximately 3,051.18 square feet total)

i. Snow shoveling is required with each plowing service.

ii. The Contractor shall shovel snow at all building entry and garage doors, walkways, stairs, oil and propane fill pipes, culverts, and dumpsters as shown in Figures 1 - 6.

1) Entrance and garage doors shall be cleared of snow beyond swing of door and beyond each side of door frame. METAL ROOFS OVER THE GARAGE

DOORS MAY RELEASE SNOW AT ANYTIME. THESE DOORS

SHOULD BE SHOVELED LAST.

2) Walkways and stairs shall be cleared of snow their full length and width; THIS INCLUDES THE

SLOPED DRIVEWAY NEXT TO THE BASIN OFFICE.

3) Culverts shall be cleared of snow beyond the full diameter of the culvert.

4) The dumpster at Tully shall be shoveled along the front and sides a width of 2 feet.

5) Kiosks shall be cleared to provide access to the brochure racks.

6) The entrance gate at Birch Hill Dam shall be cleared approximately 3 feet in circumference around both lock posts.

iii. Areas to be shoveled shall be clear to the existing pavement or concrete. If the areas are icy upon completion of shoveling, walkway salt/sand mix shall be spread to melt existing ice and prevent additional icing or hazardous conditions.

iv. Snow may not be placed against any building or be piled in front of garage bays, doorways, gates, or other access points.

c. Task 3: Sanding and Salting. The contractor shall sand plowed surfaces and shoveled areas as needed or as directed by the Technical Point of Contact. Sanding is not required for each snow plowing service unless unsafe icy conditions exist. When needed, sand shall be spread adequately to provide traction for driving and walking. The Technical Point of Contact may request additional sanding and salting as conditions require.

2. Service Locations

a. Tully Lake consists of the Administrative Area and Recreation Area (Figures 1-3). The area descriptions are presented below:

Plowing:

i. Park Office & Basin Office (Figure 2)

ii. Gate House (Figure 2)

iii. Recreation Area (Figure 3)

Shoveling:

i. Building Entrances & Garage Doors (Figure 2)

ii. Walkways & Stairs (Figure 2 & 3)

iii. Culverts (Figure 2)

iv. Dumpster- adjacent to building (Figure 2)

v. Oil and Propane Fill Pipes (Figure 2)

Sanding:

i. Administrative Area (Figure 2)

1) Plowed areas

2) Entry doors, walkways, and stairs

ii. Gate House (Figure 2)

1) Plowed areas

2) Inlet channel walkway & stairs

iii. Recreation Area (Figure 3)

1) Plowed areas

2) Romtec walkway

b. Birch Hill Dam consists of the Administration Area and Entrance Road Area (Figures 4-6). The area descriptions are presented below:

Plowing:

i. Administrative Area (Figure 5)

ii. Entrance Road (Figures 4 & 6) - Approximately 1.3 miles

iii. Parking Areas (Figure 4)

Shoveling:

i. Building Entrances, Garage Doors, Dumpster & Rain Gauge (Figure 5)

ii. Walkways & Kiosks (Figure 5 & 6)

iii. Entrance Road Gate (Figure 6)

iv. Dumpster- adjacent to building (Figure 5)

v. Oil Fill Pipes (Figure 5)

vi. Gatehouse (Figure 5)

Sanding:

i. Administrative Area including plowed areas and entry doors (Figure 5)

ii. Entrance Road (Figures 4 & 6) - Approximately 1.3 miles

iii. Parking Areas (Figure 4)

5. Quantities - The actual quantity required will be determined by the number and nature of snowstorms. The following table identifies the maximum number of services that could be required at each Service Location.

Task Qty

Plowing 20

Shoveling 20

Sanding 20

*** END OF NARRATIVE ***

Requirements Snow Removal and Sanding Services, Birch Hill Dam and Tully Lake, Royalston, MA

Contract Clauses

FAR Clauses Incorporated by Reference

Number Title Effective Date

Alternate Deviation

Variation Effective Date

52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements.

2017-01

52.204-13 System for Award Management- Maintenance. (Deviation 2026- O0038)

2026-02

52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded. (Deviation 2026- O0038)

2026-02

52.212-4 Terms and Conditions- Commercial Products and Commercial Services. (Deviation 2026-O0038)

2026-02

52.219-6 Notice of Total Small Business Set-Aside. (Deviation 2026- O0038)

2026-02

52.222-36 Equal Opportunity for Workers with Disabilities. (Deviation 2026- O0038)

2026-02

52.222-41 Service Contract Labor Standards. (Deviation 2026- O0038)

2026-02

52.222-50 Combating Trafficking in Persons. (Deviation 2026-O0038)

2026-02

52.222-55 Minimum Wages for Contractor Workers Under Executive Order 14026. (Deviation 2026-O0038)

2026-02

52.222-62 Paid Sick Leave Under Executive Order 13706. (Deviation 2026- O0038)

2026-02

52.222-90 Addressing DEI Discrimination by Federal Contractors.

(Deviation 2026-O0040, Revision 1)

2026-04

52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving.

2024-05

52.232-33 Payment by Electronic Funds Transfer-System for Award Management.

2018-10

52.232-40 Providing Accelerated Payments to Small Business Subcontractors.

2023-03

52.233-3 Protest after Award. (Deviation 2026-O0038)

2026-02

52.233-4 Applicable Law for Breach of Contract Claim. (Deviation 2026- O0038)

2026-02

DFARS Clauses Incorporated by Reference

Number Title Effective Date

Alternate Deviation

Variation Effective Date

252.203-7000 Requirements Relating to Compensation of Former DoD Officials.

2011-09

252.203-7002 Requirement to Inform Employees of Whistleblower Rights.

2022-12

252.204-7004 Antiterrorism Awareness Training for Contractors.

2023-01

252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting. (DEVIATION 2024-

O0013 REVISION 1)

2024-05 Deviation 2024- O0013

2024-05

252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services.

2023-01

252.204-7020 NIST SP 800-171 DoD Assessment Requirements.

2023-11

252.225-7056 Prohibition Regarding Business Operations with the Maduro Regime.

2023-01

252.225-7060 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region.

2023-06

252.232-7003 Electronic Submission of Payment Requests and Receiving Reports.

2018-12

252.232-7010 Levies on Contract Payments. 2006-12

252.247-7023 Transportation of Supplies by Sea.

2024-10

FAR Clauses Incorporated by Full Text

Date

Alternate Deviation

Variation Effective Date

52.219-28 Postaward Small Business Program Rerepresentation.

(Deviation 2026-O0038)

2026-02

Postaward Small Business Program Rerepresentation (Feb 2026) (Deviation 2026-O0038)

(a) . As used in this clause-Definitions

Long-term contract means a contract of more than five years in duration, including options.

However, the term does not include contracts that exceed five years in duration because the period of performance has been extended for a cumulative period not to exceed six months under the clause at 52.217-8, Option to Extend Services, or other appropriate authority.

Small business concern-

(1) Means a concern, including its affiliates, that is independently owned and operated, not dominant in its field of operation, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (c) of this clause.

(2) , as used in this definition, means business concerns, one of whom directly or Affiliates indirectly controls or has the power to control the others, or a third party or parties control or have the power to control the others. In determining whether affiliation exists, consideration is given to all appropriate factors including common ownership, common management, and contractual relationships. SBA determines affiliation based on the factors set forth at 13 CFR 121.103.

(b) If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified in

19.000(a)(3) prior to award of this contract, the Contractor shall rerepresent its size and socioeconomic status according to paragraph (e) of this clause or, if applicable, paragraph (g) of this clause, upon occurrence of any of the following:

(1) Within 30 days after execution of a novation agreement or within 30 days after modification of the contract to include this clause, if the novation agreement was executed prior to inclusion of this clause in the contract.

(2) Within 30 days after a merger or acquisition that does not require a novation or within 30 days after modification of the contract to include this clause, if the merger or acquisition occurred prior to inclusion of this clause in the contract.

(3) For long-term contracts-

(i) Within 60 to 120 days prior to the end of the fifth year of the contract; and

(ii) Within 60 to 120 days prior to the date specified in the contract for exercising any option thereafter.

(c) The Contractor shall rerepresent its size status in accordance with the size standard in effect at the time of this rerepresentation that corresponds to the North American Industry Classification System (NAICS) code(s) assigned to this contract. The small business size standard corresponding to this NAICS code(s) can be found at https://www.sba.gov/document /support--table-size-standards.

(d) The small business size standard for a Contractor providing an end item that it does not manufacture, process, or produce itself, for a contract other than a construction or service contract, is 500 employees, or 150 employees for information technology value-added resellers under NAICS code 541519, if the acquisition-

(1) Was set aside for small business and has a value above the simplified acquisition threshold;

(2) Used the HUBZone price evaluation preference regardless of dollar value, unless the Contractor waived the price evaluation preference; or

(3) Was an 8(a), HUBZone, service-disabled veteran-owned, economically disadvantaged women-owned, or women-owned small business set-aside or sole-source award regardless of dollar value.

(e) Except as provided in paragraph (g) of this clause, the Contractor shall make the representation(s) required by paragraph (b) of this clause by validating or updating all its representations in the Representations and Certifications section of the System for Award Management (SAM) and its other data in SAM, as necessary, to ensure that they reflect the Contractor's current status. The Contractor shall notify the contracting officer in writing within the timeframes specified in paragraph (b) of this clause, that the data have been validated or updated, and provide the date of the validation or update.

(f) If the Contractor represented that it was other than a small business concern prior to award of this contract, the Contractor may, but is not required to, take the actions required by paragraphs (e) or (g) of this clause.

(g) If the Contractor does not have representations and certifications in SAM, or does not have a representation in SAM for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:

(1) The Contractor represents that it is, is not a small business concern under NAICS Code assigned to contract number .561730 W912WJ26PXXXX

(2) [Complete only if the Contractor represented itself as a small business concern in paragraph .] The Contractor represents that it is, is not, a small disadvantaged (g)(1) of this clause business concern as defined in .13 CFR 124.1001

(3) . The Women-owned small business (WOSB) joint venture eligible under the WOSB Program Contractor represents that it is, is not a joint venture that complies with the requirements of 13 CFR 127.506(a) through (c). [ The Contractor shall enter the name and unique entity ____ identifier of each party to the joint venture: __.]

(4) . The Economically disadvantaged women-owned small business (EDWOSB) joint venture Contractor represents that it is, is not a joint venture that complies with the requirements of 13 CFR 127.506(a) through (c). [ The Contractor shall enter the name and unique entity ____ identifier of each party to the joint venture: __ .]

(5) Service-disabled veteran-owned small business (SDVOSB) joint venture eligible under the . The Contractor represents that it is, is not an SDVOSB joint venture eligible SDVOSB Program under the SDVOSB Program that complies with the requirements of 13 CFR 128.402. [ The ____ Contractor shall enter the name and unique entity identifier of each party to the joint venture:

(6) [ HUBZone joint venture eligible under the HUBZone Program. Complete only if the offeror is ] The offeror represents, as part of its offer, that It is, is not a HUBZone small business concern.

a HUBZone joint venture that complies with the requirements of 13 CFR 126.616(a) through (c).

[ The Contractor shall enter the name and unique entity identifier of each party to the joint ____ venture: .] Each HUBZone small business concern participating in the HUBZone joint venture must be certified as a HUBZone concern. [ Contractor to sign and date and insert ____ authorized signer's name and title.]

(End of clause)

52.222-42 Statement of Equivalent Rates for Federal Hires.

2014-05

Statement of Equivalent Rates for Federal Hires (May 2014)

In compliance with the Service Contract Labor Standards statute and the regulations of the Secretary of Labor ( 29 CFR Part 4), this clause identifies the classes of service employees expected to be employed under the contract and states the wages and fringe benefits payable to each if they were employed by the contracting agency subject to the provisions of 5 U.S.C.

5341 or 5332.

This Statement is for Information Only: It is not a Wage Determination

Employee Class Monetary Wage-Fringe Benefits (End of clause)

DFARS Clauses Incorporated by Full Text

Date

Alternate Deviation

Variation Effective Date

252.232-7006 Wide Area WorkFlow Payment Instructions.

2023-01

WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)

(a) Definitions. As used in this clause-

"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.

"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.

"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall-

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web- Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/

(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

(1) Document type. The Contractor shall submit payment requests using the following document type(s):

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items-

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

(Contracting Officer: Insert either "Invoice 2in1" or the applicable invoice and receiving report document type(s) for fixed price line items for services.)

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial financing, submit a commercial financing request.

(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

[Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC ____ Issue By DoDAAC ____ Admin DoDAAC ____ Inspect By DoDAAC ____ Ship To Code ____ Ship From Code ____ Mark For Code ____ Service Approver (DoDAAC) ____ Service Acceptor (DoDAAC) ____ Accept at Other DoDAAC ____ LPO DoDAAC ____ DCAA Auditor DoDAAC ____ Other DoDAAC(s) ____ (*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert "See Schedule" or "Not applicable.")

(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)

(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

(Contracting Officer: Insert applicable information or "Not applicable.")

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

Addendum to Contract Clauses

FAR Clauses Incorporated by Reference

Number Title Effective Date

Alternate Deviation

Variation Effective Date

52.209-10 Prohibition on Contracting With Inverted Domestic Corporations.

(Deviation 2026-O0038)

2026-02

52.222-3 Convict Labor. (Deviation 2026- O0038)

2026-02

52.223-23 Sustainable Products. (Deviation 2026-O0038)

2026-02

52.240-91 Security Prohibitions and Exclusions. (Deviation 2026- O0038)

2026-02

52.244-6 Subcontracts for Commercial Products and Commercial Services. (Deviation 2026-O0038)

2026-04

DFARS Clauses Incorporated by Reference

Date

Alternate Deviation

Variation Effective Date

252.237-7010 Prohibition on Interrogation of Detainees by Contractor Personnel.

2023-01

252.243-7001 Pricing of Contract Modifications. 1991-12

252.244-7999 Subcontracts for Commercial Products or Commercial Services. (DEVIATION 2026- O0015)

2026-02 Deviation 2026- O0015

2026-01

FAR Clauses Incorporated by Full Text

Date

Alternate Deviation

Variation Effective Date

52.217-9 Option to Extend the Term of the Contract.

2000-03

Option to Extend the Term of the Contract (Mar 2000)

The Government may extend the term of this contract by written notice to the Contractor (a) within ; provided that the Government gives the Contractor a preliminary written notice 15 days of its intent to extend at least days before the contract expires. The preliminary notice 30 days does not commit the Government to an extension.

If the Government exercises this option, the extended contract shall be considered to (b) include this option clause.

The total duration of this contract, including the exercise of any options under this clause, (c) shall not exceed .2 years

(End of clause)

52.252-2 Clauses Incorporated by Reference.

1998-02

Clauses Incorporated By Reference (Feb 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

https://www.acquisition.gov/

52.252-6 Authorized Deviations in Clauses. 2020-11

Authorized Deviations in Clauses (Nov 2020)

The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR (a) Chapter 1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause.

The use in this solicitation or contract of any (48 CFR ) clause with an (b) DFARS Chapter 2 authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

List of Contract Documents, Exhibits, or Attachments

SECURITY REQUIREMENTS:

General security requirements and guidance: The security requirements described below apply to all contract personnel (including employees of the prime Contractor ("Contractor") and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated Government representative (eg., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the Government representative.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .